CN204873403U - A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin - Google Patents

A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin Download PDF

Info

Publication number
CN204873403U
CN204873403U CN201520527620.0U CN201520527620U CN204873403U CN 204873403 U CN204873403 U CN 204873403U CN 201520527620 U CN201520527620 U CN 201520527620U CN 204873403 U CN204873403 U CN 204873403U
Authority
CN
China
Prior art keywords
steel
steel pipe
purlins
ring
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520527620.0U
Other languages
Chinese (zh)
Inventor
张定宏
张曰望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASIA DAIRY FAB Ltd
Original Assignee
ASIA DAIRY FAB Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASIA DAIRY FAB Ltd filed Critical ASIA DAIRY FAB Ltd
Priority to CN201520527620.0U priority Critical patent/CN204873403U/en
Application granted granted Critical
Publication of CN204873403U publication Critical patent/CN204873403U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种用于同时吊装屋梁檩条的辅助钢管,由钢管(1)、钢圈(2)、钢丝圈(3)、吊环(4)、起吊点(5)构成,所述钢圈(2)焊接在钢管(1)上,钢圈数量与所需安装檩条的数量相同,钢圈(2)之间的距离与大梁檩托之间的距离相同,所述钢丝圈(3)穿过钢圈(2)套在钢管(1)上,所述吊环(4)套接在钢丝圈(3)下方,所述起吊点(5)是用钢筋焊接在钢管(1)上的半圆形结构。本实用新型提供的辅助钢管,解决了传统安装工艺施工慢、质量差、风险高、效益低的问题,缩短了工期、提升了质量、增加了安全保障。

The utility model relates to an auxiliary steel pipe for hoisting roof beam purlins at the same time, which is composed of a steel pipe (1), a steel ring (2), a steel traveler (3), a suspension ring (4) and a lifting point (5). The rings (2) are welded on the steel pipe (1), the number of steel rings is the same as the number of purlins required to be installed, the distance between the steel rings (2) is the same as the distance between the girder purlins, and the steel rings (3) Go through the steel ring (2) and put it on the steel pipe (1), the lifting ring (4) is sleeved under the steel ring (3), and the lifting point (5) is a half part welded on the steel pipe (1) with steel bars. circular structure. The auxiliary steel pipe provided by the utility model solves the problems of slow construction, poor quality, high risk and low benefit of the traditional installation process, shortens the construction period, improves the quality and increases the safety guarantee.

Description

一种用于同时吊装屋梁檩条的辅助钢管An auxiliary steel pipe for simultaneous hoisting of roof beam purlins

技术领域 technical field

本发明涉及一种牧场建设施工的辅助工具,具体涉及一种用于在轻钢结构的牧场圈舍建设时同时吊装屋梁檩条的辅助钢管。 The invention relates to an auxiliary tool for pasture construction, in particular to an auxiliary steel pipe used for simultaneously hoisting roof beam purlins during the construction of light steel structure pasture sheds.

背景技术 Background technique

虽然轻钢建筑成本高于一般传统混凝土结构,但由于其施工快,节能减排等优点,已得到越来越多建筑业的认可,在我国已进入快速发展时期,在各行各业已得到广泛应用。 Although the cost of light steel buildings is higher than that of ordinary traditional concrete structures, due to its advantages of fast construction, energy saving and emission reduction, it has been recognized by more and more construction industries. It has entered a period of rapid development in our country and has been widely used in various industries. .

牧场圈舍非常适合使用轻钢结构,但是牧场,特别是奶牛场,牛舍跨度一般都很大,由于覆盖面大,所以轻钢牛舍的设计和施工上,对屋梁和檩条的要求就比较高。特别是在檩条的安装上,目前都是以人工施工为主,由于牛舍跨度大,高度高,檩条使用量大,工人需要高空作业,一根根的逐次完成安装,施工速度慢、人身安全风险大;而且安装过程中容易发生檩条侧歪、下滑等情况,会导致最后安装的位置偏移了设计好的檩条安装位置,与屋面坡度不符,修正时很困难,但是不修正又导致屋面受力不均,容易发生屋面断裂的后续问题,给牛舍维护带来后续的隐患。从成本方面看,现在的人工成本都高于机械化成本,完全使用人工安装檩条成为牛舍建设中不得不支出的一大块成本。因此,不管从檩条的安装质量上,还是安装成本上考虑,牧场建设企业都一直在谋求开发一种简便、高效、经济的檩条安装方法。一个圈舍中,檩条是有很多根的,如果能使用吊车同时吊装多根檩条,将大大节省檩条安装时间,但是这要求在同时吊装过程中檩条不能移位,不能滑动,而且由于牛舍屋面是有一定坡度的,多根檩条整体吊装过程中,即要使檩条整体与屋面坡度相同,多根檩条的安装端又不能参差不齐,要保持一条直线。 Pasture pens are very suitable for the use of light steel structures, but pastures, especially dairy farms, generally have a large span. Due to the large coverage, the design and construction of light steel cowsheds have more requirements for roof beams and purlins. high. Especially in the installation of purlins, at present, manual construction is the main method. Due to the large span and high height of the cowshed, and the large amount of purlins used, workers need to work at heights and complete the installation one by one. The construction speed is slow and personal safety The risk is high; and during the installation process, the purlins are prone to sideways, sliding, etc., which will cause the final installation position to deviate from the designed purlin installation position, which does not match the roof slope. Uneven force is prone to follow-up problems of roof breakage, which brings follow-up hidden dangers to the maintenance of cowsheds. In terms of cost, the current labor cost is higher than the cost of mechanization, and the complete use of manual installation of purlins has become a large cost that has to be paid in the construction of cowsheds. Therefore, regardless of the installation quality of purlins or the installation cost, ranch construction companies have been seeking to develop a simple, efficient and economical purlin installation method. In a barn, there are many purlins. If a crane can be used to hoist multiple purlins at the same time, it will greatly save the installation time of the purlins, but this requires that the purlins cannot be shifted or slipped during the simultaneous hoisting process. There is a certain slope. During the overall hoisting of multiple purlins, that is, the overall purlins must have the same slope as the roof, and the installation ends of multiple purlins must not be uneven, and a straight line must be maintained.

实用新型内容 Utility model content

为解决上述项问题,本实用新型提出一种用于同时吊装屋梁檩条的辅助钢管,目的在于提供一种克服目前人工安装檩条法的缺陷,利用机械代替手工的高效、简便、经济的檩条安装方法的辅助工具,能在节省工期的情况下大幅提高屋梁檩条的安装质量。 In order to solve the above problems, this utility model proposes an auxiliary steel pipe for simultaneously hoisting roof beam purlins. The purpose is to provide an efficient, simple and economical purlin installation that overcomes the defects of the current manual installation of purlins and uses machinery instead of manual work. The auxiliary tool of the method can greatly improve the installation quality of the roof beam purlins while saving the construction period.

本实用新型提供的用于同时吊装屋梁檩条的辅助钢管,由钢管1、钢圈2、钢丝圈3、吊环4、起吊点5构成,所述钢圈2焊接在钢管1上,钢圈数量与所需安装檩条的数量相同,钢圈2之间的距离与屋梁檩托之间的距离相同,所述钢丝圈3穿过钢圈2套在钢管1上,所述吊环4套接在钢丝圈3下方,所述起吊点5是用钢筋焊接在钢管1上的半圆形结构。 The utility model provides an auxiliary steel pipe for hoisting roof beam purlins at the same time, which is composed of a steel pipe 1, a steel ring 2, a steel traveler 3, a suspension ring 4, and a lifting point 5. The steel ring 2 is welded on the steel pipe 1, and the number of steel rings is The number of purlins required to be installed is the same, the distance between the steel rings 2 is the same as the distance between the purlin supports of the roof beams, the steel traveler 3 passes through the steel rings 2 and is set on the steel pipe 1, and the lifting ring 4 is sleeved on the Below the traveler 3, the lifting point 5 is a semicircular structure welded on the steel pipe 1 with a steel bar.

进一步,所述钢管1上设置2-4个起吊点5。 Further, 2-4 lifting points 5 are set on the steel pipe 1 .

进一步,所述钢圈2为6mm粗的钢筋制成。 Further, the steel ring 2 is made of 6mm thick steel bar.

进一步,所述钢丝圈3为5mm粗的钢筋制成。 Further, the traveler 3 is made of 5mm thick steel bar.

安装时,将需要安装的檩条或檩条与屋梁在地面上进行组装,根据现场施工情况,采用一根或两根辅助钢管作为支撑件,每根辅助钢管的吊环4分别与檩条6一端的檩条孔通过插销相连,每个辅助钢管的起吊点5上安装一根吊车钢丝绳7,吊车钢丝绳的另一端汇总于吊车钩,如果吊装的是檩条6与屋梁8的组合结构,则屋梁两端也安装吊车钢丝绳7,与辅助钢管的吊车钢丝绳汇总于吊车钩,调整各条吊车钢丝绳长度和角度,使檩条或者檩条与屋梁的整体结构与屋面坡度相同,启动吊车,当上升到屋梁相应位置时,稳定吊车钩,然后先按顺序安装屋梁8或一根辅助钢管上的檩条6,再按顺序安装另一侧的檩条6,安装结束后再松开吊车钩,然后打开吊环4与檩条6的插销,撤下辅助钢管。 During installation, the purlins or purlins and roof beams to be installed are assembled on the ground. According to the construction situation on site, one or two auxiliary steel pipes are used as supports. The holes are connected by pins, and a crane wire rope 7 is installed on the lifting point 5 of each auxiliary steel pipe, and the other end of the crane wire rope is collected on the crane hook. Also install the crane wire rope 7, which is combined with the crane wire rope of the auxiliary steel pipe in the crane hook, adjust the length and angle of each crane wire rope, so that the overall structure of the purlin or the purlin and the roof beam is the same as the roof slope, start the crane, and when it rises to the corresponding roof beam position, stabilize the crane hook, then first install the purlin 6 on the roof beam 8 or an auxiliary steel pipe in order, and then install the purlin 6 on the other side in order, and then loosen the crane hook after the installation is completed, and then open the ring 4 and the The latch of the purlin 6 is removed from the auxiliary steel pipe.

本实用新型的有益效果如下:The beneficial effects of the utility model are as follows:

1、使数根檩条形成一个整体,便于利用吊车进行安装:现有檩条安装方法是由下面工人把檩条挂好再由上面工人拉上屋梁后放在相应位置进行组装,得一根根的进行,施工难度大,安全风险高。利用本实用新型提供的辅助钢管,可将屋梁、檩条及其组件在地面组装好,用吊车吊装,然后只需用两个工人依次进行组装即可,施工工艺简单,安全系数高。 1. Make several purlins form a whole, which is convenient to install with a crane: the existing purlin installation method is to hang the purlins by the workers below, and then pull the purlins on the roof beams by the workers above and put them in the corresponding positions for assembly. The construction is difficult and the safety risk is high. Utilizing the auxiliary steel pipe provided by the utility model, the roof beams, purlins and their components can be assembled on the ground, hoisted by a crane, and then only need two workers to assemble in sequence, the construction process is simple, and the safety factor is high.

2、吊装面积可达200m2以上,同时保持屋架稳定:目前的吊装工艺,使用两根到四根钢丝绳,只能吊装面积小的物体,但是牛舍跨度大,檩条覆盖面大,使用现有的吊装工艺,檩条容易变型,而本实用新型提供的辅助钢管作为支撑,吊装整体可以同时使用四到八根钢丝绳吊装,吊装过程中能保持辅助钢管与屋面坡度一致并且使数根檩条的安装端呈一条直线,从而保证吊装整体不变型,一次吊装面积可达到200m2以上,同时还能保持屋架的稳定性。 2. The hoisting area can reach more than 200m2, while maintaining the stability of the roof truss: the current hoisting process uses two to four steel wire ropes, which can only hoist objects with a small area, but the span of the cowshed is large and the coverage of the purlins is large. Purlins are easy to change due to the technical process, but the auxiliary steel pipe provided by the utility model is used as a support, and four to eight steel wire ropes can be used for hoisting as a whole at the same time. Straight line, so as to ensure the overall shape of the hoisting, the hoisting area at one time can reach more than 200m2, and the stability of the roof truss can be maintained at the same time.

3、吊装时能保证檩条位置稳定:辅助钢管上与檩条相连的位置设计了钢圈,钢圈焊接位置与屋梁檩托位置距离相同,钢丝圈挂在钢圈这个位置,下面挂着檩条(钢丝圈一边连接钢管一边连接檩条),并且钢丝圈的直径小于钢圈直径,保证吊装时檩条位置的稳定,提高了安装质量。 3. When hoisting, the position of the purlin can be guaranteed to be stable: a steel ring is designed at the position connected to the purlin on the auxiliary steel pipe. The welding position of the steel ring is the same distance as the position of the roof beam purlin. The traveler is connected to the steel pipe while the purlin is connected), and the diameter of the traveler is smaller than the diameter of the steel ring, which ensures the stability of the position of the purlin during hoisting and improves the installation quality.

4、根据施工现场情况灵活调整角度和吊装方案,能与土建工程同时施工,促进工程进展:牧场圈舍设计各不相同,施工现场情况也千差万别,在以往的檩条施工中,由于施工面积跨度大、难度大且耗时长,不能与土建工程同时进行,而且施工中时常出现安装问题需要返工,导致工期延误,而通过使用本实用新型的辅助钢管,可以根据施工现场情况,选择使用两根辅助钢管、一根辅助钢管和一根屋梁、一根辅助钢管和两根屋梁的不同方案进行同时吊装,采取不同方案时只需要根据现场和屋面坡度情况,将辅助钢管上的起吊点重新确定位置进行焊接固定即可,方便易行,使檩条的安装能与土建工程同时进行,促进工程进展,保证工期。 4. The angle and hoisting scheme can be flexibly adjusted according to the conditions of the construction site, and the construction can be carried out simultaneously with the civil works, so as to promote the progress of the project: the designs of pasture pens are different, and the conditions of the construction site are also very different. In the past purlin construction, due to the large span of the construction area , Difficult and time-consuming, can not be carried out at the same time as the civil engineering, and installation problems often occur during construction and need to be reworked, resulting in delays in the construction period, and by using the auxiliary steel pipe of the utility model, two auxiliary steel pipes can be selected according to the construction site conditions One auxiliary steel pipe and one roof beam, one auxiliary steel pipe and two roof beams are hoisted at the same time. When adopting different schemes, it is only necessary to re-determine the lifting point on the auxiliary steel pipe according to the site and the slope of the roof. It only needs to be welded and fixed, which is convenient and easy, so that the installation of purlins can be carried out at the same time as the civil engineering, so as to promote the progress of the project and ensure the construction period.

附图说明 Description of drawings

图1为辅助钢管结构示意图 Figure 1 is a schematic diagram of the auxiliary steel pipe structure

图2为使用两根辅助钢管同时吊装檩条的组装示意图 Figure 2 is a schematic diagram of the assembly of purlins simultaneously hoisted using two auxiliary steel pipes

图3为使用一根辅助钢管同时吊装檩条和一根屋梁的组装示意图 Figure 3 is an assembly schematic diagram of using an auxiliary steel pipe to hoist purlins and a roof beam at the same time

图4位使用一根辅助钢管同时吊装檩条和两根屋梁的组装示意图 Figure 4 shows the assembly diagram of using an auxiliary steel pipe to hoist purlins and two roof beams at the same time

图中各标号列示如下: The symbols in the figure are listed as follows:

1-辅助钢管,2-钢圈、3-钢丝圈、4-吊环、5-起吊点、6-檩条、7-吊车钢丝绳、8-屋梁。 1-auxiliary steel pipe, 2-steel ring, 3-traveler, 4-hanging ring, 5-lifting point, 6-purlin, 7-crane wire rope, 8-roof beam.

具体实施方式 Detailed ways

下面结合附图对本实用新型的实施方式做进一步详细说明。 Below in conjunction with accompanying drawing, the embodiment of the present utility model is described in further detail.

实施例1:Example 1:

使用两根辅助钢管同时吊装檩条,辅助钢管由钢管1、钢圈2、钢丝圈3、吊环4、起吊点5构成,所述钢圈2焊接在钢管1上,钢圈数量与所需安装檩条的数量相同,钢圈2之间的距离与屋梁檩托之间的距离相同,所述钢丝圈3穿过钢圈2套在钢管1上,所述吊环4套接在钢丝圈3下方,所述起吊点5是用钢筋焊接在钢管1上的半圆形结构,数量为3个。所述钢圈2为6mm粗的钢筋制成。所述钢丝圈3为5mm粗的钢筋制成。 Use two auxiliary steel pipes to hoist purlins at the same time. The auxiliary steel pipes are composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings is the same as the required installation of purlins. The number of steel rings is the same, the distance between the steel rings 2 is the same as the distance between the beam purlins, the steel rings 3 pass through the steel rings 2 and are set on the steel pipe 1, and the lifting rings 4 are sleeved under the steel rings 3, The lifting point 5 is a semicircular structure welded on the steel pipe 1 with a steel bar, and there are three in number. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.

安装檩条时,将需要安装的檩条在地面上根据牛舍总体设计进行组装,采用两根辅助钢管作为支撑件,每根辅助钢管的吊环4分别与檩条6一端的檩条孔通过插销相连,每个辅助钢管的起吊点5上安装一根吊车钢丝绳7,吊车钢丝绳7的另一端汇总于吊车钩,调整各条吊车钢丝绳长度和角度,使檩条整体倾斜度与屋面坡度相同,启动吊车进行吊装,当上升到屋梁相应位置时,稳定吊车钩,然后先按顺序安装一根辅助钢管上的檩条,再按顺序安装另一根辅助钢管上的檩条,安装结束后再松开吊车钩,然后打开吊环与檩条的插销,撤下辅助钢管。 When installing purlins, the purlins to be installed are assembled on the ground according to the overall design of the barn, and two auxiliary steel pipes are used as supports. A crane wire rope 7 is installed on the lifting point 5 of the auxiliary steel pipe, and the other end of the crane wire rope 7 is collected on the crane hook. Adjust the length and angle of each crane wire rope so that the overall inclination of the purlin is the same as that of the roof. When rising to the corresponding position of the roof beam, stabilize the crane hook, then install the purlins on one auxiliary steel pipe in order, and then install the purlins on the other auxiliary steel pipe in order, release the crane hook after installation, and then open the suspension ring With the latch of the purlin, remove the auxiliary steel pipe.

实施例2:Example 2:

使用一根辅助钢管同时吊装檩条和一根屋梁,辅助钢管由钢管1、钢圈2、钢丝圈3、吊环4、起吊点5构成,所述钢圈2焊接在钢管1上,钢圈数量与所需安装檩条的数量相同,钢圈2之间的距离与屋梁檩托之间的距离相同,所述钢丝圈3穿过钢圈2套在钢管1上,所述吊环4套接在钢丝圈3下方,所述起吊点5是用钢筋焊接在钢管1上的半圆形结构,数量为3个。所述钢圈2为6mm粗的钢筋制成。所述钢丝圈3为5mm粗的钢筋制成。 Use an auxiliary steel pipe to hoist purlins and a roof beam at the same time. The auxiliary steel pipe is composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings The number of purlins required to be installed is the same, the distance between the steel rings 2 is the same as the distance between the purlin supports of the roof beams, the steel traveler 3 passes through the steel rings 2 and is set on the steel pipe 1, and the lifting ring 4 is sleeved on the Below the traveler 3, the lifting point 5 is a semicircular structure welded on the steel pipe 1 with steel bars, and the number is three. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.

安装时,将需要安装的檩条与屋梁在地面上根据牛舍总体设计进行组装,采用一根辅助钢管作为支撑件,辅助钢管的吊环4分别与檩条6一端的檩条孔通过插销相连,每个辅助钢管的起吊点5上安装一根吊车钢丝绳7,然后再在一根屋梁两端的相应位置分别安装吊车钢丝绳7,吊车钢丝绳7的另一端汇总于吊车钩,调整各条吊车钢丝绳长度和角度,使檩条和屋梁的整体倾斜度与屋面坡度相同,启动吊车进行吊装,当上升到屋梁相应位置时,稳定吊车钩,然后先安装屋梁,再按顺序安装另一侧的檩条,安装结束后再松开吊车钩,然后打开吊环与檩条的插销,撤下辅助钢管。 During installation, the purlins and roof beams to be installed are assembled on the ground according to the overall design of the barn, and an auxiliary steel pipe is used as a support. Install a crane wire rope 7 on the lifting point 5 of the auxiliary steel pipe, and then install the crane wire rope 7 at the corresponding positions at both ends of a roof beam. , so that the overall inclination of the purlins and roof beams is the same as that of the roof, start the crane for hoisting. After finishing, loosen the crane hook, then open the latch of the suspension ring and the purlin, and remove the auxiliary steel pipe.

实施例3:Example 3:

使用一根辅助钢管同时吊装檩条和两根屋梁,辅助钢管由钢管1、钢圈2、钢丝圈3、吊环4、起吊点5构成,所述钢圈2焊接在钢管1上,钢圈数量与所需安装檩条的数量相同,钢圈2之间的距离与屋梁檩托之间的距离相同,所述钢丝圈3穿过钢圈2套在钢管1上,所述吊环4套接在钢丝圈3下方,所述起吊点5是用钢筋焊接在钢管1上的半圆形结构,数量为3个。所述钢圈2为6mm粗的钢筋制成。所述钢丝圈3为5mm粗的钢筋制成。 Use an auxiliary steel pipe to hoist purlins and two roof beams at the same time. The auxiliary steel pipe is composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings The number of purlins required to be installed is the same, the distance between the steel rings 2 is the same as the distance between the purlin supports of the roof beams, the steel traveler 3 passes through the steel rings 2 and is set on the steel pipe 1, and the lifting ring 4 is sleeved on the Below the traveler 3, the lifting point 5 is a semicircular structure welded on the steel pipe 1 with steel bars, and the number is three. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.

安装时,将需要安装的檩条与两根屋梁在地面上根据牛舍总体设计进行组装,采用一根辅助钢管作为支撑件,辅助钢管的吊环4分别与檩条6一端的檩条孔通过插销相连,每个辅助钢管的起吊点5上安装一根吊车钢丝绳7,然后再在两根屋梁两端的相应位置分别安装吊车钢丝绳7,吊车钢丝绳7的另一端汇总于吊车钩,调整各条吊车钢丝绳长度和角度,使檩条和屋梁的整体倾斜度与屋面坡度相同,启动吊车进行吊装,当上升到屋梁相应位置时,稳定吊车钩,然后先按顺序安装屋梁,再按顺序安装另一侧的檩条,安装结束后再松开吊车钩,然后打开吊环与檩条的插销,撤下辅助钢管。 During installation, the purlins to be installed and the two roof beams are assembled on the ground according to the overall design of the cowshed, and an auxiliary steel pipe is used as a support member, and the suspension ring 4 of the auxiliary steel pipe is respectively connected to the purlin hole at one end of the purlin 6 through a bolt. A crane wire rope 7 is installed on the lifting point 5 of each auxiliary steel pipe, and then a crane wire rope 7 is installed at the corresponding positions at both ends of the two roof beams. and angle, so that the overall inclination of the purlins and roof beams is the same as the roof slope, start the crane for hoisting, when it rises to the corresponding position of the roof beams, stabilize the crane hook, and then install the roof beams in order, and then install the other side in order Purlins, loosen the crane hook after the installation is complete, then open the latches of the lifting rings and purlins, and remove the auxiliary steel pipes.

本实用新型提供的同时吊装屋梁檩条的辅助钢管,有效地解决了屋梁檩条安装时只能依次分别起吊安装,且安装过程中容易移位等问题,使数根檩条和屋梁能在地面按设计要求组装后,再同时吊装到相应位置进行安装,解决了传统安装工艺施工慢、质量差、风险高、效益低的问题,缩短了工期、提升了质量、增加了安全保障。 The utility model provides the auxiliary steel pipe for hoisting the purlins of the roof beams at the same time, which effectively solves the problems that the purlins of the roof beams can only be hoisted and installed one by one, and is easy to shift during the installation process, so that several purlins and roof beams can be placed on the ground. After being assembled according to the design requirements, it is hoisted to the corresponding position for installation at the same time, which solves the problems of slow construction, poor quality, high risk and low benefit of the traditional installation process, shortens the construction period, improves the quality, and increases the safety guarantee.

以上对本实用新型所提供的同时吊装屋梁檩条的辅助钢管进行了详细介绍。本文通过具体实施方式对本实用新型的原理和实施方式进行了阐述,以上说明只是用于帮助理解本实用新型的方法及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以对本实用新型进行若干改进和修饰,这些改进和修饰也落入本实用新型权利要求的保护范围内。 The auxiliary steel pipe for simultaneously hoisting roof beam purlins provided by the utility model has been introduced in detail above. This paper describes the principle and implementation of the utility model through specific implementation methods, and the above description is only used to help understand the method and core idea of the utility model. It should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made to the utility model, and these improvements and modifications also fall into the protection of the claims of the utility model. within range.

Claims (4)

1. one kind for lifting the auxiliary steel pipe of room beam purlin simultaneously, it is characterized in that, by steel pipe (1), steel ring (2), bead coil (3), suspension ring (4), Heave Here (5) is formed, described steel ring (2) is welded on steel pipe (1), steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring (2) is identical with the distance between room beam purlin holder, described bead coil (3) is enclosed within steel pipe (1) through steel ring (2), described suspension ring (4) are socketed in bead coil (3) below, described Heave Here (5) is with the semicircular structure of reinforcement welding on steel pipe (1).
2. according to claim 1 for lifting the auxiliary steel pipe of room beam purlin simultaneously, it is characterized in that, described steel pipe (1) is arranged 2-4 Heave Here (5).
3. according to claim 1 for lifting the auxiliary steel pipe of room beam purlin simultaneously, it is characterized in that, described steel ring (2) is made for the reinforcing bar that 6mm is thick.
4. according to claim 1 for lifting the auxiliary steel pipe of room beam purlin simultaneously, it is characterized in that, described bead coil (3) is made for the reinforcing bar that 5mm is thick.
CN201520527620.0U 2015-07-20 2015-07-20 A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin Expired - Lifetime CN204873403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520527620.0U CN204873403U (en) 2015-07-20 2015-07-20 A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520527620.0U CN204873403U (en) 2015-07-20 2015-07-20 A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin

Publications (1)

Publication Number Publication Date
CN204873403U true CN204873403U (en) 2015-12-16

Family

ID=54817803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520527620.0U Expired - Lifetime CN204873403U (en) 2015-07-20 2015-07-20 A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin

Country Status (1)

Country Link
CN (1) CN204873403U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760071A (en) * 2016-11-30 2017-05-31 盈创新材料(苏州)有限公司 A kind of 3D printing wall and preparation method thereof
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purlin modular installation combined fixture and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760071A (en) * 2016-11-30 2017-05-31 盈创新材料(苏州)有限公司 A kind of 3D printing wall and preparation method thereof
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purlin modular installation combined fixture and installation method

Similar Documents

Publication Publication Date Title
CN104989109B (en) It is a kind of at the same lift room beam purlin method
CN100557168C (en) A high-altitude installation method for long-span steel truss
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN204199686U (en) Without outrigger concrete parapet formwork system
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN105201198A (en) Tool-type cantilever beam and construction method thereof
CN103938875A (en) Ground single body tensioning lifting construction method of single layer suspendome
CN103993745B (en) An integral hoisting device for a transfer beam and its hoisting method
CN201362953Y (en) Construction platform for pouring concrete silo roof
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN106245919A (en) A prefabricated building automation assembly platform
CN204873403U (en) A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin
CN100504031C (en) Steel cage hoisting structure in tank wall construction
CN104674951A (en) Automatic tripping device for hoisting large reinforced concrete prefabricated columns and beams
CN110980500A (en) A kind of balanced force auxiliary hoisting beam and roof structure integral hoisting method
CN103993739A (en) Method for constructing stiff beam of spraying layer of prilling tower
CN102864935A (en) Novel purline mounting method
CN106320681A (en) Elevator shaft standard operation platform and implementation platform
CN204876526U (en) Instrument formula girder steel of encorbelmenting
CN205777489U (en) A kind of support system of high and big die plate
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN205062677U (en) A rebar installation auxiliary device that is used for high mound of bridge to be under construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Auxiliary steel pipe for simultaneously hoisting roof beam purlin

Effective date of registration: 20211222

Granted publication date: 20151216

Pledgee: Bank of Nanjing Limited by Share Ltd. Beijing branch

Pledgor: ASIA DAIRY FAB. Ltd.

Registration number: Y2021110000105

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231222

Granted publication date: 20151216

Pledgee: Bank of Nanjing Limited by Share Ltd. Beijing branch

Pledgor: ASIA DAIRY FAB. Ltd.

Registration number: Y2021110000105

PC01 Cancellation of the registration of the contract for pledge of patent right
CX01 Expiry of patent term

Granted publication date: 20151216

CX01 Expiry of patent term