JP2002155630A - Hanging-up method of steel frame roof purlin member - Google Patents

Hanging-up method of steel frame roof purlin member

Info

Publication number
JP2002155630A
JP2002155630A JP2000355218A JP2000355218A JP2002155630A JP 2002155630 A JP2002155630 A JP 2002155630A JP 2000355218 A JP2000355218 A JP 2000355218A JP 2000355218 A JP2000355218 A JP 2000355218A JP 2002155630 A JP2002155630 A JP 2002155630A
Authority
JP
Japan
Prior art keywords
purlin
girder
jig
purlins
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000355218A
Other languages
Japanese (ja)
Inventor
Shigetoshi Yamashita
重利 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2000355218A priority Critical patent/JP2002155630A/en
Publication of JP2002155630A publication Critical patent/JP2002155630A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To simply and efficiently perform attachment to the girder of a purlin member in the roof work of a building. SOLUTION: A plurality of the purlin members 1 are arranged on ground at the substantially same interval as the interval of the arrangement on the girder materials, hung up while holding the interval arranging the purlin members 1 by a hanging tool 3, and lowered at the arrangement position of the purlin member 1 on the girder.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鉄骨屋根母屋材の
吊り揚げ方法に関する。
The present invention relates to a method of lifting a steel roof purlin.

【0002】[0002]

【従来の技術】鉄骨屋根の従来の構築方法は、母屋材を
受ける横木となる桁材を柱及び梁に取り付け、桁材の取
り付けが完了したところで数本の母屋材を地上で束ね、
束ねられた母屋材をクレーン等の揚重機器にて取り付け
が完了している桁材の上に持ち上げてばらした後、桁材
の上において作業員の手作業により母屋材を1本1本所
定の位置に配置し、ボルト止め等公知の方法により各母
屋材を桁材に固定するという作業を繰り返し行うという
ものであった。
2. Description of the Related Art A conventional construction method of a steel roof is to attach a girder to be a crosspiece for receiving a purlin to pillars and beams, and bundle several purlins on the ground when the installation of the girder is completed.
The bundled purlin material is lifted and separated by a lifting device such as a crane onto the girder material that has been attached, and then the purlin materials are individually specified on the girder material manually by an operator. And fixing each purlin member to the girder member by a known method such as bolting.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、束ねて
揚重された複数の母屋材を桁材上で作業員が1本1本配
置するという高所作業が強いられる従来の方法では、母
屋材の施工に手間も時間もかかるため工期の遅延や工事
コストの上昇を招きやすいという問題点を有している。
特に屋根が勾配付となる場合には、作業の安全性により
一層の配慮が必要となるため、作業効率がその分低下し
て工事コストの更なる上昇を招くことになる。
However, according to the conventional method in which a plurality of purlin materials bundled and lifted are placed on a girder member one by one by an operator at a high place, a conventional method is required. Since the construction takes time and effort, there is a problem that the construction period is easily delayed and the construction cost is easily increased.
In particular, when the roof has a slope, further consideration is required for the safety of the work, so that the work efficiency is reduced and the construction cost is further increased.

【0004】本発明の目的は、従来技術における上述の
問題点を解決することができる鉄骨屋根母屋材の吊り揚
げ方法を提供することにある。
It is an object of the present invention to provide a method of lifting a steel roof purlin which can solve the above-mentioned problems in the prior art.

【0005】[0005]

【課題を解決するための手段】上記課題を解決するた
め、本発明によれば、鉄骨屋根の構築のため取り付けが
完了している桁材の上に母屋材を吊り揚げるための方法
であって、地上で複数の母屋材を前記桁材上での配置間
隔と略同一の間隔をあけて並べておき、並べられた母屋
材を吊り揚げ治具を用いて前記間隔を保ちつつ吊り揚げ
て前記桁材の母屋材配設位置に合わせて吊り下ろすよう
にしたことを特徴とする鉄骨屋根母屋材の吊り揚げ方法
が提案される。
According to the present invention, there is provided, in accordance with the present invention, a method for hoisting a purlin material on a girder material which has already been mounted for the construction of a steel roof. A plurality of purlin materials are arranged on the ground at substantially the same intervals as the arrangement intervals on the girder material, and the arranged purlin materials are lifted and lifted while maintaining the distance using a lifting jig. There is proposed a method of lifting and lowering a steel roof purlin, characterized by being suspended in accordance with the position where the purlin is disposed.

【0006】[0006]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態の一例につき詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings.

【0007】図1は、本発明の実施の形態の一例を説明
するための説明図である。図1を参照して、鉄骨屋根の
構築のために屋根工事が行われており桁材の取り付けま
でが完了している状態の建物の工事現場において、複数
本の母屋材1を取り付けが完了している桁材の上に吊り
揚げて所定の位置に配設、固定する工程について説明す
る。
FIG. 1 is an explanatory diagram for explaining an example of an embodiment of the present invention. Referring to FIG. 1, at a construction site of a building in which roof construction is being performed for construction of a steel roof and installation of a girder has been completed, installation of a plurality of purlins 1 has been completed. The following describes a process of suspending and lifting a girder material, and disposing and fixing the girder material at a predetermined position.

【0008】先ず、地面Gにセット治具2を配置する。
セット治具2は4本の角形鋼管21〜24が井桁状に組
まれ、4本の補強材25によって図示の如く補強されて
成る枠本体26を備え、4本の角形鋼管21〜24の内
1組の対向する角形鋼管21、23には、母屋材1を所
定の間隔をあけて並べた状態に位置決めしておくための
位置決金具27が9個づつ計18個図示の如く固定され
ている。図示の例では、位置決金具27は母屋材1を受
け入れることができるコ字状の形態となっており、位置
決金具27の配置間隔は、桁材(図示せず)上での母屋
材1の配設間隔と同じになっている。
First, the set jig 2 is placed on the ground G.
The set jig 2 includes a frame main body 26 in which four rectangular steel pipes 21 to 24 are assembled in a cross-girder shape and reinforced by four reinforcing members 25 as shown in the drawing, and among the four rectangular steel pipes 21 to 24, A total of 18 positioning metal fittings 27 for positioning the purlins 1 in a state where they are arranged at predetermined intervals are fixed to the pair of opposed square steel pipes 21 and 23 as shown in the figure, for a total of 18 positioning metal fittings 27. I have. In the illustrated example, the positioning metal fittings 27 have a U-shape that can receive the purlin 1, and the arrangement intervals of the positioning metal fittings 27 are different from those of the purlin material 1 on the girder (not shown). It is the same as the arrangement interval.

【0009】セット治具2は以上のように構成されてい
るので、母屋材1をセット治具2の位置決金具27内に
セットするだけで、極めて容易に母屋材1を所定の間隔
をあけて9本並べた状態とすることができる。なお、セ
ット治具2によってセットできる母屋材1の本数を9本
に限定することなく適宜に決めることができるのは勿論
である。
Since the set jig 2 is constructed as described above, the purlin 1 can be extremely easily spaced at a predetermined interval only by setting the purlin 1 in the positioning fixture 27 of the set jig 2. 9 lines can be arranged. It is needless to say that the number of the purlins 1 that can be set by the setting jig 2 is not limited to nine, but can be appropriately determined.

【0010】9本の母屋材1をセット治具2上に上述の
ように並べた後、それぞれの母屋材1を複数の全ネジボ
ルト28で連結する。これにより、9本の母屋材1が建
物の屋根の桁材の上に吊り下ろされ固定されるまでの間
及びそれ以後の工程において、母屋材1の間隔を所要の
長さに保持することができる。
After arranging nine purlins 1 on the set jig 2 as described above, each purlin 1 is connected by a plurality of full screw bolts 28. In this way, the interval between the purlins 1 can be maintained at a required length until the nine purlins 1 are suspended and fixed on the girder of the roof of the building and in the subsequent processes. it can.

【0011】次に、上述の如く所要の間隔をあけて連結
された状態の9本の母屋材1の吊り揚げ作業を吊治具3
を使用して行う。吊治具3は4本のH鋼31〜34が井
桁状に組まれて構成されている。4本のH鋼31〜34
の内1組の対向するH鋼31、33のそれぞれの下面3
1A、33Aには、L字状の係止プレート35が9枚ず
つ、位置決金具27の配置間隔と同一の配置間隔で固定
されている。1組の対向するH鋼31、33のそれぞれ
の上面31B、33Bには、吊治具3をクレーン等の揚
重機器で吊り揚げることができるようシャックル等を通
すための開口部を設けた2組の揚重用プレート36、3
6、37、37が設けられている。
Next, the hoisting operation of the nine purlins 1 connected in such a manner as to be spaced apart from each other by a predetermined distance as described above
Done using The hanging jig 3 is configured by assembling four H steels 31 to 34 in a cross-girder shape. Four H steels 31-34
The lower surface 3 of each of a pair of opposed H steels 31 and 33
Nine L-shaped locking plates 35 are fixed to 1A and 33A at the same arrangement interval as that of the positioning fitting 27. An opening for passing a shackle or the like is provided on the upper surface 31B, 33B of each of the pair of opposed H steels 31, 33 so that the lifting jig 3 can be lifted by a lifting device such as a crane. Pair of lifting plates 36, 3
6, 37, 37 are provided.

【0012】吊治具3は以上のように構成されているの
で、セット治具2上に上述の如くしてセットされている
9本の母屋材1の上に吊治具3を吊り下ろし、吊治具3
の係止プレート35に対応する母屋材1をそれぞれ側面
からすべり込ませるようにして係止させ、この状態で一
体となっている9本の母屋材1を吊治具3によって吊り
揚げることができる。
Since the suspending jig 3 is configured as described above, the suspending jig 3 is suspended on the nine purlins 1 set on the set jig 2 as described above. Hanging jig 3
The main purlins 1 corresponding to the locking plates 35 are slid so as to slide in from the respective side surfaces, and in this state, the nine purlins 1 integrated with each other can be lifted by the hanging jig 3. .

【0013】ここで、吊治具3の係止プレート35に上
述のごとく係止された9本の母屋材1が吊り揚げられて
いる際に、横風などの原因により係止プレート35から
外れ落ちてしまうことを防ぐため、ゴムバンドを用いた
適宜の手段により、母屋材1と吊治具3の係止プレート
35との係止状態を吊り揚げ作業中しっかりと保持して
おくことができるようにするのが好ましい。これに加え
て、又はこれに代えて、吊治具3による吊り揚げ作業
中、吊治具3をH鋼34がH鋼32よりも高くなるよう
に傾斜させ、これにより母屋材1が係止プレート35か
ら外れ落ちにくい姿勢を取るようにしてもよい。
Here, when the nine purlins 1 locked as described above on the locking plate 35 of the hanging jig 3 are lifted and lifted off, they fall off the locking plate 35 due to a crosswind or the like. In order to prevent such a situation, the locked state between the purlin 1 and the locking plate 35 of the hanging jig 3 can be firmly held during the lifting operation by appropriate means using a rubber band. It is preferred that In addition to or instead of this, during the lifting operation by the hanging jig 3, the hanging jig 3 is inclined so that the H steel 34 is higher than the H steel 32, thereby locking the purlin 1 You may make it take the attitude | position which is hard to fall off from the plate 35.

【0014】図2には母屋材1を吊治具3によって吊り
揚げる場合に、ゴムベルト38を用いて母屋材1と吊治
具3との係止の強化を図って外れにくくした場合の例が
示されている。
FIG. 2 shows an example in which when the purlin 1 is lifted by the hanging jig 3, the rubber belt 38 is used to strengthen the locking between the purlin 1 and the hanging jig 3 so that the purlin 1 is hard to be detached. It is shown.

【0015】吊治具3によって母屋材1を吊り揚げて屋
根の上まで到着させた後、母屋材1を吊治具3と共に図
示しない桁材の上に下ろす。桁材には、母屋材1を所定
の位置に安定して設置するための転び止め材が所定の間
隔をあけて取り付けられているが、既に説明したよう
に、吊治具3によって吊り下げられている母屋材1の間
隔はこの転び止め材の配置間隔と等しくなっている。こ
のため、母屋材1を桁材の所要の位置に降ろし、吊治具
3との連結を外せば、9本の母屋材1はそれぞれ対応す
る転び止め材によって受け止められた状態で所要の配置
を完了させることができる。
After the purlin 1 is lifted and arrived at the roof by the suspending jig 3, the purlin 1 is lowered together with the suspending jig 3 onto a girder (not shown). Anti-slip members for stably installing the purlin material 1 at predetermined positions are attached to the girder materials at predetermined intervals, but are suspended by the hanging jigs 3 as described above. The interval between the purlins 1 is equal to the arrangement interval of the anti-skid members. For this reason, if the purlin 1 is lowered to the required position of the girder material and the connection with the hanging jig 3 is released, the required arrangement of the nine purlins 1 is received in a state where the nine purlins 1 are respectively received by the corresponding anti-fall members. Can be completed.

【0016】すなわち、9本の母屋材1を転び止めに寄
り掛かるようにしてセットし、ゴムバンド38を取り外
し吊治具3を取り外した以後においても、9本の母屋材
1は、位置ずれ及び落下等することなく所定の位置にお
いて所要の間隔で並べられた状態を保持しているので、
母屋材1を桁材の所定の位置にボルト止め等の方法によ
り固定するだけで母屋材1の取り付けを完了することが
できる。
That is, even after the nine purlins 1 are set so as to lean against the anti-slip, the rubber band 38 is removed, and the hanging jig 3 is removed, the nine purlins 1 are still displaced. Because it keeps the state where it is arranged at the required interval at the predetermined position without falling etc.
The attachment of the purlin 1 can be completed only by fixing the purlin 1 to a predetermined position of the girder by a method such as bolting.

【0017】セット治具2及び吊治具3は何度でも使用
することができるので、勾配のある又は勾配のない屋根
を構築するためにセット治具2と吊治具3とを使用して
以上の作業を繰り返し行い母屋材1を吊り揚げるように
すれば、母屋材1を作業員が所定の位置に1本1本手作
業で配置するという非効率な作業を行うことなく複数の
母屋材1を一度に所定の位置に配置することができる。
桁材上での作業は母屋材1のボルト止めだけとなるので
手間がかからないため作業効率が良くなり、工期の遅延
を招くこともなくなる。また、屋根が勾配付となる場合
には、勾配のある桁材の上での作業が減少するため、作
業の安全性が増し作業員が集中して作業を進めることが
でき、作業効率を上昇させることができる。
Since the set jig 2 and the suspending jig 3 can be used any number of times, the set jig 2 and the suspending jig 3 are used to construct a sloped or non-graded roof. If the purlin material 1 is hoisted and lifted by repeating the above operation, a plurality of purlin materials can be used without performing the inefficient work of manually placing the purlin material 1 at a predetermined position one by one. One can be placed in place at a time.
Since the work on the girder material is performed only by bolting the purlin 1, the work is not required, so that the work efficiency is improved, and the work period is not delayed. In addition, when the roof has a slope, work on sloped girder materials is reduced, which increases work safety and allows workers to concentrate on work, increasing work efficiency. Can be done.

【0018】[0018]

【発明の効果】本発明によれば、地上において母屋材を
所要の間隔に並べて配置した状態を治具を用いて保持し
つつ吊り揚げるようにしたので、屋根の上で母屋材を1
本1本所定の位置に配置する作業がなくなり、ボルト止
めするだけで良いようにした。したがって、手間がかか
らないと同時に作業の安全性が増し、作業に集中するこ
とができるので作業効率が上昇し、工期遅延を招く虞も
なくなり工事コストを削減することができる。
According to the present invention, the purlins are lifted and lifted while holding a state where the purlins are arranged at required intervals on the ground by using a jig.
The work of arranging one book at a predetermined position is eliminated, and only the bolting is required. Therefore, the safety of the work is increased at the same time as the work is not required, and the work can be concentrated on the work. Therefore, the work efficiency is increased, and there is no possibility of delaying the construction period, and the construction cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態の一例を説明するための説
明図。
FIG. 1 is an explanatory diagram illustrating an example of an embodiment of the present invention.

【図2】図1に示されている吊治具で母屋材を吊り下げ
た状態の要部拡大図。
FIG. 2 is an enlarged view of a main part in a state where the purlin is suspended by the suspension jig shown in FIG. 1;

【符号の説明】[Explanation of symbols]

1 母屋材 2 セット治具 3 吊治具 21〜24 角形鋼管 25 補強材 26 枠本体 31〜34 H鋼 35 係止プレート 36、37 揚重用プレート 38 ゴムバンド G 地面 DESCRIPTION OF SYMBOLS 1 Purlin material 2 Set jig 3 Hanging jig 21-24 Square steel pipe 25 Reinforcement material 26 Frame body 31-34 H steel 35 Locking plate 36, 37 Lifting plate 38 Rubber band G Ground

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鉄骨屋根の構築のため取り付けが完了し
ている桁材の上に母屋材を吊り揚げるための方法であっ
て、 地上で複数の母屋材を前記桁材上での配置間隔と略同一
の間隔をあけて並べておき、並べられた母屋材を吊り揚
げ治具を用いて前記間隔を保ちつつ吊り揚げて前記桁材
の母屋材配設位置に合わせて吊り下ろすようにしたこと
を特徴とする鉄骨屋根母屋材の吊り揚げ方法。
1. A method for hoisting a purlin on a girder that has been installed for the construction of a steel roof, comprising: a plurality of purlins on the ground; It is arranged that they are arranged at substantially the same intervals, and the arranged purlins are suspended and lifted while maintaining the above-mentioned intervals using a lifting jig, and are suspended in accordance with the purlin arrangement position of the girder. Characteristic method of lifting steel roof purlin materials.
JP2000355218A 2000-11-22 2000-11-22 Hanging-up method of steel frame roof purlin member Pending JP2002155630A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000355218A JP2002155630A (en) 2000-11-22 2000-11-22 Hanging-up method of steel frame roof purlin member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000355218A JP2002155630A (en) 2000-11-22 2000-11-22 Hanging-up method of steel frame roof purlin member

Publications (1)

Publication Number Publication Date
JP2002155630A true JP2002155630A (en) 2002-05-31

Family

ID=18827668

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000355218A Pending JP2002155630A (en) 2000-11-22 2000-11-22 Hanging-up method of steel frame roof purlin member

Country Status (1)

Country Link
JP (1) JP2002155630A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013221328A (en) * 2012-04-17 2013-10-28 Kajima Corp Linear member holding support device and construction method for linear member
CN104989109A (en) * 2015-07-20 2015-10-21 中博农畜牧科技股份有限公司 Method for lifting roof girders and purlines at the same time
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108999413A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A method of roof purline being installed using single hoist cable more gib heads
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purline modularization installation combined tools and installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013221328A (en) * 2012-04-17 2013-10-28 Kajima Corp Linear member holding support device and construction method for linear member
CN104989109A (en) * 2015-07-20 2015-10-21 中博农畜牧科技股份有限公司 Method for lifting roof girders and purlines at the same time
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108999413A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A method of roof purline being installed using single hoist cable more gib heads
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purline modularization installation combined tools and installation method

Similar Documents

Publication Publication Date Title
JP2002155630A (en) Hanging-up method of steel frame roof purlin member
CN108086697B (en) Precise positioning device and precise positioning method for embedded part hoisting
JP5865750B2 (en) Gantry installation method
JPH05116881A (en) Plate-shaped lifting tool
JP2827856B2 (en) Hanging jig for ALC plate
JP2893171B2 (en) Safety net hanging equipment for building construction and equipment with safety net for building construction
JP5614623B2 (en) Suspension jig for steel frame construction and steel frame installation method using the same
JP3084325U (en) Concrete pole reinforcement
JP2007124720A (en) Bracket angle adjuster and method of attaching bracket to a variety of utility poles
CN215854651U (en) Steel construction roofing purlin is whole quick hoist device
JPH08128191A (en) Stopper construction of suspension device, etc., of scaffolding
JP3053847U (en) Rebar assembly equipment
CN217172968U (en) Quick installation device of steel construction roofing purlin hoist and mount in batches
JPH09184284A (en) Method for constructing steeply pitched long roof material
JP3152380B2 (en) Exterior wall panel construction method
JP7219574B2 (en) Plumbing adjustment jig and plumbing adjustment method
JPH04107773U (en) sling
JPH035547A (en) Outer wall half pc plate and mounting method thereof
JP2514612Y2 (en) Piping block carry-out jig
JPH05239929A (en) Fitting construction method for horizontal wall panel
JPH0882090A (en) Structure for connecting main beam of scaffold longitudinally
JPH11315536A (en) Device and method of assembling reinforcement
JPH0882089A (en) Unit scaffold and connected structure of same
JP2023175115A (en) Wall reinforcement arrangement method
JPH07513Y2 (en) Smashing hardware