CN104989023A - Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system - Google Patents

Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system Download PDF

Info

Publication number
CN104989023A
CN104989023A CN201510421588.2A CN201510421588A CN104989023A CN 104989023 A CN104989023 A CN 104989023A CN 201510421588 A CN201510421588 A CN 201510421588A CN 104989023 A CN104989023 A CN 104989023A
Authority
CN
China
Prior art keywords
connecting hole
hole
adaptor
junction plate
decoration panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510421588.2A
Other languages
Chinese (zh)
Inventor
陈鹏
苏杭
余沛
万红伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Decoration Co Ltd
Original Assignee
China Construction Third Bureau Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Decoration Co Ltd filed Critical China Construction Third Bureau Decoration Co Ltd
Priority to CN201510421588.2A priority Critical patent/CN104989023A/en
Publication of CN104989023A publication Critical patent/CN104989023A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a hanger for a large-span arc-shaped suspended ceiling, a suspended ceiling system and a construction method of the suspended ceiling system. The hanger comprises a cross-shaped claw piece, wherein the cross-shaped claw piece comprises a base body, four connecting plates and an adaptor, a base body connecting hole is formed in the base body, a first connecting plate through hole and a second connecting plate through hole are formed in each connecting plate, one end of each connecting plate is fixedly connected with the base body, and the four connecting plates are arranged into a cross shape; a first connecting hole and a second connecting hole are sequentially formed along the adaptor, the first connecting hole is connected with the first connecting plate through hole through a bolt, the second connecting hole is an arc-shaped hole, the arc-shaped hole and the first connecting hole share the same circle center, and the second connecting hole is connected with the second connecting plate through hole through a bolt. The included angle between each connecting plate and the adaptor of the cross-shaped claw piece can be formed by locking the relative positions of the second connecting hole and the second connecting plate through hole through adjustment of the corresponding bolt, so that designing and manufacturing of the arc-shaped suspended ceiling are made possible.

Description

For the suspender member of large span arc furred ceiling and ceiling system and construction method
Technical field
The invention belongs to the interior decoration technical field of building, particularly relate to a kind of suspender member for large span arc furred ceiling, and comprise the ceiling system of this suspender member, and the construction method of ceiling system.
Background technology
Furred ceiling refers to the top finishing of house dwelling environment.Briefly, just referring to the finishing of ceiling, is one of pith of interior decoration.Furred ceiling has insulation, heat insulation, sound insulation, the effect of sound absorption, be also electrically, air conditioner, communication and the engineering such as fire prevention, warning line equipment hidden layer.
In currently available technology, decorative panel furred ceiling button installation system as shown in Figure 1.Comprise suspension rod, braced structures and decoration panel, suspension rod 01 is by suspension hook 02 connected support structure, decoration panel is arranged on braced structures bottom surface, described braced structures is that main joist 03 and secondary joist 04 interweave in length and breadth, intersection is connected to form by time suspension member 05, adjacent keel are on same straight line, and described decoration panel 06 is button decoration panel.
But along with people's aesthetic standards are along with the change of era development, designer needs the design breaking through plane furred ceiling, need for Customer design goes out to have the ceiling structure of spherical depression.But the braced structures due to prior art furred ceiling is that main joist and secondary joist interweave in length and breadth, intersection is connected to form by time suspension member, and adjacent keel are on same straight line, cannot form the arc moulding needed for arc furred ceiling.
Summary of the invention
The first object of the present invention is to provide a kind of suspender member for large span arc furred ceiling.
The second object of the present invention is to provide a kind of ceiling system, and be on same straight line to solve adjacent keel in prior art, decorative panel cannot form the problem of the arc moulding needed for arc furred ceiling.
The third object of the present invention is to provide a kind of construction method of ceiling system.
In order to realize above-mentioned first object, the invention provides a kind of suspender member for large span arc furred ceiling, it comprises:
Cross bluff piece, described cross bluff piece comprises:
Matrix, described matrix is provided with matrix connecting hole;
Junction plate, the quantity of described junction plate is four, each junction plate is equipped with the first junction plate through hole and the second junction plate through hole; One end of junction plate is fixedly connected with described matrix, and four junction plates are arranged to cross;
Adaptor, comprises successively along described adaptor:
First connecting hole; Described first connecting hole is connected with the first junction plate through hole by bolt;
Second connecting hole, described second connecting hole is arcuate socket, and the center of circle of described arcuate socket is identical with the center of circle of the first connecting hole; Described second connecting hole is connected with the second junction plate through hole by bolt.
The present invention is as above for the suspender member of large span arc furred ceiling, and further, the radian of described arcuate socket is 5 degree ~ 60 degree.
The present invention is as above for the suspender member of large span arc furred ceiling, and further, described adaptor also comprises the 3rd connecting hole, for connecting keel; First connecting hole, the second connecting hole and the 3rd connecting hole are linearly arranged.
The present invention is as above for the suspender member of large span arc furred ceiling, and further, the quantity of described 3rd connecting hole is two, and described 3rd connecting hole is the connecting hole of bar shaped.
The present invention is as above for the suspender member of large span arc furred ceiling, and further, described adaptor is made up of C-type steel.
In order to realize above-mentioned second object, the invention provides a kind of ceiling system, it comprises the suspender member for large span arc furred ceiling as above described in any one.
The present invention's ceiling system as above, further, it also comprises:
Suspension rod, one end of suspension rod is connected with described matrix connecting hole, and the other end is connected with building structure;
Bracing or strutting arrangement, described bracing or strutting arrangement is connected with described adaptor;
Decoration panel, described decoration panel is arranged on described bracing or strutting arrangement.
The present invention's ceiling system as above, further, described bracing or strutting arrangement comprises main joist, secondary joist and Z-shaped keel; Described main joist is connected with described adaptor; Described secondary joist is connected with described main joist; Described Z-shaped keel are connected with secondary joist by suspension member.
The present invention's ceiling system as above, further, described decoration panel is hook-hang type decoration panel, and two opposite side of decoration panel have crimping, seamed end with downward crotch; During installation, described crotch is connected with the lower end of Z-shaped keel.
In order to realize above-mentioned 3rd object, the invention provides a kind of construction method of ceiling system, comprising the following steps:
Step one, under being arranged on steel work basic unit by adjustment suspension rod height by design elevation by the suspender member being used for large span arc furred ceiling; Suspender member is connected with cross bluff piece; The adaptor be fixedly connected with cross bluff piece four junction plates installs root root main joist; Between cross bluff piece and adaptor, angle can regulate;
Step 2, is connected the secondary joist with suspension member with main joist by anchor ear;
Step 3, interlocks the crotch of hook-hang type decoration panel side and Z-shaped keel bottom;
Step 4, is interlocked the hook-hang type decoration panel be buckled together mutually with Z-shaped keel by Z-shaped keel upper end and suspension member lower end draw-in groove, is fixed by suspension member by the bolt of suspension member upper end, ensures that hook-hang type decoration panel can not loosen.
The invention has the beneficial effects as follows:
1, the relative position that folded between the junction plate of cross bluff piece of the present invention and adaptor angle can lock the second connecting hole and the second junction plate through hole by adjusting bolt realizes, thus becomes possibility for design, manufacture arc furred ceiling.
2, installation procedure of the present invention completely from top to bottom, and base layer structure is firm, in furred ceiling built-in function, can not need other erection construction platform, and installation rate is fast, and it is convenient to remove.The present invention's utilize roof rack steel work and basic unit's grid system to set up installation that operating platform carries out basic unit's keel and aluminium sheet furred ceiling respectively.
3, the suspender member structure in the present invention is simple, convenient processing and installation, and the ceiling system adopting it to connect is safe and reliable.
4, the suspender member system base layer structure in the present invention is firm, if when furred ceiling need keep in repair, without the need to other erection construction platform, and convenient and quick construction, and little on surrounding enviroment impact.
5, the suspender member system construction in the present invention is convenient, does not need other erection construction platform, can carry out the construction on ground simultaneously, effectively can shorten the construction period, reduce construction cost.
Accompanying drawing explanation
By detailed description done in conjunction with the following drawings, above-mentioned and/or other aspects of the present invention and advantage will become clearer and be easier to understand, and these accompanying drawings just schematically, do not limit the present invention, wherein:
Fig. 1 is furred ceiling button installation system schematic diagram in prior art;
Fig. 2 is the suspender member schematic diagram for large span arc furred ceiling of an embodiment of the present invention;
Fig. 3 is the cross bluff piece schematic top plan view of an embodiment of the present invention;
Fig. 4 is the cross bluff piece front schematic view of an embodiment of the present invention;
Fig. 5 is the adaptor front schematic view of an embodiment of the present invention;
Fig. 6 is the adaptor side schematic view of an embodiment of the present invention;
Fig. 7 is the schematic diagram after the suspender member for large span arc furred ceiling of an embodiment of the present invention rotates to an angle;
Fig. 8 is decorative panel installation steps one schematic diagrames;
Fig. 9 is decorative panel installation steps two schematic diagrames;
Figure 10 decorative panel installation steps three schematic diagram;
Figure 11 decorative panel installation steps four schematic diagram.
In accompanying drawing, the list of parts representated by each label is as follows:
01, suspension rod, 02, suspension hook, 03, main joist, 04, secondary joist, 05, suspension member, 06, decoration panel, 1, cross bluff piece, 11, matrix, 12, junction plate, 13, junction plate through hole, 14, matrix connecting hole, 2, adaptor, the 21, first connecting hole, 22, the second connecting hole, the 23, the 3rd connecting hole, 3, bolt, 4, suspension rod, 5, main joist, 6, secondary joist, 61, anchor ear, 7, suspension member, 8, decoration panel, 81, crimping, 82, crotch, 9, Z-shaped keel.
Detailed description of the invention
Hereinafter, the embodiment of the suspender member for large span arc furred ceiling of the present invention is described with reference to the accompanying drawings.
The embodiment recorded at this is specific detailed description of the invention of the present invention, for illustration of design of the present invention, is all explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.Except the embodiment recorded at this, those skilled in the art can also adopt other technical scheme apparent based on the content disclosed in the application's claims and manual, and these technical schemes comprise the technical scheme making any apparent substitutions and modifications adopted the embodiment recorded at this.
The accompanying drawing of this manual is schematic diagram, and aid illustration design of the present invention schematically shows shape and the correlation thereof of each several part.Note that the structure of each parts for the ease of clearly showing the embodiment of the present invention, not according to identical scale between each accompanying drawing.Identical reference marker is for representing identical part.
Fig. 2 illustrates the suspender member for large span arc furred ceiling of an embodiment of the present invention, and it comprises:
Cross bluff piece 1, as shown in Figure 3 and Figure 4, described cross bluff piece comprises: matrix 11, and described matrix is provided with matrix connecting hole 14; Junction plate 12, the quantity of described junction plate is four, each junction plate is equipped with the first junction plate through hole and the second junction plate through hole (junction plate through hole 13); One end of junction plate is fixedly connected with described matrix, and four junction plates are arranged to cross;
Adaptor 2, as shown in Figure 5 and Figure 6, comprises successively along described adaptor: the first connecting hole 21; Described first connecting hole is connected with the first junction plate through hole by bolt; Second connecting hole 22, described second connecting hole is arcuate socket, and the center of circle of described arcuate socket is identical with the center of circle of the first connecting hole; Described second connecting hole is connected with the second junction plate through hole by bolt.Preferably, described adaptor is made up of steel, preferably utilizes C-type steel to make.
When above-described embodiment suspender member uses, as shown in Figure 7, the relative position that angle folded between the junction plate of cross bluff piece and adaptor can lock the second connecting hole and the second junction plate through hole by adjusting bolt is realized, thus becomes possibility for design, manufacture arc furred ceiling.
State in the suspender member specific implementation process for large span arc furred ceiling of embodiment on the invention, the radian of described arcuate socket is 5 degree ~ 60 degree, preferably 5 degree ~ 45 degree, more preferably 10 degree ~ 30 degree.The radian of described arcuate socket determines the adjustable extent of angle folded between junction plate and adaptor.
State in the suspender member specific implementation process for large span arc furred ceiling of embodiment on the invention, described adaptor also comprises the 3rd connecting hole 23, connects keel for joint bolt 3; In addition adaptor also can be connected with keel by welding, bonding mode, all can realize object of the present invention.
State in the suspender member specific implementation process for large span arc furred ceiling of embodiment on the invention, the quantity of described 3rd connecting hole is two, and described 3rd connecting hole is the connecting hole of bar shaped, described connecting hole parallel arrangement or tandem array arrangement, to make connection fastening, prevent from rotating between adaptor and keel.
State in the suspender member specific implementation process for large span arc furred ceiling of embodiment on the invention, the first connecting hole, the second connecting hole and the 3rd connecting hole are linearly arranged.
As shown in figure 11, for the embodiment of the present invention provides a kind of ceiling system, it comprises:
For the suspender member of large span arc furred ceiling, suspender member comprises:
Cross bluff piece, described cross bluff piece comprises: matrix, and described matrix is provided with matrix connecting hole; Junction plate, the quantity of described junction plate is four, each junction plate is equipped with the first junction plate through hole and the second junction plate through hole; One end of junction plate is fixedly connected with described matrix, and four junction plates are arranged to cross;
Adaptor, comprises successively along described adaptor: the first connecting hole; Described first connecting hole is connected with the first junction plate through hole by bolt; Second connecting hole, described second connecting hole is arcuate socket, and the center of circle of described arcuate socket is identical with the center of circle of the first connecting hole; Described second connecting hole is connected with the second junction plate through hole by bolt.
Ceiling system also comprises:
Suspension rod 4, one end of suspension rod is connected with described matrix connecting hole, and the other end is connected with building structure;
Bracing or strutting arrangement, described bracing or strutting arrangement is connected with described adaptor;
Decoration panel 8, described decoration panel is arranged on described bracing or strutting arrangement.
State in the specific implementation process of the ceiling system of embodiment on the invention, described bracing or strutting arrangement comprises main joist 5, secondary joist 6 and Z-shaped keel 9; Described main joist is connected with described adaptor; Described secondary joist is connected with described main joist; Described Z-shaped keel are connected with secondary joist by suspension member 7.State decoration panel 8 for hook-hang type decoration panel, two opposite side of decoration panel have crimping 81, seamed end with downward crotch 82; During installation, described crotch is connected with the lower end of Z-shaped keel 9.
Composition graphs 8, Fig. 9, Figure 10 and Figure 11, the installation process of above-described embodiment ceiling system is as follows:
Step one, under the suspender member being used for large span arc furred ceiling is arranged on steel work basic unit by adjustment suspension rod 4 height by design elevation, the cross bluff piece adaptor that all around four junction plates 12 are fixedly connected with installs 4 root main joists 5, realized the object of the angle regulated between adjacent two main joists 5 by the adjustment of angle between cross bluff piece and adaptor, the connecting hole being bar shaped by the 3rd connecting hole realizes the object of the spacing regulating adjacent two main joists.
Step 2, is connected the secondary joist 6 with suspension member with main joist by anchor ear 61.
Step 3, interlocks crotch 82 and the Z-shaped keel bottom of hook-hang type decoration panel 8 side.
Step 4, is interlocked the hook-hang type decoration panel be buckled together mutually with Z-shaped keel by Z-shaped keel upper end and suspension member lower end draw-in groove, is fixed by suspension member by the bolt of suspension member upper end, ensures that hook-hang type decoration panel 8 can not loosen.
Each technical characteristic of above-mentioned disclosure is not limited to that disclosed with combination that is further feature, other combination that those skilled in the art also can carry out between each technical characteristic according to the object of invention, is as the criterion with the object realizing the present invention.

Claims (10)

1. for a suspender member for large span arc furred ceiling, it is characterized in that, comprising:
Cross bluff piece, described cross bluff piece comprises:
Matrix, described matrix is provided with matrix connecting hole;
Junction plate, the quantity of described junction plate is four, each junction plate is equipped with the first junction plate through hole and the second junction plate through hole; One end of junction plate is fixedly connected with described matrix, and four junction plates are arranged to cross;
Adaptor, comprises successively along described adaptor:
First connecting hole; Described first connecting hole is connected with the first junction plate through hole by bolt;
Second connecting hole, described second connecting hole is arcuate socket, and the center of circle of described arcuate socket is identical with the center of circle of the first connecting hole; Described second connecting hole is connected with the second junction plate through hole by bolt.
2. the suspender member for large span arc furred ceiling according to claim 1, is characterized in that, the radian of described arcuate socket is 5 degree ~ 60 degree.
3. the suspender member for large span arc furred ceiling according to claim 1, is characterized in that, described adaptor also comprises the 3rd connecting hole, for connecting keel; And the first connecting hole, the second connecting hole and the 3rd connecting hole are linearly arranged.
4. the suspender member for large span arc furred ceiling according to claim 3, is characterized in that, the quantity of described 3rd connecting hole is two, and described 3rd connecting hole is the connecting hole of bar shaped.
5. the suspender member for large span arc furred ceiling according to any one of claim 1-4, is characterized in that, described adaptor is made up of C-type steel.
6. a ceiling system, is characterized in that, comprises the suspender member for large span arc furred ceiling described in any one of claim 1-6.
7. ceiling system according to claim 6, is characterized in that, also comprises:
Suspension rod, one end of suspension rod is connected with described matrix connecting hole, and the other end is connected with building structure;
Bracing or strutting arrangement, described bracing or strutting arrangement is connected with described adaptor;
Decoration panel, described decoration panel is arranged on described bracing or strutting arrangement.
8. ceiling system according to claim 7, is characterized in that, described bracing or strutting arrangement comprises main joist, secondary joist and Z-shaped keel; Described main joist is connected with described adaptor; Described secondary joist is connected with described main joist; Described Z-shaped keel are connected with secondary joist by suspension member.
9. ceiling system according to claim 7, is characterized in that, described decoration panel is hook-hang type decoration panel, and two opposite side of decoration panel have crimping, seamed end with downward crotch; During installation, described crotch is connected with the lower end of Z-shaped keel.
10. the construction method of ceiling system described in claim 9, comprises the following steps:
Step one, under being arranged on steel work basic unit by adjustment suspension rod height by design elevation by the suspender member being used for large span arc furred ceiling; Suspender member is connected with cross bluff piece; The adaptor be fixedly connected with cross bluff piece four junction plates installs root root main joist; Between cross bluff piece and adaptor, angle can regulate;
Step 2, is connected the secondary joist with suspension member with main joist by anchor ear;
Step 3, interlocks the crotch of hook-hang type decoration panel side and Z-shaped keel bottom;
Step 4, is interlocked the hook-hang type decoration panel be buckled together mutually with Z-shaped keel by Z-shaped keel upper end and suspension member lower end draw-in groove, is fixed by suspension member by the bolt of suspension member upper end, ensures that hook-hang type decoration panel can not loosen.
CN201510421588.2A 2015-07-17 2015-07-17 Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system Pending CN104989023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510421588.2A CN104989023A (en) 2015-07-17 2015-07-17 Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510421588.2A CN104989023A (en) 2015-07-17 2015-07-17 Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system

Publications (1)

Publication Number Publication Date
CN104989023A true CN104989023A (en) 2015-10-21

Family

ID=54300904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510421588.2A Pending CN104989023A (en) 2015-07-17 2015-07-17 Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system

Country Status (1)

Country Link
CN (1) CN104989023A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592847A (en) * 2016-12-28 2017-04-26 深圳市深装总装饰股份有限公司 Adjustable skeleton frame device of airport terminal building large span truss roof ceiling
CN109811951A (en) * 2019-03-27 2019-05-28 中建八局装饰工程有限公司 Modularization weaves plate furred ceiling component and its furred ceiling and installation method
CN112158768A (en) * 2020-09-28 2021-01-01 陈志兴 Mounting equipment for prefabricated part of assembly type building
CN113638536A (en) * 2021-08-18 2021-11-12 金螳螂精装科技(苏州)有限公司 Adjustable installation design structure of wavy smallpox

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4989387A (en) * 1989-08-24 1991-02-05 Chicago Metallic Corporation Ceiling system with staked on connectors
CN101200961A (en) * 2007-12-20 2008-06-18 北京市建筑工程装饰有限公司 Variable angle connecting overlap-connected components and construction method for ceiling of continuous curve surface
CN102220795A (en) * 2011-04-14 2011-10-19 广东省建筑装饰工程有限公司 Ceiling system applicable to large-span space steel structure and construction method thereof
CN202787612U (en) * 2012-08-29 2013-03-13 宁波红杉高新板业有限公司 Ceiling
CN203684483U (en) * 2013-12-03 2014-07-02 广州金霸建材有限公司 Novel smallpox suspended ceiling structure
CN203755520U (en) * 2013-12-03 2014-08-06 广州金霸建材有限公司 Universal rotating and hoisting disk of keel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4989387A (en) * 1989-08-24 1991-02-05 Chicago Metallic Corporation Ceiling system with staked on connectors
CN101200961A (en) * 2007-12-20 2008-06-18 北京市建筑工程装饰有限公司 Variable angle connecting overlap-connected components and construction method for ceiling of continuous curve surface
CN102220795A (en) * 2011-04-14 2011-10-19 广东省建筑装饰工程有限公司 Ceiling system applicable to large-span space steel structure and construction method thereof
CN202787612U (en) * 2012-08-29 2013-03-13 宁波红杉高新板业有限公司 Ceiling
CN203684483U (en) * 2013-12-03 2014-07-02 广州金霸建材有限公司 Novel smallpox suspended ceiling structure
CN203755520U (en) * 2013-12-03 2014-08-06 广州金霸建材有限公司 Universal rotating and hoisting disk of keel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592847A (en) * 2016-12-28 2017-04-26 深圳市深装总装饰股份有限公司 Adjustable skeleton frame device of airport terminal building large span truss roof ceiling
CN106592847B (en) * 2016-12-28 2022-10-14 深装总建设集团股份有限公司 Adjustable steel skeleton device of airport terminal building large-span net rack roof furred ceiling
CN109811951A (en) * 2019-03-27 2019-05-28 中建八局装饰工程有限公司 Modularization weaves plate furred ceiling component and its furred ceiling and installation method
CN109811951B (en) * 2019-03-27 2024-01-16 中建八局装饰工程有限公司 Modularized braided plate suspended ceiling assembly, suspended ceiling and installation method thereof
CN112158768A (en) * 2020-09-28 2021-01-01 陈志兴 Mounting equipment for prefabricated part of assembly type building
CN113638536A (en) * 2021-08-18 2021-11-12 金螳螂精装科技(苏州)有限公司 Adjustable installation design structure of wavy smallpox

Similar Documents

Publication Publication Date Title
CN106638963B (en) A kind of fast assembled integrated house and its method of construction
CN104989023A (en) Hanger for large-span arc-shaped suspended ceiling, suspended ceiling system and construction method of suspended ceiling system
CN204901084U (en) Prefabricated integration assembled sectional shelf -unit based on BIM
CN205276769U (en) Light outer wall point is hung heat preservation decorative board combination anchor and is connect system
CN108824648A (en) Space module house
CN104878867B (en) Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof
CN205822665U (en) Welding steel structure system exempted from by a kind of indoor wall stone material
WO2015071821A1 (en) Modular prefabricated panel for buildings, in particular for houses
CN103343574A (en) Assembly type integrated house
CN207776274U (en) Water-proof roofing harden structure and building
CN206144018U (en) Be suitable for opening type building bottom plate and building element of hoist and mount pendant
CN109577521A (en) A kind of PVC spray walling and its construction method
CN204475921U (en) The dismountable firm structural construction factory building of a kind of safety
CN204609092U (en) A kind of combined type conversion layer connector
CN110670786A (en) Curvature suspended ceiling large-span hoisting structure system and hoisting method thereof
CN209585349U (en) A kind of PVC spray walling
TW201839225A (en) Method for joining floor slab to steel beam of wooden building capable of quickly constructing a wooden building and shortening the construction period
CN109736503A (en) Sound-absorbing ceiling device under grid structure and construction method thereof
CN110528724A (en) A kind of pipeline separates the building of waterproof and insulation integrated wall and its composition
CN206616705U (en) The cuff connector hung for pipe roof truss
KR101780988B1 (en) Waterproofing method of building wall
CN205857761U (en) Level adjuster
CN106245843B (en) A kind of open-type building bottom plate for being applicable lifting suspension member
CN211286236U (en) Curvature suspended ceiling large-span hoisting structure system
CN115182489A (en) Deformation joint curtain wall node structure is striden to tower undaria height

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021