CN104988888B - Water obtaining structure for water works of debris flow activity regions - Google Patents
Water obtaining structure for water works of debris flow activity regions Download PDFInfo
- Publication number
- CN104988888B CN104988888B CN201510392610.5A CN201510392610A CN104988888B CN 104988888 B CN104988888 B CN 104988888B CN 201510392610 A CN201510392610 A CN 201510392610A CN 104988888 B CN104988888 B CN 104988888B
- Authority
- CN
- China
- Prior art keywords
- water intaking
- bar
- water
- drain grating
- aperture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The invention discloses a water obtaining structure, particularly discloses a water obtaining structure for water works of the debris flow activity regions, and belongs to the technical field of design and construction of buildings of water conservancy and hydropower engineering. The water obtaining structure for the water works of the debris flow activity regions is simple and can be used for conveniently overhauling and managing water obtaining galleries even during the flood season or even if debris flow happens. The water obtaining structure comprises water obtaining holes formed in a bottom grille dam of a water obtaining gallery and sewage blocking grid bars distributed on the water obtaining holes. The water obtaining structure further comprises fixing devices used for fixing the sewage blocking grid bars, and the sewage blocking grid bars are detachably mounted on the water obtaining holes through the fixing devices.
Description
Technical field
The present invention relates to a kind of water intaking structure, especially relate to a kind of water intaking for the debris flow activity region hydraulic engineering
Structure, belongs to Hydraulic and Hydro-Power Engineering Building Design building technology field.
Background technology
On mountain stream river course, channel gradient is steeper, carries substantial amounts of cobble, gravel, sand, withered tree even huge in current
Stone, for preventing a large amount of silts from entering channel, setting pot or intake tunnel, frequently with bottom sieve frame grid fence structure.But flood season or generation mud
During rock glacier, barrier gap is easily blocked by the material carrying in current, and barrier grizzly bar is easily destroyed by withered tree, megalith etc., just takes
The maintenance condition of water gallery becomes poor, and management also becomes to be inconvenient.
Content of the invention
The technical problem to be solved is:A kind of structure is provided simply, both to make to occur due to flood season or mud-rock flow
Also the water intaking structure for the debris flow activity region hydraulic engineering very easily water intaking gallery overhauled and managed.
Be employed technical scheme comprise that by solving above-mentioned technical problem:A kind of for the debris flow activity region hydraulic engineering
Water intaking structure, including the water intaking aperture on water intaking gallery grille bottom dam and the drain grating bar being arranged on this water intaking aperture, described
The water intaking structure fixing device that also includes for fixing described drain grating bar, described drain grating bar passes through described fixing dress
Put and be detachably arranged on described water intaking aperture.
The invention has the beneficial effects as follows:By arranging a fixing device, described drain grating bar is passed through described consolidating
Determine device to be detachably arranged on described water intaking aperture.So, both made the flood season in the steeper mountain stream river course of channel gradient
There is mud-rock flow, the material blocking barrier gap occurring carrying in current it is also possible to very easily by described drain grating bar from
Pull down on described water intaking aperture, to being overhauled to water intaking gallery and managing, unlike in the prior art, due to being can not
The mounting structure of dismounting, so that maintenance and management become inconvenient.
It is further that described water intaking structure also includes grizzly bar and installs strengthening frame, be fixed on described grizzly bar and reinforcing is installed
Described drain grating bar on frame is detachably arranged on described water intaking aperture by described fixing device.
Such scheme it is preferable that, described grizzly bar is installed strengthening frame and by longitudinal bracing rail and is packed in described vertical
Constitute to the horizontal reinforcing rail on supporting rail, described drain grating bar is arranged on described by described horizontal reinforcing rail
Grizzly bar install on strengthening frame, described grizzly bar is installed strengthening frame and is passed through described longitudinal bracing rail and described fixing device
It is fixedly connected.
It is further that described fixing device includes pre-buried frame and the connection being detachably arranged on described pre-buried frame
Frame, described pre-buried frame is packed in the concrete foundation of described water intaking aperture periphery, two ends of described drain grating bar and described
The two ends of longitudinal bracing rail are respectively fixed on described link.
Such scheme it is preferable that, described fixing device also includes dowel, and described pre-buried frame passes through described
Dowel is packed in the concrete foundation of described water intaking aperture periphery.
It is further that described drain grating bar is made up of two pieces of bar battens and a spacer bar, the grid described in two pieces
Batten is arranged to up big and down small chevron shaped structure on its cross section, and described spacer bar is arranged in institute along its length
State the opening of chevron shaped structure, and this opening is closed.
It is further that described water intaking aperture is in that the form of inclined downstream is arranged in described water intaking gallery on the whole
On grille bottom dam, the installation that described drain grating bar is adapted with described water intaking aperture angle of inclination by described fixing device
On described water intaking aperture.
Brief description
Fig. 1 is used for the horizontal layout schematic diagram of the water intaking structure of the debris flow activity region hydraulic engineering for the present invention;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1.
In figure is labeled as:Water intaking gallery grille bottom dam 1, water intaking aperture 2, drain grating bar 3, fixing device 4, grizzly bar are installed and are added
Gu frame 5, longitudinal bracing rail 6, horizontal reinforcing rail 7, pre-buried frame 8, link 9, dowel 10, bar batten 11, spacer bar 12.
Specific embodiment
As shown in Figure 1, Figure 2 and be that a kind of structure that the present invention provides is simple shown in Fig. 3, both make to send out due to flood season or mud-rock flow
The raw water intaking structure for the debris flow activity region hydraulic engineering also very easily water intaking gallery overhauled and managed.Institute
The water intaking structure stated includes water intaking aperture 2 and the drain grating bar being arranged on this water intaking aperture 2 on gallery grille bottom dam 1 of fetching water
3 it is characterised in that:Described water intaking structure also includes the fixing device 4 for fixing described drain grating bar 3, and described hurdle is dirty
Grizzly bar 3 is detachably arranged on described water intaking aperture 2 by described fixing device 4.Above by one fixation of setting
Device 4, described drain grating bar 3 is detachably arranged on described water intaking aperture 2 by described fixing device 4.This
Sample, had both made the flood season in the steeper mountain stream river course of channel gradient that mud-rock flow occurs, and the material blocking barrier carrying in current
Gap, it is also possible to very easily pull down described drain grating bar 3 from described water intaking aperture 4, is examined to water intaking gallery
Repair and manage, unlike in the prior art, due to being non-removable mounting structure, so that maintenance and management become very
Inconvenient.
In above-mentioned embodiment, in order to strengthen the intensity of described drain grating bar 3, in order to resist flood season or mud-rock flow in river course
The destruction that the withered tree that carries in current during generation, megalith cause to described drain grating bar 3 in flow at high speed, and then after improving
The maintenance of phase and management condition, water intaking structure described herein also includes grizzly bar and installs strengthening frame 5, is fixed on described grizzly bar peace
Described drain grating bar 3 on dress strengthening frame 5 is detachably arranged on described water intaking aperture 2 by described fixing device 4.
Now, the preferred structure that described grizzly bar installs strengthening frame 5 is by longitudinal bracing rail 6 and to be packed in described longitudinal bracing rail 6
On horizontal reinforcing rail 7 constitute, described drain grating bar 3 is arranged on described grizzly bar by described horizontal reinforcing rail 7
Install 5 on strengthening frame, it is solid by described longitudinal bracing rail 6 and described fixing device 4 that described grizzly bar installs strengthening frame 5
Fixed connection.The structure installing strengthening frame 5 with this grizzly bar is adapted, and now described fixing device 4 can adopt and include pre-buried frame 8
With the structure of the link 9 being detachably arranged on described pre-buried frame 8, described pre-buried frame 8 is packed in described water intaking aperture 2
In the concrete foundation of periphery, the two ends of the two ends of described drain grating bar 3 and described longitudinal bracing rail 6 are respectively fixed on institute
On the link 9 stated.As such, it is possible to strengthen the strength and stiffness of drain grating bar 3 to greatest extent, decrease drain grating bar and broken
Bad probability, is easy to later stage maintenance and manages.Further, in order to increase described pre-buried frame 8 in described water intaking aperture 2 periphery
The reliability being fixedly mounted with concrete foundation, described fixing device 4 also includes dowel 10, and described pre-buried frame 8 passes through described
Dowel 10 is packed in the concrete foundation of described water intaking aperture 2 periphery.
And in order to avoid cobble, gravel, sand, withered tree and the megalith especially cobble, the gravel that carry in current to greatest extent
Drain grating bar 3 described in stone and husky blocking, it is fixed by two pieces of bar battens 11 and one that described drain grating bar 3 is arranged to by the application
The structure that position reinforcing bar 12 is constituted, and the bar batten 11 described in two pieces is arranged on its cross section up big and down small chevron shaped
Structure, described spacer bar 12 is arranged in the opening of described chevron shaped structure along its length, and by this opening end seal
Close.So, along in water (flow) direction, the water gap excessively of described drain grating bar 3 just can form up-small and down-big flared structure,
As long as the upper surface of the drain grating bar 3 that the cobble carrying in current, gravel, sand, withered tree and megalith pass through, just can be directly entered
Without blocking drain grating bar 3 in water intaking gallery, it is particularly advantageous for passing through of silt, the avoiding of maximum limit delivers the stifled of dirty grizzly bar 3 for sale
Plug.Meanwhile, in order to avoid being hindered the cobble being relatively large in diameter connecing, gravel by drain grating bar 3, especially megalith is put and is stayed drain grating bar
Silt and the less cobble of diameter, the accumulation of gravel is caused, described water intaking aperture 2 is arranged and is in by the application on the whole on 3
The form of inclined downstream is arranged in the structure on described water intaking gallery grille bottom dam 1, and described drain grating bar 3 passes through described
Fixing device 4 be arranged on described water intaking aperture 2 with what described water intaking aperture 2 angle of inclination was adapted.So, in current
Carry just can not can move out described drain grating bar 3 with fast speed by drain grating bar 3 cobble, gravel and megalith,
The drain grating bar 3 that avoids of limits is blocked.
Claims (5)
1. a kind of water intaking structure for the debris flow activity region hydraulic engineering, including taking in water intaking gallery grille bottom dam (1)
Water orifice (2) and the drain grating bar (3) that is arranged on this water intaking aperture (2) it is characterised in that:Described water intaking structure also includes
For fixing the fixing device (4) of described drain grating bar (3), described drain grating bar (3) can by described fixing device (4)
That dismantles is arranged on described water intaking aperture (2),
Described water intaking structure also includes grizzly bar and installs strengthening frame (5), is fixed on described on described grizzly bar installation strengthening frame (5)
Drain grating bar (3) is detachably arranged on described water intaking aperture (2) by described fixing device (4),
Described grizzly bar installs strengthening frame (5) by longitudinal bracing rail (6) with the horizontal stroke that is packed on described longitudinal bracing rail (6)
Constitute to reinforcing rail (7), described drain grating bar (3) is arranged on described grizzly bar by described horizontal reinforcing rail (7)
Strengthening frame is installed(5)On, described grizzly bar installs strengthening frame (5) by described longitudinal bracing rail (6) and described fixation
Device (4) is fixedly connected.
2. the water intaking structure for the debris flow activity region hydraulic engineering according to claim 1 it is characterised in that:Described
Fixing device (4) include pre-buried frame (8) and the link (9) that is detachably arranged on described pre-buried frame (8), described is pre-
Bury frame (8) to be packed in the concrete foundation of described water intaking aperture (2) periphery, two ends of described drain grating bar (3) and described vertical
Respectively it is fixed on described link (9) to the two ends of supporting rail (6).
3. the water intaking structure for the debris flow activity region hydraulic engineering according to claim 2 it is characterised in that:Described
Fixing device (4) also include dowel (10), described pre-buried frame (8) is packed in described water intaking hole by described dowel (10)
In the concrete foundation of mouth (2) periphery.
4. the water intaking structure for the debris flow activity region hydraulic engineering according to claim 1,2 or 3, its feature exists
In:Described drain grating bar (3) is made up of two pieces of bar battens (11) and a spacer bar (12), the bar batten described in two pieces
(11) up big and down small chevron shaped structure is arranged on its cross section, described spacer bar (12) is arranged along its length
In the opening of described chevron shaped structure, and this opening is closed.
5. the water intaking structure for the debris flow activity region hydraulic engineering according to claim 4 it is characterised in that:Described
Water intaking aperture (2) be in that the form of inclined downstream is arranged on described water intaking gallery grille bottom dam (1) on the whole, described
Drain grating bar (3) is by being arranged on of being adapted of described fixing device (4) and described water intaking aperture (2) angle of inclination described
In water intaking aperture (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510392610.5A CN104988888B (en) | 2015-07-06 | 2015-07-06 | Water obtaining structure for water works of debris flow activity regions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510392610.5A CN104988888B (en) | 2015-07-06 | 2015-07-06 | Water obtaining structure for water works of debris flow activity regions |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104988888A CN104988888A (en) | 2015-10-21 |
CN104988888B true CN104988888B (en) | 2017-02-22 |
Family
ID=54300770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510392610.5A Active CN104988888B (en) | 2015-07-06 | 2015-07-06 | Water obtaining structure for water works of debris flow activity regions |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104988888B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113494068B (en) * | 2021-07-26 | 2022-07-26 | 四川大学工程设计研究院有限公司 | Device for eliminating blockage of water intake of bottom grid dam |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1065305A (en) * | 1991-03-25 | 1992-10-14 | 黄国宏 | The partition method of silt dirt in water conservancy, the hydroelectric project |
CN201010882Y (en) * | 2007-03-29 | 2008-01-23 | 昆明琢石机电有限责任公司 | Water surface cleaning device |
CN101260662A (en) * | 2007-03-06 | 2008-09-10 | 上海市南洋模范中学 | Detachable type sewage-barrier and method of use thereof |
JP2009068292A (en) * | 2007-09-14 | 2009-04-02 | Mitsuo Yamamoto | Zigzag-arranged bar screen for river intake works |
CN204753540U (en) * | 2015-07-06 | 2015-11-11 | 中国电建集团成都勘测设计研究院有限公司 | Multiple regional water conservancy project engineering of mud -rock flow is with water intaking structure |
-
2015
- 2015-07-06 CN CN201510392610.5A patent/CN104988888B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1065305A (en) * | 1991-03-25 | 1992-10-14 | 黄国宏 | The partition method of silt dirt in water conservancy, the hydroelectric project |
CN101260662A (en) * | 2007-03-06 | 2008-09-10 | 上海市南洋模范中学 | Detachable type sewage-barrier and method of use thereof |
CN201010882Y (en) * | 2007-03-29 | 2008-01-23 | 昆明琢石机电有限责任公司 | Water surface cleaning device |
JP2009068292A (en) * | 2007-09-14 | 2009-04-02 | Mitsuo Yamamoto | Zigzag-arranged bar screen for river intake works |
CN204753540U (en) * | 2015-07-06 | 2015-11-11 | 中国电建集团成都勘测设计研究院有限公司 | Multiple regional water conservancy project engineering of mud -rock flow is with water intaking structure |
Also Published As
Publication number | Publication date |
---|---|
CN104988888A (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100794922B1 (en) | The beam creen rhombic dam which h-steel and screen are combined | |
CN109653163A (en) | River Chip entrapment structure | |
CN204510188U (en) | One is checked winds and fixed drifting sand system | |
CN104988888B (en) | Water obtaining structure for water works of debris flow activity regions | |
CN103343690B (en) | Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer | |
CN110344374A (en) | Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam | |
CN104674781A (en) | Wind prevention and sand fixation system and method | |
CN207904879U (en) | A kind of Debris Flow on Slope Surface improvement integration engineering structure | |
CN204551491U (en) | A kind of side slope protection greening structure | |
CN204753540U (en) | Multiple regional water conservancy project engineering of mud -rock flow is with water intaking structure | |
CN206581137U (en) | A kind of drainage system device for Highway in Loess Area bridge | |
CN106677806B (en) | A kind of tubular type canopy frame support structure for underworkings, tunnel | |
CN209397564U (en) | A kind of assembled pile foundation wharfs structure | |
CN202482782U (en) | Doublet sand resistance structure for road protection in sandstorm area | |
CN206016821U (en) | Frame-type subdrain system tunnel lining structure | |
CN208183765U (en) | A kind of ecotype slope protection system | |
CN215630021U (en) | Highway bridge construction foundation ditch protector | |
CN110387835A (en) | Assembled dredges sand stop wall | |
KR101313868B1 (en) | A debris barrier with plural empty structure | |
KR101747423B1 (en) | Freestanding net system to prevent debris flow | |
CN105507210B (en) | The domatic steel facing assembled steel-structure dam of low-angle length | |
CN105545356B (en) | Bored tunnel bottom plate drainage sunk well | |
CN208167639U (en) | A kind of hydraulic engineering ecological supporting structure | |
KR101131814B1 (en) | Rhombic dam using light weight steel and rock | |
JP6692379B2 (en) | dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |