CN104988851A - 预应力空心板梁端气囊加固施工方法 - Google Patents

预应力空心板梁端气囊加固施工方法 Download PDF

Info

Publication number
CN104988851A
CN104988851A CN201510246638.8A CN201510246638A CN104988851A CN 104988851 A CN104988851 A CN 104988851A CN 201510246638 A CN201510246638 A CN 201510246638A CN 104988851 A CN104988851 A CN 104988851A
Authority
CN
China
Prior art keywords
air bag
concrete
construction method
hollow slab
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510246638.8A
Other languages
English (en)
Inventor
袁静
方威
王敬东
黄亚军
胡振辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201510246638.8A priority Critical patent/CN104988851A/zh
Publication of CN104988851A publication Critical patent/CN104988851A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种预应力空心板梁端气囊加固施工方法,在梁端开孔并设置气囊,梁体内四周浇筑自流平混凝土,增大截面面积,提高桥梁承载能力。本发明原理简单、可行性强、实用性强、成本较低,工艺成熟,质量和进度易于控制。

Description

预应力空心板梁端气囊加固施工方法
技术领域
本发明涉及一种改善桥梁使用性能的施工方法,更具体地说是采用梁端气囊加固增大截面提高梁体承载能力的方法。
背景技术
随着世界上许多发达国家公路网的日趋完善,新建公路、桥梁逐渐减少,已建公路桥梁的维修、养护、加固、改造已成为交通部门的工作重心。桥梁加固的方法有很多,如增大截面法、横向联系法、体外预应力法、换板法等。采用增大截面法加固时通常需要在构件外表面搭设模板,施工工艺复杂,难度较大,加固效果也难以保证。而对于面大量广的空心板桥,由于铰缝尺寸小,一般通过增大空心板顶板的厚度提高承载力,这种方法难以发挥增大截面法加固的优势。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种预应力空心板梁端气囊加固施工方法,其构造简单,成本较低,工艺成熟,质量和进度易于控制,具有广泛的推广应用前景。
本发明为解决技术问题采用如下技术方案:
预应力空心板梁端气囊加固施工方法,在梁端开孔并设置气囊,梁体内四周浇筑自流平混凝土,增大截面面积,提高桥梁承载能力,具体施工方法为:
采用空压机、风镐在空心板顶板开下人孔,人孔尺寸为0.5m×0.6m,布置在增大截面加固长度中间位置,开孔时注意保留原钢筋,钢筋截断后向四周弯起,采用水钻在两侧设置排气孔,直径4cm,在气囊两端的相对高程较大端附近布置;气囊加固3m范围两端端部采用24砖墙进行封堵,在气囊底面每隔40cm放置一道横撑,根据气囊横向位置在横撑上方布置φ12U型定位钢筋,定位钢筋用扎丝绑扎在横撑钢筋上,防止浇筑混凝土时气囊内模上浮和偏位,利用高压水枪对空心板内部杂物冲洗并湿润孔壁表面,然后在空心板内壁喷涂混凝土界面剂,以加强新旧混凝土的结合;浇筑底板自流平混凝土,第一次浇筑自流平混凝土高度为10cm,将气囊由下人孔放入,然后用空压机进行充气使气囊展开,形成内模,气压控制值为2MPa±0.5MPa,第二次浇筑自流平混凝土厚度为40cm,浇筑过程中要随时检查气囊是否漏气、混凝土塌落度、扩展度是否符合要求,浇筑采用溜槽避免混凝土离析,间隔15分钟左右,第三次浇筑自流平混凝土至顶板钢筋下平面并覆盖气囊,开孔钢筋连接后浇筑至顶面,抹面收光,施工过程观察排气孔混凝土溢出情况,正常溢出则表明混凝土浇筑饱满、密实;待养生结束后,粘贴750mm×1000mm×6mm的补强钢板,施工前钢板顶、底面需打磨、除锈,底面粘胶必须饱满,顶面设弯钩钢筋,有利于与铺装连接。
为增大梁体截面,采用梁端气囊的加固方法,有效提高其承载能力和刚度。
与已有技术相比,本发明有益效果体现在:
1、不需要搭设模板,相比仅通过增大顶板以增大截面,更能提高承载能力。
2、本发明原理,简单、可行性强、实用性强成本较低,工艺成熟,质量和进度易于控制。
附图说明
图1为空心板梁端气囊加固施工流程图;
图2为空心板梁端气囊加固平面示意图;
图3为空心板梁端气囊加固立面示意图。
图中标号:1:人孔;2:24砖墙;3:定位钢筋;4:气囊;5:补强钢板;6:第一次浇筑自流平混凝土;7:第二次浇筑自流平混凝土;8:第三次浇筑自流平混凝土。
具体实施方式
参见附图,预应力空心板梁端气囊加固施工方法,在梁端开孔并设置气囊,梁体内四周浇筑自流平混凝土,增大截面面积,提高桥梁承载能力,具体施工方法为:
采用空压机、风镐在空心板顶板开下人孔1,人孔1尺寸为0.5m×0.6m,布置在增大截面加固长度中间位置,开孔时注意保留原钢筋,钢筋截断后向四周弯起,采用水钻在两侧设置排气孔,直径4cm,在气囊4两端的相对高程较大端附近布置;气囊4加固3m范围两端端部采用24砖墙2进行封堵,在气囊底面每隔40cm放置一道横撑,根据气囊横向位置在横撑上方布置φ12U型定位钢筋3,定位钢筋用扎丝绑扎在横撑钢筋上,防止浇筑混凝土时气囊内模上浮和偏位,利用高压水枪对空心板内部杂物冲洗并湿润孔壁表面,然后在空心板内壁喷涂混凝土界面剂,以加强新旧混凝土的结合;浇筑底板自流平混凝土,第一次浇筑自流平混凝土6高度为10cm,将气囊由下人孔放入,然后用空压机进行充气使气囊展开,形成内模,气压控制值为2MPa±0.5MPa,第二次浇筑自流平混凝土7厚度为40cm,浇筑过程中要随时检查气囊是否漏气、混凝土塌落度、扩展度是否符合要求;浇筑采用溜槽避免混凝土离析,间隔15分钟左右,第三次浇筑自流平混凝土8至顶板钢筋下平面并覆盖气囊,开孔钢筋连接后浇筑至顶面,抹面收光,施工过程观察排气孔混凝土溢出情况,正常溢出则表明混凝土浇筑饱满、密实;待养生结束后,粘贴750mm×1000mm×6mm的补强钢板5,施工前钢板顶、底面需打磨、除锈,底面粘胶必须饱满,顶面设弯钩钢筋,有利于与铺装连接。
为增大梁体截面,采用梁端气囊的加固方法,有效提高其承载能力和刚度。
施工工艺特点:
定制气囊内模时需选用合适厚度及牢固性的材料,避免施工时发生破损。顶板开孔时应尽量保留原钢筋,钢筋截断位置应错开。为了不影响后续混凝土浇筑的连续性和施工干扰,气囊安装后、二次浇筑混凝土前进行绑焊连接,单面焊接长度不小于10d,并采用双层润湿土工布覆盖气囊,避免烧坏气囊。浇筑底板混凝土前清理可在梁底板水平较低位置钻孔,高压水枪冲洗后杂物从小孔中排出。钻孔大小宜为4cm,并根据设计图纸避开钢绞线位置。混凝土浇筑前进行开口彩条布覆盖,避免长时间未浇筑顶层混凝土造成灰尘污染。二次浇筑混凝土前应检查气囊压力,通过观察气压表读数,气压不够时进行补压,确保施工质量。自流平混凝土从原材料、配合比到拌合、浇筑全过程应由专业试验设计、审批、检查,保证混凝土塌落度、扩展度及强度满足要求。严格控制外加剂的添加数量,掺量减小会造成坍落度、扩展度、膨胀效果差,掺量增大会产生浮浆增多,不利于混凝土密实和层间结合。顶层混凝土浇筑完毕前通过排气孔观察浇筑效果,如因气囊或混凝土等原因造成漏气、跑模、混凝土不密实、空洞,及时处理。梁端气囊加固时,桥面铺装已破除,混凝土罐车运输时一次运输8方以下为宜,车轮位置保证在梁板中间,避免造成梁板破损或倾覆。

Claims (2)

1.预应力空心板梁端气囊加固施工方法,在梁端开孔并设置气囊,梁体内四周浇筑自流平混凝土,增大截面面积,提高桥梁承载能力,具体施工方法为:
采用空压机、风镐在空心板顶板开下人孔,人孔尺寸为0.5m×0.6m,布置在增大截面加固长度中间位置,开孔时注意保留原钢筋,钢筋截断后向四周弯起,采用水钻在两侧设置排气孔,直径4cm,在气囊两端的相对高程较大端附近布置;气囊加固3m范围两端端部采用24砖墙进行封堵,在气囊底面每隔40cm放置一道横撑,根据气囊横向位置在横撑上方布置φ12U型定位钢筋,定位钢筋用扎丝绑扎在横撑钢筋上,防止浇筑混凝土时气囊内模上浮和偏位,利用高压水枪对空心板内部杂物冲洗并湿润孔壁表面,然后在空心板内壁喷涂混凝土界面剂,以加强新旧混凝土的结合;浇筑底板自流平混凝土,第一次浇筑自流平混凝土高度为10cm,将气囊由下人孔放入,然后用空压机进行充气使气囊展开,形成内模,气压控制值为2MPa±0.5MPa,第二次浇筑自流平混凝土厚度为40cm,浇筑过程中要随时检查气囊是否漏气、混凝土塌落度、扩展度是否符合要求,浇筑采用溜槽避免混凝土离析,间隔15分钟左右,第三次浇筑自流平混凝土至顶板钢筋下平面并覆盖气囊,开孔钢筋连接后浇筑至顶面,抹面收光,施工过程观察排气孔混凝土溢出情况,正常溢出则表明混凝土浇筑饱满、密实;待养生结束后,粘贴750mm×1000mm×6mm的补强钢板,施工前钢板顶、底面需打磨、除锈,底面粘胶必须饱满,顶面设弯钩钢筋,有利于与铺装连接。
2.根据权利要求1所述的预应力空心板梁端气囊加固施工方法,其特征是:为增大梁体截面,采用梁端气囊的加固方法,有效提高其承载能力和刚度。
CN201510246638.8A 2015-05-14 2015-05-14 预应力空心板梁端气囊加固施工方法 Pending CN104988851A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510246638.8A CN104988851A (zh) 2015-05-14 2015-05-14 预应力空心板梁端气囊加固施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510246638.8A CN104988851A (zh) 2015-05-14 2015-05-14 预应力空心板梁端气囊加固施工方法

Publications (1)

Publication Number Publication Date
CN104988851A true CN104988851A (zh) 2015-10-21

Family

ID=54300733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510246638.8A Pending CN104988851A (zh) 2015-05-14 2015-05-14 预应力空心板梁端气囊加固施工方法

Country Status (1)

Country Link
CN (1) CN104988851A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836018A (zh) * 2016-12-27 2017-06-13 中冶建筑研究总院有限公司 预制空心板桥的底面纵向开裂加固方法
CN107447610A (zh) * 2017-06-11 2017-12-08 中铁二院工程集团有限责任公司 一种高速铁路路桥过渡段结构及构筑方法
CN109555008A (zh) * 2019-01-18 2019-04-02 山东省交通科学研究院 空心板梁抗剪加固用模板及其施工方法
CN109706853A (zh) * 2019-01-11 2019-05-03 济南城建集团有限公司 一种封堵板及用其进行空心板腹孔内注浆的施工方法
CN111021263A (zh) * 2020-01-15 2020-04-17 贵州建工集团第二建筑工程有限责任公司 一种预应力简支空心板梁橡胶芯模施工方法
CN111172897A (zh) * 2020-01-09 2020-05-19 杜雷 一种空心板梁桥的加固方法
CN111546488A (zh) * 2020-05-11 2020-08-18 武汉市华江幸福装配式建筑有限公司 一种预应力梁板共线生产工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1445422A (zh) * 2003-03-11 2003-10-01 綦玉良 现浇砼空心楼板用充气式内胎模
JP2005220629A (ja) * 2004-02-06 2005-08-18 Tokai Rubber Ind Ltd コンクリート中空床版の部分補修・補強工法
CN102392420A (zh) * 2011-10-31 2012-03-28 刘其伟 预应力混凝土空心板桥底板纵向裂缝灌浆加固方法
CN103993750A (zh) * 2014-05-16 2014-08-20 河南省交通工程加固有限责任公司 一种工程用空心构件的加固方法
CN203846406U (zh) * 2014-05-16 2014-09-24 河南省交通工程加固有限责任公司 一种桥梁加固用气囊内模

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1445422A (zh) * 2003-03-11 2003-10-01 綦玉良 现浇砼空心楼板用充气式内胎模
JP2005220629A (ja) * 2004-02-06 2005-08-18 Tokai Rubber Ind Ltd コンクリート中空床版の部分補修・補強工法
CN102392420A (zh) * 2011-10-31 2012-03-28 刘其伟 预应力混凝土空心板桥底板纵向裂缝灌浆加固方法
CN103993750A (zh) * 2014-05-16 2014-08-20 河南省交通工程加固有限责任公司 一种工程用空心构件的加固方法
CN203846406U (zh) * 2014-05-16 2014-09-24 河南省交通工程加固有限责任公司 一种桥梁加固用气囊内模

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
云飞扬12334: "旧桥加固技术150325", 《百度文库》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836018A (zh) * 2016-12-27 2017-06-13 中冶建筑研究总院有限公司 预制空心板桥的底面纵向开裂加固方法
CN107447610A (zh) * 2017-06-11 2017-12-08 中铁二院工程集团有限责任公司 一种高速铁路路桥过渡段结构及构筑方法
CN109706853A (zh) * 2019-01-11 2019-05-03 济南城建集团有限公司 一种封堵板及用其进行空心板腹孔内注浆的施工方法
CN109706853B (zh) * 2019-01-11 2024-04-26 济南城建集团有限公司 一种封堵板及用其进行空心板腹孔内注浆的施工方法
CN109555008A (zh) * 2019-01-18 2019-04-02 山东省交通科学研究院 空心板梁抗剪加固用模板及其施工方法
CN111172897A (zh) * 2020-01-09 2020-05-19 杜雷 一种空心板梁桥的加固方法
CN111021263A (zh) * 2020-01-15 2020-04-17 贵州建工集团第二建筑工程有限责任公司 一种预应力简支空心板梁橡胶芯模施工方法
CN111546488A (zh) * 2020-05-11 2020-08-18 武汉市华江幸福装配式建筑有限公司 一种预应力梁板共线生产工艺

Similar Documents

Publication Publication Date Title
CN104988851A (zh) 预应力空心板梁端气囊加固施工方法
CN207484964U (zh) 混凝土浇筑施工中后浇带处侧模结构
CN103774561B (zh) 高速公路预制小箱梁工装法流水化作业施工
CN207003479U (zh) 一种现浇城市综合管廊整体模架体系
CN207616844U (zh) 基础承台预制混凝土侧模及成型装置
CN108582466A (zh) 一种预制箱梁钢筋笼胎具
CN106193588A (zh) 一种浇筑建筑物后浇带的方法及浇筑模
CN107630565A (zh) 一种封闭外墙洞口的方法及其设备
CN200999409Y (zh) 一种预制薄板现浇叠合空心楼板
CN105064500B (zh) 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法
CN110485636A (zh) 一种空腔框架柱及其成型方法
CN207685849U (zh) 一种混凝土预制承台的连接结构
CN204662742U (zh) 一种坡屋顶活动式面层施工结构
CN204491412U (zh) 一种新型空心板铰缝结构
CN111379418B (zh) 一种超长不设缝混凝土结构及其施工方法
CN101173728B (zh) 一种砼填充用薄壁管
CN205466673U (zh) 一种混凝土浮箱成型模具
CN209584813U (zh) 框架桥系统
CN104453235B (zh) 换流站防火墙施工工艺
CN104746434B (zh) 一种不拆除外模的合龙段模板系统
CN106836592A (zh) 部分预制装配式后叠合空心楼盖
CN102936953A (zh) “大”字型劲钢结构模板施工方法
CN109826117A (zh) 电动滑模无拉杆整体通涵墙身浇筑模板台车
CN205400050U (zh) 一种薄壁方箱空心楼盖芯模
CN208668745U (zh) 一种空心楼盖大尺寸芯模结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication