CN104988572B - Plating line steel ball recovery system - Google Patents

Plating line steel ball recovery system Download PDF

Info

Publication number
CN104988572B
CN104988572B CN201510454643.8A CN201510454643A CN104988572B CN 104988572 B CN104988572 B CN 104988572B CN 201510454643 A CN201510454643 A CN 201510454643A CN 104988572 B CN104988572 B CN 104988572B
Authority
CN
China
Prior art keywords
steel ball
sorting
plating
bar
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510454643.8A
Other languages
Chinese (zh)
Other versions
CN104988572A (en
Inventor
宋藜
俞雄飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Ganghai Electroplating Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510454643.8A priority Critical patent/CN104988572B/en
Publication of CN104988572A publication Critical patent/CN104988572A/en
Application granted granted Critical
Publication of CN104988572B publication Critical patent/CN104988572B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electroplating Methods And Accessories (AREA)

Abstract

The invention discloses a kind of plating line steel ball recovery system, it gathers and the collecting mechanism (2) of mounted box and the transport mechanism (3) that the steel ball for gathering completion is back to plating line feeding station including the discharge end located at plating line for the steel ball for separating the separating mechanism (1) of product and steel ball, completing separation, it is characterised in that:The discharge end of the transport mechanism (3) is provided with the separator (4) that sorts steel ball by diameter and by the excessive de-plating device (5) for scrapping the coated metal removal of steel ball top layer of the diameter sub-elected.The present invention provides one kind and steel ball can be screened, and the plating line steel ball recovery system that can be recycled the discarded steel ball of the super technique initialization higher limit of diameter again.

Description

Plating line steel ball recovery system
Technical field
The present invention relates to the technical field of plating line auxiliary equipment, a kind of specifically plating line steel ball recovery system.
Background technology
There is a kind of barrel plating technique in electroplating technology, its electroplating process is that a number of product is placed in into rolling in simple terms In cylinder, product is immersed in plating solution with roller, is led by the anode set in the negative electrode and bath trough that are set on roller Coated metal in bath trough, is thus plated on product surface by electricity.While the coating effect in order to improve product, is generally required It is built into roller and a certain amount of accompanies plating steel ball, i.e. product surface is increased by steel ball and discharged compactness, so as to be conducive to product The deposition of overlay coating.
The barrel plating technique of above-mentioned prior art, it accompanies the steel ball of plating to be separated in the discharge end of plating line with product, So as to be recycled, but it is due to that plating line has more groove position, therefore discharge end and feed end are distant, and steel The weight of pearl is larger, and relying solely on operating personnel's carrying, not only labor intensity is big, and is easily damaged steel ball circulation magazine.
In addition, as steel ball recycles the increase of number of times, the diameter of steel ball is the thickness increasing with ball surfaces coating Plus and gradually increase, can only do when the diameter of steel ball exceedes technological requirement higher limit and scrap processing, but same plating ring Diameter change degree of the border similarly hereinafter between the steel ball of batch is inconsistent, and in the prior art in order to ensure product quality often The processing mode for taking same batch all to scrap, it is clear that this can cause a large amount of steel balls to waste.
The content of the invention
The technical problems to be solved by the invention are:There is provided one kind can screen to steel ball, and can be by the super work of diameter The plating line steel ball recovery system that the discarded steel ball of skill setting higher limit is recycled again.
The technical solution used in the present invention is:A kind of plating line steel ball recovery system is provided, it includes being located at plating line The discharge end steel ball that is used to separating the separating mechanism of product and steel ball, complete separation gather and the collecting mechanism of mounted box and The steel ball for gathering completion is back to the transport mechanism of plating line feeding station, the discharge end of the transport mechanism is provided with steel ball The separator that is sorted by diameter and by the diameter sub-elected it is excessive scrap the strip that steel ball top layer coated metal is removed Device.
Described separator includes frame, and the batch feeding end and level height in frame are less than the discharge end of batch feeding end, Connected between the batch feeding end and discharge end by a sorting bar group being obliquely installed, each sorting bar in the sorting bar group etc. Spacing be arranged in parallel, is provided with below the sorting bar group and is being less than or equal to the steel ball in adjacent sorting bar gap just for collecting diameter The waste product for being used for collecting the steel ball that diameter is more than adjacent sorting bar gap is provided with below normal product collecting box, the outlet of the discharge end Collecting box.The continuous sorting of steel ball can be realized by sorting bar group, operating personnel only need to steel ball putting into feed end Steel ball sorting is completed, it is simple and practical, without extra dynamical system.
The sorting bar includes sleeve pipe and two core bars being placed in sleeve pipe, and sleeve pipe both sides are arranged with strip opening, The width of strip opening is less than the diameter of core bar, the side of the lateral walls of two core bars respectively with each self-corresponding strip opening Edge leans, and a part for core bar lateral wall is located at outside the outer surface of sleeve pipe, and one is inserted between two core bars makes the outer of core bar Side wall is close to the fixture block of strip opening, and lateral wall of the fixture block respectively with two core bars leans.Pass through setting for sleeve pipe and core bar Meter, can increase the intensity of sorting bar, it is ensured that the dimensional accuracy in adjacent sorting bar gap.Also allow for changing and repair simultaneously.
Described batch feeding end is a feeding platform, and the side of feeding platform is connected with sorting the upper end of bar group, fed intake flat Platform is equipped with the rib that extends upward on the side in addition to bar group side is sorted, the top of the feeding platform be provided with into Funnel, the discharging opening of loading hopper is in the opening of flat.
Described de-plating device includes being provided with the plating with treating strip ball surfaces in the electroplating bath for filling electroplate liquid, electroplating bath The consistent cathode block of composition of layer and the container that strip steel ball is treated for housing, container are provided with the mesh penetrated into for plating solution, container It is interior provided with the anode conducting head being connected with the positive pole of power supply, strip steel ball is contradicted anode conducting head with treating in container.Pass through De-plating device, can be very good the exceeded steel ball of diameter carrying out secondary recovery utilization, also, also can for ball surfaces plating Layer is recycled.It is noted that the metal of coating is often costly, can be significantly by the recovery of coating Reduce enterprise's production cost.
After above structure, plating line steel ball recovery system of the invention has advantages below compared with prior art: First, the labor intensity that operating personnel carry can be reduced by transport mechanism, steel ball can be realized secondly by separator Sorted by diameter, improve the utilization rate of steel ball, reduced the cost of steel ball input, finally, one can be entered by de-plating device Step improves the utilization rate of steel ball, while can be reclaimed the coated metal of ball surfaces, reduces enterprise's production cost.
Brief description of the drawings
Fig. 1 is the structural representation of the plating line steel ball recovery system of the present invention.
Fig. 2 is the structural representation of the separator part of the present invention.
Fig. 3 is the partial schematic diagram of the sorting bar group part in " A " direction in Fig. 2.
Fig. 4 is the viewgraph of cross-section of any sorting bar in Fig. 3.
Fig. 5 is the structural representation of the de-plating device of the present invention.
Fig. 6 is the connection diagram of the loading hopper of transport mechanism of the present invention and separator.
Fig. 7 is Fig. 6 another working state schematic representation.
Fig. 8 is the structural representation of circulation material basket in Fig. 7.
Wherein, 1, separating mechanism, 2, collecting mechanism, 3, transport mechanism, 4, separator, 5, de-plating device, 5.1, electroplating bath, 5.2nd, cathode block, 5.3, container, 5.4, power supply, 6, frame, 7, batch feeding end, 7.1, feeding platform, 7.2, rib, 7.3, charging leakage Bucket, 8, discharge end, 9, sorting bar group, 9.1, sorting bar, 9.1.1, sleeve pipe, 9.1.2, core bar, 9.1.3, strip opening, 9.1.4, fixture block, 10, normal product collecting box, 11, waste collection case, 12, circulation magazine, 12.1, closure, 13, transition flat board, 14th, normal product steel ball region, 15, plating line, 15.1, feeding station, 16, roller, 17, chimb;
L is the width of strip opening, and D is the diameter of core bar.
Embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
As illustrated, the present invention provides a kind of plating line steel ball recovery system, it includes using located at the discharge end of plating line In separation product and the separating mechanism 1 of steel ball, the steel ball for completing separation is gathered the simultaneously collecting mechanism 2 of mounted box and will gathered Into steel ball be back to the transport mechanism 3 of plating line feeding station, it is characterised in that:The discharge end of the transport mechanism 3 is provided with Separator 4 that steel ball is sorted by diameter and by the diameter sub-elected it is excessive scrap the coated metal removal of steel ball top layer De-plating device 5.
Described separator 4 includes frame 6, and the batch feeding end 7 and level height in frame 6 are less than the discharging of batch feeding end End 8, is connected between the batch feeding end 7 and discharge end 8 by a sorting bar group 9 being obliquely installed, each in the sorting bar group 9 Sorting bar 9.1 equidistantly be arranged in parallel, and the lower section of sorting bar group 9, which is provided with, is used to collect diameter less than or equal to adjacent sorting bar Being provided with below the normal product collecting box 10 of the steel ball in 9.1 gaps, the outlet of the discharge end 8 is used to collect diameter more than adjacent point Select the waste collection case 11 of the steel ball in the gap of bar 9.1.
Above-mentioned being obliquely installed refers to, between the top and bottom of sorting bar group 9 not on same vertical curve, also not same One waterline, in certain angle of inclination, even if steel ball can slowly slide under self gravitation effect along sorting bar group.Certain institute The sorting bar 9.1 in sorting bar group 9 stated equidistantly be arranged in parallel, refers to that sort bar group 9 equidistantly puts down with the sorting bar 9.1 of layer Row is set, when having multilayer in sorting bar group, and the sorting bar 9.1 in its each layer equidistantly be arranged in parallel, the sorting bar of different layers Between spacing be successively to reduce from top to bottom.Thus described discharge end corresponds to the sorting bar of different layers, provided with different Discharging opening.Pass through hierarchical design, it is possible to achieve the multiple batches of steel ball sorting of different-diameter.
The sorting bar 9.1 includes sleeve pipe 9.1.1 and the two core bar 9.1.2, sleeve pipe 9.1.1 that are placed in sleeve pipe 9.1.1 Both sides are arranged with strip opening 9.1.3, and strip opening 9.1.3 width L is less than core bar 9.1.2 diameter D, two cores Edge of the bar 9.1.2 lateral wall respectively with each self-corresponding strip opening 9.1.3 leans, and core bar 9.1.2 lateral walls A part be located at outside sleeve pipe 9.1.1 outer surface, being inserted between two core bar 9.1.2 one makes core bar 9.1.2 lateral wall tight Strip opening 9.1.3 fixture block 9.1.4 is pasted, lateral walls of the fixture block 9.1.4 respectively with two core bar 9.1.2 leans.Due to The length for sorting bar 9.1 is longer, and the weight of steel ball is larger, therefore easily causes the sorting flexural deformation of bar 9.1, so as to influence To the size requirement in sorting bar 9.1 gap.By setting sleeve pipe 9.1.1, two core bar 9.1.2 are made to extend into sleeve pipe 9.1.1, And core bar 9.1.2 a part of lateral wall is stretched out sleeve pipe 9.1.1 by strip opening 9.1.3, can equally realize steel The sorting of pearl, and sleeve pipe 9.1.1, core bar 9.1.2 structural strength are high, even if core bar is damaged, also allow for changing.
Described batch feeding end 7 is a feeding platform 7.1, and the side of feeding platform 7.1 is connected with sorting the upper end of bar group 9 Connect, feeding platform 7.1 is equipped with the rib 7.2 extended upward on the side in addition to the side of bar group 9 is sorted, described to feed intake The top of platform 7.1 is provided with loading hopper 7.3, and the discharging opening of loading hopper 7.3 is in the opening of flat.The loading hopper is consolidated In fixed and frame 6, and loading hopper is in up big and down small horn shape.
Described de-plating device 5 includes being provided with treating strip steel ball in the electroplating bath 5.1 for filling electroplate liquid, electroplating bath 5.1 The consistent cathode block 5.2 of the Coating composition on surface and for the accommodating container 5.3 for treating strip steel ball, container 5.3 is provided with for plating Provided with the anode conducting head being connected with the positive pole of power supply 5.4, anode conducting head and container in the mesh that liquid penetrates into, container 5.3 Strip steel ball is contradicted treating in 5.3.The operation principle of strip is on the basis of normal electroplating technology, will treat strip steel ball Used as coated metal, i.e., as anode, and the metallic plate of coating, thus can be in electric current as negative electrode on plating line Under effect, the coated metal of ball surfaces is set to be transferred on cathode block, and electricity can be used as by gradually electroplating the cathode block for becoming big Positive plate on plate wire is used.Realize that the recycling of steel ball and the secondary recovery of ball surfaces coated metal are utilized.
Power supply needed for above-mentioned plating, rectifier and electric wire, bath composition etc. is that existing electroplating technology is routinely ripe The equipment of knowledge, herein just without repeating, the creation core of this de-plating device 5 of the invention is putting for anode and negative electrode Change.
In addition, the described separating mechanism 1 for being used to separate product and steel ball, including be placed in below plating line discharging station Sorting material basket, sorting material basket is provided with the through hole passed through for steel ball, and the sorting material is just provided with the first transmission belt in the key.
Described collecting mechanism 2, including the defeated high machine located at the end of the first transmission belt, defeated high machine is by the first transmission belt Steel ball raise, and make to fall into material collecting box during the defeated up to peak of steel ball, the discharging opening of the material collecting box is provided with by electromagnetism The circulation magazine 12 for being used for collecting steel ball is provided with below the switch that valve control is regularly opened and closed, material collecting box.
Described transport mechanism is a conveyer belt driven by motor, and described circulation magazine 12 is placed in conveyer belt On.
When the circulation magazine 12 is transported to the feeding station of plating line by conveyer belt, steel is placed in by manipulator clamping Pearl rest area, or pass through manpower transport.As the innovative point of the present invention, described circulation magazine 12 is upper end open Box like structure, the bottom of circulation magazine 12 is provided with discharge port, and discharge port is provided with closure 12.1, the one of the closure 12.1 Side and the bottom surface for the magazine 12 that circulates are hinged.When the circulation magazine 12 is placed on conveyer belt, the closure 12.1 is passed The active force of band is sent, compresses and closes discharge port, and when circulation magazine 12 is sent on the separator 4 of transmission end of tape When, closure 12.1 departs from the constraint of conveyer belt, is opened under the Action of Gravity Field of steel ball, and the steel ball completed in circulation magazine 12 is thrown Put to separator 4.Specifically, a transition is passed through between the charging aperture and conveyer belt of the loading hopper 7.3 on the separator 4 Flat board 13 is connected, and the transition flat board 13 is provided with pushes to loading hopper 7.3 by the circulation magazine 12 taken from transmission Delivery device on charging aperture, the charging aperture of the loading hopper 7.3 is provided with the chimb 17 for being used for lifting circulation magazine 12, convex While 17 with the four of circulation magazine 12 bottom surface while lean.When circulation magazine 12 slips into loading hopper in the presence of delivery device 7.3, and be erected at by the chimb 17 on loading hopper 7.3 on the charging aperture of loading hopper 7.3, and the circulation magazine 12 Closure 12.1 on discharge port departs from the constraint of conveyer belt and transition flat board 13, completes automatic discharging.
The present invention provides a kind of method that plating line steel ball is reclaimed:
Step 1, the product roller 16 for electroplating completion are opened, and pass through the separation that separating mechanism 1 carries out product and steel ball.
Step 2, the steel ball for completing separation are gathered by collecting mechanism 2 and loaded in batches in circulation magazine 12.
Step 3, by transport mechanism 3 by circulate magazine 12 connect the feeding station 15.1 that steel ball is transported to plating line 15.
Step 4, by separator 4 by circulate magazine 12 in steel ball sorted by the diameters of technological requirement.
Step 5, the qualified steel ball of diameter is positioned in normal product steel ball region 14, the underproof steel ball of diameter is put into In de-plating device 5, the strip of ball surfaces coating is completed.
Step 6, the steel ball for completing strip are cleaned, and carry out secondary sorting by separator 4, qualified, are placed in normal product Steel ball region 14, it is unqualified, scrap.
Wherein, above-mentioned steps 1 are specially that sorting material basket is placed in below plating line roller, and steel ball is by sorting material basket Sieve aperture is separated with product, and the first transmission belt put in the key located at sorting material, and steel ball is sent into collecting mechanism.
Above-mentioned steps 2 are in particular on the charging aperture that defeated high machine is provided with below the discharging opening of the first transmission belt, defeated high machine Conveyer belt raises steel ball, and falls into the material collecting box below defeated high machine discharge end, magnetic valve and controller in material collecting box Control is opened and closed, and is completed steel ball and is supplied by beat.Provided with the circulation magazine for holding steel ball below the material collecting box.
Above-mentioned steps 3 are in particular to circulate magazine under the drive of conveyer belt, are transported to the feeding station of plating line.
Above-mentioned steps 4 are in particular that the steel ball circulated in magazine is put on the feed end of separator, and by sorting bar group Carry out diameter sorting, the normal product collecting box that qualified steel ball is fallen into from the gap of sorting bar group below sorting bar group Interior, underproof steel ball is then detained in sorting bar group, and is fallen into by discharge end in waste collection case.
Preferred embodiments of the present invention are described above, but are not to be construed as limiting the scope of the invention.This hair Bright to be not only limited to above example, its concrete structure allows to change, all institutes in the protection domain of demand for independence of the present invention The various change of work is within the scope of the present invention.

Claims (3)

1. a kind of plating line steel ball recovery system, the discharge end that it includes being located at plating line is used for the separation for separating product and steel ball Mechanism (1), make separation complete steel ball gather and the collecting mechanism (2) of mounted box and by gather completion steel ball be back to plating The transport mechanism (3) of line feeding station, it is characterised in that:The discharge end of the transport mechanism (3) is provided with steel ball is big by diameter The separator (4) of small sorting and by the diameter sub-elected it is excessive scrap the de-plating device that steel ball top layer coated metal is removed (5);
Described separator (4) includes frame (6), and the batch feeding end (7) and level height in frame (6) are less than batch feeding end Discharge end (8), is connected, described point between the batch feeding end (7) and discharge end (8) by a sorting bar group (9) being obliquely installed Each sorting bar (9.1) in bar group (9) is selected equidistantly to be arranged in parallel, being provided with below the sorting bar group (9) is used to collect diameter Less than or equal to the normal product collecting box (10) of the steel ball in adjacent sorting bar (9.1) gap, the outlet lower section of the discharge end (8) Provided with for collecting the waste collection case (11) that diameter is more than the steel ball in adjacent sorting bar (9.1) gap;
The sorting bar (9.1) includes sleeve pipe (9.1.1) and two core bars (9.1.2) being placed in sleeve pipe (9.1.1), sleeve pipe (9.1.1) both sides are arranged with strip opening (9.1.3), and the width L of strip opening (9.1.3) is less than core bar (9.1.2) Diameter D, the edge of the lateral walls of two core bars (9.1.2) respectively with each self-corresponding strip opening (9.1.3) leans, And the part of core bar (9.1.2) lateral wall is located at outside the outer surface of sleeve pipe (9.1.1), inserted between two core bars (9.1.2) One makes the lateral wall of core bar (9.1.2) be close to strip opening (9.1.3) fixture block (9.1.4), and fixture block (9.1.4) is respectively with two The lateral wall of individual core bar (9.1.2) leans.
2. plating line steel ball recovery system according to claim 1, it is characterised in that:Described batch feeding end (7) is a throwing Expect platform (7.1), the side of feeding platform (7.1) is connected with the upper end of sorting bar group (9), and feeding platform (7.1) is except sorting The rib (7.2) extended upward, the top of the feeding platform (7.1) are equipped with side beyond bar group (9) side Provided with loading hopper (7.3), the discharging opening of loading hopper (7.3) is in the opening of flat.
3. plating line steel ball recovery system according to claim 1, it is characterised in that:Described de-plating device (5) includes Fill and the negative electrode consistent with treating the Coating composition of strip ball surfaces is provided with the electroplating bath (5.1) of electroplate liquid, electroplating bath (5.1) Block (5.2) and the container (5.3) that strip steel ball is treated for housing, container (5.3) are provided with the mesh penetrated into for plating solution, container (5.3) provided with the anode conducting head being connected with the positive pole of power supply (5.4) in, anode conducting head is moved back with treating in container (5.3) Steel ball is plated to contradict.
CN201510454643.8A 2015-07-29 2015-07-29 Plating line steel ball recovery system Expired - Fee Related CN104988572B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510454643.8A CN104988572B (en) 2015-07-29 2015-07-29 Plating line steel ball recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510454643.8A CN104988572B (en) 2015-07-29 2015-07-29 Plating line steel ball recovery system

Publications (2)

Publication Number Publication Date
CN104988572A CN104988572A (en) 2015-10-21
CN104988572B true CN104988572B (en) 2017-09-29

Family

ID=54300458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510454643.8A Expired - Fee Related CN104988572B (en) 2015-07-29 2015-07-29 Plating line steel ball recovery system

Country Status (1)

Country Link
CN (1) CN104988572B (en)

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2646682A1 (en) * 1976-10-15 1978-04-20 Stettner & Co CONTACT BODY
US4196058A (en) * 1977-11-23 1980-04-01 Stettner & Co. Electrical galvanic bath contact element
US5125515A (en) * 1989-07-18 1992-06-30 Brown International Corp. Fruit sizing apparatus
DE4121158A1 (en) * 1991-06-22 1992-12-24 Tscherwitschke Gmbh Richard Rotary barrel for surface treatment esp. electroplating of small parts - comprises several V=shaped barrel casing segments between longitudinal support ribs
DE4121156A1 (en) * 1991-06-22 1992-12-24 Tscherwitschke Gmbh Richard Rotary barrel for surface treatment of small parts - comprises several V=shaped barrel caging segments between longitudinal support ribs in polygonal barrel section
JP2745892B2 (en) * 1991-09-13 1998-04-28 株式会社村田製作所 How to plating small parts
JP2004307924A (en) * 2003-04-07 2004-11-04 Matsushita Electric Ind Co Ltd Method for plating electronic component
JP3589298B1 (en) * 2003-05-20 2004-11-17 Tdk株式会社 Barrel plating apparatus and design method
JP4358568B2 (en) * 2003-07-18 2009-11-04 釜屋電機株式会社 Electroplating apparatus and electroplating method for electronic parts
CN201016125Y (en) * 2007-03-02 2008-02-06 陈焕宗 Copper ball automatically adding groove
CN101301656A (en) * 2007-05-09 2008-11-12 大连信瑞科技有限公司 Device for scrubbing metal pipe inner wall
CN201140177Y (en) * 2007-11-06 2008-10-29 扬州福尔喜果蔬汁机械有限公司 Fresh fruit roller separator
JP4888468B2 (en) * 2008-10-27 2012-02-29 Tdk株式会社 How to recycle dummy media
CN101736370A (en) * 2008-11-14 2010-06-16 贵阳铝镁设计研究院 Device for eliminating impurities in alumina
CN201404917Y (en) * 2009-05-15 2010-02-17 许荣华 Conveying and grading mechanism of fruit grader
JP5435355B2 (en) * 2009-09-04 2014-03-05 日立金属株式会社 Plating equipment
CN202280996U (en) * 2011-10-31 2012-06-20 张铭泰 Device for conveying liquid yellow phosphorus with pipe
CN103831268A (en) * 2012-11-28 2014-06-04 王海军 Chinese herbal medicine washing machine
CN202954123U (en) * 2012-12-06 2013-05-29 北大方正集团有限公司 Electroplating production line and ball-shaped anode adding and recovering device
CN103170457B (en) * 2013-04-19 2015-09-02 太仓市陆渡镇滚得顺输送设备厂 A kind of steel ball automatic screening packing machine
CN203668542U (en) * 2013-12-17 2014-06-25 安徽大地熊新材料股份有限公司 Electroplating cylinder for magnet
CN203715732U (en) * 2014-03-05 2014-07-16 红板(江西)有限公司 Plating copper ball cleaning device for automatically separating copper balls
CN103820804A (en) * 2014-03-12 2014-05-28 红板(江西)有限公司 Electroplating copper ball cleaning machine
CN204380956U (en) * 2014-11-21 2015-06-10 椿中岛机械(重庆)有限公司 Reciprocating ball selector
CN204491016U (en) * 2015-03-02 2015-07-22 江苏华神电子有限公司 Plating line copper ball feeding device

Also Published As

Publication number Publication date
CN104988572A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN106609383B (en) A kind of stripping zinc for small pole plate electrowinning zinc picks plate and brush board production line and its method
CN106743447A (en) A kind of button automatic sequencing device
CN102784759A (en) Strip metal auto-screening and integrated feeding device
CN211495815U (en) Gravel and sand feed mechanism
CN104975330B (en) Plating line steel ball transferring and discharging mechanism
CN112264431A (en) Smelting processing technology for lead grids of waste lead-acid storage batteries
CN104988572B (en) Plating line steel ball recovery system
CN203108655U (en) Aluminum scrap drying and deironing device
CN203541371U (en) Diode straightening and screening machine
CN216799995U (en) Crushing device for tin ore raw materials
CN203541370U (en) Diode straightening machine with decline distribution runner
CN105312240A (en) Automatic conch grading device
CN216271814U (en) Flower grading and discharging mechanism
CN109141994B (en) Automatic combined sample preparation device
CN206476448U (en) Material box circulates radio and tape player
CN212554775U (en) Automatic material conveyer of shelling of transformer skeleton
CN205668192U (en) A kind of Novel steel ball fine grinding device
CN110961581A (en) Automatic sand core repairing machine and processing method thereof
CN210357989U (en) Multifunctional automatic screening device
CN105170442B (en) Steel ball separator
CN110404781A (en) A kind of residual pipe sorting equipment
CN111036370A (en) Production method of multi-specification steel slag aggregate
CN205169875U (en) Old metal sorting facilities of real time control loading and unloading material
CN206871862U (en) Welding needle type aluminum electrolytic capacitor cover plate feeding vibration disk
CN215587120U (en) Filtering and recycling device of vanadium-nitrogen alloy high-pressure ball making machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Song Li

Inventor after: Yu Xiongfei

Inventor before: Yu Xiongfei

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191107

Address after: No. 3, Chuangye building, 1750 Shengli West Road, Yuhui District, Bengbu, Anhui Province

Patentee after: Bengbu Keze Network Information Technology Co.,Ltd.

Address before: 315177, No. 20, Yu Lin village, Gulin Town, Ningbo, Zhejiang, Yinzhou District

Patentee before: Yu Xiongfei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200813

Address after: 529000 second floor, building 203, new fortune environmental protection electroplating base phase II, yamen Town, Xinhui District, Jiangmen City, Guangdong Province

Patentee after: Jiangmen Ganghai electroplating Co.,Ltd.

Address before: No. 3, Chuangye building, 1750 Shengli West Road, Yuhui District, Bengbu, Anhui Province

Patentee before: Bengbu Keze Network Information Technology Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20210729

CF01 Termination of patent right due to non-payment of annual fee