CN104942214A - Forging technology for race used for large-scale mine vehicle wheel - Google Patents

Forging technology for race used for large-scale mine vehicle wheel Download PDF

Info

Publication number
CN104942214A
CN104942214A CN201410117000.XA CN201410117000A CN104942214A CN 104942214 A CN104942214 A CN 104942214A CN 201410117000 A CN201410117000 A CN 201410117000A CN 104942214 A CN104942214 A CN 104942214A
Authority
CN
China
Prior art keywords
convex shoulder
forging
forging technology
scale mine
seat ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410117000.XA
Other languages
Chinese (zh)
Inventor
赵梦逸
冯娟
赵磊
崔昱
夏旭平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI LONGDI PRECISED FORGINGS Co Ltd
Original Assignee
WUXI LONGDI PRECISED FORGINGS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI LONGDI PRECISED FORGINGS Co Ltd filed Critical WUXI LONGDI PRECISED FORGINGS Co Ltd
Priority to CN201410117000.XA priority Critical patent/CN104942214A/en
Publication of CN104942214A publication Critical patent/CN104942214A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/28Making machine elements wheels; discs
    • B21K1/38Making machine elements wheels; discs rims; tyres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses a forging technology for a race used for a large-scale mine vehicle wheel. The forging technology comprises the steps that 1 rough forging process: the blank is placed into a heating furnace to heat firstly, the heating temperature ranges from 1200 DEG C to 1300 DEG C, and primary chambering is conducted on the blank heated by the heating furnace through a die; 2 refined forging process: secondary chambering is conducted on the blank on the blank on which ring rolling is conducted through the same die, and a forge piece is manufactured. The race forge piece used for the large-scale mine vehicle wheel made by the forging technology provided by the invention has the advantages that the material use is saved, preparation is made for the follow-up thermal treatment, and the quality and performance of the product are guaranteed; two-station ring rolling is achieved, second melt down of the product is avoided, and the energy is saved.

Description

A kind of Forging Technology of large-scale mine wheel seat ring
Technical field
The invention belongs to mould for forging technical field, be specifically related to a kind of Forging Technology of large-scale mine wheel seat ring.
Background technology
Large-scale mine wheel seat ring forging products is complex-shaped, and product parts inner diametric step depth is very large, and for as far as possible close to part, reduce forging surplus, the depth of forging also wants large, and it is large to roll over ring difficulty, the press power that needs are larger like this, and needs preformed.At present, mostly traditional large-scale mine wheel seat ring forging process mode is first to be processed into mould for forging the forging that cross section is rectangular configuration, and then carry out fine finishining after the shape being cut into by forging close to product design, this mode exists that chipping allowance is large, waste material, shortcoming that processing cost is high.
Summary of the invention
The technical problem to be solved in the present invention overcomes existing defect, provide that a kind of chipping allowance is little, stable performance, material-saving and the low large-scale mine wheel seat ring of processing cost Forging Technology.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
The Forging Technology of a kind of large-scale mine wheel of the present invention seat ring, it comprises the following steps:
(1) rough forge operation, first puts into heating furnace by blank and heats, and heating-up temperature is 1200 ~ 1300 DEG C, and the blank mould through heating furnace heating carries out first reaming;
(2) finish forge operation, carries out second reaming by through first blank of rolling over ring with same mould, obtained forging.
Wherein, described mould comprises core roller and main mould, forging is arranged between described core roller and described main mould, it is the cylindrical section of cylindrical structure in the middle part of described core roller, described cylindrical section is provided with convex shoulder and lower convex shoulder, groove is formed between described upper convex shoulder and described lower convex shoulder, the upper surface of described upper convex shoulder is downward-sloping, the lower surface of described upper convex shoulder is inclined upwardly, the upper surface of described lower convex shoulder is downward-sloping, the side of described lower convex shoulder is outward-dipping from top to bottom, and the side of described main mould is vertical plane.
Further, swing to control forging, also be provided with and embrace roller arrangement, described armful of roller arrangement comprises embraces roll shaft, described armful of roll shaft one end is fixed on embraces on roll shaft holder, the described armful of roll shaft other end is fixedly connected with embraces roller, and described armful of roller top is provided with boss, and described armful of roll shaft can move up and down relative to described armful of roller bearing holder.
Further, downward-sloping 42 ° ~ 48 ° of the upper surface of described upper convex shoulder.
Further, the lower surface of described upper convex shoulder is inclined upwardly 22 ° ~ 28 °, downward-sloping 6 ° ~ 8 ° of the upper surface of described lower convex shoulder, outward-dipping 1 ° ~ 5 ° from top to bottom, the side of described lower convex shoulder.
Further, described upper convex shoulder and described cylindrical section joint are the circular arc of R50.
Further, the side of described upper convex shoulder and the joint of lower surface are the circular arc of R30.
Further, the side of described lower convex shoulder and the joint of lower surface are the circular arc of R20.
The present invention is operationally:
Main mould rotates, and utilizes the driven rotation of frictional force drives forging, and core roller does straight-line feed motion while driven rotation.Under the acting in conjunction of main mould, core roller, forging produces continuous local plastic distortion.Forging is in rolled process, and because of its local pressure, contact area is asymmetric, easily produces swing.For controlling the dancing in the forging operation of rolling, setting up and embracing roller arrangement.Embrace roller to contact with forging, driven rotation under the effect of frictional force.Diameter of forgings expands, and embraces roller and does setback.
Wherein, upper convex shoulder and the cylindrical section of described core roller form the first station, and upper convex shoulder and the lower convex shoulder of described core roller form the second station, operationally, first forging is processed as the first station, when forging rolles over ring to required internal diameter, then dropped to the second station and carry out reaming.
The beneficial effect that the present invention reaches is:
The large-scale mine wheel seat ring forging processed by processing technology provided by the invention, forge monolateral surplus and be about 9-10mm, closer to the shape of product, save the use of material, raw material about 20 ~ 30% are saved than conventional rectangular forging, ratio than ever internal diameter has shape conservation 7%, and the cutting output of following process is little, and processing cost is low; Because forging surplus is little, for subsequent heat treatment is got ready, ensure that the quality and performance of product; Boss is provided with owing to embracing roller arrangement, boss serves the effect supporting forging, therefore, achieves and a core roller can be realized two station designs, save mould replacing time at least 1 hour, also save die cost, realize two stations and roll over ring, the secondary avoiding product melts down, reduce scaling loss 5%, simultaneously need not more mold exchange, directly can reach a pyrogene type, save the energy.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for description, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation embracing roller.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
The Forging Technology of a kind of large-scale mine wheel of the present invention seat ring, it comprises the following steps:
(1) rough forge operation, first puts into heating furnace by blank and heats, and heating-up temperature is 1200 ~ 1300 DEG C, and the blank mould through heating furnace heating carries out first reaming;
(2) finish forge operation, carries out second reaming by through first blank of rolling over ring with same mould, obtained forging.
As depicted in figs. 1 and 2, mould comprises core roller 1 and main mould 2, forging 3 is arranged between described core roller 1 and described main mould 2, it is the cylindrical section 4 of cylindrical structure in the middle part of described core roller 1, described cylindrical section 4 is provided with convex shoulder 5 and lower convex shoulder 6, groove 8 is formed between described upper convex shoulder 5 and described lower convex shoulder 6, the upper surface of described upper convex shoulder 5 is downward-sloping, the lower surface of described upper convex shoulder 5 is inclined upwardly, the upper surface of described lower convex shoulder 6 is downward-sloping, the side of described lower convex shoulder 6 is outward-dipping from top to bottom, the side of described main mould 2 is vertical plane.
Swing to control forging 3, also be provided with and embrace roller arrangement 7, described armful of roller arrangement 7 comprises embraces roll shaft 701, described armful of roll shaft 701 one end is fixed on embraces on roll shaft holder 702, described armful of roll shaft 701 other end is fixedly connected with embraces roller 703, described armful of roller 703 top is provided with boss 704, and described armful of roll shaft 701 can move up and down relative to described armful of roller bearing holder 702.
Wherein:
Downward-sloping 45 ° of the upper surface of described upper convex shoulder 5;
The lower surface of described upper convex shoulder 5 is inclined upwardly 25 °, downward-sloping 7 ° of the upper surface of described lower convex shoulder 6, outward-dipping 3 ° from top to bottom, the side of described lower convex shoulder 6;
Described upper convex shoulder 5 is the circular arc of R50 with described cylindrical section 4 joint;
The side of described upper convex shoulder 5 and the joint of lower surface are the circular arc of R30;
The side of described lower convex shoulder 6 and the joint of lower surface are the circular arc of R20.
The present invention is operationally:
Main mould 2 rotates, and utilizes the driven rotation of frictional force drives forging 3, and core roller 1 does straight-line feed motion while driven rotation.Under the acting in conjunction of main mould 2, core roller 1, forging 3 produces continuous local plastic distortion.Forging 3 is in rolled process, and because of its local pressure, contact area is asymmetric, easily produces swing.For controlling the dancing in forging 3 operation of rolling, setting up and embracing roller arrangement 7.Embrace roller 703 to contact with forging 3, driven rotation under the effect of frictional force.Forging 3 enlarged-diameter, embraces roller 703 and does setback.
Wherein, upper convex shoulder 5 and the cylindrical section 4 of described core roller 1 form the first station, upper convex shoulder 5 and the lower convex shoulder 6 of described core roller 1 form the second station, operationally, first forging 3 is processed as the first station, when forging 3 rolles over ring to required internal diameter, then dropped to the second station and carried out reaming.
The large-scale mine wheel seat ring forging processed by Forging Technology provided by the invention, forge monolateral surplus and be about 9-10mm, closer to the shape of product, save the use of material, raw material about 20 ~ 30% are saved than conventional rectangular forging, ratio than ever internal diameter has shape conservation 7%, and the cutting output of following process is little, and processing cost is low; Because forging surplus is little, for subsequent heat treatment is got ready, ensure that the quality and performance of product; Boss is provided with owing to embracing roller arrangement, boss serves the effect supporting forging, therefore, achieves and a core roller can be realized two station designs, save mould replacing time at least 1 hour, also save die cost, realize two stations and roll over ring, the secondary avoiding product melts down, reduce scaling loss 5%, simultaneously need not more mold exchange, directly can reach a pyrogene type, save the energy.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. a Forging Technology for large-scale mine wheel seat ring, is characterized in that, comprises the following steps:
(1) rough forge operation, first puts into heating furnace by blank and heats, and heating-up temperature is 1200 ~ 1300 DEG C, and the blank mould through heating furnace heating carries out first reaming;
(2) finish forge operation, carries out second reaming by through first blank of rolling over ring with same mould, obtained forging.
2. the Forging Technology of a kind of large-scale mine wheel seat ring according to claim 1, it is characterized in that, described mould comprises core roller and main mould, forging is arranged between described core roller and described main mould, it is the cylindrical section of cylindrical structure in the middle part of described core roller, described cylindrical section is provided with convex shoulder and lower convex shoulder, groove is formed between described upper convex shoulder and described lower convex shoulder, the upper surface of described upper convex shoulder is downward-sloping, the lower surface of described upper convex shoulder is inclined upwardly, the upper surface of described lower convex shoulder is downward-sloping, the side of described lower convex shoulder is outward-dipping from top to bottom, the side of described main mould is vertical plane.
3. the Forging Technology of a kind of large-scale mine wheel seat ring according to claim 1, it is characterized in that, described mould also embraces roller arrangement, described armful of roller arrangement comprises embraces roll shaft, described armful of roll shaft one end is fixed on embraces on roll shaft holder, the described armful of roll shaft other end is fixedly connected with embraces roller, and described armful of roller top is provided with boss, and described armful of roll shaft can move up and down relative to described armful of roller bearing holder.
4. the Forging Technology of a kind of large-scale mine wheel seat ring according to Claims 2 or 3, is characterized in that, downward-sloping 42 ° ~ 48 ° of the upper surface of described upper convex shoulder.
5. the Forging Technology of a kind of large-scale mine wheel seat ring according to Claims 2 or 3, it is characterized in that, the lower surface of described upper convex shoulder is inclined upwardly 22 ° ~ 28 °, downward-sloping 6 ° ~ 8 ° of the upper surface of described lower convex shoulder, outward-dipping 1 ° ~ 5 ° from top to bottom, the side of described lower convex shoulder.
6. the Forging Technology of a kind of large-scale mine wheel seat ring according to Claims 2 or 3, is characterized in that, described upper convex shoulder and described cylindrical section joint are the circular arc of R50.
7. the Forging Technology of a kind of large-scale mine wheel seat ring according to Claims 2 or 3, is characterized in that, the side of described upper convex shoulder and the joint of lower surface are the circular arc of R30.
8. the Forging Technology of a kind of large-scale mine wheel seat ring according to Claims 2 or 3, is characterized in that, the side of described lower convex shoulder and the joint of lower surface are the circular arc of R20.
CN201410117000.XA 2014-03-26 2014-03-26 Forging technology for race used for large-scale mine vehicle wheel Pending CN104942214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410117000.XA CN104942214A (en) 2014-03-26 2014-03-26 Forging technology for race used for large-scale mine vehicle wheel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410117000.XA CN104942214A (en) 2014-03-26 2014-03-26 Forging technology for race used for large-scale mine vehicle wheel

Publications (1)

Publication Number Publication Date
CN104942214A true CN104942214A (en) 2015-09-30

Family

ID=54157572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410117000.XA Pending CN104942214A (en) 2014-03-26 2014-03-26 Forging technology for race used for large-scale mine vehicle wheel

Country Status (1)

Country Link
CN (1) CN104942214A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109909408A (en) * 2019-04-12 2019-06-21 洛阳圣久锻件有限公司 A kind of rolling device of double channel pitch variable bearings lasso
CN110842126A (en) * 2018-08-21 2020-02-28 无锡隆迪精密锻件有限公司 Forging die for gear ring

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3899912A (en) * 1972-07-10 1975-08-19 Glaenzer Spicer Sa Method and device for cold-forming rolling elements
JP2007289967A (en) * 2006-04-20 2007-11-08 Toyota Motor Corp Method and device for sequentially forming annular component, and mandrel for sequential forming
CN101081426A (en) * 2007-06-14 2007-12-05 兰鹏光 Flange of wind power generation tower barrel forging shaping process
CN101284296A (en) * 2008-04-23 2008-10-15 贵州航宇科技发展有限公司 Rolling and shaping method of titanium alloy taper ring forged piece
KR101028501B1 (en) * 2010-12-22 2011-04-11 주식회사 진성티이씨 Method for manufacturing of caterpillar idler rim and a production apparatus therefore
KR20130118688A (en) * 2012-04-20 2013-10-30 칼텍(주) Manufacturing mathod of ring with complex cross-sectional shape
CN103406480A (en) * 2013-08-06 2013-11-27 无锡隆迪精密锻件有限公司 Die used for producing land leveller gear ring forged pieces

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3899912A (en) * 1972-07-10 1975-08-19 Glaenzer Spicer Sa Method and device for cold-forming rolling elements
JP2007289967A (en) * 2006-04-20 2007-11-08 Toyota Motor Corp Method and device for sequentially forming annular component, and mandrel for sequential forming
CN101081426A (en) * 2007-06-14 2007-12-05 兰鹏光 Flange of wind power generation tower barrel forging shaping process
CN101284296A (en) * 2008-04-23 2008-10-15 贵州航宇科技发展有限公司 Rolling and shaping method of titanium alloy taper ring forged piece
KR101028501B1 (en) * 2010-12-22 2011-04-11 주식회사 진성티이씨 Method for manufacturing of caterpillar idler rim and a production apparatus therefore
KR20130118688A (en) * 2012-04-20 2013-10-30 칼텍(주) Manufacturing mathod of ring with complex cross-sectional shape
CN103406480A (en) * 2013-08-06 2013-11-27 无锡隆迪精密锻件有限公司 Die used for producing land leveller gear ring forged pieces

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110842126A (en) * 2018-08-21 2020-02-28 无锡隆迪精密锻件有限公司 Forging die for gear ring
CN109909408A (en) * 2019-04-12 2019-06-21 洛阳圣久锻件有限公司 A kind of rolling device of double channel pitch variable bearings lasso
CN109909408B (en) * 2019-04-12 2023-12-26 洛阳圣久锻件有限公司 Rolling device for double-channel variable-pitch bearing ring

Similar Documents

Publication Publication Date Title
CN104148558B (en) The production method of T-shaped ring-type forge piece blank reheating in SB564 UNS N06690 alloy large-size
CN102873511A (en) Method for radially rolling and forming ring piece with three steps and complicated section
CN105170850A (en) Centrifugal casting duplex-metal composite ring part hot extend-rolling forming technology
CN104907471A (en) Supporting wheel closed forging process and forging die
CN101402163A (en) Bearing ferrule workblank triple external member smithing and molding process
CN104191167A (en) Forging forming method for titanium alloy thin-wall special-shaped ring
CN101786132A (en) Automobile engine valve blank cross wedge rolling accurate forming method
CN101406922A (en) Grinding ball production method and rotary cutting roll forging machine for grinding ball production
CN104139279B (en) The manufacturing process of interior trapezoidal grooved ring shape part
CN105215129B (en) A kind of hot spinning thickening method of circular plate outer circular edge
CN103230955A (en) Hot extrusion forming die of light alloy horn-shaped pipe fitting
CN104942198A (en) Die structure for producing race for large mine car wheel
CN104942214A (en) Forging technology for race used for large-scale mine vehicle wheel
CN102861857A (en) Rolling bearing forging process
CN101264489B (en) Automobile out star wheel isothermal extrusion preliminary shaping device
CN103028687A (en) Swinging and rolling device for non-rotating body and forging process of swinging and rolling device
CN103192015A (en) Automotive alternator claw-pole closed-type hot-forging device and process thereof
CN204194689U (en) A kind of mould structure for the production of large-scale mine wheel seat ring
CN106077377A (en) Biomass fuel granulator 4Cr13 ring mould rolles over ring new process for processing
CN201997666U (en) Production line for forging and moulding three bearing ring blanks at a time
CN204747242U (en) Rim becomes major part mould
CN103230951A (en) Hot extrusion forming method of light alloy horn-shaped pipe fitting
CN204035444U (en) The mould of large-scale interior T-shaped ring-type forge piece blank reheating forging
CN109909415A (en) A kind of high temperature alloy segmentation expanding method
CN109261802A (en) A kind of mold and processing method of the stamping flange of rolled plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930

RJ01 Rejection of invention patent application after publication