CN104928999B - A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure - Google Patents
A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure Download PDFInfo
- Publication number
- CN104928999B CN104928999B CN201510341806.1A CN201510341806A CN104928999B CN 104928999 B CN104928999 B CN 104928999B CN 201510341806 A CN201510341806 A CN 201510341806A CN 104928999 B CN104928999 B CN 104928999B
- Authority
- CN
- China
- Prior art keywords
- bedplate
- types
- vertical
- lifting
- tail trimmer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/04—Lifting or levelling of tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to CRTSI plate-types non-fragment orbit lifting deviation correcting device and method on a kind of high-speed railway subgrade, the device includes that H types indulge girder steel (1), H types tail trimmer (2), high-strength bolt (3), vertical jack (4), tetrafluoro plate (5), vertical concrete pier (6);The vertical girder steel (1) of the H types above bedplate is provided with to be fixedly connected with bedplate by high-strength bolt (3), H types tail trimmer (2) and the vertical girder steel (1) of H types for being arranged on bedplate upper outer are directly welded and fixed, H types tail trimmer (2) stretch out certain length in bedplate (8) left and right sides per side, it is sequentially connected from the bottom up in H types tail trimmer (2) lower section and is provided with vertical concrete pier (6), vertical jack (4), tetrafluoro plate (5), displacement is passed sequentially through by tetrafluoro plate (5) by the action of vertical jack (4), H types tail trimmer (2), H types indulge girder steel (1) and are delivered to bedplate (8), realize the lifting of bedplate (8) and track plates (7).
Description
Technical field
The invention belongs to ballastless track of high-speed railway structure repair technical field, and in particular to one kind is for settling roadbed
CRTSI plate-type non-fragment orbit lifting method for correcting error.
Background technology
Non-fragment orbit is a kind of reduced-maintenance track structure, and it replaces ballast aggregate using reinforced concrete footing plate, by wheel track
Power is distributed and is delivered on foundation of road bed.Non-fragment orbit has good track stability, continuity and ride comfort, service life
Long, structure durability is good, and the features such as maintenance load is few, therefore most of our high-speed railways built at this stage are with without tiny fragments of stone, coal, etc. rail
Based on road.The rigidity of non-fragment orbit is very big, causes its plastic deformation small.The sinking once basis below track deforms, repaiies
Multiple difficulty, improved possibility is restricted.When the basis of non-fragment orbit bottom occurs uneven sedimentation, may result in
Non-fragment orbit circuit shifts on roadbed.When side-play amount exceedes certain value, it will have a strong impact on the safety of train driving
Property, comfortableness and ride comfort.Because track panel stiffness is big, adjustment capability is poor, when there is track irregularity, it is difficult to as there is tiny fragments of stone, coal, etc. rail
Road equally adjusts the skew of rail height and level by changing railway ballast thickness, making the means such as railway ballast firm by ramming.
Traditional is to adjust rail using adjustment fastener system to non-fragment orbit Track Settlement skew restorative procedure on roadbed
Road height and level, but the adjusted value that rail height and horizontal offset are adjusted with fastener system is limited, when deviant is big
The effect of fastener system is limited when its adjusting range.When using " one kind is entangled for settling non-fragment orbit midline shift
Folk prescription method " (201410394616.1), the method is directly using the slip-casting lifting correction in roadbed, the now difficult control of lifting correction amount
System, the ride comfort on track plates can produce influence, and chemical pulp is noted in addition has change to roadbed material characteristic.When using " for soft
The method for correcting error of soil area ballastless track of high-speed railway roadbed " (201410070311.5), the method makes roadbed there occurs movement,
Change soil structures proterties and be only adapted to soft clay area.
The invention provides CRTSI plate-types non-fragment orbit lifting deviation correcting device and method on a kind of high-speed railway subgrade,
Using installing lifting frock on bedplate, using hydraulic system by bedplate (including track above plate) entirety lifting, flat
Move, solve the problems, such as that fastener system adjusted value is limited, can be in high-speed railway Window time to non-fragment orbit circuit on roadbed
Sedimentation skew disease completes to repair and ensure the ride comfort of circuit.
The content of the invention
The present invention offsets showing for damage repair for non-fragment orbit CRTSI templates Track Settlement on China Express Railway roadbed
The shortcoming of real demand and current line restorative procedure is not enough, has invented a kind of for CRTSI plate-types on high-speed railway subgrade
Non-fragment orbit lifting deviation correcting device and method.The invention quick construction, practical reliable, cost economy, are to be solved in Window time
Certainly non-fragment orbit Track Settlement skew disease provides a kind of effective lifting deviation correcting device and method on roadbed.
To achieve the above object, being lifted for CRTSI plate-types non-fragment orbit on high-speed railway subgrade designed by the present invention
Deviation correcting device is risen, it includes herein below:
A kind of non-fragment orbit lifting apparatus, including the vertical girder steel of H types, H type tail trimmers, high-strength bolt, vertical jack, tetrafluoro
Plate, vertical concrete pier;Characterized in that, the vertical girder steel of the H types being arranged on above bedplate is consolidated by high-strength bolt with bedplate
Fixed connection, the H types tail trimmer and the vertical girder steel of H types for being arranged on bedplate upper outer is directly welded and fixed, and H type tail trimmers are in base
Certain length is stretched out per side in the plate left and right sides, be sequentially connected from the bottom up below H type tail trimmers be provided with vertical concrete pier,
Displacement so, tetrafluoro plate, H type hyphens can be passed sequentially through by the action of vertical jack by vertical jack, tetrafluoro plate
The vertical girder steel of beam, H types is delivered to bedplate, so as to realize the lifting of bedplate and track plates.
The present invention also provides a kind of lifting restorative procedure using above-mentioned lifting apparatus, and described method is included in following
Hold:
Step 1:Before lifting, the elevation of the ballastless track structure of settling zone is measured using spirit level, according to survey
Amount result, determines the specific Uplifting amount of bedplate.Then needing the sidetracking anchor hole of bedplate two of lifting;Needing the base of lifting
Multiple injected holes are bored on plate;
Step 2:Carry out bolt anchoring in the anchor hole being drilled on bedplate with the anchoring adhesive of high intensity, and with high-strength
Be fixed on the vertical girder steel of H types on bedplate by bolt;H type tail trimmers are fixed on the vertical girder steel of longitudinal H types by welding again, H types
Tail trimmer stretches out certain length in the bedplate left and right sides per side;
Step 3:Vertical concrete pier is laid under H type tail trimmers, it is ensured that there is concrete under each H type tail trimmer
Pier;
Step 4:A vertical jack is laid below each H type tail trimmer extension, vertical jack top leads to
Cross tetrafluoro plate to be connected with H type tail trimmers, bottom is placed directly within above vertical concrete pier;
Step 5:Track plates Integral synchronous jacking:All vertical jack are controlled by control system simultaneously, by track plates
Jacking is to corresponding height;
Step 6:Track plates jacking uses CGM cement bases to after corresponding height between bedplate and rubble rolling layers
Polymer mortar is in the milk, and it is returned to designed elevation.Slip-casting lifting process will carry out real-time monitoring, using vertical displacement
Sensor and horizontal displacement sensors synchronize monitoring to bedplate short transverse and horizontal displacement change in displacement simultaneously, it is ensured that
Track lifting elevation and translational displacement control accuracy.
Further, the present invention also provide it is a kind of in lifting while the device of correction can be translated, including H types indulge girder steel, H
Type tail trimmer, high-strength bolt, vertical jack, tetrafluoro plate, vertical concrete pier, horizontal jack, Horizontal concrete pier;Its
In, it is arranged on the vertical girder steel of the H types above bedplate and is fixedly connected with bedplate by high-strength bolt, it is arranged on bedplate top outer
The H types tail trimmer of side is directly welded and fixed with the vertical girder steel of H types, and H types tail trimmer stretches out a fixed length in the bedplate left and right sides per side
Degree, is sequentially connected and is provided with vertical concrete pier, vertical jack from the bottom up below H type tail trimmers, tetrafluoro plate, so,
Displacement can be passed sequentially through by the vertical girder steel of tetrafluoro plate, H types tail trimmer, H types by the action of vertical jack and be delivered to base
Plate, so as to realize the lifting of bedplate and track plates;Horizontal concrete pier is arranged on bedplate outside, and horizontal jack is arranged on
Between Horizontal concrete pier and bedplate.
Further, a kind of lifting restorative procedure using above-mentioned lifting apparatus is also provided, described method is included in following
Hold:
Step 1:Before lifting, the elevation of the ballastless track structure of settling zone is measured using spirit level, according to survey
Amount result, determines the specific Uplifting amount of bedplate.Then needing the sidetracking anchor hole of bedplate two of lifting;Needing the base of lifting
Multiple injected holes are bored on plate;
Step 2:Carry out bolt anchoring in the anchor hole being drilled on bedplate with the anchoring adhesive of high intensity, and with high-strength
Be fixed on the vertical girder steel of H types on bedplate by bolt;H type tail trimmers are fixed on the vertical girder steel of longitudinal H types by welding again, H types
Tail trimmer stretches out certain length in the bedplate left and right sides per side;
Step 3:Vertical concrete pier is laid under H type tail trimmers, it is ensured that there is concrete under each H type tail trimmer
Pier;
Step 4:A vertical jack is laid below each H type tail trimmer extension, vertical jack top leads to
Cross tetrafluoro plate to be connected with H type tail trimmers, bottom is placed directly within above vertical concrete pier;
Step 5:Track plates Integral synchronous jacking:All vertical jack are controlled by control system simultaneously, by track plates
Jacking is to corresponding height;
Step 6:Track plates are translated:The horizontal jack controlled using control system makes track plates move to assigned position;
Step 7:After track plates translation in place, CGM cement-based polymers sand is used between bedplate and rubble rolling layers
Slurry is in the milk, and it is returned to designed elevation.Slip-casting lifting process will carry out real-time monitoring, using vertical displacement sensor and
Horizontal displacement sensors synchronize monitoring to bedplate short transverse and horizontal displacement change in displacement simultaneously, it is ensured that track lifting
Elevation and translational displacement control accuracy.
H types tail trimmer is 40cm per side outreach in the bedplate left and right sides in further scheme.
Further, bedplate off-load step is also included between step 3 and 4 in such scheme, specially along base
Confining bed and convex that the line of cut of each 5cm in plate both sides cuts keep off the inserts of platform.
Further, restorative procedure also includes
Step A:Lifting value is checked, checks that main frame lifting data and sensing data check rising height;
Step B:Withdraw jack cylinder;
Step C:Fastener recovers, and, along sledge, adjustment, contact net leads high measurement for lift plate section and lift plate two ends track, and lift plate is worked as
Day track uses V≤120km/h deviation management standards along sledge and accurate adjustment;
Step D:Cementer is removed after the completion of making to lifting frock, recovers former flexible using expansion joint packing material
Seam, and backfill the drilling of bedplate with closure mortar and remove the drilling after frock;
Step E:Construction quality and orbit adjusting return inspection:Scene is checked to the bedplate for having noted slurry, is seen if there is not
The full position of slip casting, and inspection is carried out back to Rail inspection.
In further scheme, when detection finds lifting value less than pre- fixing one's aim, step 5,6 before repeating.
Described injecting paste material is that with quick setting early strength, high fluidity, CGM cement bases the features such as pressure-proof and snap-resistent intensity are gathered
Compound mortar grouting material, CGM cement-based polymers mortar grouting materials are one kind of high polymer grouting material.Fluidity > 130mm,
High intensity can be formed within 30min ages.Because there is material extremely short initial set, final setting time to be spaced this feature, can be with
Track structure to being lifted realizes quick carrying effect.
The laying of described injected hole, when track plates are frame plate, injected hole is distributed in the middle of bedplate, and outside is not noted
Slurry hole, every piece of bedplate center cloth hole 8, radius is 2.5cm.Described grouting sequence, interstitial hole is the main thoroughfare of perfusion,
The mortar of injection will spread every hole from plate bottom center to both sides.Finally irrigating remaining hole every hole to interstitial hole carries out slip casting.
Described control system is preferably using PLC computer controls, and the system is main by liquid system (oil pump, oil cylinder
Deng) several parts compositions such as computer control system.Hydraulic system can be automatically performed synchronous shift by computer controls, real
Existing power and control, the control of displacement error, the control of stroke, the control of load pressure of displacement;Maloperation automatic protection, process
It has been shown that, fault alarm, emergency stop function;Oil cylinder hydraulic control one-way valve and mechanical self-locking device can prevent any type of system and
Pipeline decompression, so that proof load effectively various functions such as support.
The effect of invention
Compared with existing method for correcting error, the invention has the advantages that:
(1) injecting paste material for being used is quick setting early strength, high fluidity, the polymer slip casting material of pressure-proof and snap-resistent strength characteristics
Material, quick construction, the feature of environmental protection are good, cost economy.
(2) using H profile steel beam to track plates Integral synchronous jacking, it is possible to achieve the essence of displacement and displacement error to jacking
Really control.
(3) the horizontal jack that intelligence control system is controlled is used by track plates horizontal sliding to assigned position, it is possible to achieve right
The displacement of translation and the precise control of displacement error.
(4) this programme can be applied to all kinds of templates, have universality when being constructed so as to upper track in future.
Brief description of the drawings
Fig. 1 liftings steelframe and jack side elevational view.
Fig. 2 liftings steelframe and very heavy top plan view.
Fig. 3 lifting steelframe side elevational views.
Fig. 4 lifting H profile steel beams and jack arrangement profile.
Fig. 5 non-fragment orbit route plans.
Fig. 6 is the plan of the injected hole arrangement of typical ballastless track structure.
The elevation of the injected hole arrangement of Fig. 7 typical case's ballastless track structure solid slabs.
Fig. 8 liftings correction steelframe and very heavy top plan view.
Fig. 9 liftings correction H profile steel beam and jack arrangement profile.
Figure 10 transverse direction jack translating device figures.
Specific embodiment
Realization of the invention is introduced below by way of specific embodiment and had the advantage that, but the present invention does not limit to
In this.
In figure, 1-H types indulge girder steel, and 2-H type tail trimmers, 3- high-strength bolts, the vertical jack of 4-, 5- tetrafluoro plates, 6- is vertical
Concrete pier, 7- track plates, 8- bedplates, 9- Horizontal concrete piers, 10- transverse direction jack, 11- injected holes, 12- lines of cut,
13- convexs keep off platform.
Embodiment one:
Referring to accompanying drawing 1-4, the non-fragment orbit lifting deviation correcting device in the present invention includes that H types indulge girder steel 1, H types tail trimmer 2,
High-strength bolt 3, vertical jack 4, tetrafluoro plate 5, vertical concrete pier 6, track plates 7, bedplate 8.Wherein, first in bedplate
On be drilled with anchor hole, in it and inject anchoring adhesive and anchor high-strength bolt 3, the vertical girder steel 1 of H types is connected to by high-strength bolt 3
Bedplate 8, H types tail trimmer 2 is directly connected to the vertical girder steel 1 of H types by welding again;Below H types tail trimmer 2 from the bottom up successively
It is provided with vertical concrete pier 6, vertical jack 4, tetrafluoro plate 5, so, can be by displacement by the action of vertical jack 4
Amount passes sequentially through the vertical girder steel 1 of tetrafluoro plate 5, H types tail trimmer 2, H types and is delivered to bedplate 8, so as to realize bedplate 8 and track plates 7
Lifting.
Below in conjunction with the accompanying drawings, illustrate the non-fragment orbit lifting restorative procedure of the embodiment of the present invention 1, described method include with
Lower content:
Step 1:Before lifting, the elevation of the ballastless track structure of settling zone is measured using spirit level, according to survey
Amount result, determines the specific Uplifting amount of bedplate 8.The laying of anchor hole such as Fig. 1, anchors 8 liang of sidetrackings of bedplate of lifting are needed
Hole, anchor hole can set one or more, preferential every piece of every side cloth hole 1, totally 2;The laying of injected hole 11 such as Fig. 6,
Need to bore injected hole 11 on the bedplate 8 of lifting, injected hole equidistantly lays 8 at bedplate center;
Step 2:The vertical girder steel 1 of H types is fixed:Such as Fig. 1, the bar planting of high intensity is used in the anchor hole being drilled on bedplate 8
Glue carries out bolt anchoring, and the vertical girder steel 1 of H types is fixed on bedplate 8 with high-strength bolt 3;Such as Fig. 3, short by H types by welding
Crossbeam 2 is fixed on the vertical girder steel 1 of longitudinal H types, and H types tail trimmer 2 stretches out certain length in the left and right sides of bedplate 8 per side, for example
10-60cm, preferably 40cm;
Step 3:Vertical concrete pier 6 is made, as shown in figure 4, each H types tail trimmer 2 times layings, one vertical concrete
Pier 6, or 2 time a vertical concrete pier 6 is set in each two or multiple type tail trimmer, under can guarantee that each H types tail trimmer 2
There is concrete pier, the vertical quantity of concrete pier 6 and H types tail trimmer 2 are identical in accompanying drawing, per side 11, totally 22;
Step 4:The off-load such as Fig. 5 of bedplate 8, the confining bed and convex for cutting each 5cm in the both sides of bedplate 8 along line of cut 12 keeps off
The inserts of platform 13;
Step 5:Laying such as Fig. 1 and Fig. 4 of vertical jack 4, one is laid below each extension of H types tail trimmer 2
Individual vertical jack 4, the top of vertical jack 4 is connected by tetrafluoro plate 5 with H types tail trimmer 2, and bottom is placed directly within vertical coagulation
Above knoll 6;
Step 6:The Integral synchronous jacking of track plates 7:Check and open PLC intelligence jack-up systems, while control all vertical thousand
Jin top 4, by the jacking of track plates 7 to corresponding height;
Step 7:The jacking of track plates 7 uses CGM cement to after corresponding height between bedplate 8 and rubble rolling layers
Based polyalcohol mortar is in the milk, and it is returned to designed elevation.Slip-casting lifting process will carry out real-time monitoring, using vertical position
Displacement sensor and horizontal displacement sensors synchronize monitoring to the short transverse of bedplate 8 and horizontal displacement simultaneously, it is ensured that track
Lifting elevation and translational displacement control accuracy;
Step 8:Check lifting value:Main frame lifting data are checked, sensing data checks rising height;
Step 9:Fall plate:Withdraw jack cylinder;
Step 10:Fastener recovers, and, along sledge, adjustment, contact net leads high measurement for lift plate section and lift plate two ends track, and lift plate is worked as
Day track uses V≤120km/h deviation management standards along sledge and accurate adjustment;
Step 11:Remove deviation correcting device:Cementer is removed after the completion of making to lifting frock, and material is filled using expansion joint
Material (for example, silicone material) recovers former expansion joint, and backfills bedplate 8 with closure mortar (for example, polymer quick-setting mortar)
Drilling after drilling and dismounting frock;
Step 12:Construction quality and orbit adjusting return inspection:Scene is checked to the bedplate 8 for having noted slurry, is seen if there is
The full position of non-slip casting, and inspection is carried out back to Rail inspection.
Described injected hole 11 arranges, arrangement such as Fig. 6 of injected hole 11, and when track plates 7 are frame plate, injected hole 11 is distributed
In the middle of bedplate, outside does not have an injected hole 11, every piece of 8 center cloth hole of bedplate 8, and radius is 2.5cm.Described slip casting is suitable
Sequence, during slip casting, puts into two mortar pumps.It is controlled first since injected hole 11 in the middle of plate using " one i.e. dynamic stop ", is filled every hole
Note, interstitial hole is the main thoroughfare of perfusion, and the mortar of injection will spread from plate bottom mediad both sides.Finally interstitial hole is filled every hole
Noting remaining injected hole 11 carries out slip casting.
Non-fragment orbit Track Settlement lifting restorative procedure on described roadbed, is adapted to regulation roadbed section ballastless track structure
Railway is due to the disease that causes of sedimentation and the precise control that can realize to track structure lifting correction.
Embodiment two:
Embodiments of the invention 2 compared with Example 1, increased the function of horizontal adjustment, in structure, referring to Fig. 8-
10, embodiment 2 increased Horizontal concrete pier 9, horizontal jack 10, specifically, setting level near vertical concrete pier 6
Concrete pier 9, sets a horizontal jack 10 between its side and the vertical girder steel 1 of H types.
When the lifting of non-fragment orbit circuit is rectified a deviation on the roadbed of the present embodiment description, described construction procedure includes short transverse
Measure and determine that track plates 7, bedplate 8 that lifting rectifies a deviation drill, the vertical girder steel 1 of H types and H types tail trimmer 2 are consolidated with horizontal displacement
It is fixed, make concrete pier, the off-load of bedplate 8, arrangement jack, the Integral synchronous jacking of track plates 7, track plates 7 translate, slip casting,
The work such as lifting value, the plate that falls are checked, the following aspects is specifically included:
Step 1:Before lifting, service precision carries out short transverse and water for the spirit level of 0.01mm to certain sedimentation non-fragment orbit
The measurement that prosposition is moved, calculates required offset displacement and rising height, and determine the specific lifting correction amount of bedplate.Anchor
The laying of solid hole such as Fig. 1, in the sidetracking anchor hole of bedplate two for needing lifting to rectify a deviation, anchor hole can set one or more, excellent
First every piece of every side cloth hole 1, totally 2;The laying of injected hole 11 such as Fig. 6, injected hole is bored on the bedplate 8 for needing lifting to rectify a deviation
11, injected hole equidistantly lays 8 at bedplate center;
Step 2:The fixation of the vertical girder steel 1 of H types and H types tail trimmer 2:Such as Fig. 1, in the anchor hole being drilled on bedplate 8
Bolt anchoring is carried out with the anchoring adhesive of high intensity, and the vertical girder steel 1 of H types is fixed on bedplate 8 with high-strength bolt 3;Such as Fig. 3,
H types tail trimmer 2 is fixed on the vertical girder steel 1 of longitudinal H types by welding, H types tail trimmer 2 is stretched in the left and right sides of bedplate 8 per side
Go out certain length, preferably such as 10-60cm, 40cm;
Step 3:Vertical concrete pier 6 and Horizontal concrete pier 9 are made, as shown in figure 8, wherein each H types tail trimmer 2 is stretched
Go out part and lay a vertical concrete pier 6 below, or in one vertical coagulation of each two or multiple 2 times settings of type tail trimmer
Knoll 6, can guarantee that under each H types tail trimmer 2 there is concrete pier, the vertical quantity of concrete pier 6 and H type hyphens in accompanying drawing
Beam 2 is identical, per side 11, totally 22;On the vertical girder steel 1 of longitudinal H types multiple, preferably 3 horizontal coagulations are equidistantly laid per side
Knoll 9, totally 6;
Step 4:Such as Fig. 5, platform 13 is kept off by cutting the confining bed and convex of each 5cm in the both sides of bedplate 8 along line of cut 12
Inserts to bedplate 8 so that carry out off-load;
Step 5:Arrangement jack:Such as Fig. 1, a vertical jack is laid below each extension of H types tail trimmer 2
4, the top of vertical jack 4 is connected by tetrafluoro plate 5 with H types tail trimmer 2, and bottom is placed directly within above vertical concrete pier 6;Altogether
22;Such as Fig. 8, multiple transverse direction jack 10, preferably 3, the front face of jack 10 are equidistantly laid in the both sides of bedplate 8
Divide and be connected with the longitudinal direction vertical girder steel 1 of H types, aft section is connected with Horizontal concrete pier 9, totally 6;
Step 6:The Integral synchronous jacking of track plates 7:Check and open PLC intelligence jack-up systems, while control all vertical thousand
Jin top 4, by the jacking of track plates 7 to corresponding height;
Step 7:Track plates 7 are translated:Such as Figure 10, the horizontal jack 10 controlled using intelligence control system makes track plates 7
Move to assigned position;
Step 8:It is poly- using CGM cement bases between bedplate 8 and rubble rolling layers after the translational movement in place of track plates 7
Compound mortar is in the milk, and two mortar pumps will be put into during pouring construction, first since injected hole 11 in the middle of plate, is irrigated every hole,
Interstitial hole is the main thoroughfare of perfusion, and the mortar of injection will spread from plate bottom mediad both sides, and finally interstitial hole is irrigated every hole
Remaining injected hole 11 carries out slip casting, it is returned to designed elevation;Slip-casting lifting process wants real-time monitoring, using vertical displacement
Sensor and horizontal displacement sensors synchronize monitoring to the short transverse of bedplate 8 and horizontal displacement change simultaneously, it is ensured that rail
Road lifting elevation and translational displacement control accuracy;
Step 9:Check lifting value:Main frame lifting data are checked, sensing data checks rising height;
Step 10:Fall plate:Withdraw jack cylinder;
Step 11:Fastener recovers, and, along sledge, adjustment, contact net leads high measurement for lift plate section and lift plate two ends track, and lift plate is worked as
Day track uses V≤120km/h deviation management standards along sledge and accurate adjustment;
Step 12:Remove deviation correcting device:Cementer is removed after the completion of making to lifting frock, and material is filled using expansion joint
Material (for example, silicone material) recovers former expansion joint, and backfills bedplate 8 with closure mortar (for example, polymer quick-setting mortar)
Drilling after drilling and dismounting frock;
Step 13:Construction quality and orbit adjusting return inspection:Scene is checked to the bedplate 8 for having noted slurry, is seen if there is
The full position of non-slip casting, and inspection is carried out back to Rail inspection.
CRTSI plate-type non-fragment orbits lifting correction restorative procedure, Neng Goushi on the roadbed that the present invention is provided in sum
Now to the precise control of track structure lifting correction, can preferably recover the ride comfort of ballastless track structure and ensure the peace of operation
Full property and comfortableness.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention,
Although being described in detail to the present invention with reference to the foregoing embodiments, for a person skilled in the art, it still may be used
Modified with to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic.
All any modification, equivalent substitution and improvements within the spirit and principles in the present invention, made etc., should be included in of the invention
Within protection domain.
Claims (16)
1. a kind of non-fragment orbit lifting deviation correcting device, including H types indulges girder steel (1), H types tail trimmer (2), high-strength bolt (3), vertically
Jack (4), tetrafluoro plate (5), vertical concrete pier (6);
Characterized in that, the vertical girder steel (1) of the H types being arranged on above bedplate is fixedly connected by high-strength bolt (3) with bedplate,
H types tail trimmer (2) and the vertical girder steel (1) of H types for being arranged on bedplate upper outer are directly welded and fixed, and H types tail trimmer (2) are the bottom of at
Certain length is stretched out in seat board (8) left and right sides per side, and vertical coagulation is disposed with from the bottom up in H types tail trimmer (2) lower section
Knoll (6), vertical jack (4), tetrafluoro plate (5);By the action of vertical jack (4), displacement is passed sequentially through into tetrafluoro
The vertical girder steel (1) of plate (5), H types tail trimmer (2), H types is delivered to bedplate (8), so as to realize bedplate (8) and track plates (7)
Lifting,
Wherein, a vertical concrete pier (6) is laid under each H type tail trimmer (2).
2. a kind of non-fragment orbit lifting deviation correcting device, including H types indulges girder steel (1), H types tail trimmer (2), high-strength bolt (3), vertically
Jack (4), tetrafluoro plate (5), vertical concrete pier (6);
Characterized in that, the vertical girder steel (1) of the H types being arranged on above bedplate is fixedly connected by high-strength bolt (3) with bedplate,
H types tail trimmer (2) and the vertical girder steel (1) of H types for being arranged on bedplate upper outer are directly welded and fixed, and H types tail trimmer (2) are the bottom of at
Certain length is stretched out in seat board (8) left and right sides per side, and vertical coagulation is disposed with from the bottom up in H types tail trimmer (2) lower section
Knoll (6), vertical jack (4), tetrafluoro plate (5);By the action of vertical jack (4), displacement is passed sequentially through into tetrafluoro
The vertical girder steel (1) of plate (5), H types tail trimmer (2), H types is delivered to bedplate (8), so as to realize bedplate (8) and track plates (7)
Lifting,
Wherein, a vertical concrete pier (6) is set under each two or multiple H types tail trimmer (2).
3. a kind of non-fragment orbit lifting deviation correcting device, including H types indulges girder steel (1), H types tail trimmer (2), high-strength bolt (3), vertically
Jack (4), tetrafluoro plate (5), vertical concrete pier (6), horizontal jack (10), Horizontal concrete pier (9);
Wherein, it is arranged on the vertical girder steel (1) of the H types above bedplate to be fixedly connected with bedplate by high-strength bolt (3), is arranged on
H types tail trimmer (2) of bedplate upper outer are directly welded and fixed with the vertical girder steel (1) of H types, and H types tail trimmer (2) are in bedplate
(8) certain length is stretched out in the left and right sides per side, is sequentially connected from the bottom up in H types tail trimmer (2) lower section and is provided with vertical coagulation
Knoll (6), vertical jack (4), tetrafluoro plate (5);Displacement is passed sequentially through by tetrafluoro plate by the action of vertical jack (4)
(5), the vertical girder steel (1) of H types tail trimmer (2), H types is delivered to bedplate (8), so as to realize the lift of bedplate (8) and track plates (7)
Rise;Horizontal concrete pier (9) is arranged on bedplate (8) outside, and horizontal jack (10) is installed in Horizontal concrete pier (9) and bottom
Between seat board (8), the horizontal displacement of bedplate (8) and track plates (7) is realized by the action of horizontal jack (10),
Wherein, a vertical concrete pier (6) is laid under each H type tail trimmer (2).
4. a kind of non-fragment orbit lifting deviation correcting device, including H types indulges girder steel (1), H types tail trimmer (2), high-strength bolt (3), vertically
Jack (4), tetrafluoro plate (5), vertical concrete pier (6), horizontal jack (10), Horizontal concrete pier (9);
Wherein, it is arranged on the vertical girder steel (1) of the H types above bedplate to be fixedly connected with bedplate by high-strength bolt (3), is arranged on
H types tail trimmer (2) of bedplate upper outer are directly welded and fixed with the vertical girder steel (1) of H types, and H types tail trimmer (2) are in bedplate
(8) certain length is stretched out in the left and right sides per side, is sequentially connected from the bottom up in H types tail trimmer (2) lower section and is provided with vertical coagulation
Knoll (6), vertical jack (4), tetrafluoro plate (5);Displacement is passed sequentially through by tetrafluoro plate by the action of vertical jack (4)
(5), the vertical girder steel (1) of H types tail trimmer (2), H types is delivered to bedplate (8), so as to realize the lift of bedplate (8) and track plates (7)
Rise;Horizontal concrete pier (9) is arranged on bedplate (8) outside, and horizontal jack (10) is installed in Horizontal concrete pier (9) and bottom
Between seat board (8), the horizontal displacement of bedplate (8) and track plates (7) is realized by the action of horizontal jack (10),
Wherein, a vertical concrete pier (6) is set under each two or multiple H types tail trimmer (2).
5. the non-fragment orbit lifting deviation correcting device as described in claim any one of 1-4, it is characterised in that H types tail trimmer (2) exist
Bedplate (8) left and right sides is 10-60cm per side outreach.
6. non-fragment orbit lifting deviation correcting device according to claim 5, it is characterised in that H types tail trimmer (2) are in bedplate
(8) left and right sides is 40cm per side outreach.
7. a kind of non-fragment orbit lifting restorative procedure, wherein being realized using the non-fragment orbit lifting apparatus described in claim 1 or 2
Track lifting, it is characterised in that:
Described method includes herein below:
Step 1:Before lifting, the elevation of the ballastless track structure of settling zone is measured using spirit level, tied according to measurement
Really, determining the specific Uplifting amount of bedplate (8) is then needing the sidetracking anchor hole of bedplate (8) two of lifting;At the bottom for needing lifting
Multiple injected holes (11) are bored on seat board (8);
Step 2:Carry out bolt anchoring in the anchor hole being drilled on bedplate (8) with the anchoring adhesive of high intensity, and with high-strength
Be fixed on the vertical girder steel (1) of H types on bedplate (8) by bolt (3);H types tail trimmer (2) are fixed on by longitudinal H types by welding again
On vertical girder steel (1), H types tail trimmer (2) stretch out certain length in bedplate (8) left and right sides per side;
Step 3:Vertical concrete pier (6) is laid under H types tail trimmer (2), it is ensured that exist under each H type tail trimmer (2) perpendicular
To concrete pier (6);
Step 4:A vertical jack (4) is laid below each H types tail trimmer (2) extension, on vertical jack (4)
Portion is connected by tetrafluoro plate (5) with H types tail trimmer (2), and bottom is placed directly within vertical concrete pier (6) above;
Step 5:All vertical jack (4) are controlled by control system simultaneously, by track plates (7) jacking to corresponding height;
Step 6:Track plates (7) jacking uses CGM cement to after corresponding height between bedplate (8) and rubble rolling layers
Based polyalcohol mortar is in the milk, and it is returned to designed elevation, and slip-casting lifting process will carry out real-time monitoring, using vertical position
Displacement sensor and horizontal displacement sensors synchronize monitoring to bedplate (8) short transverse and horizontal displacement change simultaneously, protect
Card track rising height and translational displacement control accuracy.
8. method as claimed in claim 7, it is characterised in that also include bedplate (8) off-load step between step 3 and 4,
The inserts of the confining bed and convex gear platform (13) that are specially cut along the line of cut (12) of bedplate (8) each 5cm in both sides.
9. a kind of non-fragment orbit lifting restorative procedure, wherein being realized using the non-fragment orbit lifting apparatus described in claim 3 or 4
Track lifting and translation, it is characterised in that:
Described method includes herein below,
Step 1:Before lifting, the elevation of the ballastless track structure of settling zone is measured using spirit level, tied according to measurement
Really, determining the specific Uplifting amount of bedplate (8) is then needing the sidetracking anchor hole of bedplate (8) two of lifting;At the bottom for needing lifting
Multiple injected holes (11) are bored on seat board (8);
Step 2:Carry out bolt anchoring in the anchor hole being drilled on bedplate (8) with the anchoring adhesive of high intensity, and with high-strength
Be fixed on the vertical girder steel (1) of H types on bedplate (8) by bolt (3);H types tail trimmer (2) are fixed on by longitudinal H types by welding again
On vertical girder steel (1), H types tail trimmer (2) stretch out certain length in bedplate (8) left and right sides per side;
Step 3:Vertical concrete pier (6) is laid under H types tail trimmer (2), it is ensured that exist under each H type tail trimmer (2) mixed
Solidifying knoll;
Step 4:A vertical jack (4) is laid below each H types tail trimmer (2) extension, on vertical jack (4)
Portion is connected by tetrafluoro plate (5) with H types tail trimmer (2), and bottom is placed directly within vertical concrete pier (6) above;
Step 5:Track plates (7) Integral synchronous jacking:All vertical jack (4) are controlled by control system simultaneously, by track
Plate (7) jacking is to corresponding height;
Step 6:The horizontal jack (10) controlled by control system makes track plates (7) move to assigned position;
Step 7:After track plates (7) translation in place, CGM cement-based polymers are used between bedplate (8) and rubble rolling layers
Mortar is in the milk, and it is returned to designed elevation, and slip-casting lifting process will carry out real-time monitoring, using vertical displacement sensor
Monitoring is synchronized to the height of bedplate (8) and horizontal displacement change simultaneously with horizontal displacement sensors, it is ensured that track lifting
Height and control of horizontal displacement precision.
10. method as claimed in claim 9, it is characterised in that also walked including bedplate (8) off-load between step 3 and 4
Suddenly, the inserts of the confining bed and convex gear platform (13) that are specially cut along the line of cut (12) of bedplate (8) each 5cm in both sides.
11. methods as claimed in claim 7, it is characterised in that following steps are also performed after step 6,
Step 7:Lifting value is checked, checks that main frame lifting data and sensing data check rising height;
Step 8:Withdraw jack;
Step 9:Fastener recovers, and, along sledge, adjustment, contact net leads high measurement, lifts plate same day rail for lift plate section and lift plate two ends track
Road uses V≤120km/h deviation management standards along sledge and accurate adjustment;
Step 10:Cementer is removed after the completion of making to lifting frock, and former expansion joint is recovered using expansion joint packing material, and
The drilling of bedplate (8) is backfilled with closure mortar and remove the drilling after frock;
Step 11:Construction quality and orbit adjusting return inspection:Scene is checked to the bedplate (8) for having noted slurry, is seen if there is not
The full position of slip casting, and inspection is carried out back to Rail inspection.
12. methods as claimed in claim 11, wherein the mortar is polymer quick-setting mortar.
13. methods as claimed in claim 11, wherein, the packing material is silicone material.
14. methods as claimed in claim 10, wherein, when finding lifting value in step 7 less than pre- fixing one's aim, repeat
Row step 5,6 steps.
15. methods as claimed in claim 9, it is characterised in that following steps are also performed after step 7,
Step 8:Check that main frame lifting data and sensing data check rising height and horizontal displacement;
Step 9:Withdraw jack cylinder;
Step 10:Fastener recovers, and, along sledge, adjustment, contact net leads high measurement, lifts plate same day rail for lift plate section and lift plate two ends track
Road uses V≤120km/h deviation management standards along sledge and accurate adjustment;
Step 11:Cementer is removed after the completion of making to lifting frock, and former expansion joint is recovered using expansion joint packing material, and
The drilling of bedplate (8) is backfilled with closure mortar and remove the drilling after frock;
Step 12:Construction quality and orbit adjusting return inspection:Scene is checked to the bedplate (8) for having noted slurry, is seen if there is not
The full position of slip casting, and inspection is carried out back to Rail inspection.
16. methods as claimed in claim 15, wherein, find lifting value, displacement value less than fixing one's aim in advance in step 8
When, repeat step 5,6,7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510341806.1A CN104928999B (en) | 2015-06-18 | 2015-06-18 | A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510341806.1A CN104928999B (en) | 2015-06-18 | 2015-06-18 | A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104928999A CN104928999A (en) | 2015-09-23 |
CN104928999B true CN104928999B (en) | 2017-07-04 |
Family
ID=54116408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510341806.1A Active CN104928999B (en) | 2015-06-18 | 2015-06-18 | A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104928999B (en) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105603838B (en) * | 2016-01-05 | 2017-04-12 | 上海同罡建筑工程有限公司 | Method for lifting railway track board by using track board lifting trolley |
CN105803877B (en) * | 2016-04-18 | 2018-01-30 | 浙江大学包头工业技术研究院 | High ferro subgrade settlement harnessing project midsole seat board lifting apparatus |
CN105862526B (en) * | 2016-04-18 | 2017-07-25 | 浙江大学包头工业技术研究院 | The vehicle-mounted sawing device of high ferro bedplate side wall |
CN105821725A (en) * | 2016-04-29 | 2016-08-03 | 中铁第四勘察设计院集团有限公司 | Intra-segment limit structure for bearing-trail beams at double-line section of middle-low speed magnetic levitation traffic engineering low-laying line |
CN106049193B (en) * | 2016-05-17 | 2018-08-17 | 中国铁道科学研究院铁道建筑研究所 | One kind being used for roadbed section ballastless track of high-speed railway center line method for correcting error |
CN105970747A (en) * | 2016-05-20 | 2016-09-28 | 上海同罡建筑工程有限公司 | Steel member for track board lifting and jacking method of steel member |
CN106400622A (en) * | 2016-05-31 | 2017-02-15 | 中铁第四勘察设计院集团有限公司 | Repair structure for plate type ballastless track in turnout zone |
CN106835863B (en) * | 2017-01-09 | 2019-07-26 | 北京瑞威铁科高铁工程有限公司 | A kind of pulley-type device and method for non-fragment orbit lifting correction |
CN106758591B (en) * | 2017-01-09 | 2019-07-26 | 北京瑞威铁科高铁工程有限公司 | A kind of non-fragment orbit slip-casting lifting and lifting method for correcting error |
CN107905046A (en) * | 2017-11-10 | 2018-04-13 | 成都天府轨谷科技有限公司 | The magnetic railway track of track deformation adjusting apparatus and application described device |
CN110000512B (en) * | 2018-01-04 | 2020-12-18 | 烟台中集来福士海洋工程有限公司 | Method for repairing sliding track of drilling platform |
CN108442196A (en) * | 2018-05-29 | 2018-08-24 | 中国铁路设计集团有限公司 | A kind of non-fragment orbit deformation adjustment structure and method of adjustment |
CN109778612A (en) * | 2018-12-06 | 2019-05-21 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Ballastless track structure method for correcting error in railway tunnel |
CN113089394A (en) * | 2021-03-26 | 2021-07-09 | 西南交通大学 | Mechanical lifting and grouting reinforcement rapid repairing method for supporting layer of double-block ballastless track |
CN113562422B (en) * | 2021-09-26 | 2021-12-14 | 中铁九局集团有限公司 | Track slab transportation jacking device and transportation jacking method |
CN113969520B (en) * | 2021-12-02 | 2023-03-31 | 南京铁道职业技术学院 | Ballastless track structure in railway tunnel and deviation rectifying method thereof |
CN117536282A (en) * | 2024-01-10 | 2024-02-09 | 中国二十二冶集团有限公司 | Excavation-free correction construction method for sedimentation of small-sized structures |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011021421A (en) * | 2009-07-17 | 2011-02-03 | Kashiwagigumi:Kk | Hydraulic track lifting machine |
CN102888791B (en) * | 2012-10-15 | 2015-07-01 | 中铁二十三局集团轨道交通工程有限公司 | Maintenance structure and maintenance method for plate-type ballastless track |
CN103132398B (en) * | 2013-03-21 | 2015-08-26 | 中国铁道科学研究院金属及化学研究所 | A kind of method for maintaining of I-type plate-type non-fragment orbit |
CN103757993B (en) * | 2013-12-27 | 2016-02-17 | 北京中铁瑞威基础工程有限公司 | High-speed railway subgrade sedimentation repair system and method |
CN104452484A (en) * | 2014-11-10 | 2015-03-25 | 中国铁道科学研究院铁道建筑研究所 | Repair method for ballastless track foundation settlement |
CN205012173U (en) * | 2015-06-18 | 2016-02-03 | 董明 | Ballastless track lifting deviation correcting device and system |
-
2015
- 2015-06-18 CN CN201510341806.1A patent/CN104928999B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104928999A (en) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104928999B (en) | A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure | |
CN205012173U (en) | Ballastless track lifting deviation correcting device and system | |
CN106758591B (en) | A kind of non-fragment orbit slip-casting lifting and lifting method for correcting error | |
CN103757993B (en) | High-speed railway subgrade sedimentation repair system and method | |
CN106049193B (en) | One kind being used for roadbed section ballastless track of high-speed railway center line method for correcting error | |
CN101230563B (en) | Method for replacing bridge bearing without traffic interruption and special device thereof | |
CN113802424B (en) | Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway | |
KR101582901B1 (en) | Method for restoration of subsided railroad track | |
CN1916277A (en) | Track base without broken stones, and building method | |
CN107620261B (en) | Based on the horizontal existing railway track reinforcement means for holding formula just beam | |
CN106012697A (en) | Ballastless track roadbed high polymer injection lifting method | |
CN108951322A (en) | A kind of ballastless track structure sedimentation lifting apparatus and its lifting method | |
CN109235292A (en) | Railroad bridge changes beam process and changes girder system system | |
CN107059496A (en) | A kind of track road-bridge transition section slip casting correction lifting method | |
CN103741605B (en) | Suppressing beam body produces crack and suppresses the method that beam cracks expands | |
CN205591131U (en) | Whole superelevation of multispan case roof beam is jacking construction system in turn | |
CN211973067U (en) | Road and bridge connection transition structure for preventing and treating vehicle bump at bridge head | |
CN112012051B (en) | Treatment method for deformation of ballastless track | |
CN110258191B (en) | Deviation rectifying and reinforcing method for transverse displacement of high-speed railway roadbed | |
CN115434191A (en) | Deep deformation treatment method for ballast track subgrade of operation railway | |
CN107100156A (en) | High-speed railway subgrade settlement monitoring element protection and its distribution method | |
CN210737232U (en) | Side wide roadbed structure | |
CN206667292U (en) | It is a kind of to justify pile foundation counterfort wall station road structure close to bridge pier | |
CN106283945B (en) | Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation combined type support rail girder construction | |
CN110258217A (en) | The horizontal lift beam overhead transmission line construction method of prestressing force |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |