CN102888791B - Maintenance structure and maintenance method for plate-type ballastless track - Google Patents

Maintenance structure and maintenance method for plate-type ballastless track Download PDF

Info

Publication number
CN102888791B
CN102888791B CN201210391049.5A CN201210391049A CN102888791B CN 102888791 B CN102888791 B CN 102888791B CN 201210391049 A CN201210391049 A CN 201210391049A CN 102888791 B CN102888791 B CN 102888791B
Authority
CN
China
Prior art keywords
maintenance
track
screed
parts
track plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210391049.5A
Other languages
Chinese (zh)
Other versions
CN102888791A (en
Inventor
林晓波
潘微旺
喻丕金
张长春
胡志勇
黎开政
谭斌
郑红兵
王玉策
钱振地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN201210391049.5A priority Critical patent/CN102888791B/en
Publication of CN102888791A publication Critical patent/CN102888791A/en
Application granted granted Critical
Publication of CN102888791B publication Critical patent/CN102888791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Railway Tracks (AREA)

Abstract

The invention relates to a maintenance structure for a plate-type ballastless track. The maintenance structure comprises steel rails 1, fasteners 2, a track board 3, a maintenance filling layer 4, a CA (cement asphalt) mortar layer 5 and a jacking mechanism, wherein the steel rails 1 are fixed on the track board 3 through the fasteners 2; the maintenance filling layer 4 is arranged between the track board 3 and the CA mortar layer 5; the jacking mechanism comprises force-bearing components 6, fastening components 7 and jacking devices 8; the force-bearing components 6 are fixedly connected with the track board 3 through the fastening components 7; and the jacking devices 8 lift up the track board 3 through the force-bearing components 6. The invention also relates to a maintenance method for the plate-type ballastless track. The method comprises the main procedures of measuring a route, adjusting a longitudinal slope, jacking the track board, pouring quick set mortar under the board, finely adjusting the route, and the like. Compared with the prior art, the maintenance structure and the maintenance method are improved in maintenance time and cost, endurance quality, and operation and working environment of workers.

Description

A kind of plate-type ballastless track maintaining structure and method for maintaining thereof
Technical field
The present invention relates to a kind of orbital maintenance structure and method thereof, particularly a kind of plate-type ballastless track maintaining structure and method thereof, belong to railroad track field.
Background technology
At present, known high-speed railway plate type ballastless track ballast bed structure forms by three layers, is track plates, CA mortar and base respectively.Track is in use subject to the many factors such as wind, frost, rain, snow, earthquake, flood, Decline or rise of groundwater level, unsuitable distortion will be there is in its plane curve and vertical curve, have a negative impact to the safety of structure after this change exceedes certain limit, such as, uneven settlement of foundation is more than 30mm, exceed the adjustment amount of fastener, have a negative impact to the train of high-speed cruising.Therefore, need to keep in repair high speed railway track railway roadbed.The method generally adopted in the industry installs backing plate additional under fastener, but the adjusting range of backing plate is limited, can not meet the requirement of safe railway operation in some cases." ballastless track of high-speed railway line rule (trying) " that the Ministry of Railways promulgates is with reference to some method for maintaining of Japanese plate-type ballastless track, when track structure occurs being greater than 30mm gap, main employing resin material is repaired gap, but this material price is expensive, and maintenance cost is several times of newly-built expense, and, complicated construction technique, operation easier is also comparatively large, therefore, implements difficulty larger.
Summary of the invention
The present invention's a kind of plate-type ballastless track maintaining structure and method for maintaining thereof disclose new technical scheme, packing layer is added between track plates and CA screed, specifically adopt packed fast solidifying mortar to add the maintenance technique of composite material isolation bed course, solve ordi-nary maintenance and can not meet orbital motion needs and the larger problem of maintenance difficulty.
Plate-type ballastless track maintaining structure of the present invention comprises rail 1, fastener 2, track plates 3, maintenance packing layer 4, CA screed 5 and lifting body.Rail 1 is fixed on track plates 3 by fastener 2, maintenance packing layer 4 is arranged between track plates 3 and CA screed 5, lifting body comprises holds power parts 6, secure component 7 and lift-up device 8, hold power parts 6 to be fixedly connected with track plates 3 by secure component 7, track plates 3 upwards lifts by holding power parts 6 by lift-up device 8.
The method for maintaining of plate-type ballastless track of the present invention comprises step: (1) measures the radius of vertical curve of maintenance position; (2) track length and plan top lifting height that need repairing is calculated according to the above-mentioned radius of vertical curve recorded; (3) remove fastener, utilize track jack jacking rail, remove the padded backing plate under fastener; (4) lifting body is utilized to lift track plates; (5) packing material is placed in maintenance packing layer position; (6) adjust the orbit parameter of maintenance position, confirm that orbital maintenance section reaches the standard of setting.
Plate-type ballastless track maintaining structure of the present invention provides a kind of scheme of track rapid-maintenance, method for maintaining then discloses the embodiment of mating with above-mentioned maintaining structure, compare existing scheme in maintenance time, cost and endurance quality, also have on operative's operating environment and all have large improvement.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention CRTS I-type plate-type non-fragment orbit maintaining structure schematic diagram.
Fig. 2 is embodiment of the present invention CRTS II plate-type non-fragment orbit maintaining structure schematic diagram.
In Fig. 1 ~ 2,1 is rail, and 2 is fasteners, and 3 is track plates, and 4 is maintenance packing layers, and 5 is CA screeds, and 6 is hold power parts, and 7 is secure components, and 8 is lift-up device, and 9 is chipping filler layers.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As illustrated in fig. 1 and 2, the CRTS I type of plate-type ballastless track maintaining structure of the present invention and CRTS II plate-type non-fragment orbit maintaining structure schematic diagram.Plate-type ballastless track maintaining structure comprises rail 1, fastener 2, track plates 3, maintenance packing layer 4, CA screed 5 and lifting body.Rail 1 is fixed on track plates 3 by fastener 2, and maintenance packing layer 4 is arranged between track plates 3 and CA screed 5.Lifting body comprises holds power parts 6, secure component 7 and lift-up device 8, and holding that power parts 6 can adopt is T-shape steel, and secure component 7 can be bolt or spiral pin, and lift-up device 8 can be jack.Hold power parts 6 to be fixedly connected with track plates 3 by secure component 7, secure component 7 and track plates 3 can adopt internal and external threads to be fastenedly connected, and track plates 3 upwards lifts by holding power parts 6 by lift-up device 8.
This programme introduces maintenance packing layer 4 and adopts lifting body to arrange the structure of maintenance packing layer 4, solves under only relying on fastener and installs the problem that backing plate can not reach maintenance requirement additional.
Often there is the phenomenon that CA screed 5 is damaged, fall block in the case back warp damaged at CRTS II plate-type non-fragment orbit, find through research, when the uneven sedimentation of roadbed, track plates produces with CA screed and is separated, when train passes through, track plates and rail produce elastic deformation, CA screed is produced and pats compressive stress, thus cause the generation of above-mentioned infringement.In order to address this problem, this programme arranges chipping filler layer 9 in CA screed 5, and chipping filler layer 9 fills up the damaged part at CA screed 5.
Rail system carries heavy transport task, only could occur of short duration idle period at the non-peak period that transport power is sparse under normal circumstances, and this just requires that the maintenance work of track must complete within these of short duration time periods.In order to meet the requirement of this harshness, the maintenance packing layer 4 of this programme can comprise the bag of fast hard mortar described in fast hard mortar and splendid attire, first at repairing position putting bag body, then by the fast hard mortar injection that is stirred in it.In this programme, the rate of set of fast hard mortar and intensity are the keys of problem, therefore, the fast hard mortar of this programme is preferably made up of ferrous aluminate 50 parts, fine sand 80 parts, mulseal 20 parts, 14 parts, water and Admixture 3 parts, and described Admixture is by accounting for mass percent 90% polycarboxylate water-reducer and 10% natrium nitrosum forms.Equally, not fragile in order to ensure maintenance packing layer 4, the bag preferred nonwoven chemical fabric material of this programme.When rush repair, the maintenance packing layer 4 of this programme can also adopt plank, but the material of plank, size and thickness should reach certain standard, and this standard can specifically be determined as the case may be, the length of usual plank is not less than 1000mm, and width is not less than 150mm.
In order to implement above-mentioned maintaining structure, the method for maintaining that this programme adopts comprises step:
(1) radius of vertical curve of maintenance position is measured.First, utilize construction CPIII net reserved outside circuit as bench mark, measure from the side slope point of circuit, every 5m survey mark, measure length and should reach second knick point.After measurement completes, altitude data successively line is drawn vertical curve, calculate maximum versed sine.
(2) track length and plan top lifting height that need repairing is calculated according to the above-mentioned radius of vertical curve recorded.After calculating completes, configure corresponding power tool and material according to the result scheduling job personnel obtained.
(3) remove fastener, utilize track jack jacking rail, remove the padded backing plate under fastener.After dismounting operation completes, rail can be returned and put original position, also can keep jacking state, thus ease off the pressure for next step jacking track plate.
(4) lifting body is utilized to lift track plates.Specifically, erection electronic level, measure first piece, middle one piece and last block track plates rail surface height value, calculate and need the height of jacking track plate, jacking first piece, middle one piece and last block track plates to calculated height, fastening first piece, the fastener of intermediate mass and last block track plates, again check measurement elevation, the rail observing first piece and last block linkage section to, can not occur curved point, song such as to turn round at the problem.
(5) packing material is placed in maintenance packing layer position.Specifically, first lay bag at desired location, then will stir the fast hard mortar injection for preparing in it.At some in emergency circumstances, plank etc. can also be taked to be packed in desired location, but the quality of sheet material and size should specifically be determined as the case may be, the length of usual sheet material is not less than 1000mm, and width is not less than 150mm.
(6) adjust the orbit parameter of maintenance position, confirm that orbital maintenance section reaches the standard of setting.After completing above-mentioned job step, should guarantee that the track parameters after keeping in repair meets the requirement of specifying to operation quality inspection.Last site clearing, recovers normally to be open to traffic state.
This programme is in the operation process of maintenance CRTS II plate-type non-fragment orbit; usually the operation procedure repairing CA screed is also comprised; this step of repairing CA screed should be arranged between above-mentioned steps (4) and step (5); specifically; first the damaged part of CA screed is cleared up; fragment and residue are cleaned out, then the chipping filler modulated is cast in damaged part, the chipping filler that this programme adopts can be the special material that the industry is general.
This programme plate-type ballastless track maintaining structure and method for maintaining thereof are not limited to embodiment scope of disclosure, and those skilled in the art also belong to the scope of this programme in conjunction with the alternative that common practise is made according to this programme.

Claims (8)

1. a plate-type ballastless track maintaining structure, comprise rail (1), fastener (2), track plates (3), maintenance packing layer (4), CA screed (5) and lifting body, rail (1) is fixed on track plates (3) by fastener (2), maintenance packing layer (4) is arranged between track plates (3) and CA screed (5), described lifting body comprises holds power parts (6), secure component (7) and lift-up device (8), hold power parts (6) to be fixedly connected with track plates (3) by secure component (7), track plates (3) upwards lifts by holding power parts (6) by lift-up device (8), holding power parts (6) is T-shape steel, and secure component (7) is bolt or spiral pin, and lift-up device (8) is jack, and secure component (7) and track plates (3) internal and external threads are fastenedly connected.
2. maintaining structure according to claim 1, is characterized in that, also comprises chipping filler layer (9) in CA screed (5), and chipping filler layer (9) fills up the damaged part in CA screed (5).
3. maintaining structure according to claim 1 and 2, is characterized in that, maintenance packing layer (4) comprises the bag of fast hard mortar described in fast hard mortar and splendid attire.
4. maintaining structure according to claim 3, it is characterized in that, described fast hard mortar is made up of ferrous aluminate 50 parts, fine sand 80 parts, mulseal 20 parts, 14 parts, water and Admixture 3 parts, and described Admixture is by accounting for mass percent 90% polycarboxylate water-reducer and 10% natrium nitrosum forms; The material of described bag is nonwoven chemical fabric.
5. maintaining structure according to claim 1 and 2, is characterized in that, maintenance packing layer (4) is plank, and the length of described plank is not less than 1000mm, and the width of described plank is not less than 150mm.
6. the method for maintaining of plate-type ballastless track maintaining structure according to claim 1, comprises step:
(1) radius of vertical curve of maintenance position is measured;
(2) track length and plan top lifting height that need repairing is calculated according to the above-mentioned radius of vertical curve recorded;
(3) remove fastener, utilize track jack jacking rail, remove the padded backing plate under fastener;
(4) lifting body is utilized to lift track plates;
(5) packing material is placed in maintenance packing layer position;
(6) adjust the orbit parameter of maintenance position, confirm that orbital maintenance section reaches the standard of setting.
7. method according to claim 6, is characterized in that, in step (5), described packing material is bag or the plank of built-in fast hard mortar.
8. method according to claim 7, is characterized in that, between step (4) and step (5), also have a step of repairing CA screed, the step of described repairing CA screed comprises:
(1) damaged part of CA screed is cleared up;
(2) chipping filler is placed at the position after above-mentioned cleaning.
CN201210391049.5A 2012-10-15 2012-10-15 Maintenance structure and maintenance method for plate-type ballastless track Active CN102888791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210391049.5A CN102888791B (en) 2012-10-15 2012-10-15 Maintenance structure and maintenance method for plate-type ballastless track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210391049.5A CN102888791B (en) 2012-10-15 2012-10-15 Maintenance structure and maintenance method for plate-type ballastless track

Publications (2)

Publication Number Publication Date
CN102888791A CN102888791A (en) 2013-01-23
CN102888791B true CN102888791B (en) 2015-07-01

Family

ID=47532459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210391049.5A Active CN102888791B (en) 2012-10-15 2012-10-15 Maintenance structure and maintenance method for plate-type ballastless track

Country Status (1)

Country Link
CN (1) CN102888791B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132398B (en) * 2013-03-21 2015-08-26 中国铁道科学研究院金属及化学研究所 A kind of method for maintaining of I-type plate-type non-fragment orbit
CN103233400A (en) * 2013-05-22 2013-08-07 中铁二院工程集团有限责任公司 Ballastless track railway bridge joint differential settlement adjusting device
CN103757993B (en) * 2013-12-27 2016-02-17 北京中铁瑞威基础工程有限公司 High-speed railway subgrade sedimentation repair system and method
JP2015138395A (en) * 2014-01-22 2015-07-30 三菱重工業株式会社 Maintenance management device, maintenance management method, and program
CN103952952B (en) * 2014-05-13 2016-06-22 中铁二十四局集团安徽工程有限公司 High ferro CRTS II plate-type ballastless track boards gap regulation method
CN104988816A (en) * 2015-05-26 2015-10-21 上海同罡建筑工程有限公司 Track board lifting method
CN104928999B (en) * 2015-06-18 2017-07-04 董明 A kind of non-fragment orbit lifting deviation correcting device and lifting restorative procedure
CN105220582B (en) * 2015-08-25 2018-01-30 中铁三局集团有限公司 Solid concrete roabed and tunnel bottom Disease Treatment method based on combined support and slip casting template
CN106436492A (en) * 2015-12-30 2017-02-22 中国铁道科学研究院铁道建筑研究所 Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN105970747A (en) * 2016-05-20 2016-09-28 上海同罡建筑工程有限公司 Steel member for track board lifting and jacking method of steel member
CN106840899B (en) * 2017-03-30 2019-10-01 西南交通大学 Compression bar stabilization testing device
CN113089394A (en) * 2021-03-26 2021-07-09 西南交通大学 Mechanical lifting and grouting reinforcement rapid repairing method for supporting layer of double-block ballastless track
CN113235338B (en) * 2021-05-20 2023-05-12 刘新 Method for repairing rail bottom slope by using rail bottom slope repairing tool
CN113338092A (en) * 2021-06-21 2021-09-03 湖北木之君工程材料有限公司 Method for repairing damage of ballastless track filling layer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201648877U (en) * 2010-04-08 2010-11-24 中铁二院工程集团有限责任公司 Plate type vibration reducing structure for ballastless track
CN201908236U (en) * 2010-12-17 2011-07-27 中国铁道科学研究院铁道建筑研究所 Shock absorption type slab ballastless track
CN202072993U (en) * 2011-04-15 2011-12-14 中铁十局集团有限公司 Light-duty slab elevating apparatus used for fine adjustment of a high-speed train ballastless track slab
CN102433810A (en) * 2011-10-09 2012-05-02 石家庄铁道大学 Restoration equipment for ballastless track
CN102505582A (en) * 2011-11-07 2012-06-20 西南交通大学 Method for repairing filling layer of high-speed railway slab ballastless track
CN202830664U (en) * 2012-10-15 2013-03-27 中铁二十三局集团轨道交通工程有限公司 Plate-type ballastless track maintenance structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005013947A1 (en) * 2005-03-26 2006-10-05 Pfleiderer Infrastrukturtechnik Gmbh & Co Kg Method for height correction of a fixed rail track and fixed rail track

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201648877U (en) * 2010-04-08 2010-11-24 中铁二院工程集团有限责任公司 Plate type vibration reducing structure for ballastless track
CN201908236U (en) * 2010-12-17 2011-07-27 中国铁道科学研究院铁道建筑研究所 Shock absorption type slab ballastless track
CN202072993U (en) * 2011-04-15 2011-12-14 中铁十局集团有限公司 Light-duty slab elevating apparatus used for fine adjustment of a high-speed train ballastless track slab
CN102433810A (en) * 2011-10-09 2012-05-02 石家庄铁道大学 Restoration equipment for ballastless track
CN102505582A (en) * 2011-11-07 2012-06-20 西南交通大学 Method for repairing filling layer of high-speed railway slab ballastless track
CN202830664U (en) * 2012-10-15 2013-03-27 中铁二十三局集团轨道交通工程有限公司 Plate-type ballastless track maintenance structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"CRTSⅡ型板式无砟轨道CA砂浆施工技术";方宝林;《山西建筑》;20120531;第38卷(第14期);第164-166页 *

Also Published As

Publication number Publication date
CN102888791A (en) 2013-01-23

Similar Documents

Publication Publication Date Title
CN102888791B (en) Maintenance structure and maintenance method for plate-type ballastless track
CN110541329B (en) Construction method of ballastless track of heavy haul railway tunnel group
CN101748662B (en) Construction process for double-block ballastless track bed on subgrade
CN104131498B (en) A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure
CN103321111B (en) Streetcar track connects the construction method of paving
CN103952951A (en) Process for high speed railway ballastless track construction
CN104153259A (en) Rapid repairing method for sunken ballastless track through grouting lifting
CN103174071A (en) Construction technology of short sleeper vibration attenuation fastener with improved structure replacing elasticity short sleeper
CN105421170A (en) Ballastless track construction method based on high-integration track panel frame
CN113089394A (en) Mechanical lifting and grouting reinforcement rapid repairing method for supporting layer of double-block ballastless track
CN111663385A (en) Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
CN110106751A (en) A kind of sedimentation method of adjustment suitable for II plate-type non-fragment orbit of CRTS
CN109137633A (en) Level crossing mouth railway roadbed and preparation method
CN205501739U (en) Hole track construction is laid with frame rail frock to hanger rail method
CN207998757U (en) It is a kind of for subway route changeover portion solid concrete roabed sink processing without pillow formula track structure
CN106948228A (en) A kind of plate-type ballastless track track plates fast replacement system and method
CN101838967B (en) Construction technology of ballast bed of bridge double-block ballastless track
CN202830664U (en) Plate-type ballastless track maintenance structure
CN117758549A (en) Construction process of ballastless track of urban railway
CN117738032A (en) Ballastless track temporary supporting structure and ballastless track deformation renovation method
CN208995842U (en) Level crossing mouth railway roadbed
CN204174481U (en) Soft clay area modern tram abutment rebound structure
CN108130825B (en) Subgrade of metro concrete replacement technique in special limiting condition
CN107988854B (en) Later-stage reservation structure of subway upper cover vehicle base parking train inspection warehouse
CN115404731A (en) Construction method for rapidly replacing double-block sleeper in skylight period

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant