Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510282592.5A
Other languages
Chinese (zh)
Other versions
CN104895587B (en
Inventor
黄日龙
杨雄
朱其绎
李茂华
白洁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201510282592.5A priority Critical patent/CN104895587B/en
Publication of CN104895587A publication Critical patent/CN104895587A/en
Application granted granted Critical
Publication of CN104895587B publication Critical patent/CN104895587B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Provided is a construction method for pressure pouring of concrete for tunnel secondary lining. The construction method comprises following steps: (1) machining right-angle-type pre-embedded pump pipes; (2) building a reinforcement frame on the side walls and the vault of the tunnel; (3) installing the pre-embedded pump pipes between an inner layer and an outer layer of the vault reinforcement frame; (4) sealing by utilizing a template and reserving working windows; (5) enabling pressure-pouring conveying pipes to stretch into the working windows for pouring the side walls and connecting the pressure-pouring pipes with the pre-embedded pump pipes for pouring the vault; (6) detaching the template and maintaining concrete. The construction method for pressure pouring of concrete for tunnel secondary lining has following beneficial effects: the construction method is simple in design, safe in construction, fine in engineering effect and high in construction efficiency and is favorable to reduction in the construction period and decrease in engineering cost; the pre-embedded pipes are utilized for pressure pouring of concrete; the side walls and the vault is formed by one-time pouring so as to effectively ensure compactness of integral concrete pouring among the side walls and the vault without cracks; fine overall water-proof effect for secondary lining is obtained; and the construction method is applicable to integral construction of tunnels and culverts in various kinds and different fracture surfaces.

Description

A kind of Tunnel Second Lining pressure injection concrete construction method
Technical field
The present invention relates to tunnel construction technical field of construction, particularly relate to a kind of Tunnel Second Lining pressure injection concrete construction method.
Background technology
Traditional tunnel sidewalls and vault two serve as a contrast construction and generally take construction trolley mode, prefabricated lining segment block-by-block is formed entirety by circulating application work, then adds that secondary grouting guarantee overall structure meets the demands; Traditional construction exists following not enough:
1. between lining segment, seam is more, and integral waterproofing effect is poor;
2. efficiency of construction is low, long in time limit;
3., when running into many bore tunnels, construction trolley, due to conditionalities such as tunnel cross-section sizes, cannot take construction trolley lining methods at all.
Summary of the invention
The object of the present invention is to provide a kind of Tunnel Second Lining pressure injection concrete construction method, to overcome the above-mentioned deficiency existing for prior art.
The technical scheme that the present invention takes is: a kind of Tunnel Second Lining pressure injection concrete construction method, comprises the steps:
(1) the pre-buried pump line of right angle type is processed: adopt Φ 140 steel pipe and 90 ° of elbow weldings to form, or directly by curved in 90 ° for Φ 140 steel pipe, the long 0.35m of a right-angle side, another right angle length of side 1.2m;
(2) to wire-tie frame: to wire-tie frame at tunnel sidewalls and vault, the length of often encircleing along length of tunnel direction is 20 ~ 40m, point inside and outside two-layer, inside and outside two interlamellar spacings are concrete thickness deduction reinforcing bar and protective layer thickness;
(3) between Vault Steel ledges ectonexine reinforcing bar, pre-buried pump line is installed:
A, mounting method: stretch in the interlayer of reinforced frame by long for pre-buried pump line 1.2m, make long substantially parallel with reinforced frame plane of 1.2m, long 0.3m's while be welded and fixed with flange and outer reinforcement face;
B, installation site: along the every spacing 6m in length of tunnel direction, a pre-buried pump line is installed at vault, laid to relative eminence one end relative to lower one end by absolute altitude, the other addition in the termination that absolute altitude is relatively high pre-buried pump line, to ensure to build eminence most end concrete compaction;
(4) seal template: be sealed by reinforced frame skin by template, often encircle reinforced frame shelves head block head plate, vault highest point two ends bulkhead stays extravasating hole, and vault both sides arch camber place stays a working window along the every 6m in length of tunnel direction;
(5) pressure injection concrete:
A, side wall pour into: pressure injection carrier pipe is put in working window, and start pressure injection pump concrete perfusion, side wall concrete has built rear enclosed working window;
B, vault pour into: be connected with the pre-buried pump line being arranged on vault by flange by pressure injection carrier pipe, start pressure injection transport pump concrete to vault, squash type is adopted to fall back pumping concrete during perfusion, guarantee that vault concrete is closely knit, namely to be built gradually to relative eminence one end relative to lower one end by absolute altitude and bind, when bulkhead upper end, relative eminence one end extravasating hole has slurry to overflow, namely bind;
(6) after reaching concrete strength 100% by designing requirement, form removal curing concrete.
Its further technical scheme is: before carrying out the above-mentioned pressure injection concrete of step (five), quality examination to be carried out by car to entering pump concrete, its mobility and workability index reach: the slump >=220mm, divergence > 550mm, must not emanate, bleeding;
Concrete to its slump when building position more than 200mm, divergence in more than 500mm, air content between 3% ~ 4%, T500 is between 3s ~ 8s.
Further: when carrying out the described pressure injection concrete of step (five), pressure injection pump will keep 8MP pump pressure.
The specification of described working window is 400 × 400mm, and the specification of described extravasating hole is 50 × 50mm.
Owing to adopting technique scheme, a kind of Tunnel Second Lining pressure injection concrete construction method of the present invention has following beneficial effect:
1. adopt a kind of Tunnel Second Lining pressure injection concrete construction method of the present invention, side wall is shaping with vault one-time-concreting, and engineering effort well effectively ensures monobloc cast side wall and vault concrete density, free from flaw, and two to serve as a contrast integral waterproofings respond well;
2. adopt a kind of Tunnel Second Lining pressure injection concrete construction method of the present invention, only at desired location, pre-buried pump line need be installed, coordinate pressure injection concrete, simplicity of design, construction safety, efficiency of construction is high, is conducive to shortening the construction period, reduces engineering cost;
3. a kind of Tunnel Second Lining pressure injection concrete construction method of the present invention is without the need to using construction trolley, and not by conditionalities such as tunnel cross-section sizes, strong adaptability, can be applicable to the integral construction of various tunnel, culvert and different section.
Be described further below in conjunction with the technical characteristic of drawings and Examples to a kind of Tunnel Second Lining pressure injection concrete construction method of the present invention.
Accompanying drawing explanation
Fig. 1 is that template is launched and window is arranged, the pre-buried pump line arrangement diagram of vault;
Fig. 2 is pre-buried pump line drawing;
Fig. 3 is pre-buried pump line structural representation;
In figure:
1-working window, 2-arch camber, 3-extravasating hole, 4-vault reinforcing bar, 5-pre-buried pump line, 6-internal layer reinforcing bar, 7-outer reinforcement, 8-flange, 9-steel form, 10-gate valve, 11-side wall reinforcing bar, spacing between H-reinforced frame ectonexine reinforcing bar.
Detailed description of the invention
A kind of Tunnel Second Lining pressure injection concrete construction method, comprises the steps:
(1) the pre-buried pump line of right angle type is processed: adopt Φ 140 steel pipe and 90 ° of elbow weldings to form, or directly by curved in 90 ° for Φ 140 steel pipe, the long 0.35m of a right-angle side, another right angle length of side 1.2m;
(2) to wire-tie frame: to wire-tie frame at tunnel sidewalls and vault, the length of often encircleing along length of tunnel direction is 20 ~ 40m, point inside and outside two-layer, inside and outside two interlamellar spacings are concrete thickness deduction reinforcing bar and protective layer thickness;
According to designing requirement, after deducting reinforcing bar and protective layer thickness, between reinforced frame ectonexine reinforcing bar, clear space distance should be greater than the diameter of pre-buried pump line, can meet the installation of pre-buried pump line:
General concrete thickness is 600mm, deduction topping 25mm and bar diameter 25mm,
Inside and outside two-layer between clear space distance=600(concrete thickness)-25 × 2(protective layer thickness)-25 × 2 × 2(reinforcing bar thickness)=450mm, be greater than pre-buried Diameter of pump tube 140mm.)
(3) between Vault Steel ledges ectonexine reinforcing bar, pre-buried pump line is installed:
A, mounting method: by long the stretching in reinforced frame interlayer of pre-buried pump line 1.2m, make the substantially parallel with reinforced frame plane of 1.2m length, being welded and fixed with flange and outer reinforcement face of long 0.3m one side;
B, installation site: along the every spacing 6m in length of tunnel direction, a pre-buried pump line is installed at vault, laid to relative eminence one end relative to lower one end by absolute altitude, the other addition in the termination that absolute altitude is relatively high pre-buried pump line, to ensure to build eminence most end concrete compaction;
(4) seal template: be sealed by reinforced frame skin by template, often encircle reinforced frame shelves head block head plate, vault highest point two ends bulkhead stays extravasating hole, vault both sides arch camber place stays a working window along length of tunnel direction (namely according to construction direction of advance) every 6m;
(5) pressure injection concrete:
A, side wall pour into: pressure injection carrier pipe is put in working window, and start pressure injection pump concrete perfusion, side wall concrete has built rear enclosed working window;
B, vault pour into: be connected with the pre-buried pump line being arranged on vault by flange by pressure injection carrier pipe, start pressure injection transport pump concrete to vault, squash type is adopted to fall back pumping concrete during perfusion, guarantee that vault concrete is closely knit, namely to be built gradually to relative eminence one end relative to lower one end by absolute altitude and bind, when bulkhead upper end, relative eminence one end extravasating hole has slurry to overflow, namely bind;
(6) after reaching concrete strength 100% by designing requirement, form removal curing concrete.
Before carrying out the described pressure injection concrete of step (five), quality examination to be carried out by car to entering pump concrete, its mobility and workability index reach: the slump >=220mm, divergence > 550mm,, T500 is between 3s ~ 8s, must not emanate, bleeding, concrete to check when building position its slump should more than 200mm, divergence in more than 500mm, air content between 3% ~ 4%, T500 is between 3s ~ 8s.
Note: be subject to haulage stage overlong time to prevent concrete, temperature is crossed the impact of high factor and is reduced concrete performance, therefore except carrying out quality examination concrete indices by car entering pump concrete, also should guarantee to check these indexs to time on-the-spot at concrete, ensure to that when building position, concrete meets the requirements, smooth concreting; Wherein T500 is the index of concrete slump flow test, refers to viscosity degree.
When carrying out the described pressure injection concrete of step (five), pressure injection pump will keep 8MP pump pressure.
The specification of described working window is 400 × 400mm, and the specification of described extravasating hole is 50 × 50mm.

Claims (4)

1. a Tunnel Second Lining pressure injection concrete construction method, is characterized in that: described engineering method comprises the steps:
(1) the pre-buried pump line of right angle type is processed: adopt Φ 140 steel pipe and 90 ° of elbow weldings to form, or directly by curved in 90 ° for Φ 140 steel pipe, the long 0.35m of a right-angle side, another right angle length of side 1.2m;
(2) to wire-tie frame: to wire-tie frame at tunnel sidewalls and vault, the length of often encircleing along length of tunnel direction is 20 ~ 40m, point inside and outside two-layer, inside and outside two interlamellar spacings are concrete thickness deduction reinforcing bar and protective layer thickness;
(3) between Vault Steel ledges ectonexine reinforcing bar, pre-buried pump line is installed:
A, mounting method: stretch in the interlayer of reinforced frame by long for pre-buried pump line 1.2m, make long substantially parallel with reinforced frame plane of 1.2m, long 0.3m's while be welded and fixed with flange and outer reinforcement face;
B, installation site: along the every spacing 6m in length of tunnel direction, a pre-buried pump line is installed at vault, laid to relative eminence one end relative to lower one end by absolute altitude, the other addition in the termination that absolute altitude is relatively high pre-buried pump line, to ensure to build eminence most end concrete compaction;
(4) seal template: be sealed by reinforced frame skin by template, often encircle reinforced frame shelves head block head plate, vault highest point two ends bulkhead stays extravasating hole, and vault both sides arch camber place stays a working window along the every 6m in length of tunnel direction;
(5) pressure injection concrete:
A, side wall pour into: pressure injection carrier pipe is put in working window, and start pressure injection pump concrete perfusion, side wall concrete has built rear enclosed working window;
B, vault pour into: be connected with the pre-buried pump line being arranged on vault by flange by pressure injection carrier pipe, start pressure injection transport pump concrete to vault, squash type is adopted to fall back pumping concrete during perfusion, guarantee that vault concrete is closely knit, namely to be built gradually to relative eminence one end relative to lower one end by absolute altitude and bind, when bulkhead upper end, relative eminence one end extravasating hole has slurry to overflow, namely bind;
(6) after reaching concrete strength 100% by designing requirement, form removal curing concrete.
2. a kind of Tunnel Second Lining pressure injection concrete construction method as claimed in claim 1, it is characterized in that: before carrying out the described pressure injection concrete of step (five), quality examination to be carried out by car to entering pump concrete, its mobility and workability index reach: the slump >=220mm, divergence > 550mm, T500 is between 3s ~ 8s, must not emanate, bleeding, concrete to its slump when building position more than 200mm, divergence in more than 500mm, air content between 3% ~ 4%, T500 is between 3s ~ 8s.
3. a kind of Tunnel Second Lining pressure injection concrete construction method as claimed in claim 1 or 2, is characterized in that: when carrying out the described pressure injection concrete of step (five), pressure injection pump will keep 8MP pump pressure.
4. a kind of Tunnel Second Lining pressure injection concrete construction method as claimed in claim 3, it is characterized in that: the specification of described working window is 400 × 400mm, the specification of described extravasating hole is 50 × 50mm.
CN201510282592.5A 2015-05-28 2015-05-28 Construction method for pressure pouring of concrete for tunnel secondary lining Expired - Fee Related CN104895587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510282592.5A CN104895587B (en) 2015-05-28 2015-05-28 Construction method for pressure pouring of concrete for tunnel secondary lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510282592.5A CN104895587B (en) 2015-05-28 2015-05-28 Construction method for pressure pouring of concrete for tunnel secondary lining

Publications (2)

Publication Number Publication Date
CN104895587A true CN104895587A (en) 2015-09-09
CN104895587B CN104895587B (en) 2017-01-11

Family

ID=54028502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510282592.5A Expired - Fee Related CN104895587B (en) 2015-05-28 2015-05-28 Construction method for pressure pouring of concrete for tunnel secondary lining

Country Status (1)

Country Link
CN (1) CN104895587B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927249A (en) * 2016-05-24 2016-09-07 北京住总集团有限责任公司 Construction method for pouring tunnel second lining self-compacting concrete
CN106499408A (en) * 2016-11-02 2017-03-15 北京翔鲲水务建设有限公司 Wholecircle full section of tunnel one-shot forming self-compacting concrete pouring construction method
CN108150194A (en) * 2017-12-25 2018-06-12 洛阳高飞桥隧机械有限公司 A kind of casting method of tunnel lining trolley concrete shunt conduit device
CN108956226A (en) * 2018-06-27 2018-12-07 河海大学 Large scale cement-stabilized soil sample molding machine and forming method
CN110005202A (en) * 2019-04-04 2019-07-12 苏州金螳螂建筑装饰股份有限公司 A kind of concrete floor perforation structure
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN110966022A (en) * 2019-12-24 2020-04-07 中铁隧道局集团有限公司工程试验分公司 Railway tunnel lining construction method based on medium-high fluidity concrete
CN111119945A (en) * 2020-02-24 2020-05-08 中铁十七局集团第四工程有限公司 Tunnel secondary lining concrete pumping extrusion type pouring construction method
CN111156029A (en) * 2019-09-21 2020-05-15 保定市宇航机械科技有限公司 A kind of tunnel secondary lining vault pouring construction device and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144425A (en) * 2007-12-14 2009-07-02 Tekken Constr Co Ltd Shield method by direct placing concrete lining
CN202611719U (en) * 2012-05-24 2012-12-19 中铁十二局集团第三工程有限公司 Device for controlling thickness of tunnel secondary lining steel bar protection layer
CN203321535U (en) * 2013-06-17 2013-12-04 中铁二院工程集团有限责任公司 Hard rock tunnel boring machine construction method combined type steel fiber reinforced concrete lining structure
CN103527219A (en) * 2013-10-18 2014-01-22 四川省交通运输厅公路规划勘察设计研究院 Tunnel supporting structure used for large deformation stratum and construction method of tunnel supporting structure
CN103924984A (en) * 2014-05-07 2014-07-16 中铁二院工程集团有限责任公司 Method for designing tunnel composite lining structure with load acting on stratum boundaries
CN104032713A (en) * 2014-05-23 2014-09-10 北京中水科海利工程技术有限公司 Composite lining concrete impervious structure for pressure diversion tunnels and construction process thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144425A (en) * 2007-12-14 2009-07-02 Tekken Constr Co Ltd Shield method by direct placing concrete lining
CN202611719U (en) * 2012-05-24 2012-12-19 中铁十二局集团第三工程有限公司 Device for controlling thickness of tunnel secondary lining steel bar protection layer
CN203321535U (en) * 2013-06-17 2013-12-04 中铁二院工程集团有限责任公司 Hard rock tunnel boring machine construction method combined type steel fiber reinforced concrete lining structure
CN103527219A (en) * 2013-10-18 2014-01-22 四川省交通运输厅公路规划勘察设计研究院 Tunnel supporting structure used for large deformation stratum and construction method of tunnel supporting structure
CN103924984A (en) * 2014-05-07 2014-07-16 中铁二院工程集团有限责任公司 Method for designing tunnel composite lining structure with load acting on stratum boundaries
CN104032713A (en) * 2014-05-23 2014-09-10 北京中水科海利工程技术有限公司 Composite lining concrete impervious structure for pressure diversion tunnels and construction process thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927249A (en) * 2016-05-24 2016-09-07 北京住总集团有限责任公司 Construction method for pouring tunnel second lining self-compacting concrete
CN106499408A (en) * 2016-11-02 2017-03-15 北京翔鲲水务建设有限公司 Wholecircle full section of tunnel one-shot forming self-compacting concrete pouring construction method
CN108150194A (en) * 2017-12-25 2018-06-12 洛阳高飞桥隧机械有限公司 A kind of casting method of tunnel lining trolley concrete shunt conduit device
CN108956226B (en) * 2018-06-27 2021-04-06 河海大学 Large-size cement soil test piece forming device and forming method
CN108956226A (en) * 2018-06-27 2018-12-07 河海大学 Large scale cement-stabilized soil sample molding machine and forming method
CN110005202A (en) * 2019-04-04 2019-07-12 苏州金螳螂建筑装饰股份有限公司 A kind of concrete floor perforation structure
CN110005202B (en) * 2019-04-04 2024-04-19 苏州金螳螂建筑装饰股份有限公司 Concrete floor perforation structure
CN111156029A (en) * 2019-09-21 2020-05-15 保定市宇航机械科技有限公司 A kind of tunnel secondary lining vault pouring construction device and construction method
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN110966022A (en) * 2019-12-24 2020-04-07 中铁隧道局集团有限公司工程试验分公司 Railway tunnel lining construction method based on medium-high fluidity concrete
CN110966022B (en) * 2019-12-24 2022-03-11 中铁隧道局集团有限公司 Railway tunnel lining construction method based on medium-high fluidity concrete
CN111119945A (en) * 2020-02-24 2020-05-08 中铁十七局集团第四工程有限公司 Tunnel secondary lining concrete pumping extrusion type pouring construction method
CN111119945B (en) * 2020-02-24 2021-10-15 中铁十七局集团第四工程有限公司 Tunnel secondary lining concrete pumping extrusion type pouring construction method

Also Published As

Publication number Publication date
CN104895587B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN104895587B (en) Construction method for pressure pouring of concrete for tunnel secondary lining
WO2021120991A1 (en) Method for reconstructing shield tunnel for mining construction
CN104790970B (en) A kind of method that use combining structure carries out shield tunnel reinforcing
CN105134253B (en) Tunnel inverted arch composite entity template and pouring construction method
CN108915726B (en) Seamless tunnel structure using ECC concrete post-cast strip and construction method thereof
CN203452799U (en) Corrugated steel tunnel supporting structure
CN105862990B (en) A kind of prefabrication and assembly construction shaft wall structure and its construction method
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN103953363A (en) Method for connecting shield tunnel pipe sheet and transverse passage structure
CN206616585U (en) Prefabricated formula utility tunnel of split component
CN109372543A (en) Mangnolia officinalis competent structure and construction method are owed in a kind of tunnel-liner
CN103953361A (en) Clearance strengthening system for serious cracks of existing tunnel arch lining
CN107503767A (en) A kind of precast concrete FRP corrugated platings tunnel bottom construction method for supporting
CN109440909B (en) Cover plate for railway tunnel and installation method thereof
CN102758637A (en) Tunnel secondary lining structure composed of profiled steel sheets and concrete
CN103670439A (en) Tunnel lining construction method
CN103090107B (en) Construction method for rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN206071601U (en) The device that a kind of prevention tunnel double-lining vault comes to nothing
CN206753627U (en) Antiseepage ability of swimming tunnel-liner ruggedized construction
CN104929655B (en) A kind of method for reducing Shield-bored tunnels portal construction risk
CN110761815B (en) Tunnel negative-pressure laying waterproof plate and construction method thereof
CN104389619A (en) Shield excess hole construction method
CN202810867U (en) Secondary tunnel lining structure formed by combining profiled steel sheets with concrete
CN104213546B (en) Wholecircle tunnel cushion block of concrete bar protective layer construction method and topping cushion block thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20210528

CF01 Termination of patent right due to non-payment of annual fee