CN103953361A - Clearance strengthening system for serious cracks of existing tunnel arch lining - Google Patents

Clearance strengthening system for serious cracks of existing tunnel arch lining Download PDF

Info

Publication number
CN103953361A
CN103953361A CN201410211051.9A CN201410211051A CN103953361A CN 103953361 A CN103953361 A CN 103953361A CN 201410211051 A CN201410211051 A CN 201410211051A CN 103953361 A CN103953361 A CN 103953361A
Authority
CN
China
Prior art keywords
shaped steel
steel frame
lining
arch
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410211051.9A
Other languages
Chinese (zh)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201410211051.9A priority Critical patent/CN103953361A/en
Publication of CN103953361A publication Critical patent/CN103953361A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种既有隧道拱部衬砌严重开裂有净空加固体系。既有隧道衬砌拱部易发生病害,在没有拆掉重建的条件下只能只能进行适当的加固处理。本发明的加固体系于既有混凝土衬砌的拱部铺设钢筋网,钢筋网内沿隧道纵向设置多道H型钢架,打设锚杆,锚杆端部通过锚杆垫板和连接螺栓固定在H型钢架上;每道H型钢架处的锚杆之间间隔打孔预埋有用于在衬砌背后注浆填实空洞的拱部注浆管;于既有混凝土衬砌内喷射混凝土覆盖H型钢架。本发明对既有隧道拱部衬砌严重开裂部分的背后进行注浆处理,填实空洞,选用H型钢钢架配合钢筋网、锚杆、喷混凝土形成综合加固体系,对拱部严重开裂病害进行加固,施工简单,节约投资。

The invention relates to a system for reinforcing the existing tunnel arch lining with severe cracks and clear space. The arch of the existing tunnel lining is prone to damage, and it can only be properly reinforced without demolition and reconstruction. The reinforcement system of the present invention lays steel reinforcement mesh on the arch of the existing concrete lining. In the reinforcement mesh, multiple H-shaped steel frames are arranged longitudinally along the tunnel, and anchor rods are laid. The ends of the anchor rods are fixed on On the H-shaped steel frame; holes are drilled at intervals between the anchor rods at each H-shaped steel frame and pre-buried arch grouting pipes are used to grout the back of the lining to fill the void; the sprayed concrete covers the H in the existing concrete lining Type steel frame. The present invention grouts the back of the severely cracked part of the arch lining of the existing tunnel, fills the cavity, and selects H-shaped steel frame to cooperate with steel mesh, anchor rod, and sprayed concrete to form a comprehensive reinforcement system to reinforce the serious cracking disease of the arch. , Simple construction, saving investment.

Description

既有隧道拱部衬砌严重开裂有净空加固体系The arch lining of the existing tunnel is severely cracked and there is a clearance reinforcement system

技术领域 technical field

    本发明属于隧道交通工程技术领域,具体涉及一种既有隧道拱部衬砌严重开裂有净空加固体系。     The invention belongs to the technical field of tunnel traffic engineering, and in particular relates to an existing tunnel arch lining with serious cracks and a clearance reinforcement system.

背景技术 Background technique

我国铁路、公路等交通工程在修建的隧道数量较大,早期在山区修建的大量隧道也尚在使用,有的已达到当时的设计寿命,由于施工质量、腐蚀环境、混凝土耐久性、地层压力等诸多因素的影响,很多尚在使用的隧道已经产生了衬砌开裂、剥落掉块等病害,尤其是衬砌拱部更易发生,如任其发展,则会小病养成大患,对行车安全造成巨大危害,而隧道又没有拆掉重建的条件,因此只能根据病害严重程度进行适当的加固处理,选择经济合理、施工方便、安全可靠地处理措施非常关键。 A large number of tunnels are being built in traffic projects such as railways and highways in China. A large number of tunnels built in mountainous areas in the early days are still in use, and some have reached the design life at that time. Due to construction quality, corrosion environment, concrete durability, ground pressure, etc. Affected by many factors, many tunnels still in use have already had lining cracks, peeling off pieces and other diseases, especially lining arches are more likely to occur. If left unchecked, minor diseases will become serious problems, causing great harm to driving safety , and the tunnel has no conditions for demolition and reconstruction, so it can only be properly reinforced according to the severity of the disease. It is very important to choose economical and reasonable, convenient construction, safe and reliable treatment measures.

发明内容 Contents of the invention

本发明的目的是提供一种既有隧道拱部衬砌严重开裂有净空加固体系,能有效处理混凝土开裂病害,适用于既有隧道拱部衬砌严重开裂且有净空的工况。 The purpose of the present invention is to provide an existing tunnel arch lining with severe cracks and headroom reinforcement system, which can effectively deal with concrete cracking diseases, and is suitable for the working condition of the existing tunnel arch lining with severe cracks and headroom.

本发明所采用的技术方案是: The technical scheme adopted in the present invention is:

既有隧道拱部衬砌严重开裂有净空加固体系,其特征在于: There is a headroom reinforcement system for severe cracks in the arch lining of existing tunnels, which is characterized by:

于既有混凝土衬砌的拱部铺设钢筋网,钢筋网内沿隧道纵向设置多道H型钢架,在H型钢架处设置若干径向的、打入围岩的锚杆,锚杆端部通过锚杆垫板和连接螺栓固定在H型钢架上; Reinforcement mesh is laid on the arch of the existing concrete lining. In the reinforcement mesh, multiple H-shaped steel frames are arranged longitudinally along the tunnel, and a number of radial anchors driven into the surrounding rock are arranged at the H-shaped steel frames. The ends of the anchor rods are It is fixed on the H-shaped steel frame through the anchor pad and connecting bolts;

每道H型钢架处的锚杆之间间隔打孔预埋有用于在衬砌背后注浆填实空洞的拱部注浆管; Between the anchor rods at each H-shaped steel frame, holes are drilled at intervals and pre-buried arch grouting pipes are used for grouting behind the lining to fill the void;

于既有混凝土衬砌内喷射混凝土覆盖H型钢架。 The H-shaped steel frame is covered with shotcrete within the existing concrete lining.

H型钢架之间焊接有纵向连接钢筋。 There are longitudinal connecting steel bars welded between the H-shaped steel frames.

所述的既有混凝土衬砌的拱脚处和H型钢架的端部均设置有打入围岩的钢架锁脚锚管。 Both the arch foot of the existing concrete lining and the end of the H-shaped steel frame are provided with steel frame locking foot anchor pipes driven into the surrounding rock.

每道H型钢架处的锚杆横向呈折线分布,端部前后交错固定在H型钢架边沿。 The anchor rods at each H-shaped steel frame are distributed in a broken line in the transverse direction, and the ends are staggered and fixed on the edge of the H-shaped steel frame.

本发明具有以下优点: The present invention has the following advantages:

本发明对既有隧道拱部衬砌严重开裂部分背后注浆,填实空洞,选用高度小、刚度大的H型钢钢架配合钢筋网、锚杆形成综合加固体系,可以对拱部严重开裂病害进行一劳永逸的根治,具有施工简单、节约投资、安全可靠等优点。  The present invention grouts the back of the seriously cracked part of the arch lining of the existing tunnel, fills the cavity, and selects the H-shaped steel frame with small height and high rigidity to cooperate with the steel mesh and anchor rod to form a comprehensive reinforcement system, which can repair the serious cracking disease of the arch. The once-and-for-all radical cure has the advantages of simple construction, investment saving, safety and reliability. the

附图说明 Description of drawings

图1为本发明横断面图。 Figure 1 is a cross-sectional view of the present invention.

图2为本发明平面布置图。 Fig. 2 is a plane layout diagram of the present invention.

图3为本发明局部详图。 Figure 3 is a partial detailed view of the present invention.

图中,1-既有混凝土衬砌,2-锚杆,3-钢筋网,4-拱部注浆管,5-H型钢架,6-纵向连接钢筋,7-钢架锁脚锚管,8-锚杆垫板,9-连接螺栓,10-喷射混凝土。 In the figure, 1-existing concrete lining, 2-anchor rod, 3-reinforcement mesh, 4-arch grouting pipe, 5-H-shaped steel frame, 6-longitudinal connecting steel bar, 7-steel frame locking foot anchor pipe, 8-Anchor backing plate, 9-Connecting bolts, 10-Shotcrete.

具体实施方式 Detailed ways

下面结合具体实施方式对本发明进行详细的说明。 The present invention will be described in detail below in combination with specific embodiments.

本发明涉及的一种既有隧道拱部衬砌严重开裂有净空加固体系,适用于隧道拱部衬砌严重开裂、有净空、必须做处理的工况,采用了锚、网、带、注浆等综合结构,可以根据需要在隧道纵向连续或局部设置,占用空间小、施工简便。具体结构是:于既有混凝土衬砌1的拱部铺设钢筋网3,钢筋网3内沿隧道纵向设置多道H型钢架5,H型钢架5之间焊接有纵向连接钢筋6。在H型钢架5处设置若干径向的、打入围岩的锚杆2,锚杆2端部通过锚杆垫板8和连接螺栓9固定在H型钢架5上。每道H型钢架5处的锚杆2横向呈折线分布,端部前后交错固定在H型钢架5边沿。每道H型钢架5处的锚杆2之间间隔打孔预埋有用于在衬砌背后注浆填实空洞的拱部注浆管4。于既有混凝土衬砌1内喷射混凝土覆盖H型钢架5。既有混凝土衬砌1的拱脚处和H型钢架5的端部均设置有打入围岩的钢架锁脚锚管7。 The present invention relates to an existing tunnel arch lining with severe cracks and headroom reinforcement system, which is suitable for working conditions where the tunnel arch lining is severely cracked, has clearance, and must be treated. It uses anchors, nets, belts, and grouting. The structure can be arranged continuously or locally in the longitudinal direction of the tunnel according to the needs, which occupies a small space and is easy to construct. The specific structure is as follows: a steel mesh 3 is laid on the arch of the existing concrete lining 1, and a plurality of H-shaped steel frames 5 are arranged longitudinally in the steel mesh 3 along the tunnel, and longitudinal connecting steel bars 6 are welded between the H-shaped steel frames 5. A number of radial bolts 2 driven into the surrounding rock are arranged at the H-shaped steel frame 5 , and the ends of the anchor rods 2 are fixed on the H-shaped steel frame 5 through anchor backing plates 8 and connecting bolts 9 . The anchor rods 2 at the 5 places of each H-shaped steel frame are distributed in a broken line in the transverse direction, and the ends are staggered and fixed on the edge of the H-shaped steel frame 5 . Between the anchor rods 2 at each H-shaped steel frame 5, the arch grouting pipes 4 for grouting behind the lining and filling the voids are pre-embedded. The H-shaped steel frame 5 is covered with shotcrete in the existing concrete lining 1 . Both the arch foot of the existing concrete lining 1 and the end of the H-shaped steel frame 5 are provided with steel frame locking foot anchor pipes 7 driven into the surrounding rock.

本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明技术方案采取的任何等效的变换,均为本发明的权利要求所涵盖。 The content of the present invention is not limited to the examples listed, and any equivalent transformation of the technical solution of the present invention adopted by those of ordinary skill in the art by reading the description of the present invention is covered by the claims of the present invention.

Claims (4)

1. the serious cracking of existing tunnel Arch lining has headroom reinforcement system, it is characterized in that:
Steel mesh reinforcement (3) is laid in arch in existing concrete lining (1), multiple tracks H shaped steel frame (5) is longitudinally set along tunnel in steel mesh reinforcement (3), at H shaped steel frame (5), locate to arrange some anchor poles radially, that squeeze into country rock (2), anchor pole (2) end is fixed on H shaped steel frame (5) by roof bolt plate (8) and connecting bolt (9);
Between the anchor pole (2) that per pass H shaped steel frame (5) is located, interval punching is embedded with for tamp empty arch Grouting Pipe (4) at lining cutting back-grouting;
In existing concrete lining (1), sprayed mortar covers H shaped steel frame (5).
2. the serious cracking of existing tunnel Arch lining according to claim 1 has headroom reinforcement system, it is characterized in that:
Between H shaped steel frame (5), be welded with longitudinal connecting reinforcement (6).
3. the serious cracking of existing tunnel Arch lining according to claim 2 has headroom reinforcement system, it is characterized in that:
The arch springing place of described existing concrete lining (1) and the end of H shaped steel frame (5) are provided with the steelframe lock pin anchor tube (7) of squeezing into country rock.
4. the serious cracking of existing tunnel Arch lining according to claim 3 has headroom reinforcement system, it is characterized in that:
The anchor pole (2) that per pass H shaped steel frame (5) is located is laterally broken line and distributes, and end is staggered front to back and is fixed on H shaped steel frame (5) edge.
CN201410211051.9A 2014-05-20 2014-05-20 Clearance strengthening system for serious cracks of existing tunnel arch lining Pending CN103953361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410211051.9A CN103953361A (en) 2014-05-20 2014-05-20 Clearance strengthening system for serious cracks of existing tunnel arch lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410211051.9A CN103953361A (en) 2014-05-20 2014-05-20 Clearance strengthening system for serious cracks of existing tunnel arch lining

Publications (1)

Publication Number Publication Date
CN103953361A true CN103953361A (en) 2014-07-30

Family

ID=51330691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410211051.9A Pending CN103953361A (en) 2014-05-20 2014-05-20 Clearance strengthening system for serious cracks of existing tunnel arch lining

Country Status (1)

Country Link
CN (1) CN103953361A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234724A (en) * 2014-09-29 2014-12-24 中铁五局(集团)有限公司 Device for accurately positioning tunnel foot-lock anchor pipes and integrating with steel frame
CN104389321A (en) * 2014-10-31 2015-03-04 中国电建集团成都勘测设计研究院有限公司 Safety structure of underground building
CN104912571A (en) * 2015-05-28 2015-09-16 中国铁道科学研究院铁道建筑研究所 Method for renovating defect surface of cave body
CN106593466A (en) * 2017-01-19 2017-04-26 兰州交通大学 Method for reinforcing fractured lining of existing railway tunnel
CN106677805A (en) * 2016-12-28 2017-05-17 中铁第四勘察设计院集团有限公司 Connecting device of tunnel steel frame and locking anchor pipe
CN106968695A (en) * 2017-05-03 2017-07-21 云南建投基础工程有限责任公司 A kind of prefabrication type tunnel lock foot anchoring stock and steelframe connecting elements
CN109681250A (en) * 2018-12-20 2019-04-26 宁波交通工程咨询监理有限公司 A kind of mounting structure of L-type lock foot anchoring stock
CN110130930A (en) * 2019-06-12 2019-08-16 上海隧道工程有限公司 Reinforcement for large diameter shield tunnel
CN113338995A (en) * 2021-05-31 2021-09-03 北京鸿锐嘉科技发展有限公司 Anchor rod grouting construction method for existing tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2144799A1 (en) * 1995-03-16 1996-09-17 Raymond L. Weholt Insulating tunnel liner system
DE19616143C1 (en) * 1996-04-23 1997-04-30 Hochtief Ag Hoch Tiefbauten Annular lining for tunnels, using rings with tongue and groove joints
CN201513181U (en) * 2009-07-07 2010-06-23 中铁二院工程集团有限责任公司 Anti-cracking lining structure of high-speed railway tunnel
CN102996142A (en) * 2012-12-25 2013-03-27 中鼎国际工程有限责任公司 Mine tunnel supporting structure with fixed hanging rings and construction method thereof
CN103615259A (en) * 2013-12-06 2014-03-05 中国矿业大学(北京) Anchor net cable-shaped steel support coupling support structure and support method
CN203835403U (en) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 An Existing Tunnel Arch Lining with Severely Cracked Clearance Reinforcement System

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2144799A1 (en) * 1995-03-16 1996-09-17 Raymond L. Weholt Insulating tunnel liner system
DE19616143C1 (en) * 1996-04-23 1997-04-30 Hochtief Ag Hoch Tiefbauten Annular lining for tunnels, using rings with tongue and groove joints
CN201513181U (en) * 2009-07-07 2010-06-23 中铁二院工程集团有限责任公司 Anti-cracking lining structure of high-speed railway tunnel
CN102996142A (en) * 2012-12-25 2013-03-27 中鼎国际工程有限责任公司 Mine tunnel supporting structure with fixed hanging rings and construction method thereof
CN103615259A (en) * 2013-12-06 2014-03-05 中国矿业大学(北京) Anchor net cable-shaped steel support coupling support structure and support method
CN203835403U (en) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 An Existing Tunnel Arch Lining with Severely Cracked Clearance Reinforcement System

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234724A (en) * 2014-09-29 2014-12-24 中铁五局(集团)有限公司 Device for accurately positioning tunnel foot-lock anchor pipes and integrating with steel frame
CN104389321A (en) * 2014-10-31 2015-03-04 中国电建集团成都勘测设计研究院有限公司 Safety structure of underground building
CN104912571B (en) * 2015-05-28 2017-08-11 中国铁道科学研究院铁道建筑研究所 The method renovated for the disease face to hole body
CN104912571A (en) * 2015-05-28 2015-09-16 中国铁道科学研究院铁道建筑研究所 Method for renovating defect surface of cave body
CN106677805A (en) * 2016-12-28 2017-05-17 中铁第四勘察设计院集团有限公司 Connecting device of tunnel steel frame and locking anchor pipe
CN106677805B (en) * 2016-12-28 2019-02-05 中铁第四勘察设计院集团有限公司 A kind of attachment device of tunnel steelframe and lock foot anchor tube
CN106593466A (en) * 2017-01-19 2017-04-26 兰州交通大学 Method for reinforcing fractured lining of existing railway tunnel
CN106593466B (en) * 2017-01-19 2019-11-19 兰州交通大学 A method for strengthening cracked and damaged lining of existing railway tunnels
CN106968695A (en) * 2017-05-03 2017-07-21 云南建投基础工程有限责任公司 A kind of prefabrication type tunnel lock foot anchoring stock and steelframe connecting elements
CN106968695B (en) * 2017-05-03 2023-10-20 云南建投基础工程有限责任公司 Prefabricated tunnel lock foot stock and steelframe connecting element
CN109681250A (en) * 2018-12-20 2019-04-26 宁波交通工程咨询监理有限公司 A kind of mounting structure of L-type lock foot anchoring stock
CN110130930A (en) * 2019-06-12 2019-08-16 上海隧道工程有限公司 Reinforcement for large diameter shield tunnel
CN113338995A (en) * 2021-05-31 2021-09-03 北京鸿锐嘉科技发展有限公司 Anchor rod grouting construction method for existing tunnel

Similar Documents

Publication Publication Date Title
CN103953361A (en) Clearance strengthening system for serious cracks of existing tunnel arch lining
CN103939110A (en) Strengthening system for slight cracking of existing tunnel arch portion lining
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN203835404U (en) Non-clearance strengthening system for serious cracking of existing tunnel lining arch
CN104863614B (en) Method for primary support with corrugated steel plate and concrete combined structure taking place of steel grating
CN108979676B (en) A rock sandwich reinforcement structure for overlapping tunnels with small spacing and its construction method
CN103410528B (en) Tunnel lining structure and construction method
CN104047614B (en) A method of replacement and support for strongly expansive muddy soft rock roadway
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN103670446B (en) Circular diversion tunnel 2/3 circle concrete-liner construction method
CN104594926A (en) Rapid composite roof roadway support method for high-stress water guiding karst cave group
CN111577334B (en) Operation Tunnel Inverted Arch Repair Method
CN102852528A (en) Method for controlling floor heave through inverted arch anchoring beam
CN206092019U (en) A compound anchor net for administering distension at bottom of deep well soft rock roadway under high stress
CN110761804B (en) Construction structure and method of secondary lining treatment of karst stratum tunnel based on casing lining
CN204199189U (en) A kind of fin-plate type ruggedized construction of masonry arch bridge spandrel construction
CN203835403U (en) An Existing Tunnel Arch Lining with Severely Cracked Clearance Reinforcement System
CN109184733B (en) Soft rock chamber bottom drum control support structure and method based on prefabricated bottom arc plate
CN104453930A (en) Tunnel initial lining construction device and method
CN101899837A (en) Concrete anti-shear active support structure for strengthening the deep slip surface of rock slope
CN203835407U (en) Arch lining slight-cracking reinforcing system for existing tunnel
CN204783046U (en) Tunnel lining restores structure fast based on carbon fiber mesh grid
CN108708742A (en) Combined retaining structure for concrete pipe sheet anchor pole deviation
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140730

RJ01 Rejection of invention patent application after publication