CN104895085B - 一种桩基础混凝土浇筑方法 - Google Patents

一种桩基础混凝土浇筑方法 Download PDF

Info

Publication number
CN104895085B
CN104895085B CN201510154523.6A CN201510154523A CN104895085B CN 104895085 B CN104895085 B CN 104895085B CN 201510154523 A CN201510154523 A CN 201510154523A CN 104895085 B CN104895085 B CN 104895085B
Authority
CN
China
Prior art keywords
duct unit
conduit
concrete
funnel
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510154523.6A
Other languages
English (en)
Other versions
CN104895085A (zh
Inventor
陶铁军
赵明生
代青松
明悦
胡浩川
刘光汉
吴远林
康强
刘强
李�杰
余红兵
周建敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN201510154523.6A priority Critical patent/CN104895085B/zh
Publication of CN104895085A publication Critical patent/CN104895085A/zh
Application granted granted Critical
Publication of CN104895085B publication Critical patent/CN104895085B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种桩基础混凝土浇筑方法,包括如下操作步骤:输送混凝土的导管由多个导管单元依次联接而成,在第一节导管单元上端安装漏斗,在最后一节导管单元内单向叶片;在桩基础上方设置支承平台并安装支撑架,在支撑架上设置上齿轮、下齿轮、电机、减速器;启动电机驱动导管转动,将搅拌好的混凝土倒入漏斗,混凝土沿单向旋转叶片向下滑动输送给桩基础;到达一定高度后拆卸漏斗,用吊车将导管起吊一个导管单元高度,然后将第二节导管单元支承于平台上,拆卸第一节导管单元,再安装漏斗进行浇筑,以此循环操作完成浇筑,通过导管旋转使混凝土能够顺利下落,同时单向叶片使混凝土得到缓冲、混合,避免了混凝土出现离析造成断桩的发生。

Description

一种桩基础混凝土浇筑方法
技术领域
本发明涉及一种桩基础混凝土浇筑方法,属于建筑工程领域。
背景技术
目前钻孔灌注桩施工通常采用钻孔、清孔、安装钢筋笼、浇筑混凝土工序,在浇筑混凝土过程中通常采用导管灌注方法,将导管顺次链接在一起,在最上面导管安放漏斗,进行混凝土浇筑,如果桩基础较深,在混凝土下落过程中下落高度远远大于10m,下落高度过大会导致混凝土在下落过程中产生离析现象,离析的发生会间接改变混凝土配合比,严重影响桩基础质量。
发明内容
针对现有技术的不足之处,本发明旨在提供一种桩基础混凝土浇筑方法,主要解决混凝土浇筑过程中混凝土自由下落产生的离析问题。
为解决上述技术问题,本发明采用的技术方案,一种桩基础混凝土浇筑方法,包括如下操作步骤:
(1)输送混凝土的导管由多个导管单元依次联接而成,每节导管单元的上端设置内螺纹,每节导管单元的下端设置外螺纹,第一节导管单元的下端与第二节导管单元的上端螺纹联接,在每节导管单元的上端安装上齿圈,在每节导管单元的下端安装下齿圈,在下齿圈下方的导管单元再设置轴向轴承;
(2)在桩基础上方设置支承平台,在支承平台上设置一个与导管相适配的圆孔,导管上端的第一节导管单元的轴向轴承支承于支承平台上,导管下端伸向桩基础,在第一节导管单元两侧的支承平台上分别对称设置支撑架,在支撑架上设置上齿轮、下齿轮、电机、减速器,上齿轮分别与上齿圈啮合,下齿轮分别与下齿圈啮合,电机在支撑架上成对设置,与电机对应的减速器也是成对设置,一个电机带动一个减速器,靠上的减速器驱动上齿轮,靠下的减速器驱动下齿轮;
(3)在最后一节导管单元内沿轴向设置螺旋走的单向旋转叶片;
(4)在第一节导管单元上端安装漏斗,漏斗与第一节导管单元上端螺纹联接;
(5)在每节导管单元的上部设置用于起吊导管单元的挂钩;
(6)启动电机驱动导管转动,将搅拌好的混凝土倒入漏斗,混凝土沿导管单元下落,混凝土进入最后一节导管单元时沿单向旋转叶片向下滑动输送给桩基础;
(7)当浇筑的桩基础高度接近最后一节导管单元的下端时,停止往漏斗内添加混凝土,拆卸漏斗,用吊车将导管起吊一个导管单元高度,然后将第二节导管单元的轴向轴承支承于支承平台上,拆卸第一节导管单元,然后将漏斗与第二节导管单元上端螺纹联接,再进行浇筑,以此循环操作,直至浇筑好整个桩基础。
本发明有意效果:
由于在导管内设置螺旋走的单向叶片,可以减小混凝土自由下落的高度,通过导管旋转使混凝土能够顺利下落,不至于混凝土出现堵塞现象,同时单向螺旋旋转叶片使混凝土在最后一节导管单元内旋转流动,起到缓冲、混合的作用,相当于对混凝土二次搅拌,保证桩基础混凝土浇筑的质量,避免了混凝土出现离析造成断桩的发生。
附图说明
图1为浇筑装置结构示意图;
图2为最后一节导管单元结构示意图;
附图中:1第一节导管单元 2最后一节导管单元2 3上齿圈 4下齿圈 5上齿轮 6下齿轮 7轴向轴承 8支承平台 9漏斗 10电机 11减速器 12支撑架 13挂钩 14单向旋转叶片。
具体实施方式
(1)输送混凝土的导管由多个导管单元依次联接而成,每节导管单元的上端设置内螺纹,每节导管单元的下端设置外螺纹,第一节导管单元1的下端与第二节导管单元的上端螺纹联接,这样多个导管单元依次联接组成导管,在每节导管单元的上端安装上齿圈3,在每节导管单元的下端安装下齿圈4,靠近下齿圈4并在下齿圈4下方再设置轴向轴承;
(2)在桩基础上方设置支承平台8,支承平台8就是一个用于支承的工作面,在支承平台8上设置一个与导管相适配的圆孔,导管上端的第一节导管单元1的轴向轴承支承于支承平台8上,所谓第一节导管单元1也就是最上面一节,这样导管可以沿轴线转动,导管下端伸向桩基础,在第一节导管单元1的两侧分别对称设置支撑架12,在支撑架12上设置上齿轮5、下齿轮6、电机10、减速器11,上齿轮5分别与上齿圈3啮合,下齿轮6分别与下齿圈4啮合,电机10在支撑架12上成对设置,与电机10对应的减速器11也是成对设置,一个电机10带动一个减速器11,靠上的减速器11驱动上齿轮5,靠下的减速器11驱动下齿轮6;
(3)在最后一节导管单元2内沿轴向设置螺旋走的单向旋转叶片14,所述单向旋转叶片14就是混凝土螺旋向下的流动通道,最后一节导管单元2也就是最下面一节导管单元;
(4)在第一节导管单元1上端安装漏斗9,漏斗9与第一节导管单元1上端螺纹联接;
(5)在每节导管单元的上部设置用于起吊导管的挂钩13;
(6)启动电机10驱动导管转动,将搅拌好的混凝土倒入漏斗9,混凝土沿导管下落,混凝土进入最后一节导管单元2时沿单向旋转叶片14向下滑动输送给桩基础;
(7)当浇筑的桩基础高度接近最后一节导管单元2的下端时,停止往漏斗9内添加混凝土,拆卸漏斗9,用吊车将导管起吊一个导管单元高度,然后将第二节导管单元的轴向轴承支承于支承平台8上,拆卸第一节导管单元1,然后将漏斗9与第二节导管单元上端螺纹联接,再按步骤(6)进行浇筑,以此循环操作,直至浇筑好整个桩基础。

Claims (1)

1.一种桩基础混凝土浇筑方法,其特征在于包括如下操作步骤:
(1)输送混凝土的导管由多个导管单元依次联接而成,每节导管单元的上端设置内螺纹,每节导管单元的下端设置外螺纹,第一节导管单元(1)的下端与第二节导管单元的上端螺纹联接,在每节导管单元的上端安装上齿圈(3),在每节导管单元的下端安装下齿圈(4),靠近下齿圈(4)并在下齿圈(4)下方再设置轴向轴承;
(2)在桩基础上方设置支承平台(8),在支承平台(8)上设置一个与导管相适配的圆孔,导管上端的第一节导管单元(1)的轴向轴承支承于支承平台(8)上,导管下端伸向桩基础,在第一节导管单元(1)的两侧分别对称设置支撑架(12),在支撑架(12)上设置上齿轮(5)、下齿轮(6)、电机(10)、减速器(11),上齿轮(5)分别与上齿圈(3)啮合,下齿轮(6)分别与下齿圈(4)啮合,电机(10)在支撑架(12)上成对设置,与电机(10)对应的减速器(11)也是成对设置,一个电机(10)带动一个减速器(11),靠上的减速器(11)驱动上齿轮(5),靠下的减速器(11)驱动下齿轮(6);
(3)在最后一节导管单元(2)内沿轴向设置螺旋走的单向旋转叶片(14);
(4)在第一节导管单元(1)上端安装漏斗(9),漏斗(9)与第一节导管单元(1)上端螺纹联接;
(5)在每节导管单元的上部设置用于起吊导管的挂钩(13);
(6)启动电机(10)驱动导管转动,将搅拌好的混凝土倒入漏斗(9),混凝土沿导管下落,混凝土进入最后一节导管单元(2)时沿单向旋转叶片(14)向下滑动输送给桩基础;
(7)当浇筑的桩基础高度接近最后一节导管单元(2)的下端时,停止往漏斗(9)内添加混凝土,拆卸漏斗(9),用吊车将导管起吊一个导管单元高度,然后将第二节导管单元的轴向轴承支承于支承平台(8)上,拆卸第一节导管单元(1),然后将漏斗(9)与第二节导管单元上端螺纹联接,再进行浇筑,以此循环操作,直至浇筑好整个桩基础。
CN201510154523.6A 2015-04-03 2015-04-03 一种桩基础混凝土浇筑方法 Active CN104895085B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510154523.6A CN104895085B (zh) 2015-04-03 2015-04-03 一种桩基础混凝土浇筑方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510154523.6A CN104895085B (zh) 2015-04-03 2015-04-03 一种桩基础混凝土浇筑方法

Publications (2)

Publication Number Publication Date
CN104895085A CN104895085A (zh) 2015-09-09
CN104895085B true CN104895085B (zh) 2016-09-28

Family

ID=54028014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510154523.6A Active CN104895085B (zh) 2015-04-03 2015-04-03 一种桩基础混凝土浇筑方法

Country Status (1)

Country Link
CN (1) CN104895085B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705802B (zh) * 2020-07-02 2021-09-17 中国十七冶集团有限公司 一种现浇混凝土长桩振捣装置及其施工方法
CN111794215A (zh) * 2020-07-23 2020-10-20 中亿丰建设集团股份有限公司 旋挖成孔钻孔灌注桩的施工方法
CN111794118A (zh) * 2020-07-28 2020-10-20 中建七局交通建设有限公司 一种适用于黄土裂隙陷穴条件下桥梁桩基的施工方法
CN118110838B (zh) * 2024-04-26 2024-07-19 哈尔滨市第一市政工程有限公司 一种市政工程建设用注浆管埋设装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1280345A (en) * 1917-10-12 1918-10-01 Rudolph J Wig Tremie.
JPS60109420A (ja) * 1983-11-18 1985-06-14 Ohbayashigumi Ltd コンクリ−ト打設用配管装置
JPS60159220A (ja) * 1984-01-31 1985-08-20 Mitsui Petrochem Ind Ltd 水中コンクリ−トの施工方法
CN101487252A (zh) * 2009-02-13 2009-07-22 中建八局第一建设有限公司 一种钻孔灌注桩施工工艺
CN103410150A (zh) * 2013-07-24 2013-11-27 中铁大桥局股份有限公司 一种导管的导向结构及利用该导向结构的斜桩水下混凝土灌注方法
CN103437358A (zh) * 2013-09-13 2013-12-11 杭州银博交通工程材料有限公司 灌注桩混凝土浇注控制系统及方法
CN203866840U (zh) * 2014-05-14 2014-10-08 贵州新联爆破工程集团有限公司 一种桩孔内灌筑混凝土装置

Also Published As

Publication number Publication date
CN104895085A (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104895085B (zh) 一种桩基础混凝土浇筑方法
CN207415689U (zh) 一种混凝土搅拌设备
CN106945177A (zh) 一种具有加水可控功能的混凝土搅拌设备
CN107152028A (zh) 一种可旋型桁架式混凝土浇筑溜槽系统及其施工方法
CN206780667U (zh) 一种桥梁修建用石灰浆配制设备
CN110565962A (zh) 工具式溜管及施工方法
CN211736412U (zh) 一种混凝土浇筑溜槽
CN203905472U (zh) 可调式立柱支撑
CN204322290U (zh) 一种带搅拌机构的发泡水泥注浆桶
CN209353302U (zh) 用于泄水孔口闸门启闭设备安装平台的结构
CN208717933U (zh) 一种cfg桩基桩帽与桩身一体化施工装置
CN204510226U (zh) 一种桩基础混凝土浇筑装置
CN217631264U (zh) 一种楼板吊模施工结构
CN211647357U (zh) 工具式溜管
CN207092078U (zh) 多轴高压喷射桩
CN205976531U (zh) 一种构造柱混凝土新型便捷浇筑机
CN202460548U (zh) 高速搅拌机
CN205291264U (zh) 一种外循环高速搅拌装置
CN208916653U (zh) 立柱悬臂物料吊运装置
CN110107064B (zh) 烟道抹灰装置及烟道抹灰方法
CN207110483U (zh) 厚层自流平浇筑地面用装置
CN208118123U (zh) 一种道桥施工用混凝土搅拌装置
CN105538508A (zh) 一种混凝土搅拌装置及其搅拌方法
CN208219724U (zh) 一种防止地下连续墙沉降的加固装置
CN207092513U (zh) 一种用于储罐内部施工的可旋转式升降装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Tao Tiejun

Inventor after: Li Jie

Inventor after: Yu Hongbing

Inventor after: Zhou Jianmin

Inventor after: Zhao Mingsheng

Inventor after: Dai Qingsong

Inventor after: Ming Yue

Inventor after: Hu Haochuan

Inventor after: Liu Guanghan

Inventor after: Wu Yuanlin

Inventor after: Kang Qiang

Inventor after: Liu Qiang

Inventor before: Ming Yue

Inventor before: Hu Haochuan

Inventor before: Liu Guanghan

Inventor before: Wu Yuanlin

Inventor before: He Kailin

Inventor before: Zhi Chengjiang

Inventor before: Wu Hongbo

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee after: Poly Xinlian Blasting Engineering Group Co., Ltd.

Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee before: Guizhou Xinlian Blasting Engineering Group Co., Ltd.