CN104894938A - 水泥稳定粒料结构层两层连铺下层作业段长度确定方法 - Google Patents

水泥稳定粒料结构层两层连铺下层作业段长度确定方法 Download PDF

Info

Publication number
CN104894938A
CN104894938A CN201510170720.7A CN201510170720A CN104894938A CN 104894938 A CN104894938 A CN 104894938A CN 201510170720 A CN201510170720 A CN 201510170720A CN 104894938 A CN104894938 A CN 104894938A
Authority
CN
China
Prior art keywords
time
moisture content
paving
job step
optimum moisture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510170720.7A
Other languages
English (en)
Inventor
李文
王志刚
陈胜亮
易达
林章虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201510170720.7A priority Critical patent/CN104894938A/zh
Publication of CN104894938A publication Critical patent/CN104894938A/zh
Pending legal-status Critical Current

Links

Abstract

水泥稳定粒料结构层两层连铺下层作业段长度确定方法适用于高速公路、一级公路、城市道路等各种水泥稳定粒料基层施工。其技术特征是:按照现场到场4辆混合料运输车后开始摊铺作业,拌和、摊铺、碾压设备确定后,一个作业段的拌和时间和碾压时间也基本能够确定,水稳混合料的延迟时间前期已经确定,那么下层一个作业段的允许摊铺时间主要由运输时间来控制了,运距远,运输时间长,允许摊铺时间就短,根据下层作业段有效作业时长T、混合料拌和时间T拌、运输时间T运、最后一段碾压时间等参数就可计算出下层一个作业段的允许摊铺时间,进一步计算出下层作业段最长施工长度。本发明公式简单明了,操作性强,保证了施工质量。

Description

水泥稳定粒料结构层两层连铺下层作业段长度确定方法
技术领域
本发明型适用于高速公路、一级公路、城市道路等各种水泥稳定粒料基层施工。对于桥梁和通道相对密集,路基段落短,路基作业面提供不及时,基层与桥梁、通道频繁衔接而致摊铺作业不连续的水泥稳定粒料结构层使用本发明技术经济最佳。
背景技术
水泥稳定粒料半刚性基层在高等级公路和城市道路中被广泛应用,虽然有些高速公路不同程度的采用两层连铺技术,但由于作业段长度和延迟时间控制不好,措施不到位,造成水稳基层压实度不够,上下层连接性不好,表面平整度差等问题。针对这一问题,我公司结合多年来水泥稳定粒料结构层采用两层连铺技术的施工经验,以及在水泥稳定粒料延迟时间和两层连铺作业段长度确定及控制等方面做了的一些课题的研究成果,并确定出了水泥稳定粒料结构层两层连铺下层作业段施工长度确定方法。
发明内容
水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其技术特征是:按照现场到场4辆混合料运输车(160t)后开始摊铺作业,下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分三种情况来测算,拌和、摊铺、碾压设备确定后,一个作业段的拌和时间和碾压时间也基本能够确定,水稳混合料的延迟时间前期已经确定,那么下层一个作业段的允许摊铺时间主要由运输时间来控制了,运距远,运输时间长,允许摊铺时间就短,根据下层作业段有效作业时长T、混合料拌和时间T拌、运输时间T运、最后一段碾压时间等参数就可计算出下层一个作业段的允许摊铺时间,进一步计算出下层作业段最长施工长度。
其技术内容如下:
本发明型是水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其特征是:下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况来测算,三种情况的下层作业段长度都和混合料初始加水量有关系。
所述的水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其特征是:25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况及混合料初始加水量给出了下层作业段最长施工长度L和运距A的的回归关系。
水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其特征是:按照现场到场4辆混合料运输车后开始摊铺作业,
下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况来测算,三种情况的下层作业段长度都和混合料初始加水量有关系,具体如下:
25℃以下(包含25℃)情况下,当初始加水量为最佳含水量至最佳含水量+2%之间时,下层作业段最长施工长度L(单位m)和运距A(单位为km),关系为L=-4.5A+249,有效时长为223min。
在25℃~35℃(包含35℃)时,当初始加水量为最佳含水量时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+69,有效时长为103min,当初始加水量为最佳含水量至最佳含水量+2%之间并且包括最佳含水量+2%时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min,当初始加水量为最佳含水量+2%至最佳含水量+3%之间并且包括最佳含水量+3%时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min,此时要防止弹簧出现。
35℃室外不覆盖,当初始加水量小于等于最佳含水量时,不适宜施工,当初始含水量为最佳含水量至最佳含水量+1%(包含)之间时,下层作业段最长施工长度L和运距A关系为L=-4.5A+159,有效时长为163min,当初始含水量为最佳含水量+1%至最佳含水量+3%(包含)之间时,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min。根据规范要求,水稳混合料应该覆盖,所以这种情况一般不出现。所述的水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其特征是:按此方法进行水泥稳定粒料结构层两层连铺施工控制,保证了上下层的连接,降低施工成本,而且保证了施工质量。
利用本发明型的作业段长度确定方法,具有如下优点:
一、使水泥稳定粒料结构层两层连铺作业段长度的确定有了理论依据,避免了施工长度确定的盲目性和随意性。
二、计算公式简单明了,操作性强。
三、保证了水稳层上下层的连接,提高了整体性,保证了施工质量。
附图说明
图1是部分通层取芯芯样图。
具体实施方式
水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其技术特征是:按照现场到场4辆混合料运输车(160t)后开始摊铺作业(一般一台车载重40t左右),下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分三种情况来测算,拌和、摊铺、碾压设备确定后,一个作业段的拌和时间和碾压时间也基本能够确定,水稳混合料的延迟时间前期已经确定,那么下层一个作业段的允许摊铺时间主要由运输时间来控制了,运距远,运输时间长,允许摊铺时间就短,根据下层作业段有效作业时长T、混合料拌和时间T拌、运输时间T运、最后一段碾压时间等参数就可计算出下层一个作业段的允许摊铺时间,进一步计算出下层作业段最长施工长度。
下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况来测算,三种情况的下层作业段长度都和混合料初始加水量有关系。
其特征是:25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况及混合料初始加水量给出了下层作业段最长施工长度L和运距A的的回归关系。
公式运用说明:①根据规范要求,水稳施工应在混合料最佳含水量时进行碾压,施工气温在25℃以下时,初始含水量应控制在最佳含水量到最佳含水量+2%范围内,含水量大于2%现场有可能会出现“弹簧”现象,所以公式均采用L=-4.5A+249;
②施工气温在25℃~35℃时,为保证施工质量,给出了最不利条件35℃时的计算公式,初始含水量应控制在最佳含水量+1%~最佳含水量+3%范围内,在35℃覆盖时,应选用公式L=-4.5A+249,所以在25℃~35℃范围均可选用该公式,35℃不覆盖已不符合规范要求,所以一般情况选用公式L=-4.5A+249;
③综上所述,两层连铺作业段长度均可选用公式L=-4.5A+249;
④公式中,L单位为米,A单位为公里,斜率为-4.5m/km。
按此方法进行水泥稳定粒料结构层两层连铺施工控制,保证了上下层的连接。施工效果如下:
检测结果汇总表
检测项目 规定值 检测点数 平均值 合格率
压实度(%) 98 800 99.3 98
强度(MPa) 4 160 5.2 100
平整度(mm) 8 8000 4.6 97
取芯情况 完整 500 98

Claims (1)

1.水泥稳定粒料结构层两层连铺下层作业段长度确定方法,其特征是:按照现场到场4辆混合料运输车后开始摊铺作业,
下层一个作业段的允许摊铺时间和下层结构层最长作业段长度分25℃室内、35℃室外覆盖和35℃室外不覆盖三种情况来测算,三种情况的下层作业段长度都和混合料初始加水量有关系,具体如下:
25℃以下且包含25℃情况下,当初始加水量为最佳含水量至最佳含水量+2%之间时,下层作业段最长施工长度L和运距A,关系为L=-4.5A+249,有效时长为223min;L单位为m,A单位为km以下同;
在25℃~35℃且包含35℃时,当初始加水量为最佳含水量时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+69有效时长为103min,当初始加水量为最佳含水量至最佳含水量+2%之间并且包括最佳含水量+2%时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min,当初始加水量为最佳含水量+2%至最佳含水量+3%之间并且包括最佳含水量+3%时,室外覆盖情况下,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min;
35℃室外不覆盖,当初始加水量小于等于最佳含水量时,不适宜施工,当初始含水量为最佳含水量至最佳含水量+1%且包含+1%之间时,下层作业段最长施工长度L和运距A关系为L=-4.5A+159,有效时长为163min,当初始含水量为最佳含水量+1%至最佳含水量+3%且包含+3%之间时,下层作业段最长施工长度L和运距A关系为L=-4.5A+249,有效时长为223min。
CN201510170720.7A 2015-04-12 2015-04-12 水泥稳定粒料结构层两层连铺下层作业段长度确定方法 Pending CN104894938A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510170720.7A CN104894938A (zh) 2015-04-12 2015-04-12 水泥稳定粒料结构层两层连铺下层作业段长度确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510170720.7A CN104894938A (zh) 2015-04-12 2015-04-12 水泥稳定粒料结构层两层连铺下层作业段长度确定方法

Publications (1)

Publication Number Publication Date
CN104894938A true CN104894938A (zh) 2015-09-09

Family

ID=54027868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510170720.7A Pending CN104894938A (zh) 2015-04-12 2015-04-12 水泥稳定粒料结构层两层连铺下层作业段长度确定方法

Country Status (1)

Country Link
CN (1) CN104894938A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176815A (zh) * 2020-09-27 2021-01-05 重庆市交通工程监理咨询有限责任公司 公路水稳结构分段阶梯式连铺施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003137631A (ja) * 2001-10-25 2003-05-14 Hoshino Sansho:Kk 多孔質無機成形硬化物および複層多孔質無機成形硬化物
US20040197145A1 (en) * 2003-03-04 2004-10-07 Naum Sapozhnikov Asphalt concrete pavement with concrete subbase with the enriched quarry limestone waste as a coarse aggregate
CN203034333U (zh) * 2013-01-31 2013-07-03 江苏淮安交通勘察设计研究院有限公司 一种水泥稳定碎石基层道路结构
CN103741570A (zh) * 2013-12-18 2014-04-23 山东省交通科学研究所 一种快速施工成型沥青路面铺装方法
CN103964769A (zh) * 2014-04-30 2014-08-06 中铁四局集团有限公司 一种用于市政道路或现代有轨电车路基及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003137631A (ja) * 2001-10-25 2003-05-14 Hoshino Sansho:Kk 多孔質無機成形硬化物および複層多孔質無機成形硬化物
US20040197145A1 (en) * 2003-03-04 2004-10-07 Naum Sapozhnikov Asphalt concrete pavement with concrete subbase with the enriched quarry limestone waste as a coarse aggregate
CN203034333U (zh) * 2013-01-31 2013-07-03 江苏淮安交通勘察设计研究院有限公司 一种水泥稳定碎石基层道路结构
CN103741570A (zh) * 2013-12-18 2014-04-23 山东省交通科学研究所 一种快速施工成型沥青路面铺装方法
CN103964769A (zh) * 2014-04-30 2014-08-06 中铁四局集团有限公司 一种用于市政道路或现代有轨电车路基及其施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
康亮亮: ""水泥稳定碎石基层双层连铺施工工艺与质量控制"", 《公路交通科技(应用技术版)》 *
武海燕: ""水稳碎石基层双层连铺技术在某高速中的应用"", 《山西建筑》 *
靳志强等: ""水泥稳定粒料结构层两层连铺施工关键技术"", 《施工技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176815A (zh) * 2020-09-27 2021-01-05 重庆市交通工程监理咨询有限责任公司 公路水稳结构分段阶梯式连铺施工工艺

Similar Documents

Publication Publication Date Title
CN103922645B (zh) 一种沥青混合料及其制备方法
CN103224347B (zh) 一种钢渣透水沥青混合料
CN101550670B (zh) 沥青路面抗车辙方法及其应用
CN105884262B (zh) 一种薄层路面铺装超粘磨耗层及其施工方法
CN101694083A (zh) 高速公路路面沥青混凝土施工工艺
CN104762862A (zh) Sma沥青混合料路面施工方法
CN106045384A (zh) 一种单级配粒径钢渣透水沥青混合料
CN101708978B (zh) 适用于高寒地区城市交叉路口和公交站台的沥青路面材料
Aavik et al. Use of pavement surface texture characteristics measurement results in Estonia
CN110904764A (zh) 一种超薄磨耗层沥青混合料的配合比设计方法
CN104140223B (zh) 一种直投活化橡胶沥青混合料及其制备方法
CN104894938A (zh) 水泥稳定粒料结构层两层连铺下层作业段长度确定方法
CN105293995B (zh) 一种长寿命超薄排水抗滑表层及其制备方法
CN108314355A (zh) 微孔隙透水树脂胶砂及其制备方法
CN109796155A (zh) 一种沥青混凝土及其道路施工方法
KR20100012226A (ko) 상온의 아스콘 순환골재를 사용한 가열 혼합식 재생아스팔트 콘크리트 및 그의 제조방법
CN114351529A (zh) 一种采用温拌超薄层罩面的路面结构及其施工方法
CN103045067B (zh) 一种水泥混凝土桥面用防水材料及其制备方法
CN112195709A (zh) 山区公路渗固磨耗层养护的apr渗固剂及其施工方法
CN102154968B (zh) 掺拌pr-plasts混凝土施工工艺
CN105297576B (zh) 一种车内噪声测试路面及其铺设方法、车内噪声测试方法
CN206692972U (zh) 一种用于快速公交车道的排水沥青路面结构
CN102532658B (zh) 适用多雨水地区的沥青改性剂及其制备方法和应用工艺
CN107220460A (zh) 一种高摩阻沥青混合料的配合比设计方法
Aho et al. 10 Years of Experience Using Warm Mix Asphalt for Airside Pavements—Boston Logan Airport

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150909

WD01 Invention patent application deemed withdrawn after publication