CN104894929A - 复合型水泥道板地滚托架 - Google Patents
复合型水泥道板地滚托架 Download PDFInfo
- Publication number
- CN104894929A CN104894929A CN201510322371.6A CN201510322371A CN104894929A CN 104894929 A CN104894929 A CN 104894929A CN 201510322371 A CN201510322371 A CN 201510322371A CN 104894929 A CN104894929 A CN 104894929A
- Authority
- CN
- China
- Prior art keywords
- ground roll
- roll bracket
- bracket
- ground
- sidewalk slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004568 cement Substances 0.000 title claims abstract description 18
- 239000002131 composite material Substances 0.000 claims description 5
- 238000009434 installation Methods 0.000 abstract description 7
- 239000003245 coal Substances 0.000 abstract description 4
- 241001669679 Eleotris Species 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B23/00—Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
- E01B23/02—Tracks for light railways, e.g. for field, colliery, or mine use
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
复合型水泥道板地滚托架,其涉及煤矿设备安装中的使用设备技术领域。其特征在于它包含水泥道板(1)、地滚托架(2)、地滚托架(3),地滚托架(2)和地滚托架(3)分别安装在水泥道板(1)上,并且地滚托架(2)和地滚托架(3)安装在同一条水平线上,所述的地滚托架(2)为开口式,所述地滚托架(3)为插孔式。本发明具有成本低、强度和稳固性好、安装拆卸地滚方便、提高了工作效率以及降低了劳动成本等特点。
Description
技术领域
本发明涉及煤矿设备安装中的使用设备技术领域,具体涉及一种复合型水泥道板地滚托架。
背景技术
煤矿设备安装使用地滚托架目的就是避免绞车钢丝绳在轨枕与地板上拖行,防止钢丝绳磨损,一旦地滚托架变形或损坏,地滚无法正常起到托绳作用,会造成钢丝绳与轨枕磨损,就会同时降低钢丝绳及轨枕的安全系数与使用寿命。
目前市场上的此类产品,安装方式是轨道道板与地滚托架分别安装,地滚托架利用轨道道轨固定,悬空安装,较单薄,尤其是在煤矿井下斜巷运输系统使用中,此类产品抗压能力弱,受运行环境影响较大,易松动、变形、损坏,维修更换困难、频繁,材料费用重复投入,成本高。
发明内容
本发明的目的是为了提供一种复合型水泥道板地滚托架,其具有成本低、强度和稳固性好、安装拆卸地滚方便、提高了工作效率以及降低了劳动成本等特点。
为了背景技术所存在的问题,本发明是采用以下技术方案的:它包含水泥道板1、地滚托架2、地滚托架3,地滚托架2和地滚托架3分别安装在水泥道板1上,并且地滚托架2和地滚托架3安装在同一条水平线上,所述的地滚托架2为开口式,所述地滚托架3为插孔式。
本发明具有的以下优点:
1、轨道道板与地滚托架合成一体,利用轨道道板重量及凹槽型地滚托架,增加了地滚托架的强度和稳固性;
2、轨道道板与地滚托架复合型设计,即安装轨道道板的同时完成了地滚托架的安装,减少了安装工序,提高了安装效率;
3、地滚托架插槽式设计安装方式,提高了维护更换速度,解决了地滚更换困难的问题。
附图说明
图1为本发明结构示意图;
图2为本发明地滚托架2的结构示意图;
图3为本发明地滚托架3的结构示意图。
具体实施方式
参照图1-3,它包含水泥道板1、地滚托架2、地滚托架3,地滚托架2和地滚托架3分别安装在水泥道板1上,并且地滚托架2和地滚托架3安装在同一条水平线上,所述的地滚托架2为开口式,所述地滚托架3为插孔式。
本发明为复合型设计,在制造水泥轨道道板的同时预埋加工好的地滚托架,轨道道板与地滚托架合成一体,使用中,利用轨道道板重量及插槽型地滚托架,有效增加了地滚托架的强度和稳固性,降低了系统材料成本的重复投入;地滚托架固定架是一边插孔、一边开口的插槽式设计,方便地滚拆卸与安装,提高了地滚维护更换速度,有效降低了因更换地滚对系统运行影响的时间,从而提高了工作效率,降低了劳动成本。
Claims (2)
1.复合型水泥道板地滚托架,其特征在于它包含水泥道板(1)、地滚托架(2)、地滚托架(3),地滚托架(2)和地滚托架(3)分别安装在水泥道板(1)上,并且地滚托架(2)和地滚托架(3)安装在同一条水平线上。
2.根据权利要求1所述的复合型水泥道板地滚托架,其特征在于所述的地滚托架(2)为开口式,所述地滚托架(3)为插孔式。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510322371.6A CN104894929A (zh) | 2015-06-13 | 2015-06-13 | 复合型水泥道板地滚托架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510322371.6A CN104894929A (zh) | 2015-06-13 | 2015-06-13 | 复合型水泥道板地滚托架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104894929A true CN104894929A (zh) | 2015-09-09 |
Family
ID=54027859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510322371.6A Pending CN104894929A (zh) | 2015-06-13 | 2015-06-13 | 复合型水泥道板地滚托架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104894929A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780614A (zh) * | 2016-05-23 | 2016-07-20 | 肥西县鑫山机械厂 | 复合型水泥道板地滚托架 |
CN105926377A (zh) * | 2016-06-30 | 2016-09-07 | 合肥慧林建材有限公司 | 复合型水泥道板地滚托架 |
CN106087613A (zh) * | 2016-07-02 | 2016-11-09 | 安徽碧源环保工程有限公司 | 复合型水泥道板地滚托架 |
CN106120487A (zh) * | 2016-06-27 | 2016-11-16 | 肥西县碧涛建材有限公司 | 复合型水泥道板地滚托架 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3381586A (en) * | 1965-06-10 | 1968-05-07 | Gewerk Eisenhuette Westfalia | Mine roof prop and advancing arrangement |
CN202574257U (zh) * | 2012-06-05 | 2012-12-05 | 淮南矿业(集团)有限责任公司 | 卡槽式斜坡地滚子固定结构 |
CN204370253U (zh) * | 2014-12-11 | 2015-06-03 | 安徽省亿海矿山设备制造有限公司 | 复合型水泥道板地滚托架 |
CN104847403A (zh) * | 2015-05-22 | 2015-08-19 | 合肥昊诚工贸有限责任公司 | 复合型水泥道板地滚托架 |
-
2015
- 2015-06-13 CN CN201510322371.6A patent/CN104894929A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3381586A (en) * | 1965-06-10 | 1968-05-07 | Gewerk Eisenhuette Westfalia | Mine roof prop and advancing arrangement |
CN202574257U (zh) * | 2012-06-05 | 2012-12-05 | 淮南矿业(集团)有限责任公司 | 卡槽式斜坡地滚子固定结构 |
CN204370253U (zh) * | 2014-12-11 | 2015-06-03 | 安徽省亿海矿山设备制造有限公司 | 复合型水泥道板地滚托架 |
CN104847403A (zh) * | 2015-05-22 | 2015-08-19 | 合肥昊诚工贸有限责任公司 | 复合型水泥道板地滚托架 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780614A (zh) * | 2016-05-23 | 2016-07-20 | 肥西县鑫山机械厂 | 复合型水泥道板地滚托架 |
CN106120487A (zh) * | 2016-06-27 | 2016-11-16 | 肥西县碧涛建材有限公司 | 复合型水泥道板地滚托架 |
CN105926377A (zh) * | 2016-06-30 | 2016-09-07 | 合肥慧林建材有限公司 | 复合型水泥道板地滚托架 |
CN106087613A (zh) * | 2016-07-02 | 2016-11-09 | 安徽碧源环保工程有限公司 | 复合型水泥道板地滚托架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370253U (zh) | 复合型水泥道板地滚托架 | |
CN104847403A (zh) | 复合型水泥道板地滚托架 | |
CN104894929A (zh) | 复合型水泥道板地滚托架 | |
CN105780614A (zh) | 复合型水泥道板地滚托架 | |
CN103001146A (zh) | 钢管杆作业平台及其使用方法 | |
CN104047630A (zh) | 一种综采工作面机械化安装工艺方法 | |
CN105926377A (zh) | 复合型水泥道板地滚托架 | |
CN106120487A (zh) | 复合型水泥道板地滚托架 | |
CN103151750A (zh) | 巷道电缆托架 | |
CN103523667A (zh) | 矿用钢丝绳牵引单轨吊车运输系统及其运输方法 | |
CN202785426U (zh) | 无极绳绞车钢丝绳托绳轮装置 | |
CN105936481A (zh) | 复合型水泥道板地滚托架 | |
CN204281144U (zh) | 一种无极绳绞车压线轮 | |
CN106087613A (zh) | 复合型水泥道板地滚托架 | |
CN208650908U (zh) | 一种斜巷提升导向兼耙装机防滑装置 | |
CN103032633B (zh) | 轮式线缆单轨吊 | |
CN203354455U (zh) | 擦窗机吊船悬挂滑轨器 | |
CN100462265C (zh) | 矿用连续牵引车转弯机构 | |
CN204644820U (zh) | 路面混凝土浇筑保护装置 | |
CN204959611U (zh) | 用于高速公路建设桥梁护栏基座模板的吊装设备 | |
CN204386643U (zh) | 一种斜井工程施工的安全保护装置 | |
CN103231993A (zh) | 室内gis运输就位装置及使用方法 | |
CN203624937U (zh) | 遮板安装机 | |
CN103303831B (zh) | 锁绳器 | |
CN107090751A (zh) | 复合型水泥道板地滚托架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150909 |