CN104880643B - 电压暂降监测节点的优化配置方法 - Google Patents

电压暂降监测节点的优化配置方法 Download PDF

Info

Publication number
CN104880643B
CN104880643B CN201510313399.3A CN201510313399A CN104880643B CN 104880643 B CN104880643 B CN 104880643B CN 201510313399 A CN201510313399 A CN 201510313399A CN 104880643 B CN104880643 B CN 104880643B
Authority
CN
China
Prior art keywords
mrow
msubsup
msub
short circuit
monitoring node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510313399.3A
Other languages
English (en)
Other versions
CN104880643A (zh
Inventor
陈礼频
王海燕
任志超
曹开江
胥威汀
刘旭娜
马瑞光
汪伟
陈谦
张全明
杜新伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510313399.3A priority Critical patent/CN104880643B/zh
Publication of CN104880643A publication Critical patent/CN104880643A/zh
Priority to PCT/CN2015/090418 priority patent/WO2016197484A1/zh
Application granted granted Critical
Publication of CN104880643B publication Critical patent/CN104880643B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Other Investigation Or Analysis Of Materials By Electrical Means (AREA)

Abstract

一种电压暂降监测节点的优化配置方法,包括:基于电网拓扑和系统参数获得临界故障电阻矩阵;根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束;以监测节点数量最少为目标,获得满足所述不等式约束的最优监测节点配置方案。本发明提供的电压暂降监测节点的优化配置方法,将短路故障点的故障电阻引入到监测节点优化配置模型中,消除了电压暂降的监测盲区。

Description

电压暂降监测节点的优化配置方法
技术领域
本发明涉及配电网络规划技术领域,特别涉及一种电压暂降监测节点的优化配置方法。
背景技术
电压暂降或下跌是指供电电压有效值在短时间内突然下降又回升恢复的现象。在电网中,这种现象的持续时间大多为0.5秒至1.5秒。国际电气与电子工程师协会将电压暂降定义为供电电压有效值快速下降到额定值的90%至10%,然后回升至正常值附近;而国际电工委员会则将其定义为下降到额定值的90%至1%,持续时间为10毫秒至1分钟。电压暂降的时间过长,会导致设备非正常停机。随着高新科技的不断发展,大量对电压暂降极为敏感的精密设备被广泛应用于各行各业,为人们生产生活带来了极大便利。与此同时,由电压暂降引起的经济损失和用户抱怨等问题也日益凸显。在电网中准确有效地监测电压暂降事件,是客观反应电力用户受电压暂降扰动程度以及合理制定电压暂降治理措施的必要前提。
考虑到成本约束,不可能在所有母线处安装电压暂降监测装置,由此诞生了针对电压暂降监测节点的优化配置方法。电压暂降监测节点的优化配置方法主要思路为:从构建电压暂降监测网络的角度出发,基于系统元件参数和网络拓扑结构,并结合电压暂降产生机理和传播机理,以最少的监测节点构建覆盖整个电网的监测网络。监测节点可观域(MRA,monitor reach area)是指能触发监测装置记录电压暂降事件的短路故障发生区域,传统电压暂降监测节点的优化配置方法基于MRA原理,并假设发生电压暂降时所有短路故障的故障电阻值均为0,将发生短路故障时的节点电压与设定的电压阈值进行比较,构建电压暂降可观性矩阵:
其中,t为短路故障类型,n为电网中设定的短路故障点数量,b为可作为监测节点的节点数量。可观性矩阵Pt中任意元素取值为:
其中,为短路故障点i发生t类短路故障时对应监测节点j的电压幅值,发生非对称性短路故障时取幅值最小一相电压,Vth为预先设定的电压阈值。
定义b维监测位置决策向量:
D=[d1 d2 … db],
监测位置决策向量D中任意元素dj取值为:
为确保电网中任意位置发生短路故障时,电压暂降事件均能被监测装置记录,则对于可观性矩阵Pt中第i行元素,监测位置决策电量D均须满足以下不等式约束:
以监测节点数量最少为目标,以上式为不等式约束,对该0-1整数线性规划问题进行求解,便能得出传统方法的监测节点优化配置方案。
传统电压暂降监测节点的优化配置方法可概括为如图1所示以最少的监测节点实现其MRA联合覆盖整个电网,其中,M、N为监测节点,f为短路故障点,A为与短路故障点f相邻的节点。然而,按现有方法在电网中配置监测节点,会出现监测盲区。
发明内容
本发明所要解决的是现有的电压暂降监测节点的优化配置方法存在监测盲区的问题。
为解决上述问题,本发明提供一种电压暂降监测节点的优化配置方法,包括:
基于电网拓扑和系统参数获得临界故障电阻矩阵;
根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束;
以监测节点数量最少为目标,获得满足所述不等式约束的最优监测节点配置方案。
可选的,所述基于电网拓扑和系统参数获得临界故障电阻矩阵包括:
获得短路故障点的自阻抗以及短路故障点和监测节点之间的互阻抗;
根据所述短路故障点的自阻抗以及短路故障点和监测节点之间的互阻抗,获得发生不同类型短路故障时所述监测节点的各相电压幅值关于所述短路故障点处故障电阻值的函数;
以所述监测节点的各相电压幅值等于预设的电压阈值反解所述监测节点的各相电压幅值关于所述短路故障点处故障电阻值的函数,以获得发生不同类型短路故障时所述短路故障点的临界故障电阻值;
根据发生不同类型短路故障时所述短路故障点的临界故障电阻值构建所述临界故障电阻矩阵:
其中,是所述临界故障电阻矩阵,t是短路故障类型,n是设定的短路故障点数量,b是可作为监测节点的节点数量,所述临界故障电阻矩阵中任意元素取值即为在故障点i处发生t类短路故障时对应监测节点j的临界故障电阻值。
可选的,所述短路故障点的自阻抗根据获得,其中,f是位于线路u-v之间短路故障点;c=0、1、2,分别表示零序、正序和负序;是所述短路故障点f的各序自阻抗;l是所述短路故障点f与线路节点u之间的距离;是线路节点u的各序自阻抗;是线路节点v的各序自阻抗;是线路节点u与线路节点v之间的各序互阻抗;是线路u-v的各序阻抗。
可选的,所述短路故障点和监测节点之间的互阻抗根据获得,其中,m是监测节点;是所述短路故障点f和所述监测节点m之间的各序互阻抗;是所述线路节点u与所述监测节点m之间的各序互阻抗;是所述线路节点v与所述监测节点m之间的各序互阻抗。
可选的,发生A相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生B、C相间短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生B、C两相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生三相短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
其中,Vm,A是所述监测节点m的A相电压幅值,Vm,B是所述监测节点m的B相电压幅值,Vm,C是所述监测节点m的C相电压幅值,α是旋转因子ej120°,Rx是所述短路故障点f的故障电阻值。
可选的,所述根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束包括:
建立与决策向量[d1 d2 … db]对应的决策方案临界故障电阻矩阵:
其中,是所述决策方案临界故障电阻矩阵,所述决策方案临界故障电阻矩阵中任意元素取值为dj是所述决策向量[d1 d2 … db]中任意元素,
根据所述临界故障电阻矩阵和所述决策方案临界故障电阻矩阵获得短路故障点i引起电压暂降的电压暂降可观率:
其中,是所述短路故障点i引起电压暂降的电压暂降可观率,是所述决策方案临界故障电阻矩阵中第i行元素的最大值,是所述临界故障电阻矩阵中第i行元素的最大值,Rimin是所述短路故障点i的故障电阻最小值,f(Rix)是所述短路故障点i处故障电阻的概率密度函数,Rix是所述短路故障点i的故障电阻值;
根据所述短路故障点i对应的电压暂降可观率建立所述短路故障点i的不等式约束:
其中,β是电压暂降可观率阈值。
可选的,所述以监测节点数量最少为目标的目标函数为:
与现有技术相比,本发明具有以下优点:
本发明提供的电压暂降监测节点的优化配置方法,基于临界故障电阻矩阵,建立电压暂降监测节点优化配置模型不等式约束,将短路故障点的故障电阻这一关键变量引入到了监测节点优化配置模型中,由此定量刻画并提高了监测节点配置方案在故障电阻非零条件下的工程适用性,消除了电压暂降的监测盲区。
附图说明
图1是采用传统电压暂降监测节点的优化配置方法设置监测节点在理想情况下监测电压暂降的示意图;
图2是采用传统电压暂降监测节点的优化配置方法设置监测节点在实际情况下监测电压暂降的示意图;
图3是本发明实施方式的电压暂降监测节点的优化配置方法的流程示意图;
图4是本发明实施例的电网结构示意图。
具体实施方式
电网元件发生短路故障时,故障电阻广泛客观存在,且其电阻值受短路媒介类型、相间距离以及大地导电率等因素影响,常呈现出较强的随机不确定特性。由背景技术中描述的传统电压暂降监测节点的优化配置方法可知,基于MRA原理进行监测节点优化配置的假设前提是短路故障点的故障电阻值必须为零。
故障电阻值对短路故障点的电压暂降幅值影响显著,故障电阻值越大,各监测节点对应的MRA范围越小。若基于传统电压暂降监测节点的优化配置方法在全网配置监测节点,当电网中发生非金属性短路故障时,图1中监测节点M和监测节点N的MRA范围相应缩小,将会出现图2所示的监测盲区。在监测盲区中短路故障点f发生非金属性短路故障时,由于故障电阻Rf的存在,短路故障点f的相邻节点A处电压虽已低于电压阈值,但监测节点M和监测节点N处电压仍高于电压阈值,因而监测节点M和监测节点N处的监测装置不会记录电压暂降事件。
由此可见,传统电压暂降监测节点的优化配置方法由于未引入故障电阻这一关键变量,必将导致电网中出现大量监测盲区,最终影响全网电压暂降监测评估结果的准确性。本发明提供一种电压暂降监测节点的优化配置方法,基于临界故障电阻矩阵,建立电压暂降监测节点优化配置模型不等式约束,将短路故障点的故障电阻这一关键变量引入到了监测节点优化配置模型中。
图3是本发明实施方式的电压暂降监测节点的优化配置方法的流程示意图,所述电压暂降监测节点的优化配置方法包括:
步骤S31:基于电网拓扑和系统参数获得临界故障电阻矩阵;
步骤S32:根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束;
步骤S33:以监测节点数量最少为目标,获得满足所述不等式约束的最优监测节点配置方案。
下面结合实施例及附图,对本发明作进一步地的详细说明,但本发明的实施方式不限于此。
如步骤S31所述,基于电网拓扑和系统参数获得临界故障电阻矩阵。
具体地,获得短路故障点的自阻抗以及短路故障点和监测节点之间的互阻抗。图4是本发明实施例的电网结构示意图,假设f是线路u-v上的短路故障点,l是短路故障点f与线路节点u之间距离,m是监测节点,则所述短路故障点f的自阻抗为:
所述短路故障点f和监测节点m之间的互阻抗为:
其中,c=0、1、2,分别表示零序、正序和负序;是所述短路故障点f的各序自阻抗;是线路节点u的各序自阻抗;是线路节点v的各序自阻抗;是线路节点u与线路节点v之间的各序互阻抗;是线路u-v的各序阻抗;是所述短路故障点f和所述监测节点m之间的各序互阻抗;是所述线路节点u与所述监测节点m之间的各序互阻抗;是所述线路节点v与所述监测节点m之间的各序互阻抗。
当所述短路故障点f处发生不同类型短路故障时,根据所述短路故障点f的自阻抗以及所述短路故障点f和监测节点m之间的互阻抗,获得发生不同类型短路故障时所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数。
发生A相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生B、C相间短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生B、C两相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
发生三相短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
其中,Vm,A是所述监测节点m的A相电压幅值,Vm,B是所述监测节点m的B相电压幅值,Vm,C是所述监测节点m的C相电压幅值,Rx是所述短路故障点f的故障电阻值,α是旋转因子ej120°
以所述监测节点m的各相电压幅值等于预设的电压阈值反解所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数,以获得发生不同类型短路故障时所述短路故障点f的临界故障电阻值Rx。需要说明的是,所述电压阈值根据实际需求进行设置,本发明实施例对此不作限定。
采用与获得所述短路故障点f的临界故障电阻值Rx相同的方法,获得电网中其他短路故障点的临界故障电阻值。对于非对称性短路故障,取三相临界故障电阻值中的最大值作为该短路故障点该类故障的临界故障电阻值。
根据发生不同类型短路故障时所述短路故障点的临界故障电阻值构建所述临界故障电阻矩阵:
其中,是所述临界故障电阻矩阵;t是短路故障类型,即:A相接地短路故障,B、C相间短路故障,B、C两相接地短路故障,三相短路故障;n是设定的短路故障点数量;b是可作为监测节点的节点数量。所述临界故障电阻矩阵中任意元素取值即为在短路故障点i处发生t类短路故障时对应监测节点j的临界故障电阻值。
如步骤S32所述,根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束。
具体地,与现有技术中相同,定义b维监测位置决策向量:
D=[d1 d2 … db]。
监测位置决策向量D中任意元素dj取值为:
与决策向量D对应的决策方案临界故障电阻矩阵为:
其中,是所述决策方案临界故障电阻矩阵,所述决策方案临界故障电阻矩阵中任意元素取值为dj是所述决策向量D中任意元素。
定义电压暂降可观率为:
短路故障点的故障电阻值具有随机不确定特性,若用f(Rix)表示所述短路故障点i处故障电阻的概率密度函数,表示所述临界故障电阻矩阵中第i行元素的最大值,表示所述决策方案临界故障电阻矩阵中第i行元素的最大值,Rimin表示所述短路故障点i的故障电阻最小值。将所述短路故障点i的故障电阻值Rix看作变量,根据所述临界故障电阻矩阵和所述决策方案临界故障电阻矩阵获得短路故障点i引起电压暂降的电压暂降可观率:
其中,是所述短路故障点i引起电压暂降的电压暂降可观率。
对于所述短路故障点i,当其故障电阻值大于所述临界故障电阻矩阵中第i行元素的最大值时,全网所有节点的电压值均大于电压阈值,即所述短路故障点i的电压暂降可观率刻画了所述短路故障点i处发生具有不同故障电阻值的短路故障时,所述决策向量D对应监测点配置方案能记录到电压暂降事件的概率。
若用β表示电压暂降可观率阈值,所述电压暂降可观率阈值β根据实际需求进行设置,为保证全网任意短路故障点发生任意类型短路故障时的电压暂降可观率均大于所述电压暂降可观率阈值β,则对于任意短路故障点i,根据所述短路故障点i的电压暂降可观率建立不等式约束:
如步骤S33所述,以监测节点数量最少为目标,获得满足所述不等式约束的最优监测节点配置方案。
为使监测节点数量最少,所述以监测节点数量最少为目标的目标函数为:
所述目标函数和所述不等式约束构成一个具有非线性约束的0-1整数线性规划问题,采用常规遗传算法对该规划问题进行求解,即能得出最优监测节点配置方案。本领域技术人员知晓如何采用遗传算法对所述目标函数和所述不等式约束构成的具有非线性约束的0-1整数线性规划问题求解,在此不再赘述。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化,均落入本发明的保护范围之内。

Claims (6)

1.一种电压暂降监测节点的优化配置方法,其特征在于,包括:
基于电网拓扑和系统参数获得临界故障电阻矩阵;
根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束;
以监测节点数量最少为目标,获得满足所述不等式约束的最优监测节点配置方案;
所述基于电网拓扑和系统参数获得临界故障电阻矩阵包括:
获得短路故障点的自阻抗以及短路故障点和监测节点之间的互阻抗;
根据所述短路故障点的自阻抗以及短路故障点和监测节点之间的互阻抗,获得发生不同类型短路故障时所述监测节点的各相电压幅值关于所述短路故障点处故障电阻值的函数;
以所述监测节点的各相电压幅值等于预设的电压阈值反解所述监测节点的各相电压幅值关于所述短路故障点处故障电阻值的函数,以获得发生不同类型短路故障时所述短路故障点的临界故障电阻值;
根据发生不同类型短路故障时所述短路故障点的临界故障电阻值构建所述临界故障电阻矩阵:
其中,是所述临界故障电阻矩阵,t是短路故障类型,n是设定的短路故障点数量,b是可作为监测节点的节点数量,所述临界故障电阻矩阵中任意元素取值即为在故障点i处发生t类短路故障时对应监测节点j的临界故障电阻值。
2.根据权利要求1所述的电压暂降监测节点的优化配置方法,其特征在于,所述短路故障点的自阻抗根据获得,其中,f是位于线路u-v之间短路故障点;c=0、1、2,分别表示零序、正序和负序;是所述短路故障点f的各序自阻抗;l是所述短路故障点f与线路节点u之间的距离;是线路节点u的各序自阻抗;是线路节点v的各序自阻抗;是线路节点u与线路节点v之间的各序互阻抗;是线路u-v的各序阻抗。
3.根据权利要求2所述的电压暂降监测节点的优化配置方法,其特征在于,所述短路故障点和监测节点之间的互阻抗根据获得,其中,m是监测节点;是所述短路故障点f和所述监测节点m之间的各序互阻抗;是所述线路节点u与所述监测节点m之间的各序互阻抗;是所述线路节点v与所述监测节点m之间的各序互阻抗。
4.根据权利要求3所述的电压暂降监测节点的优化配置方法,其特征在于,发生A相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>A</mi> </mrow> </msub> <mo>=</mo> <mn>1</mn> <mo>-</mo> <mfrac> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>3</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>B</mi> </mrow> </msub> <mo>=</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <mo>-</mo> <mfrac> <mrow> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>3</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mi>&amp;alpha;</mi> <mo>-</mo> <mfrac> <mrow> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>3</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>;</mo> </mrow>
发生B、C相间短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>A</mi> </mrow> </msub> <mo>=</mo> <mn>1</mn> <mo>-</mo> <mfrac> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>B</mi> </mrow> </msub> <mo>=</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <mo>-</mo> <mfrac> <mrow> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mi>&amp;alpha;</mi> <mo>-</mo> <mfrac> <mrow> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>;</mo> </mrow>
发生B、C两相接地短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>A</mi> </mrow> </msub> <mo>=</mo> <mn>1</mn> <mo>-</mo> <mfrac> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> <mn>3</mn> <msubsup> <mi>R</mi> <mi>x</mi> <mn>2</mn> </msubsup> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>B</mi> </mrow> </msub> <mo>=</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <mo>-</mo> <mfrac> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> <mn>3</mn> <msubsup> <mi>R</mi> <mi>x</mi> <mn>2</mn> </msubsup> </mrow> </mfrac> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mi>&amp;alpha;</mi> <mo>-</mo> <mfrac> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>&amp;alpha;Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msup> <mi>&amp;alpha;</mi> <mn>2</mn> </msup> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>-</mo> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>-</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> <mo>)</mo> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> </mrow> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>+</mo> <mn>2</mn> <msub> <mi>R</mi> <mi>x</mi> </msub> <mrow> <mo>(</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mo>+</mo> <mn>3</mn> <msubsup> <mi>R</mi> <mi>x</mi> <mn>2</mn> </msubsup> </mrow> </mfrac> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>;</mo> </mrow>
发生三相短路故障时,所述监测节点m的各相电压幅值关于所述短路故障点f处故障电阻值的函数为:
<mrow> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>A</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>B</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>V</mi> <mrow> <mi>m</mi> <mo>,</mo> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mn>1</mn> <mo>-</mo> <mfrac> <msubsup> <mi>Z</mi> <mrow> <mi>m</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mrow> <msubsup> <mi>Z</mi> <mrow> <mi>f</mi> <mi>f</mi> </mrow> <mn>1</mn> </msubsup> <mo>+</mo> <msub> <mi>R</mi> <mi>x</mi> </msub> </mrow> </mfrac> <mo>;</mo> </mrow>
其中,Vm,A是所述监测节点m的A相电压幅值,Vm,B是所述监测节点m的B相电压幅值,Vm,C是所述监测节点m的C相电压幅值,α是旋转因子ej120°,Rx是所述短路故障点f的故障电阻值。
5.根据权利要求4所述的电压暂降监测节点的优化配置方法,其特征在于,所述根据故障电阻随机分布特性和所述临界故障电阻矩阵建立不等式约束包括:
建立与决策向量[d1 d2 … db]对应的决策方案临界故障电阻矩阵:
其中,是所述决策方案临界故障电阻矩阵,所述决策方案临界故障电阻矩阵中任意元素取值为dj是所述决策向量[d1d2…db]中任意元素,
根据所述临界故障电阻矩阵和所述决策方案临界故障电阻矩阵获得短路故障点i引起电压暂降的电压暂降可观率:
<mrow> <msubsup> <mi>p</mi> <mrow> <mi>D</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>t</mi> </msubsup> <mo>=</mo> <mfrac> <mrow> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>R</mi> <mrow> <mi>i</mi> <mi>min</mi> </mrow> </msub> <msubsup> <mi>A</mi> <mrow> <mi>D</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>A</mi> </msubsup> </msubsup> <mi>f</mi> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>i</mi> <mi>x</mi> </mrow> </msub> <mo>)</mo> </mrow> <msub> <mi>dR</mi> <mrow> <mi>i</mi> <mi>x</mi> </mrow> </msub> </mrow> <mrow> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>R</mi> <mrow> <mi>i</mi> <mi>min</mi> </mrow> </msub> <msubsup> <mi>A</mi> <mrow> <mi>c</mi> <mi>r</mi> <mi>i</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>t</mi> </msubsup> </msubsup> <mi>f</mi> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>i</mi> <mi>x</mi> </mrow> </msub> <mo>)</mo> </mrow> <msub> <mi>dR</mi> <mrow> <mi>i</mi> <mi>x</mi> </mrow> </msub> </mrow> </mfrac> <mo>,</mo> </mrow>
其中,是所述短路故障点i引起电压暂降的电压暂降可观率,是所述决策方案临界故障电阻矩阵中第i行元素的最大值,是所述临界故障电阻矩阵中第i行元素的最大值,Ri min是所述短路故障点i的故障电阻最小值,f(Rix)是所述短路故障点i处故障电阻的概率密度函数,Rix是所述短路故障点i的故障电阻值;
根据所述短路故障点i对应的电压暂降可观率建立所述短路故障点i的不等式约束:
<mrow> <msubsup> <mi>p</mi> <mrow> <mi>D</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>t</mi> </msubsup> <mo>&amp;GreaterEqual;</mo> <mi>&amp;beta;</mi> <mo>,</mo> <mo>&amp;ForAll;</mo> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mn>...</mn> <mo>,</mo> <mi>n</mi> <mo>,</mo> <mo>&amp;ForAll;</mo> <mi>t</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mn>3</mn> <mo>,</mo> <mn>4</mn> <mo>,</mo> </mrow>
其中,β是电压暂降可观率阈值。
6.根据权利要求5所述的电压暂降监测节点的优化配置方法,其特征在于,所述以监测节点数量最少为目标的目标函数为:
<mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>d</mi> <mi>j</mi> </msub> <mo>.</mo> </mrow> 3
CN201510313399.3A 2015-06-09 2015-06-09 电压暂降监测节点的优化配置方法 Active CN104880643B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510313399.3A CN104880643B (zh) 2015-06-09 2015-06-09 电压暂降监测节点的优化配置方法
PCT/CN2015/090418 WO2016197484A1 (zh) 2015-06-09 2015-09-23 电压暂降监测节点的优化配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510313399.3A CN104880643B (zh) 2015-06-09 2015-06-09 电压暂降监测节点的优化配置方法

Publications (2)

Publication Number Publication Date
CN104880643A CN104880643A (zh) 2015-09-02
CN104880643B true CN104880643B (zh) 2017-09-29

Family

ID=53948210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510313399.3A Active CN104880643B (zh) 2015-06-09 2015-06-09 电压暂降监测节点的优化配置方法

Country Status (2)

Country Link
CN (1) CN104880643B (zh)
WO (1) WO2016197484A1 (zh)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880643B (zh) * 2015-06-09 2017-09-29 国网四川省电力公司经济技术研究院 电压暂降监测节点的优化配置方法
CN106646128B (zh) * 2016-12-12 2019-02-01 浙江工业大学 基于滑模控制的暂态电压扰动源容错性定位方法
CN107992339B (zh) * 2017-11-15 2020-06-30 浙江大学 一种自动生成物联网节点硬件配置的方法
CN107894554A (zh) * 2017-11-23 2018-04-10 国网山东省电力公司枣庄供电公司 基于监测节点电压变化的配电网故障定位方法
CN109599874B (zh) * 2018-10-29 2022-07-12 国网江苏省电力有限公司 基于电压暂降事件关联分析的治理设备选择方法
CN109298244A (zh) * 2018-12-04 2019-02-01 广东电网有限责任公司 一种考虑故障阻抗的暂降域识别方法
CN109557415B (zh) * 2018-12-06 2021-07-02 国电南瑞科技股份有限公司 一种输电线路分布式故障诊断终端选点方法
CN110082639B (zh) * 2019-05-15 2020-06-26 广东电网有限责任公司 一种基于最小幅值搜索的电压暂降监测点优化配置方法
CN110137958B (zh) * 2019-05-22 2023-01-20 深圳供电局有限公司 一种用户电压暂降分析方法及其系统
CN110266818B (zh) * 2019-07-16 2021-12-07 重庆工商职业学院 基于物联网终端组的管理方法
CN110991693A (zh) * 2019-10-28 2020-04-10 重庆大学 一种考虑购电成本不确定性的负荷价-量曲线聚合系统
CN110749767B (zh) * 2019-10-31 2020-07-10 四川大学 考虑网络拓扑动态重构的电压暂降监测装置配置方法
CN110795867A (zh) * 2019-11-19 2020-02-14 中国石油大学(华东) 一种基于概率可观测的电压暂降监测点的优化配置方法
CN111461924B (zh) * 2020-04-13 2022-12-16 国网山西省电力公司电力科学研究院 一种电压暂降监测点多目标优化配置方法
CN112269099A (zh) * 2020-10-12 2021-01-26 广东电网有限责任公司广州供电局 一种基于压缩感知理论的电压暂降状态估计方法及系统
CN112731150B (zh) * 2020-12-08 2023-07-07 深圳供电局有限公司 电压暂降状态估计方法、装置、计算机设备和存储介质
CN112834867B (zh) * 2021-01-06 2022-08-02 南京工程学院 一种广域同步智能传感器的优化部署方法
CN113109664B (zh) * 2021-03-31 2024-05-31 国网福建省电力有限公司电力科学研究院 一种基于小波奇异熵的电压暂降源定位方法
CN113468758B (zh) * 2021-07-19 2024-02-23 国网冀北电力有限公司 考虑用户经济损失风险的暂降监测装置多目标优化配置方法
CN114019295A (zh) * 2021-09-13 2022-02-08 大唐水电科学技术研究院有限公司 一种同杆四回线路两回线三相断线故障分析方法、装置
CN113779112A (zh) * 2021-09-27 2021-12-10 南京乐帆电气科技有限公司 基于空间信息和大数据映射算法的电能质量分析系统
CN115469192B (zh) * 2022-11-02 2023-04-25 国网信息通信产业集团有限公司 一种电压暂降源定位方法及定位系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080079135A (ko) * 2007-02-26 2008-08-29 엘에스산전 주식회사 새그의 위상보상이 가능한 실시간 전압제어 장치 및 방법
CN102790390A (zh) * 2012-07-27 2012-11-21 华北电力大学 一种电压凹陷域的分析方法
CN103576048A (zh) * 2013-10-09 2014-02-12 国家电网公司 一种用于电压暂降源定位的可能故障线路集提取方法
CN103605027A (zh) * 2013-11-26 2014-02-26 国家电网公司 一种电网电压暂降源定位系统

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103457279A (zh) * 2013-09-23 2013-12-18 广东电网公司电力调度控制中心 大规模电网的分区d-statcom综合优化配置方案的确定方法
CN103995178A (zh) * 2014-05-20 2014-08-20 江苏大学 一种基于时频聚集特性准则s变换的电压暂降检测方法
CN104880643B (zh) * 2015-06-09 2017-09-29 国网四川省电力公司经济技术研究院 电压暂降监测节点的优化配置方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080079135A (ko) * 2007-02-26 2008-08-29 엘에스산전 주식회사 새그의 위상보상이 가능한 실시간 전압제어 장치 및 방법
CN102790390A (zh) * 2012-07-27 2012-11-21 华北电力大学 一种电压凹陷域的分析方法
CN103576048A (zh) * 2013-10-09 2014-02-12 国家电网公司 一种用于电压暂降源定位的可能故障线路集提取方法
CN103605027A (zh) * 2013-11-26 2014-02-26 国家电网公司 一种电网电压暂降源定位系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于线路分段法的电压跌落监测网络优化布点策略;王东旭等;《电工技术学报》;20111031;第26卷(第10期);31-38页 *
考虑故障阻抗与多级变压器影响的电压凹陷评估;肖先勇等;《电力自动化设备》;20100228;第30卷(第2期);43-47,52页 *

Also Published As

Publication number Publication date
CN104880643A (zh) 2015-09-02
WO2016197484A1 (zh) 2016-12-15

Similar Documents

Publication Publication Date Title
CN104880643B (zh) 电压暂降监测节点的优化配置方法
Amanulla et al. Reconfiguration of power distribution systems considering reliability and power loss
US20140195844A1 (en) System and method for developing, deploying and implementing power system computer applications
CN108459240A (zh) 一种配电网线路故障区间定位方法
Farajollahi et al. Location identification of distribution network events using synchrophasor data
CN108199891B (zh) 一种基于人工神经网络多角度综合决策的cps网络攻击辨识方法
Mahmoud et al. Cyberphysical infrastructures in power systems: architectures and vulnerabilities
CN111044843B (zh) 一种基于多源数据的输电线路故障定位方法
Khezrimotlagh et al. MILP modeling of targeted false load data injection cyberattacks to overflow transmission lines in smart grids
CN106253244B (zh) 一种基于电流自构参考量的电流方向纵联保护方法
Alhelou et al. A dynamic-state-estimator-based tolerance control method against cyberattack and erroneous measured data for power systems
CN107219453A (zh) 一种基于多维混合量的变电站继电保护隐性故障诊断方法
Shahinzadeh et al. Anomaly detection and resilience-oriented countermeasures against cyberattacks in smart grids
Zhou et al. Cyber attacks, detection and protection in smart grid state estimation
Zhai et al. Modeling and identification of worst-case cascading failures in power systems
Cao et al. Cyber-Physical Energy and Power Systems
Baba et al. Synchrophasor based real time monitoring of grid events in Indian power system
Guttromson et al. Momentary cessation: Improving dynamic performance and modeling of utility-scale inverter based resources during grid disturbances
CN105629097A (zh) 一种继电保护装置的隐性故障检测方法
Jacobs et al. Next-generation relay voting scheme design leveraging consensus algorithms
CN108808661A (zh) 考虑交叉跨越和输电通道的多重故障静态安全分析方法
Ayad et al. Cyber-physical security of state estimation against attacks on wide-area load shedding protection schemes
Sou A branch-decomposition approach to power network design
Wang et al. Probabilistic static voltage stability security assessment for power transmission system
CN110783923A (zh) 变电站主变中性点接地处理方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant