CN104863592A - 一种大结构分段凿岩阶段出矿嗣后充填采矿法 - Google Patents

一种大结构分段凿岩阶段出矿嗣后充填采矿法 Download PDF

Info

Publication number
CN104863592A
CN104863592A CN201510339681.9A CN201510339681A CN104863592A CN 104863592 A CN104863592 A CN 104863592A CN 201510339681 A CN201510339681 A CN 201510339681A CN 104863592 A CN104863592 A CN 104863592A
Authority
CN
China
Prior art keywords
stope
ore
ore removal
polycrystalline substance
back production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510339681.9A
Other languages
English (en)
Other versions
CN104863592B (zh
Inventor
宋嘉栋
周爱民
林卫星
詹进
周礼
柳小胜
欧任泽
王长军
甯瑜林
宋兴
罗佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mining Industry Co. Ltd.
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201510339681.9A priority Critical patent/CN104863592B/zh
Publication of CN104863592A publication Critical patent/CN104863592A/zh
Application granted granted Critical
Publication of CN104863592B publication Critical patent/CN104863592B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Earth Drilling (AREA)

Abstract

本发明涉及一种大结构分段凿岩阶段出矿嗣后充填采矿法,采场回采与底部结构回收同步交叉进行,第一步回采奇数号采场,回采方式为分段凿岩阶段出矿,采空区暂不充填;第二步回采奇数号采场对应的1/2底部结构,回采结束后将矿房及其对应的1/2底部结构对应采空区进行充填;第三步回采偶数号采场,采空区暂不充填;第四步回采矿柱对应的1/2底部结构,回采结束后将矿柱及其对应1/2底部结构对应空区进行充填。本发明采准切割工程量大大减少,单个采场生产能力大,效率高,工人劳动强度低,生产调度和管理简单。同时,在采场主体矿石回采的同时对采场底部结构的矿石进行了同步交叉回收,回采作业安全,资源回收率高。

Description

一种大结构分段凿岩阶段出矿嗣后充填采矿法
技术领域
本发明属于地下矿山开采领域,特别涉及矿岩稳固急倾斜厚大矿体开采的一种大结构分段凿岩阶段出矿嗣后充填采矿法。
背景技术
对于矿岩稳固~极稳固的急倾斜厚大矿体开采而言,分段凿岩阶段出矿嗣后充填采矿法是一种比较适合的采矿方法。该方法将中段内矿体划分为分段,阶段底部水平设有底部出矿结构,在分段凿岩巷道中凿岩、爆破落矿,崩落矿石集中在底部出矿水平进行铲装或搬运,采场落矿、出矿完毕后对采空区进行充填处理。
目前我国矿山所采用的分段凿岩阶段出矿嗣后充填采矿法阶段高度通常为50~60m,分段高度10~12m,矿房、矿柱跨度10~12m。正常回采分两步进行,一步骤回采矿房,二步骤回采矿柱,期间不对底部结构进行回采。底部结构矿石通常不回收、在中段回采完毕后回收或在矿山服务年限末尾作为“残矿”统一回收。
对于大型特大型地下矿山来说,采用上述结构参数的分段凿岩阶段出矿嗣后充填法进行生产,为满足矿山生产能力,往往需要同时安排多个中段、多个采场同时进行生产,矿山采准切割工程量大、工期紧,采场生产调度、作业安排等工作量繁复,人员设备工班消耗大,工效低。此外,若不对底部结构进行回收,则相当一部分矿石资源被浪费损失;若在中段回采完毕或服务年限末期回收,原有部分工程需维护费用高,且受前期采动及底部结构矿石特殊赋存形态影响,后期回采环境严重恶化,新增工程布置、施工难度大。
发明内容
本发明的目的是提供一种大结构分段凿岩阶段出矿嗣后充填采矿法,该方法采场生产能力大,效率高,能够满足大型特大型矿山生产能力的要求,同时能在回采主体矿石的同时实现底部结构的安全高效回收。
本发明的同步回收底部结构的大结构分段凿岩阶段出矿嗣后充填采矿法,阶段高度100~120m,分段高度20~25m,采场长为矿体厚度,宽20~30m,阶段出矿水平采用平底式底部结构。采场回采与底部结构回收同步交叉进行。
所述采场沿矿体走向划分为奇数号采场和偶数号采场。
两个相邻的奇数号采场和偶数号采场共用一个底部结构,所述底部结构的回采分为左右两个1/2底部结构进行回采。
从回采时间和空间上来看,回采分四步进行:第一步回采奇数号采场,采空区不充填;第二步回采奇数号采场对应的1/2底部结构,回采完毕后充填奇数号采场及其底部结构采空区;第三步回采偶数号采场,采空区不充填;第四步回采偶数号采场对应的另外1/2底部结构,回采完毕后充填偶数号采场及其底部结构采空区。
所述阶段高度100~120m,分段高度20~25m,采场长为矿体厚度,宽20~30m,其值根据矿体赋存形态、矿岩稳固性、理论分析计算结果及所用机械设备等因素综合确定。
所述平底式底部结构包括一条出矿穿脉、两条受矿巷道、数条出矿进路,空间形态呈一个大的对称三角形产出。其中,出矿穿脉布置在矿块中央位置由两侧采场共用,最优选巷道规格4.2m×4.1m;两条受矿堑沟分别位于远离中央出矿穿脉的一侧边界位置,最优选沟底宽度4.2m,高25m,坡角55°。
奇数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以奇数号采场空区为自由面和补偿空间进行爆破,崩矿后铲运机经奇数号采场和相邻偶数号采场的出矿进路出矿;偶数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以偶数号采场空区为自由面和补偿空间进行爆破,崩矿后铲运机经偶数号采场的出矿进路出矿。
在第一步进行奇数号采场回采的同时,在偶数号采场对应的1/2底部结构中同时施工出矿进路,施工进度应保证在奇数号采场对应的1/2底部结构回采正式开始前完成。
底部结构回采时,中深孔凿岩台车在出矿进路中钻凿反向排面倾角的扇形炮孔,最优选炮孔孔底距底部结构斜面距离控制为1.5m,排面倾角90~82°不等,随着回采工作面向后的推进炮孔排面倾角逐渐变小。底部结构下部矿体凿岩采用YG-40型凿岩机凿小角度孔和水平孔。
底部结构回采时,要求底部结构回采工作面推进至出矿穿脉4~5m时即停止回采。然后在出矿进路相对平整、断面面积较小处砌筑充填挡墙并进行充填。
偶数号采场对应底部结构回采出矿石采用遥控铲运机出矿;奇数号采场对应底部结构回采出矿可采用常规铲运机,当矿石无法铲装干净时可采用遥控铲运机。
相比于现有采矿方法和技术,本发明具有以下优势:采准切割工程量大大减少,单个采场生产能力大,效率高,工人劳动强度低,生产调度和管理简单。同时,在采场主体矿石回采的同时对采场底部结构的矿石进行了同步交叉回收,回采作业安全,资源回收率高,能充分利用现有工程,解决了后期单独回收底部结构时工程维护费用高、回采环境恶化、新增工程布置难度大等一系列问题。
附图说明
图1是本发明的主视图。
图2是本发明的采场回采的左视图。
图3是本发明的俯视图。
图4是本发明回收底部结构的左视图。
图中:1-中段运输巷道;2-分段巷道;3-凿岩巷道;4-崩落矿石;5-出矿进路;6-出矿穿脉;7-中深孔;8-充填体;9-充填挡墙。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步说明。
参见图1、图2、图3及图4,将矿体沿走向划分为奇数号采场和偶数号采场,并按照中段高度100m,采场跨度均为20m,分段高度25m的采场结构参数形成中段运输巷道、分段巷道、凿岩巷道、出矿穿脉、出矿进路等采准切割工程。采切工程形成后即可开始回采,回采时第一步回采奇数号采场,采空区不充填;第二步回采奇数号采场对应的1/2底部结构,回采完毕后充填奇数号采场及其底部结构采空区;第三步回采偶数号采场,采空区不充填;第四步回采偶数号采场对应的另外1/2底部结构,回采完毕后充填偶数号采场及其底部结构采空区。奇数号、偶数号采场回采采用分段凿岩阶段出矿的方式,人员设备在分段凿岩巷道中进行凿岩、装药、爆破等作业,崩落矿石在出矿水平对应1/2底部结构中经出矿穿脉、出矿进路用铲运机铲装。奇数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以奇数号采场空区为自由面和补偿空间进行爆破,崩矿后铲运机经奇数号采场和相邻偶数号采场的出矿进路出矿;偶数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以偶数号采场空区为自由面和补偿空间进行爆破,崩矿后铲运机经偶数号采场的出矿进路出矿。

Claims (7)

1.一种大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:采场沿矿体走向划分为奇数号采场和偶数号采场,阶段出矿水平采用平底式底部结构,两个相邻的奇数号采场和偶数号采场共用一个底部结构,底部结构的回采分为左右两个1/2底部结构进行回采,采场回采与底部结构回收同步交叉进行:第一步回采奇数号采场,回采方式为分段凿岩阶段出矿,采空区暂不充填;第二步回采奇数号采场对应的1/2底部结构,回采结束后将矿房及其对应的1/2底部结构对应采空区进行充填;第三步回采偶数号采场,回采同样采用分段凿岩阶段出矿方式进行,采空区暂不充填;第四步回采矿柱对应的1/2底部结构,回采结束后将矿柱及其对应1/2底部结构对应空区进行充填。
2.根据权利要求1所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:阶段高100~120m,分段高度20~25m,采场长为矿体厚度,宽20~30m。
3.根据权利要求1所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:所述平底式底部结构包括一条出矿穿脉、两条受矿巷道和数条出矿进路,空间形态呈一个大的对称三角形产出,出矿穿脉布置在矿块中央位置由两侧采场共用,两条受矿堑沟分别位于远离中央出矿穿脉的一侧边界位置。
4.根据权利要求1或3所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:奇数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以奇数号采场空区为自由面和补偿空间进行爆破,崩矿后经奇数号采场和相邻偶数号采场的出矿进路出矿;偶数号采场对应的1/2底部结构回采时,人员设备在采场底部结构的出矿进路中进行凿岩、装药,以偶数号采场空区为自由面和补偿空间进行爆破,崩矿后经偶数号采场的出矿进路出矿。
5.根据权利要求1所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:在第一步进行奇数号采场回采的同时,在偶数号采场对应的1/2底部结构中同时施工出矿进路。
6.根据权利要求1或3所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:底部结构回采时,在出矿进路中钻凿反向排面倾角的扇形炮孔,随着回采工作面向后的推进炮孔排面倾角逐渐变小。
7.根据权利要求1或3所述的大结构分段凿岩阶段出矿嗣后充填采矿法,其特征在于:底部结构回采时,要求底部结构回采工作面推进至出矿穿脉4~5m时即停止回采。
CN201510339681.9A 2015-06-18 2015-06-18 一种大结构分段凿岩阶段出矿嗣后充填采矿法 Active CN104863592B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510339681.9A CN104863592B (zh) 2015-06-18 2015-06-18 一种大结构分段凿岩阶段出矿嗣后充填采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510339681.9A CN104863592B (zh) 2015-06-18 2015-06-18 一种大结构分段凿岩阶段出矿嗣后充填采矿法

Publications (2)

Publication Number Publication Date
CN104863592A true CN104863592A (zh) 2015-08-26
CN104863592B CN104863592B (zh) 2017-03-01

Family

ID=53909715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510339681.9A Active CN104863592B (zh) 2015-06-18 2015-06-18 一种大结构分段凿岩阶段出矿嗣后充填采矿法

Country Status (1)

Country Link
CN (1) CN104863592B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525922A (zh) * 2015-12-07 2016-04-27 五矿邯邢矿业有限公司西石门铁矿 一种难采矿体双堑沟平底采矿方法
CN105781611A (zh) * 2016-03-03 2016-07-20 河北钢铁集团矿业有限公司 基于超静定三铰拱的连跨矿房结构设计方法
CN105822306A (zh) * 2016-03-22 2016-08-03 河北钢铁集团矿业有限公司 急倾斜厚大矿体连跨结构体系的矿房结构设计方法
CN105927227A (zh) * 2016-04-21 2016-09-07 西北矿冶研究院 一种底部结构堑沟角度的确定方法
CN105952450A (zh) * 2016-06-20 2016-09-21 中钢集团马鞍山矿山研究院有限公司 一种地下矿山井下双采场协同开采的新方法
CN109184694A (zh) * 2018-09-05 2019-01-11 巴彦淖尔西部铜业有限公司 一种上盘预锚分段凿岩阶段空场嗣后充填采矿法
CN110644997A (zh) * 2019-10-10 2020-01-03 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
CN110685737A (zh) * 2019-09-02 2020-01-14 河北省矾山磷矿有限公司 平底结构分段凿岩阶段出矿嗣后充填采矿法
CN109490499B (zh) * 2018-11-15 2021-02-05 长沙矿山研究院有限责任公司 一种充填体水质动态监测与预测方法
CN113338937A (zh) * 2021-06-18 2021-09-03 内蒙古科技大学 一种减少倾斜矿体崩落法开采下盘矿石损失的回采方法
WO2022052716A1 (zh) * 2020-09-11 2022-03-17 中钢集团马鞍山矿山研究总院股份有限公司 一种适于厚大矿体多采场同步开采的采矿新方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009299361A (ja) * 2008-06-13 2009-12-24 Eesukon Kogyo Kk 地下空洞部充填方法
CN101871347A (zh) * 2010-07-08 2010-10-27 中南大学 采矿环境再造分层分条中深孔落矿采矿法
CN101881169A (zh) * 2010-06-25 2010-11-10 东北大学 一种分段留矿崩落阶段空场嗣后充填采矿法
CN102619513A (zh) * 2012-03-26 2012-08-01 中南大学 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法
CN102704934A (zh) * 2012-06-28 2012-10-03 中钢集团马鞍山矿山研究院有限公司 地下矿山大产能、低成本嗣后充填采矿方法
CN104695960A (zh) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 空气柱成井后退回采嗣后充填采矿法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009299361A (ja) * 2008-06-13 2009-12-24 Eesukon Kogyo Kk 地下空洞部充填方法
CN101881169A (zh) * 2010-06-25 2010-11-10 东北大学 一种分段留矿崩落阶段空场嗣后充填采矿法
CN101871347A (zh) * 2010-07-08 2010-10-27 中南大学 采矿环境再造分层分条中深孔落矿采矿法
CN102619513A (zh) * 2012-03-26 2012-08-01 中南大学 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法
CN102704934A (zh) * 2012-06-28 2012-10-03 中钢集团马鞍山矿山研究院有限公司 地下矿山大产能、低成本嗣后充填采矿方法
CN104695960A (zh) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 空气柱成井后退回采嗣后充填采矿法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王晓云: "上盘喷锚支护分段空场嗣后充填采矿法试验研究", 《有色矿冶》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525922A (zh) * 2015-12-07 2016-04-27 五矿邯邢矿业有限公司西石门铁矿 一种难采矿体双堑沟平底采矿方法
CN105781611B (zh) * 2016-03-03 2017-08-29 河北钢铁集团矿业有限公司 基于超静定三铰拱的连跨矿房结构设计方法
CN105781611A (zh) * 2016-03-03 2016-07-20 河北钢铁集团矿业有限公司 基于超静定三铰拱的连跨矿房结构设计方法
CN105822306A (zh) * 2016-03-22 2016-08-03 河北钢铁集团矿业有限公司 急倾斜厚大矿体连跨结构体系的矿房结构设计方法
CN105927227A (zh) * 2016-04-21 2016-09-07 西北矿冶研究院 一种底部结构堑沟角度的确定方法
CN105952450B (zh) * 2016-06-20 2018-04-10 中钢集团马鞍山矿山研究院有限公司 一种地下矿山井下双采场协同开采的新方法
CN105952450A (zh) * 2016-06-20 2016-09-21 中钢集团马鞍山矿山研究院有限公司 一种地下矿山井下双采场协同开采的新方法
CN109184694A (zh) * 2018-09-05 2019-01-11 巴彦淖尔西部铜业有限公司 一种上盘预锚分段凿岩阶段空场嗣后充填采矿法
CN109490499B (zh) * 2018-11-15 2021-02-05 长沙矿山研究院有限责任公司 一种充填体水质动态监测与预测方法
CN110685737A (zh) * 2019-09-02 2020-01-14 河北省矾山磷矿有限公司 平底结构分段凿岩阶段出矿嗣后充填采矿法
CN110644997A (zh) * 2019-10-10 2020-01-03 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
CN110644997B (zh) * 2019-10-10 2021-06-11 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
WO2022052716A1 (zh) * 2020-09-11 2022-03-17 中钢集团马鞍山矿山研究总院股份有限公司 一种适于厚大矿体多采场同步开采的采矿新方法
CN113338937A (zh) * 2021-06-18 2021-09-03 内蒙古科技大学 一种减少倾斜矿体崩落法开采下盘矿石损失的回采方法

Also Published As

Publication number Publication date
CN104863592B (zh) 2017-03-01

Similar Documents

Publication Publication Date Title
CN104863592B (zh) 一种大结构分段凿岩阶段出矿嗣后充填采矿法
CN102011589B (zh) 一种适于井下二步骤回采的采场底部结构及其生产工艺
CN102635356B (zh) 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN104806244A (zh) 一种倾斜中厚矿体充填采矿方法
CN103615250B (zh) 分条间柱全空场开采嗣后充填协同采矿法
CN103362510B (zh) 分段凿岩并段出矿分段矿房采矿法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN106223956B (zh) 中深孔天井采矿嗣后充填法
CN103306720A (zh) 一种特厚煤层倾斜分层固体充填采煤方法
CN103437768B (zh) 一种不留顶底柱预置空间充填采矿法
CN104453904A (zh) 免拉槽分段充填采矿法
CN104695960A (zh) 空气柱成井后退回采嗣后充填采矿法
CN103527196A (zh) 一种黄土充填回收房式煤柱的方法
CN102979526B (zh) 中深孔分段采矿出矿堑沟充填法构筑工艺
CN106640080B (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN102733809B (zh) 回收露天煤矿终帮上煤的采煤方法
CN102011590B (zh) 一种矿山井下双采场底部结构
CN109577979A (zh) 一种高地应力大型矿体下向分段充填采矿方法
CN101158287A (zh) 一种蜂巢结构胶结充填采矿法
CN105003269A (zh) 一种巨厚煤层长壁工作面的开采方法
CN108104816B (zh) 一种急倾斜薄矿体的上向开采方法
CN103557001A (zh) 一种低段高无底柱留矿嗣后充填采矿法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wei Shuxiang

Inventor after: Liu Xiaosheng

Inventor after: Luo Wenchong

Inventor after: Ou Renze

Inventor after: Wang Changjun

Inventor after: Ning Yulin

Inventor after: Song Xing

Inventor after: Luo Jia

Inventor after: Song Jiadong

Inventor after: Zhou Aimin

Inventor after: Chen Chao

Inventor after: Lin Weixing

Inventor after: Li Aiguo

Inventor after: Zhan Jin

Inventor after: Zhang Lixin

Inventor after: Zhou Li

Inventor before: Song Jiadong

Inventor before: Song Xing

Inventor before: Luo Jia

Inventor before: Zhou Aimin

Inventor before: Lin Weixing

Inventor before: Zhan Jin

Inventor before: Zhou Li

Inventor before: Liu Xiaosheng

Inventor before: Ou Renze

Inventor before: Wang Changjun

Inventor before: Ning Yulin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160711

Address after: 410012 Hunan province Changsha Lushan Road No. 343

Applicant after: Changsha Institute of Mining Research Co., Ltd.

Applicant after: Mining Industry Co. Ltd.

Address before: 410012 Hunan province Changsha Lushan Road No. 343

Applicant before: Changsha Institute of Mining Research Co., Ltd.

GR01 Patent grant
GR01 Patent grant