CN103557002B - 一种盘区机械化集中溜井上向水平分层充填采矿法 - Google Patents

一种盘区机械化集中溜井上向水平分层充填采矿法 Download PDF

Info

Publication number
CN103557002B
CN103557002B CN201310588037.6A CN201310588037A CN103557002B CN 103557002 B CN103557002 B CN 103557002B CN 201310588037 A CN201310588037 A CN 201310588037A CN 103557002 B CN103557002 B CN 103557002B
Authority
CN
China
Prior art keywords
filling
arteries
veins
panel
studding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310588037.6A
Other languages
English (en)
Other versions
CN103557002A (zh
Inventor
刘艳章
张丙涛
张群
叶义成
柯丽华
王其飞
邓磊
赵卫
石志军
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201310588037.6A priority Critical patent/CN103557002B/zh
Publication of CN103557002A publication Critical patent/CN103557002A/zh
Application granted granted Critical
Publication of CN103557002B publication Critical patent/CN103557002B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

本发明涉及一种盘区机械化集中溜井上向水平分层充填采矿法。其技术方案是:将阶段内矿体沿走向划分盘区,盘区沿走向等间隔划分矿房和间柱,留顶柱(17)和底柱(10);矿房和间柱水平分层;盘区下盘布置分段平巷(8)、脉外斜坡道(2)、采场联络道(9)和盘区集中溜井(4),构成无轨采准系统;上阶段穿脉(18)和下阶段穿脉(7)通过对应的通风充填井联络道(16)和行人滤水天井联络道(11)与各矿房或矿柱内的通风充填井(15)和行人滤水天井(12)相通。机械化开采,所有矿房先同时回采,每采一层,将采空区和采场联络道(9)充填,矿房采充完毕,用相同方法回采间柱,最后回采顶柱(17)和底柱(10)。本发明具有生产能力大、回采效率高、回采工艺简单和作业安全性好的优点。

Description

一种盘区机械化集中溜井上向水平分层充填采矿法
技术领域
本发明涉及一种充填采矿法。具体是涉及一种盘区机械化集中溜井上向水平分层充填采矿法。
技术背景
充填采矿法是一种绿色环保的采矿方法,它能即时对采空区进行充填,能有效地减小矿山开采对矿区环境的影响。目前,厚大矿体一般采用空场法、崩落法这两类采矿方法进行开采,这两类采矿方法虽具有生产能力大、回采效率高、回采工艺结构相对简单等优点,但这两类采矿方法开采会造成近期或远期的大面积地表塌陷,塌陷给矿区环境和矿区的工农业安全生产带来严重威胁。
随着国家对矿区环境与安全的日益重视,充填采矿法取代空场法和崩落法进行开采是发展趋势。因此,厚大矿体的矿山将会越来越多地采用充填法进行开采。上向水平分层充填采矿法是一种常用的充填采矿法,然而现有的上向水平分层充填采矿法存在生产能力小、回采效率低、回采工艺结构复杂、劳动强度高等缺陷,不适用于厚大矿体的开采。
发明内容
本发明旨在克服现有技术缺陷,目的是提供一种生产能力大、回采效率高、回采工艺简单、开采作业安全性好的盘区机械化集中溜井上向水平分层充填采矿法,该方法适用于厚大矿体开采。
为实现上述目的,本发明采用的技术方案是:将阶段内矿体沿矿体走向划分盘区,再将盘区沿矿体走向划分为间隔布置的矿房和间柱,留顶柱和底柱,对矿房和间柱进行水平分层。在盘区下盘布置分段平巷,每3个分层的矿体通过各自对应的采场联络道与1个分段平巷相通;脉外斜坡道与每个斜坡道联络道相通,每个斜坡道联络道与各自对应的分段平巷相通。
在盘区中央布置上阶段穿脉和下阶段穿脉,上阶段穿脉通过通风充填井联络道与各矿房或间柱内的通风充填井相通,下阶段穿脉通过行人滤水天井联络道与各矿房或间柱内行人滤水天井相通。盘区集中溜井布置在脉外,盘区集中溜井与上阶段穿脉和下阶段穿脉相通,盘区集中溜井与每个溜井联络道相通,每个溜井联络道与各自对应的分段平巷连接。
采用机械化开采,先回采矿房,后回采间柱;所有矿房同时回采,自下向上回采一层,充填一层。待矿房充填完毕,再采用与矿房相同的方法回采间柱;当盘区内矿房和间柱充填完毕,进行顶柱和底柱的回采。
回采矿房是指:铲运机和凿岩台车通过脉外斜坡道和斜坡道联络道进入分段平巷,凿岩台车经采场联络道到达矿房最下层矿体后水平打孔,装药和爆破,然后铲运机经采场联络道到达矿房矿体铲运矿石;铲运的矿石依次经过采场联络道、分段平巷和溜井联络道到达盘区集中溜井,由盘区集中溜井溜下的矿石通过下阶段穿脉内的电机车运至下阶段运输大巷。
采用前进式回采,凿岩台车与铲运机交替工作;当第一层矿体采完后,用充填料对采空区和采场联络道进行充填;待充填稳固后,再对上一分层矿体进行回采充填;当3个分层矿体都采充完毕,铲运机和凿岩台车通过脉外斜坡道和斜坡道联络道进入上一个分段平巷,进行回采;依此继续下去,直到采充完所有矿房内矿体。
所述的间隔布置的矿房和间柱的总数为5~7个,矿房和间柱宽度b均为8~15m,矿房和间柱的分层高度h均为5~8m。
所述的充填料分别是:矿房回采时用高强度的充填料进行充填,高强度的充填料的灰砂比为1︰(6~10);间柱回采时用中等强度的充填料进行充填,中等强度的充填料灰砂比为1︰(10~15)。
所述的脉外斜坡道的坡度β为12~18%。
所述的采场联络道的坡度α为15~18%。
所述的顶柱和底柱的高c均为5~8m。
由于采用上述技术方案,本发明与现有技术相比具有的有益效果是:
①生产能力大
本发明将阶段内矿体以盘区为单位组织生产,盘区内所有的矿房或间柱同步回采,采用凿岩台车和铲运机的无轨高效率采掘设备,机械化程度高,提高了生产能力。
②回采效率高,回采工艺结构简单
本发明设计的盘区内矿房和间柱宽度及分层高度都较大,减少了采准工作量,采用由脉外斜坡道、分段平巷、采场联络道和盘区集中溜井组成的无轨采准系统,凿岩台车打眼,铲运机出矿,实现盘区内所有矿房或间柱的凿岩、爆破、出矿和充填作业相互独立进行,提高了回采效率,降低了回采工艺的复杂性。
③开采作业安全性好
盘区内矿体先采矿房,以间柱支撑围压,矿房采完后,用高强度充填料对采空区进行充填,充填稳定后再回采间柱,并用中等强度的充填料对采空区进行充填,暂留顶柱和底柱,保证了各巷道的稳定性;同时,机械化开采,盘区集中溜井位于盘区中央,从而使开采作业安全性好。
因此,本发明具有生产能力大、回采效率高、回采工艺结构简单、开采作业安全性好的特点,适用于厚大矿体的大规模地下开采。
附图说明
图1为本发明的一种采矿方法结构示意图;
图2为图1的Ⅱ—Ⅱ线剖面图;
图3为图1的Ⅲ—Ⅲ线剖面图。
具体实施方式:
下面结合附图和具体实施方式对本发明作进一步描述,并非对其保护范围的限制:
实施例1
一种盘区机械化集中溜井上向水平分层充填采矿法。如图1、图2和图3所示,将阶段内矿体沿矿体走向划分盘区,再将盘区沿矿体走向划分为间隔布置的矿房和间柱,留顶柱17和底柱10,对矿房和间柱进行水平分层。在盘区下盘布置分段平巷8,每3个分层的矿体通过各自对应的采场联络道9与1个分段平巷8相通;脉外斜坡道2与每个斜坡道联络道3相通,每个斜坡道联络道3与各自对应的分段平巷8相通。
如图2和图1所示,在盘区中央布置上阶段穿脉18和下阶段穿脉7,上阶段穿脉18通过通风充填井联络道16与各矿房或间柱内的通风充填井15相通,下阶段穿脉7通过行人滤水天井联络道11与各矿房或间柱内行人滤水天井12相通。盘区集中溜井4布置在脉外,盘区集中溜井4与上阶段穿脉18和下阶段穿脉7相通,盘区集中溜井4与每个溜井联络道5相通,每个溜井联络道5与各自对应的分段平巷8连接。
采用机械化开采,先回采矿房,后回采间柱;所有矿房同时回采,自下向上回采一层,充填一层。待矿房充填完毕,再采用与矿房相同的方法回采间柱;当盘区内矿房和间柱充填完毕,进行顶柱17和底柱10的回采。
如图3和图1所示,回采矿房是指:铲运机和凿岩台车由上阶段运输大巷1通过脉外斜坡道2和斜坡道联络道3进入分段平巷8,凿岩台车经采场联络道9到达矿房最下层矿体后水平打孔,装药和爆破,然后铲运机经采场联络道9到达矿房矿体铲运矿石;铲运的矿石依次经过采场联络道9、分段平巷8和溜井联络道5到达盘区集中溜井4,由盘区集中溜井4溜下的矿石通过下阶段穿脉7内的电机车运至下阶段运输大巷6。
采用前进式回采,在出矿采场14内,凿岩台车与铲运机交替工作;当第一层矿体采完后,用充填料13对采空区和采场联络道9进行充填;待充填稳固后,再对上一分层矿体进行回采充填;当3个分层矿体都采充完毕,铲运机和凿岩台车通过脉外斜坡道2和斜坡道联络道3进入上一个分段平巷8,进行回采;依此继续下去,直到采充完所有矿房内矿体。
所述的间隔布置的矿房和间柱的总数为7个,矿房和间柱宽度b均为8~12m,矿房和间柱的分层高度h均为5~7m。
所述的充填料13分别是:矿房回采时用高强度的充填料13进行充填,高强度的充填料13的灰砂比为1︰(6~8);间柱回采时用中等强度的充填料13进行充填,中等强度的充填料13灰砂比为1︰(10~13)。
所述的脉外斜坡道2的坡度β为12~15%。
所述的采场联络道9的坡度α为15~16%。
所述的顶柱17和底柱10的高c均为5~6m。
实施例2
一种盘区机械化集中溜井上向水平分层充填采矿法。除下述技术参数外,其余与实施例1相同。
所述的间隔布置的矿房和间柱的总数为5~6个,矿房和间柱宽度b均为12~15m,矿房和间柱的分层高度h均为6~8m。
所述的充填料13分别是:矿房回采时用高强度的充填料13进行充填,高强度的充填料13的灰砂比为1︰(8~10);间柱回采时用中等强度的充填料13进行充填,中等强度的充填料13灰砂比为1︰(12~15)。
所述的脉外斜坡道2的坡度β为15~18%。
所述的采场联络道9的坡度α为16~18%。
所述的顶柱17和底柱10的高c均为6~8m。
本具体实施方式与现有技术相比具有的有益效果是:
①生产能力大
本具体实施方式将阶段内矿体以盘区为单位组织生产,盘区内所有的矿房或间柱同步回采,采用凿岩台车和铲运机的无轨高效率采掘设备,机械化程度高,提高了生产能力。
②回采效率高,回采工艺结构简单
本具体实施方式设计的盘区内矿房和间柱宽度及分层高度都较大,减少了采准工作量,采用由脉外斜坡道2、分段平巷8、采场联络道9和盘区集中溜井4组成的无轨采准系统,凿岩台车打眼,铲运机出矿,实现盘区内所有矿房或间柱的凿岩、爆破、出矿和充填作业相互独立进行,提高了回采效率,降低了回采工艺的复杂性。
③开采作业安全性好
盘区内矿体先采矿房,以间柱支撑围压,矿房采完后,用高强度的充填料13对采空区进行充填,充填稳定后再回采间柱,并用中等强度的充填料13对采空区进行充填,暂留顶柱17和底柱7,保证了各巷道的稳定性;同时,机械化开采,盘区集中溜井4位于盘区中央,从而使开采作业安全性好。
因此,本具体实施方式具有生产能力大、回采效率高、回采工艺结构简单、开采作业安全性好的特点,适用于厚大矿体的大规模地下开采。

Claims (6)

1.一种盘区机械化集中溜井上向水平分层充填采矿法,其特征在于:将阶段内矿体沿矿体走向划分盘区,再将盘区沿矿体走向划分为间隔布置的矿房和间柱,留顶柱(17)和底柱(10),对矿房和间柱进行水平分层;在盘区下盘布置分段平巷(8),每3个分层的矿体通过各自对应的采场联络道(9)与1个分段平巷(8)相通;脉外斜坡道(2)与每个斜坡道联络道(3)相通,每个斜坡道联络道(3)与各自对应的分段平巷(8)相通;
在盘区中央布置上阶段穿脉(18)和下阶段穿脉(7),上阶段穿脉(18)通过通风充填井联络道(16)与各矿房或间柱内的通风充填井(15)相通,下阶段穿脉(7)通过行人滤水天井联络道(11)与各矿房或间柱内行人滤水天井(12)相通;盘区集中溜井(4)布置在脉外,盘区集中溜井(4)与上阶段穿脉(18)和下阶段穿脉(7)相通,盘区集中溜井(4)与每个溜井联络道(5)相通,每个溜井联络道(5)与各自对应的分段平巷(8)连接;
采用机械化开采,先回采矿房,后回采间柱;所有矿房同时回采,自下向上回采一层,充填一层;待矿房充填完毕,再采用与矿房相同的方法回采间柱;当盘区内矿房和间柱充填完毕,进行顶柱(17)和底柱(10)的回采;
回采矿房是指:铲运机和凿岩台车通过脉外斜坡道(2)和斜坡道联络道(3)进入分段平巷(8),凿岩台车经采场联络道(9)到达矿房最下层矿体后水平打孔,装药和爆破,然后铲运机经采场联络道(9)到达矿房矿体铲运矿石;铲运的矿石依次经过采场联络道(9)、分段平巷(8)和溜井联络道(5)到达盘区集中溜井(4),由盘区集中溜井(4)溜下的矿石通过下阶段穿脉(7)内的电机车运至下阶段运输大巷(6);
采用前进式回采,凿岩台车与铲运机交替工作;当第一层矿体采完后,用充填料(13)对采空区和采场联络道(9)进行充填;待充填稳固后,再对上一分层矿体进行回采充填;当3个分层矿体都采充完毕,铲运机和凿岩台车通过脉外斜坡道(2)和斜坡道联络道(3)进入上一个分段平巷(8),进行回采;依此继续下去,直到采充完所有矿房内矿体。
2.根据权利要求1所述的盘区机械化集中溜井上向水平分层充填采矿法,其特征在于所述的间隔布置的矿房和间柱的总数为5~7个,矿房和间柱宽度b均为8~15m,矿房和间柱的分层高度h均为5~8m。
3.根据权利要求1所述的盘区机械化集中溜井上向水平分层充填采矿法,其特征在于所述的充填料(13)分别是:矿房回采时用高强度的充填料(13)进行充填,高强度的充填料(13)的
灰砂比为1︰(6~10);间柱回采时用中等强度的充填料(13)进行充填,中等强度的充填料(13)灰砂比为1︰(10~15)。
4.根据权利要求1所述的盘区机械化集中溜井上向水平分层充填采矿法,其特征在于所述的脉外斜坡道(2)的坡度β为12~18%。
5.根据权利要求1所述的盘区机械化集中溜井上向水平分层充填采矿法,其特征在于所述的采场联络道(9)的坡度α为15~18%。
6.根据权利要求1所述的盘区机械化集中溜井上向水平分层充填采矿法,其特征在于所述的顶柱(17)和底柱(10)的高c均为5~8m。
CN201310588037.6A 2013-11-21 2013-11-21 一种盘区机械化集中溜井上向水平分层充填采矿法 Expired - Fee Related CN103557002B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310588037.6A CN103557002B (zh) 2013-11-21 2013-11-21 一种盘区机械化集中溜井上向水平分层充填采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310588037.6A CN103557002B (zh) 2013-11-21 2013-11-21 一种盘区机械化集中溜井上向水平分层充填采矿法

Publications (2)

Publication Number Publication Date
CN103557002A CN103557002A (zh) 2014-02-05
CN103557002B true CN103557002B (zh) 2015-10-21

Family

ID=50011337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310588037.6A Expired - Fee Related CN103557002B (zh) 2013-11-21 2013-11-21 一种盘区机械化集中溜井上向水平分层充填采矿法

Country Status (1)

Country Link
CN (1) CN103557002B (zh)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967493B (zh) * 2014-05-23 2015-12-02 山东黄金矿业(莱州)有限公司三山岛金矿 一种缓倾斜薄矿体矿柱采矿法
CN104100270B (zh) * 2014-06-13 2016-08-24 贵州开磷集团股份有限公司 一种缓倾斜矿脉无轨开采方法
CN104018836B (zh) * 2014-06-25 2016-05-18 中南大学 一种有不稳固假顶倾斜中厚矿体的分采方法
CN104153780B (zh) * 2014-07-28 2016-06-01 鞍钢集团矿业公司 薄矿体分段崩落留矿连续回采工艺
CN104373125B (zh) * 2014-09-11 2016-05-25 长沙矿山研究院有限责任公司 两步骤上向高分层袋装充填采矿法
CN104405394B (zh) * 2014-12-19 2017-02-01 中矿金业股份有限公司 一种采矿方法
CN104895566B (zh) * 2015-06-15 2017-03-08 武汉科技大学 一种残矿回收采矿法
CN105178960B (zh) * 2015-08-07 2017-05-31 辽宁科技大学 一种上向充填采矿封闭式封顶方法
CN106761912B (zh) * 2015-11-19 2018-07-03 中钢集团马鞍山矿山研究院有限公司 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN106761756B (zh) * 2015-11-19 2018-07-03 中钢集团马鞍山矿山研究院有限公司 一种用于上向分层全尾砂胶结充填法的采场结构
CN105804748B (zh) * 2016-04-07 2018-03-13 东北大学 一种露天运输系统下分区开采挂帮矿的方法
CN105927226A (zh) * 2016-04-21 2016-09-07 西北矿冶研究院 一种中深孔落矿连续分段水平充填采矿法
CN106285677A (zh) * 2016-08-31 2017-01-04 湖北三鑫金铜股份有限公司 超前上向进路扩帮回采分区充填间柱开采方法
CN107687341A (zh) * 2017-10-26 2018-02-13 中冶北方(大连)工程技术有限公司 一种极厚大不稳固矿体的上向分层点柱式充填采矿方法
CN107503748A (zh) * 2017-10-26 2017-12-22 中冶北方(大连)工程技术有限公司 一种极厚大稳固矿体的上向分层充填采矿方法
CN107762515B (zh) * 2017-11-15 2019-06-21 中冶沈勘秦皇岛工程设计研究总院有限公司 一种缓倾斜中厚矿体盘区充填采矿方法
CN108071397A (zh) * 2017-12-06 2018-05-25 广西大学 基于混凝土布凝固特性的上向水平分层充填采矿法
CN108060924B (zh) * 2018-01-15 2019-06-07 中南大学 急倾斜多层薄矿体机械化联合采矿方法
CN108756880B (zh) * 2018-06-12 2019-12-03 中国煤炭科工集团太原研究院有限公司 一种急倾斜破碎薄脉矿体悬臂式掘进机开采方法
CN109505604B (zh) * 2018-09-25 2020-07-07 南京银茂铅锌矿业有限公司 应用于上向分层充填采矿法采场的斜坡道布置方法
CN110905517B (zh) * 2019-12-09 2021-04-20 山东金洲矿业集团有限公司 一种适用于高中段的连续采矿法
CN111594171A (zh) * 2020-05-25 2020-08-28 吉林吉恩镍业股份有限公司 一种井下开采转分段工程施工方法
CN112282759B (zh) * 2020-11-30 2023-06-27 昆明理工大学 一种适用于底盘漏斗空场嗣后充填法矿柱回采的采矿方法
CN113586057B (zh) * 2021-09-09 2022-10-28 昆明理工大学 一种安全高效回收分段空场嗣后充填法盘区间柱的方法
CN114000877B (zh) * 2021-10-29 2022-07-01 中南大学 一种脉内外天井联合采准的浅孔留矿嗣后充填采矿方法及结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2283431C1 (ru) * 2005-04-28 2006-09-10 Государственное образовательное учреждение высшего профессионального образования СИБИРСКИЙ ГОСУДАРСТВЕННЫЙ ИНДУСТРИАЛЬНЫЙ УНИВЕРСИТЕТ Способ разработки мощного крутого пласта полезного ископаемого с закладкой выработанного пространства
CN1932241A (zh) * 2006-09-30 2007-03-21 长沙矿山研究院 盘区卸荷高分层充填采矿方法
CN101858217A (zh) * 2010-05-18 2010-10-13 中南大学 房柱变换式盘区上向分层充填采矿法
CN102392641A (zh) * 2011-08-02 2012-03-28 中钢矿业开发有限公司 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法
CN103147761A (zh) * 2013-03-25 2013-06-12 武汉科技大学 一种缓倾斜松软顶板薄矿床充填采矿方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2283431C1 (ru) * 2005-04-28 2006-09-10 Государственное образовательное учреждение высшего профессионального образования СИБИРСКИЙ ГОСУДАРСТВЕННЫЙ ИНДУСТРИАЛЬНЫЙ УНИВЕРСИТЕТ Способ разработки мощного крутого пласта полезного ископаемого с закладкой выработанного пространства
CN1932241A (zh) * 2006-09-30 2007-03-21 长沙矿山研究院 盘区卸荷高分层充填采矿方法
CN101858217A (zh) * 2010-05-18 2010-10-13 中南大学 房柱变换式盘区上向分层充填采矿法
CN102392641A (zh) * 2011-08-02 2012-03-28 中钢矿业开发有限公司 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法
CN103147761A (zh) * 2013-03-25 2013-06-12 武汉科技大学 一种缓倾斜松软顶板薄矿床充填采矿方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
缓倾斜中厚矿体机械化上向水平分层充填采矿法关键技术;田明华;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20120315(第3期);第35-45页 *

Also Published As

Publication number Publication date
CN103557002A (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN102619513B (zh) 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法
CN103306720B (zh) 一种特厚煤层倾斜分层固体充填采煤方法
CN103615250B (zh) 分条间柱全空场开采嗣后充填协同采矿法
CN102080518B (zh) 煤层顶板复杂分支井抽采瓦斯方法
US10012080B2 (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
CN103089266B (zh) 露天转地下过渡期无底柱分段空场崩落采矿方法
CN102251773B (zh) 适合于极复杂矿体开采的进路式上向水平分层充填采矿法
CN102518438B (zh) 一种顶板再造中深孔落矿嗣后充填采矿法
CN103437769B (zh) 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN102352769A (zh) 高突矿井煤与瓦斯共采一体化开采方法
CN101105129A (zh) 采矿环境再造连续采矿嗣后充填采矿法
CN105587318A (zh) 一种缓倾斜平行中厚矿体群连续回采的充填采矿法
CN102877884B (zh) 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法
CN105041314A (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN105626071A (zh) 一种缓倾斜薄矿体采矿方法
CN104832178A (zh) 一种厚煤层分层部分充填采煤方法
CN102168579A (zh) 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN104453996B (zh) 一种上向分层壁式袋装充填采矿法
CN104018836A (zh) 一种有不稳固假顶倾斜中厚矿体的分采方法
CN104847355A (zh) 中厚急倾斜矿体空场连续开采方法
CN102226396A (zh) 非爆破开挖再造人工群柱深孔崩矿嗣后充填采矿法
CN104100270A (zh) 一种缓倾斜矿脉无轨开采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20161121