CN109577979A - 一种高地应力大型矿体下向分段充填采矿方法 - Google Patents

一种高地应力大型矿体下向分段充填采矿方法 Download PDF

Info

Publication number
CN109577979A
CN109577979A CN201811503963.8A CN201811503963A CN109577979A CN 109577979 A CN109577979 A CN 109577979A CN 201811503963 A CN201811503963 A CN 201811503963A CN 109577979 A CN109577979 A CN 109577979A
Authority
CN
China
Prior art keywords
back production
ore body
filling
section
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811503963.8A
Other languages
English (en)
Other versions
CN109577979B (zh
Inventor
张鹏强
李凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201811503963.8A priority Critical patent/CN109577979B/zh
Publication of CN109577979A publication Critical patent/CN109577979A/zh
Application granted granted Critical
Publication of CN109577979B publication Critical patent/CN109577979B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明的一种高地应力大型矿体下向分段充填采矿方法包括以下步骤:回采矿体顶部分层;将矿体划分为分段和中段回采;采场内掘进充填回风巷道和凿岩出矿巷道,完成回采后进行一次充填;回采前掘进凿岩硐室,并钻凿垂直炮孔,形成切割立槽,在凿岩出矿巷道内打上向扇形炮孔,并依次完成回采区段内装药、起爆、通风、出矿,直至完成回采区段的回采;回采结束后砌筑充填挡墙,充填后开始下一个回采区段的作业。每完成一个区段的回采对采空区进行充填,形成即采即充的中深孔落矿回采工艺。本发明能够在提高采场生产能力的前提下,将控制采空区暴露面积,避免采空区暴露面积过大、暴露时间过长的问题,降低了采场失稳的风险。

Description

一种高地应力大型矿体下向分段充填采矿方法
技术领域
本发明涉及高地应力矿体开采技术领域,具体涉及一种高地应力大型矿体下向分段充填采矿方法。
背景技术
在高地应力大型矿体的开采中,因工程地质条件复杂,地压管理难度大,通常采用下向分层进路式回采嗣后充填法采矿,以减小采空区暴露面积,避免采场失稳破坏,达到安全回采的目的。虽然进路式回采能够有效控制地压、实现安全回采,但其只能采用水平浅孔落矿,回采效率低、成本高、工艺冗长复杂,矿山产能提升受到制约,很难实现资源的经济、高效开发。
发明内容
本发明是针对现有技术中存在的不足,提供一种缩短采空区的暴露面积和暴露时间、提高回采效率、降低采矿成本的高地应力大型矿体下向分段充填采矿方法。
本发明的目的通过以下技术方案来实现:
一种高地应力大型矿体下向分段充填采矿方法,其特征在于,所述方法包括以下步骤:
步骤一:将矿体顶部分为上下两个分层,采用下向分层进路式胶结充填法回采两个分层,形成矿体控顶层;
步骤二:将矿体在竖直方向划分为分段和中段,以分段矿体高度作为采场高度自上而下回采;沿矿体走向将分段矿体划分为若干采场,采场垂直矿体走向分布,再从矿体上盘至矿体下盘将采场划分为若干回采区段;采场内靠近顶板和底板的区域分别掘进充填回风巷道和凿岩出矿巷道,每个采场回采前充填回风巷道和凿岩出矿巷道需从矿体下盘一次性施工到矿体上盘,再从矿体上盘开始以回采区段为单元向矿体下盘后退式开采,每完成一个回采区段的回采后进行一次充填,直至回采至矿体下盘矿岩边界停止;
步骤三:每个回采区段回采之前,在相应采场的充填回风巷道的端部掘进垂直于充填回风巷道的凿岩硐室;在凿岩硐室铅垂方向对应的凿岩出矿巷道内施工垂直于凿岩出矿巷道的拉底空间;
步骤四:在凿岩硐室内向对应的拉底空间钻凿垂直炮孔;
步骤五:采用炸药包在垂直炮孔内自下而上分层装药、分次引爆,形成回采区段端部的切割立槽;
步骤六:回采区段的切割立槽形成后,在凿岩出矿巷道内按照排间距参数打扇形炮孔,并按照落矿步距参数在回采区段内依次完成装药、起爆、通风、出矿,直至完成回采区段的回采;
步骤七:一个回采区段回采结束后,分别在充填回风巷道和凿岩出矿巷道靠近采空区的区域砌筑充填挡墙,从充填回风巷道内连接充填管道对采空区进行砂浆胶结充填;
步骤八:一个回采区段完成充填后继续从步骤三开始进行下一个回采区段的回采作业。
根据上述的方法,其特征在于,步骤一中矿体顶部上下两个分层的进路垂直交错布置。
根据上述的方法,其特征在于,步骤六中炸药包为球状。
本发明的有益技术效果:本发明将下向分段采场沿轴向从上盘依次划分为若干区段进行回采和充填,形成“即采即充”的中深孔落矿高效回采工艺,有效缩短了采空区的暴露面积和暴露时间,实现了高地应力大型矿体从进路式浅孔落矿工艺向分段中深孔高效落矿工艺的改进,大幅提高回采效率、降低采矿成本。
附图说明
图1为本发明方法的过程示意图;
图2为图1的左视图;
图3为图1的俯视图。
具体实施方式:
参见图1、图2和图3,本发明的一种高地应力大型矿体下向分段充填采矿方法,包括以下步骤:步骤一:将矿体顶部分为上下两个分层,采用下向分层进路式胶结充填法回采两个分层,形成矿体控顶层1,优选的,矿体顶部上下两个分层的进路垂直交错布置;步骤二:将矿体在竖直方向划分为分段和中段,以分段矿体高度作为采场高度自上而下回采;沿矿体走向将分段矿体划分为若干采场,采场垂直矿体走向分布,再从矿体上盘至矿体下盘将采场划分为若干回采区段,回采区段是最小的回采单元;采场内靠近矿体底板掘进凿岩出矿巷道3,在凿岩出矿巷道3附近掘进下一分段充填回风联络道12至下一分段采场顶板,形成充填回风巷道2,每个采场回采前充填回风巷道2和凿岩出矿巷道3需从矿体下盘一次性施工到矿体上盘,再从矿体上盘开始以回采区段为单元向矿体下盘后退式开采,每完成一个回采区段的回采后进行一次充填,直至回采至矿体下盘矿岩边界停止;在分段沿脉运输巷道9中每隔一定距离设置中段溜井10;步骤三:每个回采区段回采之前,在相应采场的充填回风巷道2的端部掘进垂直于充填回风巷道的凿岩硐室6;在凿岩硐室6铅垂方向对应的凿岩出矿巷道3内施工垂直于凿岩出矿巷道3的拉底空间;步骤四:在凿岩硐室6内向对应的拉底空间钻凿垂直炮孔4;步骤五:采用炸药包在垂直炮孔4内自下而上分层装药、分次引爆,形成回采区段端部的切割立槽7,优选的,炸药包为球状;步骤六:回采区段的切割立槽7形成后,在凿岩出矿巷道3内按照排间距参数打扇形炮孔5,并按照落矿步距参数在回采区段内依次完成装药、起爆、通风、出矿,直至完成回采区段的回采;步骤七:一个回采区段回采结束后,分别在充填回风巷道2和凿岩出矿巷道3靠近采空区8的区域砌筑充填挡墙13,从充填回风巷道内连接充填管道对采空区8进行砂浆胶结充填形成充填体11;步骤八:一个回采区段完成充填后继续从步骤三开始进行下一个回采区段的回采作业。
实施例1
一种高地应力大型矿体下向分段充填采矿方法,包括以下步骤:步骤一:将矿体顶部分为上下两个分层,两个分层的进路垂直交错布置,每个分层高度为4m,进路宽度为5m,采用下向分层进路式胶结充填法回采两个分层,充填体强度为5MPa,形成矿体控顶层;步骤二:将矿体在竖直方向划分为100m中段和20m分段,自上而下回采,沿矿体走向将分段矿体划分为多个宽度为20m的采场,采场垂直矿体走向分布,再从矿体上盘至矿体下盘将采场划分为多个长度为20m-30m的回采区段;采场中每隔100m布设一条中段溜井,采场内靠近顶板和底板的区域分别掘进断面为4m×4m的充填回风巷道(2)和断面为4m×4m的凿岩出矿巷道(3),每个采场回采前充填回风巷道(2)和凿岩出矿巷道(3)需从矿体下盘一次性施工到矿体上盘,再从矿体上盘开始以回采区段为单元向矿体下盘后退式开采,每完成一个回采区段的回采后进行一次充填,直至回采至矿体下盘矿岩边界停止;步骤三:每个回采区段回采之前,在相应采场的充填回风巷道(2)的端部掘进垂直于充填回风巷道的断面为4m×4m的凿岩硐室(6);在凿岩硐室铅垂方向对应的凿岩出矿巷道(3)内施工垂直于凿岩出矿巷道的断面为20m×4m的拉底空间;步骤四:在凿岩硐室内向对应的拉底空间钻凿直径为89mm垂直炮孔(4);步骤五:采用球形炸药包在垂直炮孔(4)内自下而上分层装药、分次引爆,形成回采区段端部的切割立槽(7);步骤六:回采区段的切割立槽形成后,在凿岩出矿巷道(3)内按照排间距参数打直径为76mm的扇形炮孔,并按照落矿步距参数在回采区段内依次完成装药、起爆、通风、出矿,直至完成回采区段的回采;步骤七:一个回采区段回采结束后,分别在充填回风巷道(2)和凿岩出矿巷道(3)靠近采空区的区域砌筑充填挡墙(13),从充填回风巷道内连接充填管道对采空区进行砂浆胶结充填。

Claims (3)

1.一种高地应力大型矿体下向分段充填采矿方法,其特征在于,所述方法包括以下步骤:
步骤一:将矿体顶部分为上下两个分层,采用下向分层进路式胶结充填法回采两个分层,形成矿体控顶层;
步骤二:将矿体在竖直方向划分为分段和中段,以分段矿体高度作为采场高度自上而下回采;沿矿体走向将分段矿体划分为若干采场,采场垂直矿体走向分布,再从矿体上盘至矿体下盘将采场划分为若干回采区段;采场内靠近顶板和底板的区域分别掘进充填回风巷道和凿岩出矿巷道,每个采场回采前充填回风巷道和凿岩出矿巷道需从矿体下盘一次性施工到矿体上盘,再从矿体上盘开始以回采区段为单元向矿体下盘后退式开采,每完成一个回采区段的回采后进行一次充填,直至回采至矿体下盘矿岩边界停止;
步骤三:每个回采区段回采之前,在相应采场的充填回风巷道的端部掘进垂直于充填回风巷道的凿岩硐室;在凿岩硐室铅垂方向对应的凿岩出矿巷道内施工垂直于凿岩出矿巷道的拉底空间;
步骤四:在凿岩硐室内向对应的拉底空间钻凿垂直炮孔;
步骤五:采用炸药包在垂直炮孔内自下而上分层装药、分次引爆,形成回采区段端部的切割立槽;
步骤六:回采区段的切割立槽形成后,在凿岩出矿巷道内按照排间距参数打扇形炮孔,并按照落矿步距参数在回采区段内依次完成装药、起爆、通风、出矿,直至完成回采区段的回采;
步骤七:一个回采区段回采结束后,分别在充填回风巷道和凿岩出矿巷道靠近采空区的区域砌筑充填挡墙,从充填回风巷道内连接充填管道对采空区进行砂浆胶结充填;
步骤八:一个回采区段完成充填后继续从步骤三开始进行下一个回采区段的回采作业。
2.根据权利要求1所述的方法,其特征在于,步骤一中矿体顶部上下两个分层的进路垂直交错布置。
3.根据权利要求1所述的方法,其特征在于,步骤六中炸药包为球状。
CN201811503963.8A 2018-12-10 2018-12-10 一种高地应力大型矿体下向分段充填采矿方法 Active CN109577979B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811503963.8A CN109577979B (zh) 2018-12-10 2018-12-10 一种高地应力大型矿体下向分段充填采矿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811503963.8A CN109577979B (zh) 2018-12-10 2018-12-10 一种高地应力大型矿体下向分段充填采矿方法

Publications (2)

Publication Number Publication Date
CN109577979A true CN109577979A (zh) 2019-04-05
CN109577979B CN109577979B (zh) 2020-11-10

Family

ID=65929346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811503963.8A Active CN109577979B (zh) 2018-12-10 2018-12-10 一种高地应力大型矿体下向分段充填采矿方法

Country Status (1)

Country Link
CN (1) CN109577979B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088979A (zh) * 2019-12-03 2020-05-01 南华大学 一种下向进路充填采矿方法
CN113187545A (zh) * 2021-05-28 2021-07-30 金川镍钴研究设计院有限责任公司 一种下向分层上下交错进路充填采矿法
CN114427463A (zh) * 2022-01-25 2022-05-03 长沙矿山研究院有限责任公司 深部矿床下向进路式盘区分区卸荷分层超前卸压回采方法
CN114562268A (zh) * 2022-02-23 2022-05-31 长沙矿山研究院有限责任公司 基于菱形回采结构的分区卸荷分段充填采矿法
CN114562327A (zh) * 2022-03-15 2022-05-31 紫金矿业集团股份有限公司 一种下向分段充填方法
CN115182728A (zh) * 2022-09-14 2022-10-14 矿冶科技集团有限公司 一种下向分段空场嗣后充填采矿方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013059911A1 (en) * 2011-10-26 2013-05-02 2341451 Ontario Inc. Undercut excavation method with continuous concrete floors
RU2520228C1 (ru) * 2012-12-17 2014-06-20 Станислав Александрович Кариман Способ разработки мощного пологого пласта крупными блоками
CN103953344A (zh) * 2014-04-30 2014-07-30 金川集团股份有限公司 一种下向进路分层胶结充填采矿法
CN104533416A (zh) * 2014-12-25 2015-04-22 中冶北方(大连)工程技术有限公司 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN104832178A (zh) * 2015-03-23 2015-08-12 中国矿业大学 一种厚煤层分层部分充填采煤方法
CN106677780A (zh) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 一种上下向阶段凿岩分段切底出矿嗣后充填采矿法
US20170268335A1 (en) * 2013-03-14 2017-09-21 Seneca Industries Inc. Mining systems
CN107939399A (zh) * 2017-11-25 2018-04-20 彝良驰宏矿业有限公司 一种多中段同时开采模式下水平矿柱回收方法及进路结构
CN107975372A (zh) * 2017-11-22 2018-05-01 中国矿业大学 一种特厚煤层下行分层充填采矿方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013059911A1 (en) * 2011-10-26 2013-05-02 2341451 Ontario Inc. Undercut excavation method with continuous concrete floors
RU2520228C1 (ru) * 2012-12-17 2014-06-20 Станислав Александрович Кариман Способ разработки мощного пологого пласта крупными блоками
US20170268335A1 (en) * 2013-03-14 2017-09-21 Seneca Industries Inc. Mining systems
CN103953344A (zh) * 2014-04-30 2014-07-30 金川集团股份有限公司 一种下向进路分层胶结充填采矿法
CN104533416A (zh) * 2014-12-25 2015-04-22 中冶北方(大连)工程技术有限公司 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN104832178A (zh) * 2015-03-23 2015-08-12 中国矿业大学 一种厚煤层分层部分充填采煤方法
CN106677780A (zh) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 一种上下向阶段凿岩分段切底出矿嗣后充填采矿法
CN107975372A (zh) * 2017-11-22 2018-05-01 中国矿业大学 一种特厚煤层下行分层充填采矿方法
CN107939399A (zh) * 2017-11-25 2018-04-20 彝良驰宏矿业有限公司 一种多中段同时开采模式下水平矿柱回收方法及进路结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗绍文 等: "混凝土假顶的破坏形式及布筋方法", 《矿业研究与开发》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088979A (zh) * 2019-12-03 2020-05-01 南华大学 一种下向进路充填采矿方法
CN111088979B (zh) * 2019-12-03 2021-05-04 南华大学 一种下向进路充填采矿方法
CN113187545A (zh) * 2021-05-28 2021-07-30 金川镍钴研究设计院有限责任公司 一种下向分层上下交错进路充填采矿法
CN114427463A (zh) * 2022-01-25 2022-05-03 长沙矿山研究院有限责任公司 深部矿床下向进路式盘区分区卸荷分层超前卸压回采方法
CN114427463B (zh) * 2022-01-25 2022-11-15 长沙矿山研究院有限责任公司 深部矿床下向进路式盘区分区卸荷分层超前卸压回采方法
CN114562268A (zh) * 2022-02-23 2022-05-31 长沙矿山研究院有限责任公司 基于菱形回采结构的分区卸荷分段充填采矿法
CN114562327A (zh) * 2022-03-15 2022-05-31 紫金矿业集团股份有限公司 一种下向分段充填方法
CN115182728A (zh) * 2022-09-14 2022-10-14 矿冶科技集团有限公司 一种下向分段空场嗣后充填采矿方法
CN115182728B (zh) * 2022-09-14 2022-12-13 矿冶科技集团有限公司 一种下向分段空场嗣后充填采矿方法

Also Published As

Publication number Publication date
CN109577979B (zh) 2020-11-10

Similar Documents

Publication Publication Date Title
CN109577979A (zh) 一种高地应力大型矿体下向分段充填采矿方法
CN103590831B (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN102635356B (zh) 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN104806244B (zh) 一种倾斜中厚矿体充填采矿方法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN101871347B (zh) 采矿环境再造分层分条中深孔落矿采矿法
CN110644997A (zh) 分阶段凿岩并阶段开采嗣后充填采矿法
CN104863592B (zh) 一种大结构分段凿岩阶段出矿嗣后充填采矿法
CN104453901A (zh) 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法
CN109630115B (zh) 用于缓倾斜中厚矿体的分段空场嗣后充填采矿法
CN103362510B (zh) 分段凿岩并段出矿分段矿房采矿法
CN111828007B (zh) 一种地下矿山采空区遗留间柱的回采方法
CN110656939B (zh) 用于遇水泥化围岩的急倾斜中厚矿体大阶段高效采矿方法
CN108798672B (zh) 一种大垮塌区矿石高效开采的采矿方法
CN110331978A (zh) 一种环境再造分段中深孔嗣后充填采矿法
CN108625855B (zh) 一种充填体下的采矿方法
CN101158287A (zh) 一种蜂巢结构胶结充填采矿法
CN103437766B (zh) 一种原地碎裂采矿方法
CN109812268A (zh) 盘区机械化上向水平分层充填顶柱定向抛掷爆破采矿法
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN103557001A (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN102926753B (zh) 一种人工冻结采场顶板深孔崩矿嗣后充填采矿法
CN104389604A (zh) 一种崩落采矿法覆盖层的形成方法
CN104343453A (zh) 一种缓倾斜中厚矿床充填采矿方法
CN105863727A (zh) 间柱采空区处理方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant