CN104863291B - Manufacturing method for light weight wall - Google Patents

Manufacturing method for light weight wall Download PDF

Info

Publication number
CN104863291B
CN104863291B CN201510342797.8A CN201510342797A CN104863291B CN 104863291 B CN104863291 B CN 104863291B CN 201510342797 A CN201510342797 A CN 201510342797A CN 104863291 B CN104863291 B CN 104863291B
Authority
CN
China
Prior art keywords
concrete
cement
siphunculus
wall
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510342797.8A
Other languages
Chinese (zh)
Other versions
CN104863291A (en
Inventor
王磊
赵广俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Tengyuan Design Institute Co Ltd
Original Assignee
Qingdao Tengyuan Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Tengyuan Design Institute Co Ltd filed Critical Qingdao Tengyuan Design Institute Co Ltd
Priority to CN201510342797.8A priority Critical patent/CN104863291B/en
Publication of CN104863291A publication Critical patent/CN104863291A/en
Application granted granted Critical
Publication of CN104863291B publication Critical patent/CN104863291B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a manufacturing method for a light weight wall. A light weight thermal insulation wall comprises 1# concrete, 2# concrete, bamboo pipes and fixed cross bars, the 1# concrete is arranged in the bamboo pipes, the 2# concrete is arranged at four sides of the bamboo pipes, and the fixed cross bars are fixed at two sides of the bamboo pipes and firmly connected with the adjacent bamboo pipes. The manufacturing method includes manufacturing steps that preparing the 1# concrete; preparing the 2# concrete; building a die; filling the concrete; removing the die. The manufacturing method is capable of manufacturing the integrated wall featured with large structure intensity, strong pressure bearing performance and light weight, and the light weight wall is capable of meeting the site construction and market demands.

Description

A kind of preparation method of Light Wall
Technical field
The invention belongs to building field, and in particular to a kind of preparation method of light insulating wall.
Background technology
With the improvement of people ' s living standards, develop all along the direction of skyscraper in city and part district, it is existing Reinforced concrete frame structure typically is being used when building body is built, while constituting wall using the ash bricks of lightweight, is working as Lou Tijie Structure still carries out the decoration of external and internal wall after the completion of making.The exterior wall of building building body is typically built using concrete or building block now Build, with cement mortar it is floating after, in exterior wall using the organic plastics plate thin plastering heat-insulation system such as styrofoam, this mode is present not Fire prevention, site operation of poor quality, low construction efficiency, it is long in time limit the problems such as, with science and technology progress, people design with hair Soaked mud belongs to A grades of fire-protection rating as exterior-wall heat insulation fire-proof board, can exceed the heat insulation effect of expansion polyphenyl plate, but Foam cement poor waterproof properties, and because its bulk density is low, cause intensity relatively low, integral rigidity poor performance, it is impossible to as Composite.Therefore study a kind of fireproof heat-preserving wall that load bearing heat preserving is integrated in one meets market needs very much.Existing interior The reason for brick wall, Chang Yinwei seif-citing rates, causes wall crazing, therefore, wall is formed integrally becomes one kind well Settling mode.
The content of the invention
Goal of the invention of the invention is:For above-mentioned problem, there is provided a kind of making side of light insulating wall Method, is an entirety by cast-in-place the building of wall, solves the problems, such as wall crazing;Using being made Light Wall, and in Light Wall plus If load-carrying members, solve the problems, such as that foam cement waterproof is poor, low intensity.
The technical solution adopted by the present invention is as follows:
The invention discloses a kind of preparation method of light insulating wall, comprise the following steps:
A kind of preparation method of light insulating wall, it is characterised in that comprise the following steps:
(1)Prepare a concrete:With volume ratio, rubble:Fine sand:Cement:Bamboo fibre:Additive=(30~38):(8~ 13):(17~30):(8~13):(0.02~0.04), the stirring that adds water is put into mixer, it is 1800~2,050,000 to obtain density Gram every cubic metre of concrete is standby;
(2)Prepare No. two concrete:With volume ratio, polystyrene foam particles:Fine sand:Cement:Bamboo fibre:Perlite: Additive=(35~40):(8~15):(15~25):(5~11):(6~13):(0.02~0.04), be put into mixer plus Water is stirred, and obtains density for 1000-1500 kilograms every cubic metre No. two concrete are standby;
(3)Set up mould:By two templates with placed side by side and fixed, vertically put between template and set siphunculus, in siphunculus Outer being arranged by 30~50cm of spacing is arranged reinforcing ring, and 3~8 siphunculus are averagely set up at every square metre, and adjacent siphunculus is by solid Determine cross bar to interfix;
(4)Penetration concrete:It is a concrete of 30-50cm that height is poured into siphunculus, is poured between two templates No. two concrete of same height, it is that 10~50HZ, amplitude are 2~8mm, 2~5min of time shaking that frequency is applied to siphunculus It is dynamic, every cubic metre of vibration of 10~15min is applied to No. two cement using cement vibrating head, action above is then repeated until reaching To predetermined wall highly;
(5)Pressurization heats up:To the wall temperature adjustment that has irrigated to 30-50 degrees Celsius, and impose the pressure of 300~600kPa;
(6)Form removal:After a number concrete and No. two concrete formations, the template on two sides is dismantled, wall is formed, to wall table Face temperature control 12~24h of moisturizing, temperature adjustment is 24~28 degrees Celsius, and relative humidity is 60%~75%;
A number additive for concrete includes hydrophober, water reducer, early strength agent and retarder;
The additive of No. two concrete includes foaming agent, hydrophober, water reducer and retarder;
Softened dose of immersion softens bamboo fibre in advance, and its average length is 10~50mm.
Traditional brick wall body is solved as a result of the light insulating wall that above-mentioned steps are made, problem easy to crack, Wherein No. one concrete has the characteristics of resistance to pressure is good, stability is high, and being poured into bamboo trunk can form compared with high structural strength Support column, as the skeleton of whole wall, in addition, wall is strong and good heat preservation performance using No. two light weights, waterproof ability Feature, realizes wall thermal insulating, water-proof function, wherein the perlite component added in No. two concrete is that acidic lava can one Determine to neutralize the alkalescence in cement in degree, prevent the bubble structure in sodium ion or potassium ion destruction wall, be the guarantor of its wall Gentle water resistance is more preferable.
Preferably, the polystyrene foam particles of No. two concrete are partly or totally replaced with leca, The granularity of its polystyrene foam particles or leca is 3~10mm;The granularity of the rubble is 8~15mm.Leca Effectively in the structural strength and bearing capacity of enhancing wall, and can will not roll up the quality of wall.
Preferably, a concrete uses magnesia cement;No. two concrete use general-purpose cement or expanding cement. Magnesia cement has intensity high, the advantage that resistance to pressure is waited well, while it has the disadvantage easily to return halogen and poor water resistance, and by magnesia cement The concrete being made stay material the most is wrapped in No. two good concrete of water resistance, and its can effectively utilize magnesite The advantage of cement simultaneously evades its shortcoming, is a kind of brand-new application mode.
Preferably, the siphunculus is bamboo trunk or plastic tube;The bamboo trunk, plastic tube are provided with passage.Passage profit In a drying for concrete.
Preferably, the bamboo trunk is in the preceding 5~12h under water in advance of use, and the outer surface of bamboo trunk is polished coarse.
Preferably, the spacing between two templates is 15~30cm,
In sum, by adopting the above-described technical solution, the beneficial effects of the invention are as follows:A kind of lightweight of the invention is protected The preparation method of warm wall, can obtain structural strength greatly, and bearing capacity is strong, lightweight, the wall of integration, disclosure satisfy that scene Construction and the market demand.
Brief description of the drawings
Fig. 1 is the structure chart of the light insulating wall in the present invention;
Marked in figure:1- templates, 2- siphunculus, number concrete of 3-, No. bis- concrete of 4-, 5- fixed transverse rods, 6- reinforcing rings.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Specific embodiment 1:As shown in figure 1, light insulating wall of the invention includes 3, No. two concrete of a concrete 4th, siphunculus, fixed transverse rod 5, in siphunculus, No. two concrete 4 are located at siphunculus surrounding to a concrete 3, and fixed transverse rod 5 is fixed It is connected on adjacent siphunculus in both sides of siphunculus and being fixed, its specific preparation method is:
(1)Prepare a concrete:With volume ratio, rubble:Fine sand:Cement:Bamboo fibre:Additive=(30~38):(8~ 13):(17~30):(8~13):(0.02~0.04), it is preferably in a proportion of:Rubble:Fine sand:Cement:Bamboo fibre:Additive=35: 12:22:10:0.02, the stirring that adds water is put into mixer, density is obtained for 1800~2050 kilograms every cubic metre concrete Standby, preferred density is 1900-1950 kilograms every cubic metre.
(2)Prepare No. two concrete:With volume ratio, polystyrene foam particles:Fine sand:Cement:Bamboo fibre:Perlite: Additive=(35~40):(8~15):(15~25):(5~11):(6~13):(0.02~0.04), it is preferably in a proportion of:Polyphenyl Vinyl foam particle:Fine sand:Cement:Bamboo fibre:Perlite:Additive=38:9:18:10:11:0.03, be put into mixer plus Water is stirred, and obtains density for 1000-1500 kilograms every cubic metre No. two concrete are standby, and 1150-1250 kilograms of preferred density is every Cubic meter;
(3)Set up mould:By two templates with placed side by side and fixed, vertically put between template and set siphunculus, in siphunculus Reinforcing ring is arranged by spacing of 30~50cm outward, 3~8 siphunculus are averagely set up at every square metre, adjacent siphunculus is by fixed horizontal Bar interfixes;
(4)Penetration concrete:It is a concrete of 30-50cm that height is poured into siphunculus, is poured between two templates No. two concrete of same height, it is that 10~50HZ, amplitude are 2~8mm, 2~5min of time shaking that frequency is applied to siphunculus It is dynamic, every cubic metre of vibration of 10~15min is applied to No. two cement using cement vibrating head, action above is then repeated until reaching To predetermined wall highly;
(5)Pressurization heats up:To the wall temperature adjustment that has irrigated to 30-50 degrees Celsius, and impose the pressure of 300~600kPa;
(6)Form removal:After a number concrete and No. two concrete formations, the template on two sides is dismantled, wall is formed, to wall table Face temperature control 12~24h of moisturizing, temperature adjustment is 24~28 degrees Celsius, and relative humidity is 60%~75%;
Number additive for concrete includes hydrophober, water reducer, early strength agent and retarder, and its volume ratio is, hydrophobic Agent:Water reducer:Early strength agent:Retarder=(3~4):(3~5):(4~7):(5~7);
The additive of No. two concrete includes foaming agent, hydrophober, water reducer and retarder;Its volume ratio is to foam Agent:Hydrophober:Water reducer:Retarder=(5~9)(3~4):(3~4):(5~7);
Softened dose of immersion softens bamboo fibre in advance, and its average length is 10~50mm, preferably 30-40mm.
A number concrete 3 uses magnesia cement;No. two concrete 4 use general-purpose cement or expanding cement.By magnesia cement The concrete being made stay material the most is wrapped in No. two good concrete 4 of water resistance, so as to effectively utilize magnesia cement High with intensity, the advantage that resistance to pressure is waited well evades its shortcoming for easily returning halogen and poor water resistance, is a kind of brand-new application side Formula.Siphunculus 2 uses bamboo trunk or plastic tube;Bamboo trunk, plastic tube are provided with passage.Bamboo trunk using preceding under water in advance 5~ 12h, and the outer surface of bamboo trunk is polished coarse, more than 15 microns of its surface roughness.Bamboo trunk passes through fixed transverse rod 5 and adjacent bamboo Pipe is fixed.Be connected for bamboo trunk by fixed transverse rod 5, is conducive to the mutual cooperation of multiple bamboo trunks, improves the structural strength of wall.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (6)

1. a kind of preparation method of light insulating wall, it is characterised in that comprise the following steps:
(1)Prepare a concrete:With volume ratio, rubble:Fine sand:Cement:Bamboo fibre:Additive=(30~38):(8~13): (17~30):(8~13):(0.02~0.04), the stirring that adds water is put into mixer, density is obtained for 1800~2050 kilograms are every A number concrete of cubic meter is standby;
(2)Prepare No. two concrete:With volume ratio, polystyrene foam particles:Fine sand:Cement:Bamboo fibre:Perlite:It is additional Agent=(35~40):(8~15):(15~25):(5~11):(6~13):(0.02~0.04), it is put into mixer to add water and stirs Mix, obtain No. two concrete that density is 1000-1500 kilograms every cubic metre standby;
(3)Set up mould:By two templates with placed side by side and fixed, vertically put between template and set siphunculus, in siphunculus overcoat If being arranged reinforcing ring by 30~50cm of spacing, 3~8 siphunculus are averagely set up at every square metre, adjacent siphunculus is by fixed horizontal Bar interfixes;
(4)Penetration concrete:It is a concrete of 30-50cm that height is poured into siphunculus, is poured between two templates same No. two concrete of height, it is that 10~50HZ, amplitude are 2~8mm, 2~5min of time vibration that frequency is applied to siphunculus, profit Every cubic metre of vibration of 10~15min is applied to No. two cement with cement vibrating head, action above is then repeated until reaching pre- Determine wall highly;
(5)Pressurization heats up:To the wall temperature adjustment that has irrigated to 30-50 degrees Celsius, and impose the pressure of 300~600kPa;
(6)Form removal:After a number concrete and No. two concrete formations, the template on two sides is dismantled, wall is formed, to surface of wall control Warm 12~24h of moisturizing, temperature adjustment is 24~28 degrees Celsius, and relative humidity is 60%~75%;
A number additive for concrete includes hydrophober, water reducer, early strength agent and retarder;
The additive of No. two concrete includes foaming agent, hydrophober, water reducer and retarder;
Softened dose of immersion softens bamboo fibre in advance, and its average length is 10~50mm;
The siphunculus is plastic tube or bamboo trunk;The bamboo trunk, plastic tube are provided with passage.
2. the preparation method of a kind of light insulating wall according to claim 1, it is characterised in that by No. two coagulations The polystyrene foam particles of soil are partly or totally replaced with leca, the grain of its polystyrene foam particles or leca It is 3~10mm to spend;The granularity of the rubble is 8~15mm.
3. a kind of preparation method of light insulating wall according to claim 1 a, it is characterised in that concrete Use magnesia cement;No. two concrete use general-purpose cement or expanding cement.
4. the preparation method of a kind of light insulating wall according to claim 1, it is characterised in that the bamboo trunk is being used Preceding 5~12h under water in advance, and the outer surface polishing of bamboo trunk is coarse.
5. the preparation method of a kind of light insulating wall according to claim 1, it is characterised in that two templates it Between spacing be 15~30cm.
6. a kind of preparation method of light insulating wall according to claim 1, it is characterised in that the surface of the wall It is floating using aluminate cement or lime.
CN201510342797.8A 2015-06-19 2015-06-19 Manufacturing method for light weight wall Expired - Fee Related CN104863291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510342797.8A CN104863291B (en) 2015-06-19 2015-06-19 Manufacturing method for light weight wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510342797.8A CN104863291B (en) 2015-06-19 2015-06-19 Manufacturing method for light weight wall

Publications (2)

Publication Number Publication Date
CN104863291A CN104863291A (en) 2015-08-26
CN104863291B true CN104863291B (en) 2017-05-24

Family

ID=53909423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510342797.8A Expired - Fee Related CN104863291B (en) 2015-06-19 2015-06-19 Manufacturing method for light weight wall

Country Status (1)

Country Link
CN (1) CN104863291B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480980A (en) * 2016-06-08 2017-03-08 广东合力建造科技有限公司 One kind is whole to pour formula peripheral structure and construction method
CN109025056A (en) * 2018-08-28 2018-12-18 南京林业大学 A kind of raw bamboo confined concrete composite structure
CN109629696B (en) * 2018-12-28 2020-09-15 西安建筑科技大学 Connection node and bamboo building structure of former bamboo combination wallboard of assembled and floor
CN111764650B (en) * 2020-07-15 2021-11-05 新昌县品创建筑设计有限公司 Stripping device and stripping method for building construction
CN113982179B (en) * 2021-11-15 2023-03-17 宁乡宁华新材料有限公司 Heat-insulating environment-friendly baking-free brick and preparation method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365230C (en) * 2004-06-23 2008-01-30 李巍 Fiber reinforcement battened composite porous light partition plate and production process thereof
US20080066408A1 (en) * 2006-09-14 2008-03-20 Blain Hileman Insulated concrete form
CN101376582B (en) * 2008-07-07 2012-07-25 湖南江盛新型建筑材料有限公司 Heat insulation wall integral pouring material and construction method
CN201588316U (en) * 2009-09-11 2010-09-22 闫振甲 Fire-proof and self-heat insulating structure of cast-in-place foam concrete of wall with steel structure and concrete frame structure
CN102127930B (en) * 2010-07-19 2012-10-17 曾庆胜 Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN103485441A (en) * 2013-09-10 2014-01-01 华南理工大学 Combined shearing wall

Also Published As

Publication number Publication date
CN104863291A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN104863291B (en) Manufacturing method for light weight wall
CN201704818U (en) Novel composite wallboard with high strength, high heat insulation and high sound isolation
CN105297943B (en) The heat insulation decorative load-bearing integration assembled wall and preparation method of composite aerogel
CN103074936A (en) Low-density AAC (autoclaved aerated concrete) precise-masonry self-thermal insulation system and construction method
EP3568273B1 (en) Plant and method for producing pumice blocks having cavities filled with insulation material
CN108546034A (en) A kind of concrete composition of sound-insulating
CN103266686B (en) Inflatable skeleton filling wall
KR20130091045A (en) The manufacturing mehtod of the ceramic sandwich a fire door of the nonflammable and insulating and a composite of filling mixture
CN110078453A (en) A kind of lightweight concrete and its preparation method and application
CN207405824U (en) A kind of green walling insulation construction of assembled architecture
CN102248575A (en) Process for manufacturing ultra-light cement-based thermal insulation waterproof board by cast-in-place method
KR20120115641A (en) Form-free both insulation wall
KR101615530B1 (en) The process of making mortar and method of construction for noise reduction of apartment houses
CN107780590A (en) A kind of superfined flyash lightweight Self-insulation wall plate and preparation method thereof
CN201645604U (en) Foamed concrete producing equipment
WO2021042222A1 (en) Monolithic stratified-concrete panels; method for the in-situ manufacture of monolithic stratified-concrete panels having variable thickness and density; and use as thermal insulation panels of an envelope or acoustic insulators
CN204040459U (en) A kind of cast-in-situ concrete fireproof heat insulating non-dismantling formwork
CN202347725U (en) Novel heat-preserving and sound-insulation composite wall board
CN108373340A (en) A kind of preparation method of the compound precast concrete wall of sound-insulating
CN205712698U (en) Conveniently break disconnected foaming concrete brick
CN204059740U (en) A kind of novel water-proof gypsum composite board
CN106368404A (en) Light board with natural stone material surface and manufacturing method
CN202064516U (en) Water-proof heat-insulation bearing wall board
JP2001163684A (en) Sound absorbing body and sound absorbing/sound insulating structure using the sound absorbing body
CN201172894Y (en) High-intensity high-insulation composite wall slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Lei

Inventor after: Zhao Guangjun

Inventor before: Lu Ye

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: 266000 Haier Road, Laoshan District, Shandong, Qingdao, China 182-8

Applicant after: QINGDAO TENGYUAN DESIGN STUDIO Co.,Ltd.

Address before: 610041 Sichuan province hi tech Zone Tianfu street, No. 1, building 1, unit 16, level 1610, No.

Applicant before: SICHUAN JIUDINGZHIYUAN INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 266000 Room 301-1, No. 17, Changsha Road, Wangcheng Sub district Office, Laixi City, Qingdao, Shandong Province

Patentee after: QINGDAO TENGYUAN DESIGN STUDIO Co.,Ltd.

Address before: No. 182-8, Haier Road, Laoshan District, Qingdao, Shandong 266000

Patentee before: QINGDAO TENGYUAN DESIGN STUDIO Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

CF01 Termination of patent right due to non-payment of annual fee