CN104863177A - 一种复合式挡土墙结构及其施工方法 - Google Patents

一种复合式挡土墙结构及其施工方法 Download PDF

Info

Publication number
CN104863177A
CN104863177A CN201510318413.9A CN201510318413A CN104863177A CN 104863177 A CN104863177 A CN 104863177A CN 201510318413 A CN201510318413 A CN 201510318413A CN 104863177 A CN104863177 A CN 104863177A
Authority
CN
China
Prior art keywords
pile
retaining wall
wall structure
construction
rotary churning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510318413.9A
Other languages
English (en)
Inventor
曹慧
许利东
王晓曙
涂伟
陈明
彭小毅
崔洪
潘延连
王向敏
余琨琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih Foundation Engineering Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd, YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd filed Critical YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201510318413.9A priority Critical patent/CN104863177A/zh
Publication of CN104863177A publication Critical patent/CN104863177A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种复合式挡土墙结构及其施工方法,挡土墙结构包括有一排或两排以上平行的立面钻孔灌注桩或支护桩(1)、设置于各相邻的钻孔灌注桩或支护桩之间并水平或倾斜插入基坑侧壁或边坡的一组旋喷桩(2)、插入旋喷桩的预制钢筋混凝土方桩(3)、在不同高度横向连接钻孔灌注桩或支护桩并套在预制钢筋混凝土方桩伸出头上的一组腰梁(6)、连接于立面钻孔灌注桩或支护桩顶部的冠梁(5)。本发明的旋喷固结体可与桩后土体紧密咬合,预制钢筋混凝土桩能将各段旋喷固结体连接在一起,可有效增加排桩挡土墙结构的稳定性和刚度,有效控制基坑开挖过程中的桩体位移,保证基坑安全。

Description

一种复合式挡土墙结构及其施工方法
技术领域
本发明涉及建筑基坑工程和边坡工程技术领域。
背景技术
21世纪是岩土工程大发展的时代。随着我国城市化进程的逐步推进,岩土工程领域得到快速发展,各类基坑工程和边坡工程随之涌现。对于基坑工程和边坡工程而言,挡土墙结构都是关键。近年来,排桩结构因其支护效果好,施工简便快速,工程造价低等优点,被广泛用于基坑支护和边坡支护工程。但对于某些深基坑工程或超高边坡而言,常规排桩挡土墙结构通常会面临桩体变形过大的问题,工程的安全性存在潜在威胁。
发明内容
本发明的目的在于克服深基坑工程中排桩支护结构的不足,提供一种能有效控制排桩支护结构在深基坑开挖过程中的桩体位移,并提高其稳定性的复合式挡土墙结构及其施工方法。
本发明的目的通过如下技术方案实现:
一种复合式挡土墙结构,包括有一排或两排以上平行的立面钻孔灌注桩或支护桩、设置于各相邻的钻孔灌注桩或支护桩之间并水平或倾斜插入基坑侧壁或边坡的一组旋喷桩、插入旋喷桩的预制钢筋混凝土方桩、在不同高度横向连接钻孔灌注桩或支护桩并套在预制钢筋混凝土方桩伸出头上的一组腰梁、连接于立面钻孔灌注桩或支护桩顶部的冠梁。
本发明所述旋喷桩为连续施工而得的连续型旋喷柱或分段施工而得的分段型旋喷柱。旋喷桩的尾部为旋喷直径增大的扩大头锚固体。所述预制钢筋混凝土方桩为实心桩,其桩长与旋喷桩相同或略长于旋喷桩。所述旋喷桩可选择在钻孔灌注桩或支护桩桩间等间距或不等间距地连续布置或间隔布置。旋喷桩最细段的直径应大于预制钢筋混凝土方桩截面边长至少20mm。
本发明所述复合式挡土墙结构的施工方法如下:
a. 桩机就位,进行钻孔灌注桩或支护桩施工;
b.钻孔灌注桩或支护桩质量趋于稳定后,进行基坑开挖,在开挖过程中预先配置水泥水玻璃浆液,基坑挖到设计位置后将水泥水玻璃浆液用于旋喷桩的水平或倾斜注浆施工;
c.旋喷桩注浆施工完毕后,在其桩体质量稳定前即注浆的浆体完全凝固前,进行预制钢筋混凝土方桩打桩施工,将预制钢筋混凝土方桩打入旋喷桩内;
d.同一高度层的旋喷桩和预制钢筋混凝土方桩施工完毕后,进行腰梁的浇筑;
e.全部腰梁浇筑完毕后,进行钻孔灌注桩或支护桩顶部冠梁的浇筑。
本发明在进行步骤b的注浆施工时,增大旋喷桩尾部的旋喷直径,形成扩大头锚固体。旋喷桩采用分段旋喷施工或连续旋喷施工,旋喷桩的直径为0.6~1.2m,桩长不小于6m;分段旋喷施工时的分段间距为1~2m。旋喷桩的注浆材料为水泥水玻璃浆液,即水泥浆液中掺入水玻璃的复合注浆材料,其中,水泥浆液的水灰比为0.75:1~1:1,水玻璃掺入量为水泥浆液质量的2%~4%。
本发明的复合式挡土墙结构,其旋喷固结体可与桩后土体紧密咬合,而预制钢筋混凝土桩能将各段旋喷固结体连接在一起,可有效增加排桩挡土墙结构的稳定性和刚度,有效控制基坑开挖过程中的桩体位移,保证基坑安全。钻孔灌注桩、旋喷桩及其扩大头锚固体、预制钢筋混凝土方桩、冠梁和腰梁相互结合和制约,构成一个稳固的三维挡土结构,结构稳定可靠。
本发明的施工方法科学合理,分段施工的旋喷固结体及其注浆形成的扩大头锚固体可确保与桩后土体紧密咬合,预制钢筋混凝土方桩打入旋喷桩内,使预制钢筋混凝土方桩位置稳固,有利于后续浇筑结构稳固的腰梁和梁冠。
附图说明
图1为本发明复合式挡土墙结构的立面示意图;
图2为本发明复合式挡土墙结构的俯视示意图(旋喷桩采用分段旋喷施工);
图3为本发明复合式挡土墙结构的侧视示意图(旋喷桩采用分段旋喷施工);
图4为本发明复合式挡土墙结构的侧视示意图(旋喷桩采用连续旋喷施工)。
图中各标号为: 1——钻孔灌注桩;2——旋喷桩;3——预制钢筋混凝土方桩;4——扩大头锚固体;5——冠梁;6——腰梁;A——地表;B——基坑底。
具体实施方式
下面通过附图和实施例对本发明作进一步详细说明,但本发明的保护范围不局限于所述内容。
如图1-图4所示,本发明的复合式挡土墙结构包括有一排或两排或更多排平行的立面钻孔灌注桩或支护桩1,设置于各相邻的钻孔灌注桩或支护桩之间并水平或倾斜插入基坑侧壁或边坡的一组旋喷桩2,插入旋喷桩2的预制钢筋混凝土方桩3,在不同高度横向连接钻孔灌注桩或支护桩并套在预制钢筋混凝土方桩3伸出头上的一组腰梁6,连接于立面钻孔灌注桩或支护桩1顶部的冠梁5。旋喷桩2为如图4所示的连续施工而得的连续型旋喷柱或如图2、图3所示的分段施工而得的分段型旋喷柱,旋喷桩2的尾部为旋喷直径增大的扩大头锚固体4。旋喷桩2最细段的直径应大于预制钢筋混凝土方桩3截面边长至少20mm。预制钢筋混凝土方桩3为实心桩,其桩长基本与旋喷桩2相同或略长于旋喷桩。旋喷桩2可选择在钻孔灌注桩或支护桩1桩间等间距或不等间距地连续布置或间隔布置。
本发明复合式挡土墙结构的施工方法如下:
a. 根据施工场区勘察报告和基坑支护稳定性验算结果,确定钻孔灌注桩和旋喷桩的桩位、直径和桩长等施工参数后,桩机就位,进行钻孔灌注桩或支护桩1施工;
b.钻孔灌注桩或支护桩1质量趋于稳定后,从地表A向地下开挖基坑,在开挖过程中预先配置水泥水玻璃浆液,基坑挖到设计位置即基坑底B后将水泥水玻璃浆液用于旋喷桩2的水平或倾斜注浆施工。可采用二重管法或单管法或三重管法进行旋喷桩2的分段旋喷施工,分段旋喷施工时的分段间距为1~2m,并增大旋喷桩2尾部的旋喷直径,形成扩大头锚固体4;也可采用连续旋喷施工法得到连续型旋喷桩2。旋喷桩的直径为0.6~1.2m,桩长不小于6m。旋喷桩2的注浆材料为水泥水玻璃浆液,即水泥浆液中掺入水玻璃的复合注浆材料,其中,水泥浆液的水灰比为0.75:1~1:1,水玻璃掺入量为水泥浆液质量的2%~4%;
c.旋喷桩注浆施工完毕后,在其桩体质量稳定前即注浆的浆体完全凝固前,进行预制钢筋混凝土方桩3打桩施工,将预制钢筋混凝土方桩打入旋喷桩2内;
d.同一高度层的旋喷桩和预制钢筋混凝土方桩施工完毕后,进行腰梁6的浇筑;
e.全部腰梁浇筑完毕后,进行钻孔灌注桩或支护桩1顶部冠梁5的浇筑。
本发明所述钻孔灌注桩或支护桩的施工、旋喷桩的连续注浆施工或分段注浆施工均可采用现有技术方法。

Claims (10)

1.一种复合式挡土墙结构,其特征在于,包括有一排或两排以上平行的立面钻孔灌注桩或支护桩(1)、设置于各相邻的钻孔灌注桩或支护桩之间并水平或倾斜插入基坑侧壁或边坡的一组旋喷桩(2)、插入旋喷桩(2)的预制钢筋混凝土方桩(3)、在不同高度横向连接钻孔灌注桩或支护桩并套在预制钢筋混凝土方桩(3)伸出头上的一组腰梁(6)、连接于立面钻孔灌注桩或支护桩(1)顶部的冠梁(5)。
2.根据权利要求1所述的复合式挡土墙结构,其特征在于,所述旋喷桩(2)为连续施工而得的连续型旋喷柱或分段施工而得的分段型旋喷柱。
3.根据权利要求1或2所述的复合式挡土墙结构,其特征在于,所述旋喷桩(2)的尾部为旋喷直径增大的扩大头锚固体(4)。
4.根据权利要求1或2或3所述的复合式挡土墙结构,其特征在于,所述预制钢筋混凝土方桩(3)为实心桩,其桩长与旋喷桩(2)相同或略长于旋喷桩。
5.根据权利要求1或2或3或4所述的复合式挡土墙结构,其特征在于,所述旋喷桩(2)可选择在钻孔灌注桩或支护桩(1)桩间等间距或不等间距地连续布置或间隔布置。
6.根据权利要求1或2或3或4或5所述的复合式挡土墙结构,其特征在于:所述旋喷桩(2)最细段的直径应大于预制钢筋混凝土方桩(3)截面边长至少20mm。
7.如权利要求1-6任一项所述的复合式挡土墙结构的施工方法,其特征在于,施工方法如下:
a. 桩机就位,进行钻孔灌注桩或支护桩(1)施工;
b.钻孔灌注桩或支护桩(1)质量趋于稳定后,进行基坑开挖,在开挖过程中预先配置水泥水玻璃浆液,基坑挖到设计位置后将水泥水玻璃浆液用于旋喷桩(2)的水平或倾斜注浆施工;
c.旋喷桩注浆施工完毕后,在其桩体质量稳定前即注浆的浆体完全凝固前,进行预制钢筋混凝土方桩(3)打桩施工,将预制钢筋混凝土方桩打入旋喷桩(2)内;
d.同一高度层的旋喷桩和预制钢筋混凝土方桩施工完毕后,进行腰梁(6)的浇筑;
e.全部腰梁浇筑完毕后,进行钻孔灌注桩或支护桩(1)顶部冠梁(5)的浇筑。
8.根据权利要求7所述的复合式挡土墙结构的施工方法,其特征在于,进行步骤b的注浆施工时,增大旋喷桩(2)尾部的旋喷直径,形成扩大头锚固体(4)。
9.根据权利要求7或8所述的复合式挡土墙结构的施工方法,其特征在于,所述旋喷桩(2)采用分段旋喷施工或连续旋喷施工,旋喷桩的直径为0.6~1.2m,桩长不小于6m;分段旋喷施工时的分段间距为1~2m。
10.根据权利要求7或8或9所述的复合式挡土墙结构的施工方法,其特征在于,所述旋喷桩(2)的注浆材料为水泥水玻璃浆液,即水泥浆液中掺入水玻璃的复合注浆材料,其中,水泥浆液的水灰比为0.75:1~1:1,水玻璃掺入量为水泥浆液质量的2%~4%。
CN201510318413.9A 2015-06-11 2015-06-11 一种复合式挡土墙结构及其施工方法 Pending CN104863177A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510318413.9A CN104863177A (zh) 2015-06-11 2015-06-11 一种复合式挡土墙结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510318413.9A CN104863177A (zh) 2015-06-11 2015-06-11 一种复合式挡土墙结构及其施工方法

Publications (1)

Publication Number Publication Date
CN104863177A true CN104863177A (zh) 2015-08-26

Family

ID=53909313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510318413.9A Pending CN104863177A (zh) 2015-06-11 2015-06-11 一种复合式挡土墙结构及其施工方法

Country Status (1)

Country Link
CN (1) CN104863177A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464079A (zh) * 2015-12-24 2016-04-06 李金良 一种长螺旋成孔桩板桩支护、防渗连续墙成型工法
CN105804101A (zh) * 2016-05-16 2016-07-27 陈静波 减小支挡结构受力的减荷支挡体系及施工方法及应用
CN107419730A (zh) * 2017-07-07 2017-12-01 中国建筑第八工程局有限公司 结合高压旋喷技术的基坑支护挡水结构及方法
CN109914432A (zh) * 2019-04-12 2019-06-21 四川省交通勘察设计研究院有限公司 一种挖方边坡预加固桩墙支护结构及方法
CN109972634A (zh) * 2019-05-05 2019-07-05 北京万兴建筑集团有限公司 一种横穿支线管沟的管廊明挖基坑侧壁挡土方法
CN115198762A (zh) * 2022-07-22 2022-10-18 中建一局集团第二建筑有限公司 一种紧邻既有建筑基坑支护结构及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291575A (ja) * 2005-04-11 2006-10-26 Kanuka Design:Kk 擁壁及びその施工方法
CN202610808U (zh) * 2012-03-15 2012-12-19 十九冶成都建设有限公司 盖压、锚固、侧挡组合作用的基坑支护结构
CN203855971U (zh) * 2014-06-05 2014-10-01 中国建筑材料工业地质勘查中心广东总队 疏排桩锚基坑支护结构
CN104563129A (zh) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 一种桩身设有加芯水平旋喷桩的双排桩结构
CN104594360A (zh) * 2014-12-31 2015-05-06 云南建工基础工程有限责任公司 一种复合式双排桩基坑支护结构
CN204780990U (zh) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 一种复合式挡土墙结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291575A (ja) * 2005-04-11 2006-10-26 Kanuka Design:Kk 擁壁及びその施工方法
CN202610808U (zh) * 2012-03-15 2012-12-19 十九冶成都建设有限公司 盖压、锚固、侧挡组合作用的基坑支护结构
CN203855971U (zh) * 2014-06-05 2014-10-01 中国建筑材料工业地质勘查中心广东总队 疏排桩锚基坑支护结构
CN104563129A (zh) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 一种桩身设有加芯水平旋喷桩的双排桩结构
CN104594360A (zh) * 2014-12-31 2015-05-06 云南建工基础工程有限责任公司 一种复合式双排桩基坑支护结构
CN204780990U (zh) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 一种复合式挡土墙结构

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464079A (zh) * 2015-12-24 2016-04-06 李金良 一种长螺旋成孔桩板桩支护、防渗连续墙成型工法
CN105804101A (zh) * 2016-05-16 2016-07-27 陈静波 减小支挡结构受力的减荷支挡体系及施工方法及应用
CN107419730A (zh) * 2017-07-07 2017-12-01 中国建筑第八工程局有限公司 结合高压旋喷技术的基坑支护挡水结构及方法
CN109914432A (zh) * 2019-04-12 2019-06-21 四川省交通勘察设计研究院有限公司 一种挖方边坡预加固桩墙支护结构及方法
CN109972634A (zh) * 2019-05-05 2019-07-05 北京万兴建筑集团有限公司 一种横穿支线管沟的管廊明挖基坑侧壁挡土方法
CN115198762A (zh) * 2022-07-22 2022-10-18 中建一局集团第二建筑有限公司 一种紧邻既有建筑基坑支护结构及其施工方法

Similar Documents

Publication Publication Date Title
CN104863177A (zh) 一种复合式挡土墙结构及其施工方法
CN106930321B (zh) 一种大直径顶管结合洞桩修建地下结构的施工方法
CN207109475U (zh) 傍山高填路堤稳定与变形控制结构
CN204780990U (zh) 一种复合式挡土墙结构
CN109594568A (zh) 一种岩石边坡生态防护结构及其方法
CN110777802A (zh) 深基坑高低跨支护结构及其施工方法
CN211200426U (zh) 一种微型钢管桩挡墙抗滑支挡结构
CN104594360A (zh) 一种复合式双排桩基坑支护结构
CN205152983U (zh) 地下空间施工的地层预加固处理结构
CN207525758U (zh) 一种加强型基坑排桩支护结构
CN103758132A (zh) 一种结合放坡的悬臂排桩支护结构的施工工艺
CN207159983U (zh) 一种水泥土搅拌桩结合抗拔锚杆的软土地区建筑地基结构
CN206635768U (zh) 复合土钉墙与桩锚支护复合支护结构
CN211174126U (zh) 隧道明洞结构
CN108035360A (zh) 一种用于基坑支护的方法
CN202730796U (zh) 既有挡土墙肋板式卸荷加固结构
CN209243910U (zh) 一种边坡建筑结构
CN110685287A (zh) 一种带排水沟和挡土墙的双排桩基坑支护体系及施工方法
CN111042161A (zh) 一种崩坡积高边坡柔性处理结构及其施工方法
CN203684222U (zh) 旋喷扩大头预应力锚杆桩锚联合支护结构
CN203498863U (zh) 立体连续框架式钢筋混凝土结构挡土墙
CN203429645U (zh) 边坡支护结构总成
CN105178355A (zh) 地下空间施工的地层预加固处理方法
CN202543946U (zh) 一种软土地区疏排式围护桩的支护结构
CN108005086A (zh) 一种用于基坑支护的高支墩反拉式斜撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant after: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant before: YUNNAN CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING CO.,LTD.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170524

Address after: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant after: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant before: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150826