CN104863118A CN201510180806.8A CN201510180806A CN104863118A CN 104863118 A CN104863118 A CN 104863118A CN 201510180806 A CN201510180806 A CN 201510180806A CN 104863118 A CN104863118 A CN 104863118A
Authority
CN
China
Prior art keywords
shield
gap
stratum
control method
excavation gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510180806.8A
Other languages
English (en)
Inventor
江华
江玉生
武福美
周刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Beijing Urban Construction Group Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
China University of Mining and Technology Beijing CUMTB
Beijing Urban Construction Design and Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB, Beijing Urban Construction Design and Development Group Co Ltd filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201510180806.8A priority Critical patent/CN104863118A/zh
Publication of CN104863118A publication Critical patent/CN104863118A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种基于盾构开挖间隙的地层沉降控制方法,包括如下步骤:步骤1:在盾体中开孔,在中盾和前盾部位设置好注浆孔,盾构掘进过程中,将预先配置好的材料注入至开挖间隙,通过实时填充盾构开挖间隙的方式来控制地层变形;步骤2:通过步骤1中的开孔在中盾和前盾部位设置好注浆孔;步骤3:在盾构掘进过程中,通过所述注浆孔将预先配置好的材料注入至开挖间隙;步骤4:通过实时填充盾构开挖间隙来控制地层变形。

Description

一种基于盾构开挖间隙的地层沉降控制方法
技术领域
本发明涉及地层监测技术领域,特别是涉及一种基于盾构开挖间隙的地层沉降控制方法。
背景技术
与传统的浅埋暗挖法相比,盾构工法引起的地层移动和地表沉降量相对较小,而且生产过程便于控制和管理。由于土压平衡盾构的结构特征及盾构工法的施工特点决定了盾构施工过程中也同样无法完全避免地层沉降的产生。然而目前对于不同地层盾构施工在不采取其它辅助措施的条件下,仅靠盾构自身的控制措施到底能将地表沉降(或地层移动:主要对穿越工程而言)控制在什么范围内,并没有相关结论。盾构穿越地层沉降控制要求严格的重大风险工程或区域时,大多采取预先加固,然后盾构再穿越的施工方案。这种方案虽然相对比较安全,但必须要求能够存在加固的条件,但是由于目前城市地面及浅部地下空间资源已开发殆尽,很多情况盾构穿越重大风险工程时并不存在预先加固的条件,而且预先加固大大增加了工程造价题。因此,基于盾构设备自身条件的地层变形控制技术至关重要。
盾构隧道开挖后,地层与盾壳之间存在开挖间隙,而盾构盾壳与管片之间存在盾尾间隙。目前,国内外在地层变形控制上既有的盾构施工技术通常采用同步注浆和二次补浆的方法实现对常规盾尾间隙的填充,开挖间隙的处理目前国内外并无研究。对地层稳定性较好的土层或变形控制要求较低的穿越工程而言,盾构开挖间隙诱发变形较小。然而,当地层敏感性较高,且盾构距离特、一级风险工程较近、地层无预先加固条件时,仅通过盾构参数的优化、控制和采用同步注浆或者二次补浆的方式对常规盾尾间隙进行充填而忽略开挖间隙的影响很难将变形控制在合理范围内。因为由土压平衡盾构本身的构造特征可知,盾构刀盘开挖直径通常要大于盾壳外径,而且盾构前盾、中盾、尾盾的直径逐渐减小。因此盾构隧道开挖后,地层与盾壳之间存在开挖间隙,理论上来讲开挖间隙均匀的分布与盾壳与土体之间,大约为2~4cm,实际中,由于盾构自身重量的原因,盾体的下部一般直接与土体接触,盾构的开挖间隙通常呈上部大、下部小,两侧基本一致的分布方式,因此,盾构顶部的开挖间隙有6~8cm,这么大的开挖间隙,如果不在盾构开挖过程中及时充填盾构开挖间隙,诱发的地层及地表变形极易超过控制标准。特别是盾构穿越特、一级重大风险工程时,如果不及时充填开挖间隙,通过后期的同步注浆和二次补浆是很难在变形控制在3mm以内
因此希望有一种基于盾构开挖间隙的地层沉降控制方法来克服或至少减轻上述的缺陷。
发明内容
本发明的目的在于提供一种基于盾构开挖间隙的地层沉降控制方法来克服现有技术中存在的上述问题。
为实现上述目的,本发明提供一种基于盾构开挖间隙的地层沉降控制方法,包括如下步骤:
步骤1:在盾体中开孔,在中盾和前盾部位设置好注浆孔,盾构掘进过程中,将预先配置好的材料注入至开挖间隙,通过实时填充盾构开挖间隙的方式来控制地层变形;
步骤2:通过步骤1中的开孔在中盾和前盾部位设置好注浆孔;
步骤3:在盾构掘进过程中,通过所述注浆孔将预先配置好的材料注入至开挖间隙;
步骤4:通过实时填充盾构开挖间隙来控制地层变形。
本发明提供了一种基于盾构开挖间隙的地层沉降控制方法,通过实时填充盾构开挖间隙来控制不存在预先加固条件的要求严格的重大风险工程或区域的地层变形,并减少了预先加固的工程成本。
附图说明
图1是盾构开挖间隙平剖面示意图。
图2是盾构开挖间隙示意图。
图3是盾尾间隙构造示意图。
具体实施方式
为使本发明实施的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行更加详细的描述。在附图中,自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。所描述的实施例是本发明一部分实施例,而不是全部的实施例。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明,而不能理解为对本发明的限制。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。下面结合附图对本发明的实施例进行详细说明。
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明保护范围的限制。
在本发明一宽泛实施例中:一种基于盾构开挖间隙的地层沉降控制方法,包括如下步骤:
步骤1:在盾体中开孔,在中盾和前盾部位设置好注浆孔,盾构掘进过程中,将预先配置好的材料注入至开挖间隙,通过实时填充盾构开挖间隙的方式来控制地层变形;
步骤2:通过步骤1中的开孔在中盾和前盾部位设置好注浆孔;
步骤3:在盾构掘进过程中,通过所述注浆孔将预先配置好的材料注入至开挖间隙;
步骤4:通过实时填充盾构开挖间隙来控制地层变形。
通过实时填充盾构开挖间隙来控制不存在预先加固条件的要求严格的重大风险工程或区域的地层变形,并减少了预先加固的工程成本。
最后需要指出的是:以上实施例仅用以说明本发明的技术方案,而非对其限制。尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。

Claims (1)

1.一种基于盾构开挖间隙的地层沉降控制方法,其特征在于:包括如下步骤:
步骤1:在盾体中开孔,在中盾和前盾部位设置好注浆孔,盾构掘进过程中,将预先配置好的材料注入至开挖间隙,通过实时填充盾构开挖间隙的方式来控制地层变形;
步骤2:通过步骤1中的开孔在中盾和前盾部位设置好注浆孔;
步骤3:在盾构掘进过程中,通过所述注浆孔将预先配置好的材料注入至开挖间隙;
步骤4:通过实时填充盾构开挖间隙来控制地层变形。
CN201510180806.8A 2015-04-17 2015-04-17 一种基于盾构开挖间隙的地层沉降控制方法 Pending CN104863118A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510180806.8A CN104863118A (zh) 2015-04-17 2015-04-17 一种基于盾构开挖间隙的地层沉降控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510180806.8A CN104863118A (zh) 2015-04-17 2015-04-17 一种基于盾构开挖间隙的地层沉降控制方法

Publications (1)

Publication Number Publication Date
CN104863118A true CN104863118A (zh) 2015-08-26

Family

ID=53909258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510180806.8A Pending CN104863118A (zh) 2015-04-17 2015-04-17 一种基于盾构开挖间隙的地层沉降控制方法

Country Status (1)

Country Link
CN (1) CN104863118A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105426576A (zh) * 2015-11-03 2016-03-23 中国矿业大学(北京) 一种研究盾构开挖间隙对沉降影响的数值模拟方法
CN106437723A (zh) * 2016-08-08 2017-02-22 中国矿业大学(北京) 一种控制盾构穿越风险源时地层沉降的注浆方法
CN107218050A (zh) * 2017-07-20 2017-09-29 中铁工程装备集团有限公司 一种防卡机单护盾tbm主机结构及其防卡机方法
CN108868799A (zh) * 2018-08-03 2018-11-23 中国电建集团铁路建设有限公司 一种土压平衡盾构同步注泥构造及施工辅助系统
CN110924967A (zh) * 2019-11-27 2020-03-27 中建五局土木工程有限公司 富水砂卵石地层盾构近接敏感建筑物精细化控制施工方法
CN111189401A (zh) * 2020-01-10 2020-05-22 中国矿业大学(北京) 用于盾尾间隙测量的标定方法、盾尾间隙实时自动测量方法及系统
CN113898355A (zh) * 2021-12-09 2022-01-07 北京城建集团有限责任公司 一种月牙型盾体间隙的三孔注浆方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105426576A (zh) * 2015-11-03 2016-03-23 中国矿业大学(北京) 一种研究盾构开挖间隙对沉降影响的数值模拟方法
CN106437723A (zh) * 2016-08-08 2017-02-22 中国矿业大学(北京) 一种控制盾构穿越风险源时地层沉降的注浆方法
CN107218050A (zh) * 2017-07-20 2017-09-29 中铁工程装备集团有限公司 一种防卡机单护盾tbm主机结构及其防卡机方法
CN108868799A (zh) * 2018-08-03 2018-11-23 中国电建集团铁路建设有限公司 一种土压平衡盾构同步注泥构造及施工辅助系统
CN110924967A (zh) * 2019-11-27 2020-03-27 中建五局土木工程有限公司 富水砂卵石地层盾构近接敏感建筑物精细化控制施工方法
CN111189401A (zh) * 2020-01-10 2020-05-22 中国矿业大学(北京) 用于盾尾间隙测量的标定方法、盾尾间隙实时自动测量方法及系统
CN113898355A (zh) * 2021-12-09 2022-01-07 北京城建集团有限责任公司 一种月牙型盾体间隙的三孔注浆方法

Similar Documents

Publication Publication Date Title
CN104863118A (zh) 一种基于盾构开挖间隙的地层沉降控制方法
CN107762533B (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN103306683B (zh) 一种开挖深埋隧道时洞内综合降水的施工方法
CN104653187B (zh) 富水砂层地质大断面隧道开挖方法
CN103306713B (zh) 一种高突煤层穿层钻孔网络化加固方法
CN108412509A (zh) 双护盾tbm防卡机方法
CN103775096B (zh) 一种软弱土层的盾构始发方法
CN103195455B (zh) 软弱地质环境大断面隧道施工支护体系及施工方法
CN103277106A (zh) 公路隧道三台阶五步开挖施工方法
CN102926770A (zh) 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN110700841B (zh) 用于隧道开挖的双侧壁导坑式开挖方法
CN104533451A (zh) 在散体碎石土及破碎围岩中的隧道超前预支护技术
CN106437723A (zh) 一种控制盾构穿越风险源时地层沉降的注浆方法
CN203925513U (zh) 边仰坡陡峻地段的隧道洞口衬砌结构
CN105909256A (zh) 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法
CN105649092A (zh) 破碎岩层的边坡支护方法
CN104481555A (zh) 一种穿过软弱围岩进行钻注注浆施工的方法
CN105019913A (zh) 基岩隆起区盾构换刀原位加固方法
CN110761300A (zh) 高层建筑深基坑边坡微膨胀不透水软弱土体支护施工方法
CN202132053U (zh) Ⅵ级围岩双线隧道衬砌支护结构
CN209115129U (zh) 一种小导洞超前支护设备
CN203347799U (zh) 能够实现三维注浆的盾构机
CN101979826A (zh) 煤层气多分支水平井事故井的补救方法
CN102493436A (zh) 矩形抗滑桩人工掘进新工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Jinxun

Inventor after: Jiang Hua

Inventor after: Jiang Yusheng

Inventor after: Wu Fumei

Inventor after: Zhou Liugang

Inventor after: Yang Zhiyong

Inventor before: Jiang Hua

Inventor before: Jiang Yusheng

Inventor before: Wu Fumei

Inventor before: Zhou Liugang

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160512

Address after: 100088 Haidian District, North Beijing, Tai Ping Road, No. 18

Applicant after: Beijing City Building Group Co., Ltd.

Applicant after: China University of Mining & Technology, Beijing

Applicant after: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED

Address before: 100083 Beijing City, Haidian District Institute of Rutosids No. 11

Applicant before: China University of Mining & Technology, Beijing

Applicant before: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED

RJ01 Rejection of invention patent application after publication

Application publication date: 20150826