CN104848845B - Underground tunnel virtual double-lead control measurement method - Google Patents

Underground tunnel virtual double-lead control measurement method Download PDF

Info

Publication number
CN104848845B
CN104848845B CN201510309200.XA CN201510309200A CN104848845B CN 104848845 B CN104848845 B CN 104848845B CN 201510309200 A CN201510309200 A CN 201510309200A CN 104848845 B CN104848845 B CN 104848845B
Authority
CN
China
Prior art keywords
virtual
measurement
conductor line
traverse
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510309200.XA
Other languages
Chinese (zh)
Other versions
CN104848845A (en
Inventor
郭平
王靠省
段太生
李学仕
江华
李小龙
周适
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201510309200.XA priority Critical patent/CN104848845B/en
Publication of CN104848845A publication Critical patent/CN104848845A/en
Application granted granted Critical
Publication of CN104848845B publication Critical patent/CN104848845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Abstract

The invention discloses an underground tunnel virtual double-lead control measurement method which comprises the following steps: in the underground tunnel engineering control and measurement process, selecting and burying one conventional branch lead according to most advantageous measurement conditions firstly, establishing virtual double leads inside the conventional branch lead in advance, and then performing field surveying and internal data processing by using a specific method strictly according to the established virtual double leads, thereby obtaining control point accomplishment of which the precision is equal to or even superior to that of conventional double leads. Therefore, underground tunnel lead control measurement has characteristics of flexibility and simplicity in arrangement and rapidness and convenience in measurement of the conventional branch lead, and high precision and high reliability of double leads, the problems that the underground tunnel lead control measurement site arrangement, measurement efficiency and measurement cost are conflicted with one another can be effectively solved, and the underground tunnel virtual double-lead control measurement method is wide in popularization prospect, can be used in various engineering control measurements, and particularly has remarkable advantages in control measurement in which the longer an underground tunnel is, the harder the measurement environment is.

Description

A kind of virtual two-conductor line of subterranean tunnel controls measuring method
Technical field
The invention belongs to engineering survey field, the virtual two-conductor line of more particularly to a kind of subterranean tunnel controls measuring method.
Background technology
Underground tunnel project control measurement is divided in hole and two parts outside hole, and control measurement purpose is to ensure subterranean tunnel work The working face that Cheng Xiangxiang is excavated by the correct insertion of precision of regulation, and can be such that every building repaiies by design attitude and geometry Build, do not invade track clearance, meet examination required precision, all kinds of engineerings have corresponding specifications of surveys to have strictly piercing error Regulation, different specification regulation is variant, as a example by requiring higher High Speed Rail Projects to underground tunnel holing through,《High-speed iron Road Code for engineering surveying (TB10601-2009)》Underground tunnel through error is made and is specified below:
Regulation of the Tunnel control network survey to piercing error
In Practical Project work progress, often have and cause liner sections to invade tunnel because subterranean tunnel piercing error transfinites Road headroom and causing repair chisel, do over again, line transfer, few up to a million of economic loss, at most up to ten million, control tunnel through error is extremely It is important.
Present measurement of the level means and high-precision leveling instrument, meet specification over the ground by measuring by specification The requirement of lower tunnel elevation piercing error;Outside tunnel control survey due to observation condition preferably, the applications of GPS measurement means, Code requirement also can easily be met by impact part of the outer control measurement in hole to tunnel lateral direction penetrating error;The internal control of subterranean tunnel hole Net processed is progressively pushed ahead in work progress and built up, and front end is without known point constraint, error or all proportional radiation of mistake Shape expands, and whether become subterranean tunnel can be by the crucial measurement links of specification specification error insertion.
The current method of subterranean tunnel Horizontal control in tunnel has two kinds:
A kind of method is open traverse:Wire extends out successively from known control point and does not conform to, is not closed to appoint On what known control point.
Open traverse measurement advantage be:Laying is simple, flexible, measurement workload is little, and it has the disadvantage:Because open traverse lacks Condition is checked, is made a mistake in observation or calculating process or rough error cannot be found by checking, therefore only in subterranean tunnel Length is very short, certainty of measurement is adopted when requiring relatively low.
Another kind of method is two-conductor line:Two points are laid in pairs at every place when traverse point is laid, and also can all around be staggered Arrangement, a polygonal circuit is constituted during observation per 4~6 sides.
Two-conductor line measurement advantage be:The excess observation component that net can be rolled up, the closure for increasing wire check condition, carry The bulk strength and precision of height net, at present this kind of method is in the subterranean tunnel plane control survey that length is longer, required precision is higher It is widely adopted in amount, it has the disadvantage:Choosing is layouted difficulty, relative to open traverse pile anchoring quantity, measurement workload, measurement cost into Increase again.
The development of control measurement in past subterranean tunnel hole is centered around instrument hardware equipment and data processing software On, now already at bottleneck, up developing again in a period of time has become extremely difficult, underground for the development of instrument and software Tunnel is special due to its present position, and narrow space in hole, cannot receive satellite-signal can only be using traverse survey, in decades Never new measuring method is substituted, thus subterranean tunnel Horizontal control in tunnel in order to improve net overall precision and can By property, we measure the traditional two-conductor line of Long-Time Service of having to, it is well known that measurement cost is controlled in subterranean tunnel hole Three aspects are mainly reflected in, one is that control net is laid in reconnaissance pile anchoring, and two is that field operation measurement data is collected, and three is interior industry performance data Process, and to set two-conductor line in narrow subterranean tunnel lining, good sighting condition, avoiding barrier, in pairs should be ensured Lay traverse point and network forming forms closure ring, reconnaissance pile anchoring is not only extremely difficult, and pile anchoring quantity is more, and control is laid in reconnaissance pile anchoring Net high cost processed;When field operation is measured, the time of the real measurement per survey station is relatively-stationary after preparation is carried out, for not Biconditional operation personnel's time of measuring is also no much difference, often the time of a tunnel Traverse Survey, and major part is Be used in and looked for barrier, connection lighting apparatus in point, cleaning sight line, set up in the preparation such as measuring apparatus, field operation measurement with The interlaced impact of constructing tunnel, measurement efficiency is extremely low, and measurement is controlled in subterranean tunnel hole to make measurement and construction cost, enter Degree is all severely impacted;Because industry software part is greatly developed in computer and measurement, make different survey crews process in industry Performance data efficiency is very nearly the same;Analyze more than comprehensive, want control measurement cost in subterranean tunnel hole and controlled, measurement effect Rate is improved, and can only find breach on control net is laid in reconnaissance pile anchoring and field operation measurement data is collected.
The content of the invention
It is an object of the invention to overcome the shortcoming controlled in existing subterranean tunnel hole in e measurement technology, there is provided a kind of underground The virtual two-conductor line in tunnel controls measuring method.The method has flexible open traverse laying, convenience, measurement cost low, while and having The characteristics of having two-conductor line high accuracy, high reliability, finally ensure that certainty of measurement, improves operating efficiency, saves measurement cost 's.
In order to realize foregoing invention purpose, the invention provides technical scheme below:
A kind of virtual two-conductor line of subterranean tunnel controls measuring method, comprises the following steps:
Step 1, lays an open traverse, and number-mark.Open traverse, open traverse cloth are laid by traditional open traverse method If being also called embedded, refer to burial and construction or the arrangement construction of open traverse, the open traverse laid be referred to as it is actual bury prop up and lead Line, numbers conventionally number consecutively and identifies clear.Preferably, it is advantageously selected for the embedded side of open traverse of measuring condition Case carries out open traverse and lays construction.
Step 2, draws laid open traverse schematic diagram, and industry builds one in the side of the actual embedded open traverse Virtual open traverse, each traverse point one virtual wires point of correspondence of actual embedded open traverse, each virtual wires point is respectively provided with Numbering, code requirement is pressed together with former actual embedded open traverse and constitutes a closure ring, constitutes virtual two-conductor line.Preferably, Numbering is independent numbering, is not repeated with actual embedded open traverse numbering.Preferably, the code requirement refers to that associated tunnel is constructed Specifications of surveys, such as《High Speed Rail Projects specifications of surveys》The laying of the 6.5.3 holes inside conductor of TB10601-2009 should meet following Regulation.It is preferred that such as, 4~6 points constitute a closure ring, constitute virtual two-conductor line.
Step 3, the virtual two-conductor line for strictly building by Inner industry carries out field operation measurement, it is preferred that virtual two-conductor line test side Method is tested by the two-conductor line method of testing of standard.Preferably, level angle, vertical angle and wire are collected when field operation is measured One or more traverse survey field datas in the length of side.Preferably, virtual open traverse and the actual traverse point for burying open traverse It is same, measured using the order contrary with actual embedded open traverse.Preferably, the backward measurement is:By measuring instrument When flattening with measurement speculum surveyor's beacon optical centering device centering direction and levelling tube direction rotate 180 ° carry out again it is accurate right Middle leveling, by the contrary order of actual embedded traverse survey reading measurement is carried out.Preferably, traverse measurement data at least can be real The purpose of existing Traverse Survey.Preferably, above-mentioned field survey data are through the qualified data of field-checking.More preferably , measurement data can also include other relevant test datas, for aiding in virtual two-conductor line control measuring method to improve precision.
Step 4, field data is processed, and each traverse point coordinate results of virtual two-conductor line are obtained after rigorous adjustment.It is excellent The field data of choosing should be qualified, and in test site manifest error data, invalid data should be rejected.Rigorous adjustment can be with Impact of the rough error to Traverse Accuracy is reduced to greatest extent, and the specification regulation fourth class and above traverse adjustment adopt rigorous adjustment.
Step 5, each open traverse point and its corresponding virtual wires point coordinates are averaged, final as the traverse point Coordinate.
The present inventor has found existing single conductor and two-conductor line measuring method in long-term measurement practice process All there is certain defect, but those skilled in the art fails to find suitable method to solve this problem, inventor again Put into practice and grope by long-term measurement, finally given the control measuring method of the virtual two-conductor line of the present invention.It is of the invention same When have open traverse lay flexibly, the low advantage of convenient, measurement cost, and with two-conductor line high accuracy, the advantage of high reliability, Certainty of measurement is ensure that, operating efficiency is improved, is saved measurement cost.
Further, the open traverse arrangement in step 1 selects best observation bar completely by now traditional open traverse arrangement Part.
Further, the virtual two-conductor line for building in step 2, actual is a traditional open traverse, is one in measurement process The virtual two-conductor line of an empty reality, by traditional two-conductor line net field data measurement is carried out.
Further, when step 3 field data is measured, the measurement to virtual wires point really measures each virtual wires point Corresponding open traverse point, the measuring apparatus for measure Specifications, selecting are performed both by conventional wires e measurement technology standard.Can join Standard/books are examined including as follows:TB10601-2009《High Speed Rail Projects specifications of surveys》, GB50308-2008《City rail Traffic engineering specifications of surveys》, TB10101-2009《Railroad engineering survey specification》, books《Engineering surveying》.Preferably, measure During virtual open traverse, direction is equal when measuring instrument and measurement speculum surveyor's beacon optical centering device centering direction and levelling tube are flattened 180 ° of rotation carries out again precise alignment leveling, and then routinely measuring method is measured the data of virtual open traverse.
Further, step 4 data processing, is to carry out the virtual two-conductor line data that fieldwork observation is obtained by traditional two-conductor line Data prediction, detection of closure error, rigorous adjustment.
Further, step 5 averages each open traverse point and corresponding virtual wires point coordinates, used as the traverse point Final coordinate, actually used achievement is to be equal to or even surmount an open traverse in traditional double Traverse Accuracy.
Compared with prior art, beneficial effects of the present invention:
1. there is the present invention open traverse to lay advantage flexible, that convenient, measurement cost is low simultaneously, and high-precision with two-conductor line Degree, the advantage of high reliability, ensure that certainty of measurement, improve operating efficiency, save measurement cost.
2. the present invention is on the basis of any new hardware and software input is increased, by virtual wires and open traverse group Synthesize virtual two-conductor line measurement scheme, obtain the open traverse for being equal to or even surmounting in traditional double Traverse Accuracy, make underground Tunnel control network survey becomes easy, quick, efficient.
3. the virtual two-conductor line measuring method of the present invention is provided simultaneously with the advantage of open traverse and two-conductor line, the convenient spirit of arrangement Living, reconnaissance pile anchoring cost savings 50%, personnel cost saves 40%, and field operation measurement operating efficiency improves more than 30%, not only saves Measurement cost is saved, also reduce affects construction speed and the situation of increase construction cost to go out because constructing tunnel is interlaced Existing, economic effect is fairly obvious.It is particularly more significantly excellent in the control measurement that subterranean tunnel is longer, measuring environment is more difficult Gesture.
4. measuring method effectively solving subterranean tunnel Traverse Survey point arrangement, measurement efficiency, the measurement of the present invention Conflicting problem between cost, with extensive promotion prospect, can be used for various engineering control surveys.
Description of the drawings:
Fig. 1 is the actual embedded open traverse schematic diagram in scene in the present invention.
Fig. 2 is the virtual two-conductor line schematic diagram that interior industry builds in the present invention.
Fig. 3 finally adopts open traverse schematic diagram for virtual two-conductor line in the present invention.
Description of symbols in figure:K1 ... Kn are Tunnel outer control point, only be marked in Fig. 1-3 outside the tunnel Hai Dong of K1-K4 Control point, but only 4 control points are should not be construed as, as long as the target that Tunnel external pelivimetry is controlled can be realized, control point The adjustment that quantity is adapted to, it is of course possible to comprising more Tunnel outer controls.
D1 ... Dn are open traverse point in Tunnel.
XD1 ... XDn are virtual wires point in Tunnel.
D1 ends ... Dn is eventually final open traverse point.
Specific embodiment
The present invention is provided subterranean tunnel virtual two-conductor line control measuring method with reference to the accompanying drawings and examples make into One step is illustrated, but this scope for being interpreted as above-mentioned theme of the invention should not be only limitted to into below example, all based on the present invention The technology that content is realized belongs to the scope of the present invention.The present invention is comprised the following steps:
Step 1, as shown in figure 1, having K1 outside the hole of underground tunnel project one end ..., K4 Tunnels outer control point, opens along tunnel Excavate into the best measuring condition choosing of set direction and bury an open traverse, number consecutively D1 ... Dn marks are clear, draw institute's cloth If open traverse schematic diagram.
This is existing traditional open traverse method for arranging, and stake point position selectes identical with open traverse with embedded, such as Fig. 1 Middle D1 ... Dn buries traverse point for actual choosing, and open traverse lays simple, flexibly, the sighting condition for choosing to greatest extent and observation bar Part, largely avoids two-conductor line point in underground chamber and lays because narrow space, construction interference, sighting condition, other folding Difficult problem is laid in the factor reconnaissances such as light impact, and greatly alleviates the embedded workload of stake point, reduces pile anchoring Cost 50%.
Step 2, as shown in Fig. 2 drawing on laid open traverse schematic diagram, in former actual embedded open traverse D1 ... Dn Side in industry build a virtual open traverse XD1 ... XDn, D1 ... Dn and XD1 ... XDn correspond, virtual wires point with original Actual embedded open traverse presses together 4~6 points of code requirement and constitutes a closure ring, constitutes virtual two-conductor line.
Virtual open traverse XD1 ... the XDn actual points position that interior industry builds is exactly D1 ... Dn, can be assumed to be infinite approach into To control point, by technical solution of the present invention, reach and both save 50% pile anchoring cost, two-conductor line can be constituted by enough points again Purpose.
Step 3, the virtual two-conductor line for strictly building by Fig. 2 Inner industry carries out field operation measurement, collects qualified level angle, leads The traverse survey field data such as line length of side.
Field survey Specifications and survey are chosen according to measuring and design in measurement of correlation specification, length of tunnel, hole etc. Amount equipment carries out fieldwork observation, is illustrated with a pair observation procedures of D2 in Fig. 2 and XD2, and remaining survey station is analogized.
Barrier in cleaning measurement point position measuring environment and measurement sight line, measuring instrument is erected on D2 survey stations, auxiliary The person of helping others will measure speculum surveyor's beacon and be set up in respectively on D1 and D3 and flatten centering, and measuring instrument and measurement speculum surveyor's beacon are each Levelling tube direction during direction and leveling when writing down optical centering device centering, connects measurement speculum surveyor's beacon houselights, presses Face left sight D1 readings, face left move clockwise to D3 sight reading, the reversing face disk right side sight D3 readings, disk the right side go to counterclockwise D1 photograph The order of quasi- reading completes the data such as a survey time measurement and recording level angle, the wire length of side, and the rest may be inferred, completes D2 survey stations Remaining survey time work, it is ∠ D1-D2-D3 that the level angle for coming is measured in reflection so on record, i.e., with D2 as summit, D1 up times Pin goes to the horizontal sextant angle of D3.
Direction rotates when measuring instrument and measurement speculum surveyor's beacon optical centering device centering direction and levelling tube are flattened 180 ° carry out again precise alignment leveling, that is, complete the erection of XD2 survey stations instrument, and D3 readings, fine motion of facing left then are sighted by facing left Instrument sight XD3 readings, face left move clockwise to XD1 sight reading, the reversing face disk right side sight XD1 readings, disk the right side go to counterclockwise XD3 sights the order that the right fine motion instrument of reading, disk sights D3 readings and completes a survey time measurement and recording level angle, polygon leg The data such as long, the rest may be inferred, completes XD2 survey stations remaining survey time work, and the reflection so on record is measured the level angle for coming and is ∠ D3-XD2-XD3 and ∠ D3-XD2-XD1, i.e., with XD2 as summit, D3 moves clockwise to the horizontal sextant angle of XD3 and XD1.
Each line represents an observed direction, entitled two points of D3 and XD3 in Fig. 2, and reality is same point position, But carry out independently sighting observation by two independent control points when observing;Carry out all drawing XDn during industry network forming in virtual two-conductor line It is easy to check in the side of Dn, due to measure error contingency, actual measured results XDn are likely to be at random order around Dn Put, but this does not affect to control composition and the calculating of net.
In observation process, traditional two-conductor line measurement, respectively needs in front and back 2 people to set up to survey survey station at least 1 people's operating instrument Amount speculum surveyor's beacon, a measurement group at least needs 5 people, and because Dn and XDn are a points in measurement scheme of the present invention Position, measurement speculum surveyor's beacon is set up in front and back respectively needs 1 people, and a measurement group only needs to 3 people, therefore can save personnel Cost 40% or so;Because Dn and XDn are a point positions, when XDn survey stations are changed to by Dn, measuring instrument and measurement speculum are observed Mark optical centering device centering direction and levelling tube flatten when direction rotate 180 ° carry out again precise alignment leveling complete frame If measuring instrument and measurement speculum surveyor's beacon are carried out on the basis of Dn survey stations are slightly flat, can be quickly finished very much accurate Centering is flattened, and barrier cleaning, the houselights etc. in measurement point position measuring environment and measurement sight line all in Dn survey stations When be ready for, this step can save 30%~50% very compared with traditional double traverse survey depending on field environmental condition To more preparation times;Dn survey stations and XDn survey stations, measuring instrument and measurement speculum surveyor's beacon optical centering device centering side Direction rotates 180 ° when flattening with levelling tube carries out again precise alignment leveling, measures the left comer that level angle is respectively Dn And right corner, not only additionally increase a ∠ left side+∠ it is right=360, ∠ D3-XD2-XD3=0 etc. check condition, also as below by Dn and XDn takes and averagely uses, and can offset most of measure error not exclusively caused because of equipment calibration, so as to improve wire essence Degree.
Step 4, qualified field data is processed, obtain after rigorous adjustment each wire point coordinates of virtual two-conductor line into Really.
Carry out by traditional double wire data processing method during data processing, calculating process can be completed by corresponding software.
Length of side projection correction calculating is carried out by formula 1.
(formula 1)
In formula:△ S --- point A is to point B length of side shadow boundary values, unit m
HAB--- the Mean height plane of actual measurement length of side AB,Unit m;
Hm--- tunnel coordinate system perspective plane elevation, unit m;
Rm--- reference ellipsoid ground side AB midpoints mean radius of curvature, unit m;
SAB--- point A is to point actual measurement length of side value, unit m.
Ym--- the approximate abscissa mean values of point A, B,(should deduct herein in order to avoid abscissa appearance The additive constant 500km of negative value), unit m;YA、YBRespectively A, B abscissa.
Calculate virtual two-conductor line closure loop closure and coordinate mis-tie misclosure, such as closure ring K1-D1-D2-D3-XD2-XD1- K1, closure ring XD2-D3-D4-D5-XD4-XD3-XD2, closure ring XD4-D5-D6-Dn-XD6-XD5-XD4 etc., check that field operation is seen Survey whether the quality of data meets code requirement, find rough error and mistake.
And mean square error of angle observation is calculated according to mis-tie misclosure by formula 2, according to the virtual two-conductor line mean square error of angle observation evaluation for calculating Whether angle measurement accuracy meets corresponding precision specified in specification.
(formula 2)
M in formula --- virtual two-conductor line mean square error of angle observation (second);
fβ--- the azimuth closure (second) of virtual two-conductor line ring angular error of closure or connecting traverse;
N --- the number of virtual two-conductor line ring and connecting traverse;
N --- calculate fβWhen corresponding survey station number.
Finally, rigorous adjustment is carried out to measuring qualified data using adjustment Software, obtains each traverse point of virtual two-conductor line Coordinate results, and precision after adjustment is evaluated, if meet corresponding precision specified in specification.
Above computational methods, principle, technical indicator, software etc. are identical with traditional two-conductor line, any new without carrying out Input, the virtual two-conductor line measurement result of the present invention, all features with traditional two-conductor line.
Step 5, as shown in figure 3, each open traverse point and its corresponding virtual wires point coordinates are averaged, as this Traverse point final coordinate.
Control point Dn whole X-coordinate isY-coordinate is
Traditional open traverse is calculated, because constituting adjustment condition without any redundant observation, wire achievement is directly measured by field operation The corner data reckoning for obtaining obtains each open traverse point coordinates achievement, does not make any to the angle containing error, length of side observation Beneficial correction, is restricted naturally in acquired results precision;Traditional two-conductor line constitutes closure condition by great quantities of spare observation, presses Rigorous adjustment calculating can be carried out according to measurement adjustment theory, makes the angle containing error, length of side observation be worth to most beneficial changing Just, wire uses achievement after rigorous adjustment, precision and reliability to be improved significantly with open traverse ratio;The present invention is provided Virtual two-conductor line not only can obtain being equal to the result of traditional double Traverse Accuracy, also as empty by traditional double traverse adjustment Intend the real empty traverse point in pairs of two-conductor line one, inherently same control point point position, due to inevitable in measurement process Measure error, make overlap originally an one real empty traverse point coordinate results be divided into two and no longer overlap, will be led by step 5 Line point and its corresponding virtual wires point coordinates are averaged and are united two into one, and are carried again on the basis of traditional two-conductor line High Traverse Accuracy and reliability, so the virtual two-conductor line Measurement results of the present invention even surmount in traditional two-conductor line essence for equivalent One open traverse of degree.

Claims (7)

1. a kind of virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that comprise the following steps:
Step 1, lays an open traverse, number-mark;
Step 2, draws the open traverse schematic diagram that step 1 is laid, and industry builds one in the side of the actual embedded open traverse The virtual open traverse of bar, each traverse point one virtual wires point of correspondence of actual embedded open traverse, each virtual wires point is all provided with Numbering is put, code requirement is pressed together with former actual embedded open traverse and is constituted a closure ring, constitute virtual two-conductor line;
Step 3, the virtual two-conductor line for strictly building by Inner industry carries out field operation measurement, collects traverse survey field data;
When measuring virtual open traverse, by measuring instrument and measurement speculum surveyor's beacon optical centering device centering direction and levelling tube leveling Shi Fangxiang rotates 180 ° carries out again precise alignment leveling, and then routinely measuring method is measured the number of virtual open traverse According to;
Step 4, field data is processed, and each traverse point coordinate results of virtual two-conductor line are obtained after rigorous adjustment;
Data processing is that the virtual two-conductor line data for obtaining fieldwork observation carry out data prediction and/or close by traditional two-conductor line Close difference inspection;
Step 5, each open traverse point and its corresponding virtual wires point coordinates are averaged, and are finally sat as the traverse point Mark.
2. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that 4~6 in step 2 Individual point constitutes a closure ring, constitutes virtual two-conductor line.
3. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that build in step 2 Virtual two-conductor line, actual is a traditional open traverse, is the virtual two-conductor line of an empty reality in measurement process, by traditional Two-conductor line net carries out field data measurement.
4. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that step 3, field operation number According to during measurement, the measurement to virtual wires point really measures the corresponding open traverse point of each virtual wires point, the related skill of measurement Art index, the measuring apparatus selected are performed both by conventional wires e measurement technology standard.
5. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that step 3, wire is surveyed Amount data can at least realize the purpose of Traverse Survey.
6. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that step 3, wire is surveyed Amount data include one or more in level angle, vertical angle and the wire length of side.
7. according to claim 1 the virtual two-conductor line of subterranean tunnel controls measuring method, it is characterised in that step 4, using tight Close adjustment is processed.
CN201510309200.XA 2015-06-08 2015-06-08 Underground tunnel virtual double-lead control measurement method Active CN104848845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510309200.XA CN104848845B (en) 2015-06-08 2015-06-08 Underground tunnel virtual double-lead control measurement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510309200.XA CN104848845B (en) 2015-06-08 2015-06-08 Underground tunnel virtual double-lead control measurement method

Publications (2)

Publication Number Publication Date
CN104848845A CN104848845A (en) 2015-08-19
CN104848845B true CN104848845B (en) 2017-05-10

Family

ID=53848671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510309200.XA Active CN104848845B (en) 2015-06-08 2015-06-08 Underground tunnel virtual double-lead control measurement method

Country Status (1)

Country Link
CN (1) CN104848845B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109596109A (en) * 2018-09-30 2019-04-09 陕西省引汉济渭工程建设有限公司 Take the hole inside conductor net precision simulation calculation method of centering and observation error influence into account
CN109459765B (en) * 2018-12-12 2020-09-01 中铁二局集团有限公司 High-precision tunnel independent control network establishment method based on existing GNSS control network
CN109883371A (en) * 2019-01-22 2019-06-14 中国华冶科工集团有限公司 Mine down-hole open traverse adjustment measurement method and system
CN109751983B (en) * 2019-03-05 2021-05-07 淮南矿业(集团)有限责任公司 Method for emergency setting laser data and transmission point elevation
CN110132219B (en) * 2019-04-30 2021-04-30 曲相屹 Deep well tunnel measuring method
CN111323001A (en) * 2020-03-27 2020-06-23 中铁二局集团有限公司 Forced centering device for engineering measurement and use method thereof
CN112483099A (en) * 2020-10-27 2021-03-12 中建三局基础设施建设投资有限公司 Method for improving through precision of short directional side length and small diameter shield tunnel
CN113532399B (en) * 2021-07-09 2022-12-02 上海宝冶集团有限公司 Multi-target observation control measurement method in tunnel
CN113532403B (en) * 2021-07-29 2023-01-10 中交第一航务工程局有限公司 Tunnel long-side wire penetration measuring method
CN114046770A (en) * 2021-09-22 2022-02-15 中国铁建大桥工程局集团有限公司 Marine settlement observation and measurement method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103196425A (en) * 2013-04-27 2013-07-10 中铁第一勘察设计院集团有限公司 Estimation method of extra-long tunnel horizontal through error
CN103363965A (en) * 2013-07-16 2013-10-23 中铁四局集团建筑工程有限公司 Precision measurement method of underline engineering during station yard transformation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103196425A (en) * 2013-04-27 2013-07-10 中铁第一勘察设计院集团有限公司 Estimation method of extra-long tunnel horizontal through error
CN103363965A (en) * 2013-07-16 2013-10-23 中铁四局集团建筑工程有限公司 Precision measurement method of underline engineering during station yard transformation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
交叉双导线网在长隧道CP Ⅱ测量中的应用;龚秋全,董武钟,张届;《地理空间信息》;20150228;第13 卷(第1期);第160-161页 *
虚拟导线法计算线路中线坐标;王化光;《铁道建筑》;20061231(第1期);第75-77页 *
高铁隧道平面控制网横向贯通误差仿真研究;周凌焱,刘成龙,聂松广,张强,孙维亚;《铁道科学与工程学报》;20150228;第12卷(第1期);第29-34页 *

Also Published As

Publication number Publication date
CN104848845A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104848845B (en) Underground tunnel virtual double-lead control measurement method
CN102174893B (en) Testing method for laying ballastless tracks in early stage before overall completion of super long tunnel
CN109598714A (en) A kind of Tunnel Overbreak & Underbreak detection method based on 3-dimensional reconstruction and grid surface
EP2703774A1 (en) Monitoring method and monitoring system of settlement of engineering buildings
CN103115610B (en) Be applicable to the leveling measuring method of composite level
CN111623757A (en) CPII control network measuring method in long and large tunnel with receiving well
CN101614127B (en) Method for surveying river-crossing leveling during shield breakthrough construction
CN108007429A (en) A kind of measuring method of total powerstation in underworkings
CN104316024A (en) Simple cascading camera chain measuring method and system for monitoring multipoint settlement
CN108253946A (en) Multi-functional vertical measurement connection survey integrated three-dimensional coordinate transfer device and method
CN111597509B (en) Railway center line measuring and setting method based on reference ellipsoid
WO2021218152A1 (en) Navigation control method for track laying machine, track laying machine, and track laying machine system
JP6695451B2 (en) Dual system type inter-observation multi-level traverse survey method
CN205300569U (en) Tunnel warp monitoring facilities and system
CN104748695B (en) Based on large-section underground cavern's early deformation monitoring method that section is finely measured
CN110044326A (en) Mountainous area highway application Trigonometric Leveling
CN104482918B (en) Metro shield tunnel forming tunnel portal measurement method
CN110057344A (en) Settle detection method and platform
CN105674967A (en) Method for measuring rail transportation shaft relation
CN104535078B (en) A kind of measuring method of optoelectronic device based on index point to airbound target
CN102620699A (en) Method for measuring deformation monitoring directional horizontal displacement by using directional vertical distance method
CN108981660A (en) A kind of Opposite side survey method of triangulated height
CN103276644A (en) Rail traffic catenary system and conductor rail measuring method based on rail foundation pile control network
CN107607904A (en) A kind of multiple target homogeneity recognition methods based on Angle Information
CN103759705B (en) Three-point closed laying measurement method for composite water level

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160301

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Applicant before: China Railway Erju Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder