CN104846833A - Backfilling hardening method for open pit ore face sludge - Google Patents
Backfilling hardening method for open pit ore face sludge Download PDFInfo
- Publication number
- CN104846833A CN104846833A CN201510198741.XA CN201510198741A CN104846833A CN 104846833 A CN104846833 A CN 104846833A CN 201510198741 A CN201510198741 A CN 201510198741A CN 104846833 A CN104846833 A CN 104846833A
- Authority
- CN
- China
- Prior art keywords
- mud
- sludge
- backfilling
- hardening method
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a backfilling hardening method for open pit ore face sludge. The backfilling hardening method for the open pit ore face sludge comprises the following steps that firstly, damming is conducted on the periphery to block the sludge; secondly, a sand material applied to casting is discharged into a sludge pit defined by a dam to be mixed with the sludge. By the adoption of the backfilling hardening method, the characteristic that the sand material can neutralizes the sludge is utilized, the sand material applied to casting is mixed with the sludge according to a proportion, in this way, the water content of the sludge is reduced, the property of material is greatly improved, the sludge can be compacted and buried, and the compacted and buried sludge can be used as a foundation.
Description
Technical field
The present invention relates to opencast mining field, particularly a kind of backfill method for curing of outdoor ore faces mud.
Background technology
At present, each opencut is in time needing to lay various facility on mud, and the method extensively taked is, utilizes casting to build a dam body in mud surrounding, is prohibited within the specific limits by mud circle, then utilize the refuse dump discrepancy in elevation, presses the mode of burying to solve.
But the darker mud of on-the-spot mud foundation ditch is more sometimes, and casting cannot be pressed and be buried, on the contrary by more crowded for mud higher, finally overflow out of control.And this conventional method is directly pressed and is buried, and often can not meet the pressure-bearing needs as substrate.
The information being disclosed in this background technology part is only intended to increase the understanding to general background of the present invention, and should not be regarded as admitting or imply in any form that this information structure has been prior art that persons skilled in the art are known.
Summary of the invention
The object of the present invention is to provide a kind of backfill method for curing of outdoor ore faces mud of simple and reasonable steps, the backfill method for curing of this outdoor ore faces mud utilize sand material can in and the ins and outs of mud, material sand used for casting is mixed in proportion with mud, thus reduce mud water content, its material property is significantly promoted, can not only press and bury mud, and the position after pressure can be made to bury meet as the needs of substrate.
For achieving the above object, the invention provides the backfill method for curing of outdoor ore faces mud, comprise the following steps: first, surrounding is built a dam shutoff mud; Then, material sand used for casting is entered in the mud hole that dam body surrounds and mix with mud.
Preferably, in technique scheme, the mixed proportion of casting material sand used and mud is 4:1.
Compared with prior art, the present invention has following beneficial effect: the backfill method for curing of this outdoor ore faces mud utilize sand material can in and the ins and outs of mud, material sand used for casting is mixed in proportion with mud, thus reduce mud water content, its material property is significantly promoted, can not only press and bury mud, and the position after pressure can be made to bury meet as the needs of substrate.
Accompanying drawing explanation
Fig. 1 is that the surrounding of the backfill method for curing of outdoor ore faces mud of the present invention is built a dam schematic diagram;
Fig. 2 be material sand and the mud of the backfill method for curing of outdoor ore faces mud of the present invention mix schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail, but is to be understood that protection scope of the present invention not by the restriction of detailed description of the invention.
Clearly represent unless otherwise other, otherwise in whole manual and claims, term " comprise " or its conversion as " comprising " or " including " etc. by be understood to include the element of stating or ingredient, and do not get rid of other element or other ingredient.
According to the backfill method for curing of the outdoor ore faces mud of the specific embodiment of the invention by changing casting material, utilize sand material ins and outs, its can in and mud, reduce mud water content.Refer and synthesize in proportion.Mud water content reduces the most at last, its material property is significantly promoted, meets substrate needs.This backfill method for curing comprises the following steps:
First, surrounding is built a dam shutoff mud.
As shown in Figure 1, adopt surrounding to build a dam the mode of shutoff, namely to build a dam body 2 in the surrounding of mud 1, when extruding to prevent casting, mud is extruded.
Then, material sand used for casting is entered in the mud hole that dam body surrounds and mix with mud.
As shown in Figure 2, material sand 3 used for casting is entered in the mud hole 4 that dam body 2 surrounds, make material sand 3 be 4:1 with the mixed proportion of mud 1.Constantly be discharged into mud hole by sand, sand absorbs moisture and gets more and more, and mud water content is fewer and feweri, and material property is more and more stronger.Final satisfied with substrate needs.
To sum up, the backfill method for curing of this outdoor ore faces mud utilize sand material can in and the ins and outs of mud, material sand used for casting is mixed in proportion with mud, thus reduce mud water content, its material property is significantly promoted, can not only press and bury mud, and the position after pressure can be made to bury meet as the needs of substrate.
The aforementioned description to concrete exemplary of the present invention is to illustrate and the object of illustration.These descriptions not want the present invention to be defined as disclosed precise forms, and obviously, according to above-mentioned instruction, can much change and change.The object selected exemplary embodiment and describe is to explain certain principles of the present invention and practical application thereof, thus those skilled in the art can be realized and utilize various different exemplary of the present invention and various different selection and change.Scope of the present invention is intended to limited by claims and equivalents thereof.
Claims (2)
1. a backfill method for curing for outdoor ore faces mud, is characterized in that, comprise the following steps:
First, surrounding is built a dam shutoff mud;
Then, material sand used for casting is entered in the mud hole that dam body surrounds and mix with mud.
2. the backfill method for curing of outdoor ore faces mud according to claim 1, is characterized in that, the mixed proportion of described casting material sand used and mud is 4:1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510198741.XA CN104846833A (en) | 2015-04-24 | 2015-04-24 | Backfilling hardening method for open pit ore face sludge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510198741.XA CN104846833A (en) | 2015-04-24 | 2015-04-24 | Backfilling hardening method for open pit ore face sludge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104846833A true CN104846833A (en) | 2015-08-19 |
Family
ID=53846792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510198741.XA Pending CN104846833A (en) | 2015-04-24 | 2015-04-24 | Backfilling hardening method for open pit ore face sludge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104846833A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114033379A (en) * | 2021-09-30 | 2022-02-11 | 华能伊敏煤电有限责任公司 | Treatment method for ultra-large-volume sludge area of strip mine |
CN114086538A (en) * | 2021-12-14 | 2022-02-25 | 万宝矿产有限公司 | Method for replacing open pit bottom sludge by utilizing waste rock partition alternate extrusion |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101314532A (en) * | 2007-05-29 | 2008-12-03 | 上海海马海洋生物科技开发有限公司 | Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool |
CN103145383A (en) * | 2013-04-02 | 2013-06-12 | 连云港港口工程设计研究院有限公司 | Building material utilizing seabed sludge and preparation method of building material |
CN103510522A (en) * | 2013-10-23 | 2014-01-15 | 中国建筑一局(集团)有限公司 | Construction method of sludge soil texture deep foundation pit excavation and pumping sand compacted backfilling |
KR101357829B1 (en) * | 2013-04-16 | 2014-02-06 | (주)서해산업개발 | Recycling material of industrial sludge for use of fill material, cover material and subbase material and method for producing the same |
CN102733349B (en) * | 2011-04-15 | 2014-10-15 | 浙江科技学院 | Method for de-silting lake and constructing lake center island |
CN104358271A (en) * | 2014-11-17 | 2015-02-18 | 句容华源电器设备有限公司 | High-voltage tower pole foundation construction method |
-
2015
- 2015-04-24 CN CN201510198741.XA patent/CN104846833A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101314532A (en) * | 2007-05-29 | 2008-12-03 | 上海海马海洋生物科技开发有限公司 | Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool |
CN102733349B (en) * | 2011-04-15 | 2014-10-15 | 浙江科技学院 | Method for de-silting lake and constructing lake center island |
CN103145383A (en) * | 2013-04-02 | 2013-06-12 | 连云港港口工程设计研究院有限公司 | Building material utilizing seabed sludge and preparation method of building material |
KR101357829B1 (en) * | 2013-04-16 | 2014-02-06 | (주)서해산업개발 | Recycling material of industrial sludge for use of fill material, cover material and subbase material and method for producing the same |
CN103510522A (en) * | 2013-10-23 | 2014-01-15 | 中国建筑一局(集团)有限公司 | Construction method of sludge soil texture deep foundation pit excavation and pumping sand compacted backfilling |
CN104358271A (en) * | 2014-11-17 | 2015-02-18 | 句容华源电器设备有限公司 | High-voltage tower pole foundation construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114033379A (en) * | 2021-09-30 | 2022-02-11 | 华能伊敏煤电有限责任公司 | Treatment method for ultra-large-volume sludge area of strip mine |
CN114086538A (en) * | 2021-12-14 | 2022-02-25 | 万宝矿产有限公司 | Method for replacing open pit bottom sludge by utilizing waste rock partition alternate extrusion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201334669Y (en) | Anchoring structure of tailings reservoir preliminary dam top leakproof geomembrane | |
CN203742623U (en) | Water-pressure-resistant composite structure for tunnel | |
CN103573274B (en) | Soft foundation shield tunnel subsidence controls steel sleeve grouting and reinforcing device | |
CN103321256A (en) | Anti-pollution three-dimensional composite seepage-proofing barrier system | |
CN104846833A (en) | Backfilling hardening method for open pit ore face sludge | |
CN101713197A (en) | Method for sealing foundation pit pressure reduction well | |
CN104878739A (en) | Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly | |
CN102912807A (en) | Open caisson jacking deviation correcting method | |
CN202678902U (en) | Novel assembly type reinforced concrete cable groove | |
CN108086255B (en) | Seepage-proofing method for midline-type tailing damming dam body and midline-type tailing dam | |
CN102071675A (en) | Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles | |
CN206486875U (en) | One kind sizing channel | |
CN207700221U (en) | A kind of prefabricated pipe gallery steel plate cast-in-place concrete sealing connection structure | |
CN204825969U (en) | Inspection shaft subsides prevents and treats structure | |
CN108000699A (en) | A kind of urban water-through type storm sewer and its preparation process | |
CN204875755U (en) | Drainage body and solidification stratum society foundation structure | |
CN204267041U (en) | A kind of tunnel portal structure adopting embedded cover arch | |
CN207812410U (en) | A kind of middle wire type tailing dam | |
CN100422447C (en) | Technique for quickly reinforcing soft soil foundation | |
CN105625444A (en) | Impermeable surface layer structure for soil slope | |
CN105178322B (en) | A kind of grouting construction method | |
CN204849847U (en) | Basement terrace prevention of seepage water structure | |
CN202564898U (en) | Novel assembling type reinforced concrete cable trench | |
CN103999592A (en) | Method for avoiding vegetation degradation of acid mine waste rock yard | |
CN205206055U (en) | Basement outer wall post -cast strip thickening anti -seepage waterstop structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150819 |