CN101314532A - Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool - Google Patents

Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool Download PDF

Info

Publication number
CN101314532A
CN101314532A CNA2007100413930A CN200710041393A CN101314532A CN 101314532 A CN101314532 A CN 101314532A CN A2007100413930 A CNA2007100413930 A CN A2007100413930A CN 200710041393 A CN200710041393 A CN 200710041393A CN 101314532 A CN101314532 A CN 101314532A
Authority
CN
China
Prior art keywords
alkaline residue
backfill
water
soil
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100413930A
Other languages
Chinese (zh)
Inventor
邹兴
邹顾洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HAIMA HALOBIOS TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
SHANGHAI HAIMA HALOBIOS TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HAIMA HALOBIOS TECHNOLOGY DEVELOPMENT Co Ltd filed Critical SHANGHAI HAIMA HALOBIOS TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CNA2007100413930A priority Critical patent/CN101314532A/en
Publication of CN101314532A publication Critical patent/CN101314532A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/20Waste processing or separation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The invention relates to a method for completely clearing out caustic dross from a caustic dross pool so as to make industrial backfilling. The method is characterized in that the method comprises the following steps that: a level dam exceeding backfill scale height is enclosed around a backfill site; a construction site is cleaned up at the bottom of a caustic dross pool; backfilling raw materials such as caustic dross, phosphorite metal ore, natural soil and fly ash, etc. are flushed out to form slurry by a water gun by means of a high-pressure water pump; according to the percentage of caustic dross and the raw materials used to make backfilling, the slurry is conveyed to and mixed inside a pipe through a slurry pump pipe, and then is fully mixed to form a backfilling material through the slurry pump; moreover, the backfilling material is conveyed to a backfill site; the surface of the backfilling material is dried in the sun after water is discharged; then, a channel is dug by an excavator with the bottom of the channel provided with a water pump to realize drainage; therefore, the backfilling is leveled and pressed compact by a bulldozer after the backfilling is dewatered to reach backfilling hardness. The method has the advantages that: the method makes full use of resources and changes waste materials into things of value; moreover, the method has simple process, fewer links and low production cost.

Description

A kind of removing caustic sludge in caustic sludge pool completely manufactures the method for industrial backfill soil
Technical field:
The present invention relates to the method that a kind of removing caustic sludge in caustic sludge pool completely manufactures industrial backfill soil, especially relate to a kind of method of utilizing the alkaline residue of large-scale alkali factory discharging, useless unslaked lime, flyash to manufacture industrial backfill soil, can be used for coastal beach saline-alkali ground, backfill becomes general industrial land and urban land with bottom land in the solarization salt pond.
Background technology:
Produce 1000000 tons large-scale alkali factory per year, its alkaline residue pond, fine coal ashpit, useless unslaked lime pond land occupation are all at several thousand mu, wherein:
1, alkaline residue: main component is the milk of lime that soda ash is produced in solvay soda process, and milk of lime contains the very difficult nature of salt solution and oozes out, and is placed on decades in the pond, and alkaline residue still can not done naturally as mud in the pond.
2, useless unslaked lime: main component is a calcium oxide, produces the lime that soda ash can not melt.
3, flyash: main component is silicon oxide, aluminum oxide, and large-scale alkali factory is in the same place with the power station, has every day a large amount of flyash to discharge.
Chinese large-sized alkali factory is all in the coastland, the alkaline residue pond, the land seizure amount has several thousand mu, owing to there is not the alkaline residue in the suitable technique means processing alkaline residue pond, alkaline residue pond about 20 years does not have so far and can clear up, make the land seizure amount increasing, and the most and power station of large-scale alkali factory, Lime Factory connects together, all be industrial town on every side, land resources all is of great value, and Chinese large-sized alkali factory is all in the coastland, and large stretch of manufacturing district is all in exploitation, and the development area very big area be former beach ground and shine the salt pond, the amount of banketing is very big, all uses stone earthen backfill manufacturing district, nature mountain and urban land now, and many so natural mountains are cut out, expose blocks of fresh stone, all can not grow trees decades, some mountain is all scraped out the level land, and environmental destruction is serious.
Summary of the invention:
The objective of the invention is to invent the useless resource of a kind of effective utilization, the low a kind of removing caustic sludge in caustic sludge pool completely that there is no problem of secondary pollution of cost of development manufactures the method for industrial backfill soil.
For realizing purpose of the present invention, technical scheme to be solved by this invention is the method that a kind of removing caustic sludge in caustic sludge pool completely manufactures industrial backfill soil, it is characterized in that, it comprises the following steps:
One, the processing in backfill place:
A, horizontal dam is built in the backfill soil place on four sides, the height on dam is controlled on the backfill absolute altitude.
B, the trench digging when fetching earth of building a dam, water pump is installed in the depths of ditch, and drain water every day, and the backfill place is dried.
Soil allows and dries digging machine and can free in and out with construction operation could discharge alkaline residue in c, the backfill place.
Two, the alkaline residue in alkaline residue pond is handled:
A, will pile the alkaline residue pond that alkaline residue does not re-use, excavate alkaline residue pond dam, excavate out the passage that frees in and out in the time of can supplying digging machine truck, alkaline residue stirring conveyor construction operation in bottom, alkaline residue pond on the spot with digging machine.
B, alkaline residue is on truck transported the back filled region, clean out in the alkaline residue pond 500 square metres~1500 square metres place with digging machine.
C, cut out bottom soil naturally with digging machine in the centre in place, the square shape pond that area is 50 square metres~200 square metres, 1.5 meters~4 meters of the degree of depth, the installation water pump drains pool inner water in the pond.
D, according to the quantity of clearing up alkaline residue every day, transfer roller (seeing Figure of description) unit is installed in the pond.
Cleared up on the place of alkaline residue in e, the alkaline residue pond, alkaline residue, water of coal ash have been installed, mixing/stirring conveyor (seeing Figure of description) unit, mixing/stirring conveyor, aim at the direction that needs the cleaning alkaline residue, hoisting crane is installed on the opposite, with wireline (1) pulling mixing/stirring conveyor.The back is installed a hoisting crane mixing/stirring conveyor of clearing up behind the dam of opposite is retracted, and clears up elsewhere again.
Flyash, waste water that f, the plantmix that will generate electricity put, pass through pipeline (2) with high-pressure hydraulic pump, utilize alkaline residue in water blast gun (3) the flushing alkaline residue pond, make alkaline residue, flyash and water, be mixed into muddy, before flowing to mixing and blending machine, carry with sand suction pump (5), be transported in the transfer roller unit pond by pipeline (6) through stirring (4).
G, be transported to the mixture of alkaline residue, flyash and water in the pond, stir (7) through transfer roller and be transported to the backfill area by pipeline (9) with sand suction pump (8).
H, backfill distance location are far away, and the centre can be installed transmitting power equipment in addition.
I, mixing/stirring conveyor, also can install can the own equipment that moves, or promote with digging machine when constructing.
J, mix the quantity of transfer roller unit and transfer roller unit, the earth volume of needs backfill is equipped with according to every day.The diameter of conveyor delivery pipeline is according to the earth volume design of constructing every day.
K, alkaline residue have been cleared up the back and have been repaired dam.
Three, alkaline residue, rock phosphate sand manufacture backfill soil
A, the water coolant, the natural water that utilize the power station to discharge wash into muddy with water blast gun with alkaline residue by pipe-line transportation with high-pressure hydraulic pump behind the alkaline residue pond.
The slush pump of installing in b, the alkaline residue pond, with slimy alkaline residue by pipe-line transportation to the place that needs backfill.
C, the nontoxic waste water that utilizes nature water or factory to discharge, arrive in the rock phosphate sand pond by pipe-line transportation with high-pressure pump, with water blast gun rock phosphate sand is washed into muddy with water, utilization is installed in the slush pump in the rock phosphate sand pond, to wash into slimy rock phosphate sand, by pipe-line transportation to the place that needs backfill.
If d backfill distance location is far away, a slush pump can not be transported to the backfill place with alkaline residue and rock phosphate sand, the distance that can carry according to the slush pump transmission power in the intermediate distance, and the centre is built the mud pumping plant in addition, is transported to the backfill place.
The pipeline of e, the pipeline that will carry alkaline residue and conveying rock phosphate sand is merged into a pipeline in the backfill point of destination, and muddy alkaline residue and muddy rock phosphate sand are blended in the pipeline of a bore greater than the transport pipe bore.
After f, alkaline residue, rock phosphate sand are merged into a pipeline, be transported to the backfill destination through slush pump again, mixture ratio is an alkaline residue 20%~35%, rock phosphate sand 80%~65%.
When if g alkaline residue alkaline residue pool is carried with slush pump, to carry with flyash and alkaline residue with the waste water of power station discharging, the rock phosphate sand ratio according to the content of flyash and alkaline residue, reduces the degree of rock phosphate sand.
After h, mixed alkaline residue, rock phosphate sand are discharged into the absolute altitude of backfill, water discharging on the face is done, allowing it dewater naturally dries, when digging machine can start on the ground by the time, ditch with digging machine, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch, and the distance between ditch and the ditch is 8 meters~15 meters.
After i, backfill soil were dried naturally, the face of the natural soil of ditch bottom being translated into after the backfill with digging machine came up, and the mixture of alkaline residue, rock phosphate sand is filled out to be put in the ditch go.
J, the natural soil that digging machine is translated into the backfill soil surface cover on the good ground of backfill, and it is real to push away concora crush with dozer.Upper layer and natural earthen backfill difference after the backfill are reduced.
If k plants greening, add a cover mountain soil again above the greening place with the needs plantation.
Four, alkaline residue and natural soil manufacture backfill soil
A, the water coolant that utilizes power station discharging or natural water with high-pressure hydraulic pump by pipe-line transportation to the alkaline residue pond, with water blast gun alkaline residue is washed into muddy after, utilize the slush pump that is installed in to arrive the backfill place by pipe-line transportation in alkaline residue the pond in.
B, utilize slush pump will need the natural soil and the natural water of backfill, perhaps utilize suction cutter dredger in the sea or in the rivers with silt particle soil with excavating pump by pipe-line transportation to the place that needs backfill.
The pipeline of c, the pipeline that will carry alkaline residue and conveying nature silt soil is merged into a pipeline in the destination of backfill, and slimy alkaline residue and muddy nature soil is blended in the pipeline of a bore greater than the transport pipe bore.
After d, alkaline residue, natural soil are merged into a pipeline, be transported to the destination of backfill again through slush pump.
E, alkaline residue and argillous naturally mixture ratio are: naturally soil 50%~70%, alkaline residue 50%~30% when if alkaline residue is carried, is transported to the backfill place with alkaline residue together with the flyash of power station discharging, according to the content in flyash and the alkaline residue, reduce the degree of nature soil.
After f, mixed alkaline residue, natural soil are discharged into the absolute altitude of backfill, the discharging of the water on the face is done, allowed it dewater naturally and dry, when digging machine can start on the ground by the time, with the digging machine trench digging, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch.
After g, backfill soil were dried naturally, it was real to push away concora crush with dozer.
If h plants greening, add a cover mountain soil again above the greening place with the needs plantation.
Five, alkaline residue, flyash manufacture backfill soil
A, the water coolant, the natural water that utilize the power station to discharge wash into muddy with water blast gun with alkaline residue by pipe-line transportation with high-pressure hydraulic pump behind the alkaline residue pond.
The slush pump of installing in b, the alkaline residue pond, with slimy alkaline residue by pipe-line transportation to the place that needs backfill.
C, the nontoxic waste water that utilizes nature water or factory to discharge, arrive in the fine coal ashpit by pipe-line transportation with high-pressure pump, with water blast gun flyash is washed into muddy with water, utilization is installed in the slush pump in the fine coal ashpit, to wash into slimy flyash, by pipe-line transportation to the place that needs backfill.
If d backfill distance location is far away, a slush pump can not arrive the backfill place with alkaline residue and ash transfer, the distance that can carry according to the slush pump transmission power in the intermediate distance, and the centre is built the mud pumping plant in addition, is transported to the backfill place.
The pipeline of e, the pipeline that will carry alkaline residue and conveying flyash is merged into a pipeline in the backfill point of destination, and muddy alkaline residue and muddy flyash are blended in the pipeline of a bore greater than the transport pipe bore.
After f, alkaline residue, flyash are merged into a pipeline, be transported to the backfill destination through slush pump again, mixture ratio is an alkaline residue 50%~60%, flyash 50%~40%.
After g, mixed alkaline residue, flyash are discharged into the absolute altitude of backfill, water discharging on the face is done, allowing it dewater naturally dries, when digging machine can start on the ground by the time, ditch with digging machine, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch, and the distance between ditch and the ditch is 8 meters~15 meters.
After h, backfill soil were dried naturally, the face of the natural soil of ditch bottom being translated into after the backfill with digging machine came up, and the mixture of alkaline residue, flyash is filled out to be put in the ditch go.
I, the natural soil that digging machine is translated into the backfill soil surface cover on the good ground of backfill, and it is real to push away concora crush with dozer.Upper layer and natural earthen backfill difference after the backfill are reduced.
If j plants greening, add a cover mountain soil again above the greening place with the needs plantation.
Advantage of the present invention is:
1, environmental protection comprehensive utilization makes full use of resource, turn waste into wealth, and whole process of production does not have twice pollution and produce, and has good social benefit;
2, can save the land resources that a large amount of backfill soil are used, protect a large amount of natural mountain regions;
3, make a large amount of out of use beach ground, shine saline land, bottom land etc. becomes urban land and industrial land;
4, technology of the present invention is simple, and middle-chain is few, and it is low to produce required cost.
Description of drawings:
Accompanying drawing (1) is the mixing/stirring conveyor accompanying drawing; Accompanying drawing (2) is the transfer roller accompanying drawing
(1) wireline of mixing/stirring conveyor pulling
(2) mixing/stirring conveyor high-pressure hydraulic pump water pipe
(3) mixing/stirring conveyor water blast gun
(4) rotary cultivator of mixing/stirring conveyor
(5) mixing/stirring conveyor sand suction pump
(6) transport pipe of mixing/stirring conveyor
(7) rotary cultivator of transfer roller
(8) sand suction pump of transfer roller
(9) transport pipe of transfer roller
The alkaline residue stirring conveyor is the ship type, is conducive to carry alkaline residue in the muddy ground of bottom, alkaline residue pond; Be conducive to stir and be transported to the backfill place after conveying alkaline residue, flyash and water mix; Be conducive in the muddy ground on backfill ground, work.
Specific implementation method
The invention will be further described below in conjunction with drawings and Examples.
Embodiment
Cleaning alkali factory alkaline residue pond manufactures the method for urban industry backfill soil, and it comprises the following steps:
One, the processing in backfill place:
A, built a dam on four sides in the backfill place, dam facing is wide 2 meters, 4 meters of bottoms, and area is at 100 meters * 100 meters, and the height of dam epidemic disease is controlled at alkaline residue backfill absolute altitude to be increased more than 20 centimetres again.
B, the trench digging that fetches earth when building a dam, trench depth are at 50 centimeters~70 centimeters, and when digging machine was processed backfill soil after being advisable, being convenient in the limit, dam, digging machine can not operation in ditch.
Water pump is installed in the depths of c, the inherent ditch in back filled region, and draining every day makes and dries quickening in the dam.
Soil allows and dries digging machine and can freely start with construction operation could discharge alkaline residue in d, the back filled region.
Two, the alkaline residue in alkaline residue pond is handled:
A, excavate alkaline residue pond dam, excavate out the passage that can pass in and out for truck and stirring conveyor in bottom, alkaline residue pond with digging machine.
B, because of the alkaline residue truck will overflow after filling, so digging machine only adorns 70%~80% alkaline residue, covers 20%~30% flyash above, makes that alkaline residue is not scattered on the road in the truck transport way.
C, alkaline residue and flyash mix shipment, and caustic sludge dehydration is accelerated, and help construction operation.
D, with digging machine with alkaline residue on truck transports out the alkaline residue pond, cleans out 40 meters * 40 meters, and about 1600 square metres, the alkaline residue height is with 8 meters calculating, earlier the construction operation place of the about 12000 cubic metres of alkaline residues of cleaning.
E, usefulness digging machine are gone up on the spot at the place intermediary, cut out about 10 meters * 10 meters, and the degree of depth is 3 meters pond.The real area and the degree of depth are determined when installing according to the transfer roller unit.Water pump is installed in the pond, drain the ponding the pond in after, installation 3 transfer rollers (seeing Figure of description) in the pond.
F, mixing/stirring conveyor are identical with transfer roller physical dimension, and rotary cultivator, sand suction pump and pipeline are same producer model, with convenient construction and maintenance.For used mechanical means is to other city use from now on, convenient with the container truck shipment, the transfer roller size is: 240 centimetres of width, and 380 centimetres of length, 280 centimetres of height, a container truck can load and transport 3 conveyor apparatus simultaneously.
G, mixing/stirring conveyor are installed on the place of having cleared up alkaline residue, match with transfer roller, install 3.The stirring conveyor direction is facing to the alkaline residue direction that needs cleaning, and the windlass of 3 pulling stirring conveyors is installed on the opposite, and with wireline (1) pulling mixing/stirring conveyor, a hoisting crane is installed in the back.By the time mixing and blending machine is withdrawn into the alkaline residue limit that needs cleaning after being transported to dam.
H, the flyash of power station discharging and the pipelining of waste water are arrived the alkaline residue pool side, simultaneously flyash and waste water are transported on 3 mixing/stirring conveyors by pipeline (2) with 3 high-pressure hydraulic pumps, alkaline residue with about 8 meters height of water blast gun (3) flushing, make alkaline residue, flyash, three kinds of materials of waste water are mixed into muddy, before flowing to mixing/stirring conveyor, be conveyed into pipeline (6) through stirring (4) with sand suction pump (5), arrive in the transfer roller unit pond by pipe-line transportation, being transported to sand suction pump (8) input channel (9) through transfer roller stirring (7) needs the backfill place.
I, far away as the backfill distance location, the middle power-equipment of carrying that increases.
When J, mixing/stirring conveyor construction operation, use the digging machine coordinative construction.
After k, alkaline residue have been cleared up, repair dam.
Three, alkaline residue, flyash manufacture backfill soil
A, the water coolant, the natural water that utilize the power station to discharge wash into muddy with water blast gun with alkaline residue by pipe-line transportation with 10 kilowatts of high-pressure hydraulic pumps behind the alkaline residue pond.
40 kilowatts slush pump is installed in b, the alkaline residue pond, with slimy alkaline residue by pipe-line transportation to the place that needs backfill.
C, the nontoxic waste water that utilizes nature water or factory to discharge, arrive in the fine coal ashpit by pipe-line transportation with high-pressure pump, with water blast gun flyash is washed into muddy with water, utilization is installed in the slush pump in the fine coal ashpit, to wash into slimy flyash, by pipe-line transportation to the place that needs backfill.
If d backfill distance location is far away, a slush pump can not arrive the backfill place with alkaline residue and ash transfer, the distance that can carry according to the slush pump transmission power in the intermediate distance, and the centre is built the mud pumping plant in addition, is transported to the backfill place.
The pipeline of e, the pipeline that will carry alkaline residue and conveying flyash is merged into a pipeline in the backfill point of destination, and muddy alkaline residue and muddy flyash are blended in the pipeline of a bore greater than the transport pipe bore.
After f, alkaline residue, flyash are merged into a pipeline, be transported to the backfill destination through slush pump again, mixture ratio is an alkaline residue 50%~60%, flyash 50%~40%.
After g, mixed alkaline residue, flyash are discharged into the absolute altitude of backfill, water discharging on the face is done, allowing it dewater naturally dries, when digging machine can start on the ground by the time, ditch with digging machine, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch, and the distance between ditch and the ditch is 8 meters~15 meters.
After h, backfill soil were dried naturally, the face of the natural soil of ditch bottom being translated into after the backfill with digging machine came up, and the mixture of alkaline residue, flyash is filled out to be put in the ditch go.
I, the natural soil that digging machine is translated into the backfill soil surface cover on the good ground of backfill, and it is real to push away concora crush with dozer.Upper layer and natural earthen backfill difference after the backfill are reduced.
If j plants greening, add a cover mountain soil again above the greening place with the needs plantation.

Claims (3)

1. a removing caustic sludge in caustic sludge pool completely manufactures the method for urban industry backfill soil, it is characterized in that it comprises the following steps:
One, the processing in backfill place:
A, horizontal dam is built in the backfill soil place on four sides, the height on dam is controlled on the backfill absolute altitude.
B, the trench digging when fetching earth of building a dam, water pump is installed in the depths of ditch, and drain water every day, and the backfill place is dried.
Soil allows and dries digging machine and can free in and out with construction operation could discharge alkaline residue in c, the backfill place.
Two, the alkaline residue in alkaline residue pond is handled:
A, will pile the alkaline residue pond that alkaline residue does not re-use, excavate alkaline residue pond dam, excavate out the passage that frees in and out in the time of can supplying digging machine truck, alkaline residue stirring conveyor construction operation in bottom, alkaline residue pond on the spot with digging machine.
B, alkaline residue is on truck transported the back filled region, clean out in the alkaline residue pond 500 square metres~1500 square metres place with digging machine.
C, cut out bottom soil naturally with digging machine in the centre in place, the square shape pond that area is 50 square metres~200 square metres, 1.5 meters~4 meters of the degree of depth, the installation water pump drains pool inner water in the pond.
D, according to the quantity of clearing up alkaline residue every day, the transfer roller unit is installed in the pond.
Cleared up on the place of alkaline residue in e, the alkaline residue pond, alkaline residue, water of coal ash have been installed, the mixing/stirring conveyor unit, mixing/stirring conveyor is aimed at the direction that needs the cleaning alkaline residue, and hoisting crane is installed on the opposite, spurs mixing/stirring conveyor with wireline.The back is installed a hoisting crane mixing/stirring conveyor of clearing up behind the dam of opposite is retracted, and clears up elsewhere again.
F, with flyash, the waste water of power station discharging, pass through pipeline with high-pressure hydraulic pump, utilize alkaline residue in the water blast gun flushing alkaline residue pond, make alkaline residue, flyash and water, be mixed into muddy, before flowing to mixing and blending machine, carry, arrive in the transfer roller unit pond by pipe-line transportation through stirring with sand suction pump.
G, be transported to the mixture of alkaline residue, flyash and water in the pond, stir with sand suction pump by pipe-line transportation to the backfill area through transfer roller.
H, backfill distance location are far away, and the centre can be installed transmitting power equipment in addition.
I, mixing/stirring conveyor, also can install can the own equipment that moves, or promote with digging machine when constructing.
J, mix the quantity of transfer roller unit and transfer roller unit, the earth volume of needs backfill is equipped with according to every day.The diameter of conveyor delivery pipeline is according to the earth volume design of constructing every day.
K, alkaline residue have been cleared up the back and have been repaired dam.
Three, alkaline residue, rock phosphate sand manufacture backfill soil
A, the water coolant, the natural water that utilize the power station to discharge wash into muddy with water blast gun with alkaline residue by pipe-line transportation with high-pressure hydraulic pump behind the alkaline residue pond.
The slush pump of installing in b, the alkaline residue pond, with slimy alkaline residue by pipe-line transportation to the place that needs backfill.
C, the nontoxic waste water that utilizes nature water or factory to discharge, arrive in the rock phosphate sand pond by pipe-line transportation with high-pressure pump, with water blast gun rock phosphate sand is washed into muddy with water, utilization is installed in the slush pump in the rock phosphate sand pond, to wash into slimy rock phosphate sand, by pipe-line transportation to the place that needs backfill.
If d backfill distance location is far away, a slush pump can not be transported to the backfill place with alkaline residue and rock phosphate sand, the distance that can carry according to the slush pump transmission power in the intermediate distance, and the centre is built the mud pumping plant in addition, is transported to the backfill place.
The pipeline of e, the pipeline that will carry alkaline residue and conveying rock phosphate sand is merged into a pipeline in the backfill point of destination, and muddy alkaline residue and muddy rock phosphate sand are blended in the pipeline of a bore greater than the transport pipe bore.
After f, alkaline residue, rock phosphate sand are merged into a pipeline, be transported to the backfill destination through slush pump again, mixture ratio is an alkaline residue 20%~35%, rock phosphate sand 80%~65%.
When if g alkaline residue alkaline residue pool is carried with slush pump, to carry with flyash and alkaline residue with the waste water of power station discharging, the rock phosphate sand ratio according to the content of flyash and alkaline residue, reduces the degree of rock phosphate sand.
After h, mixed alkaline residue, rock phosphate sand are discharged into the absolute altitude of backfill, water discharging on the face is done, allowing it dewater naturally dries, when digging machine can start on the ground by the time, ditch with digging machine, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch, and the distance between ditch and the ditch is 8 meters~15 meters.
After i, backfill soil were dried naturally, the face of the natural soil of ditch bottom being translated into after the backfill with digging machine came up, and the mixture of alkaline residue, rock phosphate sand is filled out to be put in the ditch go.
J, the natural soil that digging machine is translated into the backfill soil surface cover on the good ground of backfill, and it is real to push away concora crush with dozer.Upper layer and natural earthen backfill difference after the backfill are reduced.
If k plants greening, add a cover mountain soil again above the greening place with the needs plantation.
2. a kind of removing caustic sludge in caustic sludge pool completely according to claim 1 manufactures the method for urban industry backfill soil, it is characterized in that: after box dam and the solution of inner bottom part workyard, alkaline residue pond were built in the backfill place, alkaline residue and natural soil manufactured backfill soil:
A, the water coolant that utilizes power station discharging or natural water with high-pressure hydraulic pump by pipe-line transportation to the alkaline residue pond, with water blast gun alkaline residue is washed into muddy after, utilize the slush pump that is installed in to arrive the backfill place by pipe-line transportation in alkaline residue the pond in.
B, utilize slush pump will need the natural soil and the natural water of backfill, perhaps utilize suction cutter dredger in the sea or in the rivers with silt particle soil with excavating pump by pipe-line transportation to the place that needs backfill.
The pipeline of c, the pipeline that will carry alkaline residue and conveying nature silt soil is merged into a pipeline in the destination of backfill, and slimy alkaline residue and muddy nature soil is blended in the pipeline of a bore greater than the transport pipe bore.
After d, alkaline residue, natural soil are merged into a pipeline, be transported to the destination of backfill again through slush pump.
E, alkaline residue and argillous naturally mixture ratio are: naturally soil 50%~70%, alkaline residue 50%~30% when if alkaline residue is carried, is transported to the backfill place with alkaline residue together with the flyash of power station discharging, according to the content in flyash and the alkaline residue, reduce the degree of nature soil.
After f, mixed alkaline residue, natural soil are discharged into the absolute altitude of backfill, the discharging of the water on the face is done, allowed it dewater naturally and dry, when digging machine can start on the ground by the time, with the digging machine trench digging, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch.
After g, backfill soil were dried naturally, it was real to push away concora crush with dozer.
If h plants greening, add a cover mountain soil again above the greening place with the needs plantation.
3. a kind of removing caustic sludge in caustic sludge pool completely according to claim 1 manufactures the method for urban industry backfill soil, it is characterized in that: after box dam and the solution of inner bottom part workyard, alkaline residue pond were built in the backfill place, alkaline residue and flyash caused backfill soil:
A, the water coolant, the natural water that utilize the power station to discharge wash into muddy with water blast gun with alkaline residue by pipe-line transportation with high-pressure hydraulic pump behind the alkaline residue pond.
The slush pump of installing in b, the alkaline residue pond, with slimy alkaline residue by pipe-line transportation to the place that needs backfill.
C, the nontoxic waste water that utilizes nature water or factory to discharge, arrive in the fine coal ashpit by pipe-line transportation with high-pressure pump, with water blast gun flyash is washed into muddy with water, utilization is installed in the slush pump in the fine coal ashpit, to wash into slimy flyash, by pipe-line transportation to the place that needs backfill.
If d backfill distance location is far away, a slush pump can not arrive the backfill place with alkaline residue and ash transfer, the distance that can carry according to the slush pump transmission power in the intermediate distance, and the centre is built the mud pumping plant in addition, is transported to the backfill place.
The pipeline of e, the pipeline that will carry alkaline residue and conveying flyash is merged into a pipeline in the backfill point of destination, and muddy alkaline residue and muddy flyash are blended in the pipeline of a bore greater than the transport pipe bore.
After f, alkaline residue, flyash are merged into a pipeline, be transported to the backfill destination through slush pump again, mixture ratio is an alkaline residue 50%~60%, flyash 50%~40%.
After g, mixed alkaline residue, flyash are discharged into the absolute altitude of backfill, water discharging on the face is done, allowing it dewater naturally dries, when digging machine can start on the ground by the time, ditch with digging machine, the original place is dark more than 20 centimetres during the depth ratio backfill of ditch, and the water pump draining is installed in the ditch, and the distance between ditch and the ditch is 8 meters~15 meters.
After h, backfill soil were dried naturally, the face of the natural soil of ditch bottom being translated into after the backfill with digging machine came up, and the mixture of alkaline residue, flyash is filled out to be put in the ditch go.
I, the natural soil that digging machine is translated into the backfill soil surface cover on the good ground of backfill, and it is real to push away concora crush with dozer.Upper layer and natural earthen backfill difference after the backfill are reduced.
If j plants greening, add a cover mountain soil again above the greening place with the needs plantation.
CNA2007100413930A 2007-05-29 2007-05-29 Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool Pending CN101314532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100413930A CN101314532A (en) 2007-05-29 2007-05-29 Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100413930A CN101314532A (en) 2007-05-29 2007-05-29 Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool

Publications (1)

Publication Number Publication Date
CN101314532A true CN101314532A (en) 2008-12-03

Family

ID=40105688

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100413930A Pending CN101314532A (en) 2007-05-29 2007-05-29 Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool

Country Status (1)

Country Link
CN (1) CN101314532A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394500A (en) * 2013-08-05 2013-11-20 顾建华 Alkaline residue processing method using slurry
CN103590409A (en) * 2013-11-22 2014-02-19 天津住宅集团建设工程总承包有限公司 Slurry replacing filling separate support construction method
CN104846833A (en) * 2015-04-24 2015-08-19 华能伊敏煤电有限责任公司 Backfilling hardening method for open pit ore face sludge
CN104963349A (en) * 2015-06-30 2015-10-07 南通理工学院 Construction method for backfilling of underground foundation pit excavation soil

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394500A (en) * 2013-08-05 2013-11-20 顾建华 Alkaline residue processing method using slurry
CN103590409A (en) * 2013-11-22 2014-02-19 天津住宅集团建设工程总承包有限公司 Slurry replacing filling separate support construction method
CN103590409B (en) * 2013-11-22 2015-07-15 天津住宅集团建设工程总承包有限公司 Slurry replacing filling separate support construction method
CN104846833A (en) * 2015-04-24 2015-08-19 华能伊敏煤电有限责任公司 Backfilling hardening method for open pit ore face sludge
CN104963349A (en) * 2015-06-30 2015-10-07 南通理工学院 Construction method for backfilling of underground foundation pit excavation soil

Similar Documents

Publication Publication Date Title
CN103334469B (en) The treatment system removed for inner city pollution of river bed mud and treatment process
CN109056761A (en) Channel cleanout method
CN104803572A (en) Method and system for carrying out sediment dredging and ectopic treatment on seasonal river heavy metal pollution
Chu et al. Land reclamation using clay slurry or in deep water: challenges and solutions
CN102449239B (en) In sea wall, form the method for land reclamation and use the facility structure of the method
CN203498891U (en) Treatment system for removing polluted bed mud in river channel of central urban area
CN104805799A (en) Heavy metal-polluted ephemeral stream sediment dredging method
CN105019425A (en) Construction method of drainage body and solidified layer combined foundation structure
CN101314532A (en) Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool
CN112962525B (en) Dredged soil filling and diking structure and filling bag diking method thereof
RU2402682C1 (en) Method for arrangement of potassium plants dressing works wastes
CN112772039A (en) Method for recovering vegetation in abandoned mine land
CN101187209A (en) Discarded pipe harmless filling technology
CN204644106U (en) Dredging markets dehydrating and curing integrated device
CN101134205A (en) Industry method of oil backfilling by manufacturing alkaline residue after the entire cleaning of the alkaline residue pool
CN100383347C (en) Earthwork construction method
CN104829089A (en) Dredging soil dehydrating and curing device
CN114888063A (en) In-situ remediation method for contaminated soil around buried sewage pipeline
RU2569145C1 (en) Set of mechanical and hydraulic recultivation of disturbed lands
CN204661517U (en) The dredging of seasonal stream heavy metal polluted bed mud and dystopy governing system
CN114182748A (en) Jointless continuous in-situ impervious wall construction device and curtain construction method
Muntean et al. The influence of slag and ash deposit used by Drobeta-Turnu Severin power plant concerning groundwater in the area
CN207739245U (en) The construction equipment of waste silt shallow-layer in-situ solidifying
RU2261331C2 (en) Open-cast mining method
Dixon-Hardy et al. Methods for the disposal and storage of mine tailings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Zou Xing

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081203