- CN104821497A CN104821497A CN201510179736.4A CN201510179736A CN104821497A CN 104821497 A CN104821497 A CN 104821497A CN 201510179736 A CN201510179736 A CN 201510179736A CN 104821497 A CN104821497 A CN 104821497A
- Authority
- CN
- China
- Prior art keywords
- circuit breaker
- foundation
- bolts
- fixing
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Breakers (AREA)
Abstract
一种旧断路器更换成新断路器用基础。其包括基础本体、四根螺栓、方形钢板、四个固定孔和四个固定体;四个固定孔形成在基础本体上原基础固定螺栓以内位置,每个固定孔内设有一根螺栓;固定体设置在固定孔内螺栓外部的空间中,其是由高强度螺纹锁固剂凝固后形成;方形钢板覆盖在基础本体的顶面上,且中间部位和边缘部位分别与基础本体上螺栓及原基础固定螺栓的上端相接触。本发明能在拆除旧断路器后仍利用旧的基础本体安装新断路器,从而缩短了拆除原断路器基础及之后重制作模板、新基础养护等时间,整个停电施工周期由1个月缩短到7天就完成断路器的更换工作,从而节省了人力、物力、财力,因此提高了施工效率,降低了电网安全运行的风险。
Description
技术领域
本发明属于电力设施技术领域,特别是涉及一种旧断路器更换成新断路器用基础。
背景技术
目前在电力系统中,诸如500kV变电站中型号为MHME-2Y-550的断路器由于运行年限长,现已超过20年规定寿命期,因此需要更换。但由于原生产厂家现已不生产这种断路器,所以需要更换成新的不同型号的断路器。由于断路器更换时所需停电施工周期较长,包括:拆除引线、拆除断路器、拆除基座基础、制作模板、绑筋打基础、基础养护、安装新的断路器、二次接线、打耐压、调试传动送电等项工作,所以整个停电施工周期至少需要1个月。
发明内容
为了解决上述问题,本发明的目的在于提供一种旧断路器更换成新断路器用基础。
为了达到上述目的,本发明提供的旧断路器更换成新断路器用基础包括基础本体、四根螺栓、方形钢板、四个固定孔和四个固定体;其中基础本体为原断路器基础;四个固定孔呈矩形形成在基础本体上原基础固定螺栓以内的位置,每个固定孔内设有一根螺栓;固定体设置在固定孔内螺栓外部的空间中,其是由高强度螺纹锁固剂凝固后形成;方形钢板覆盖在基础本体的顶面上,且中间部位和边缘部位分别由螺栓及原基础固定螺栓将其固定在基础本体上。
所述的方形钢板的厚度为30mm。
所述的固定孔的直径为100mm,深度为900mm。
本发明提供的旧断路器更换成新断路器用基础能够在拆除旧断路器后仍利用旧的基础本体安装新断路器,从而缩短了拆除原断路器基础及之后重制作模板、新基础养护等时间,整个停电施工周期由1个月缩短到7天就完成断路器的更换工作,从而节省了人力、物力、财力,因此提高了施工效率,减少了设备停电周期,降低了电网安全运行的风险。
附图说明
图1为本发明提供的旧断路器更换成新断路器用基础结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明提供的旧断路器更换成新断路器用基础进行详细说明。
如图1所示,本发明提供的旧断路器更换成新断路器用基础包括基础本体1、四根螺栓2、方形钢板3、四个固定孔4和四个固定体5;其中基础本体1为原断路器基础;四个固定孔4呈矩形形成在基础本体1上原基础固定螺栓6以内的位置,每个固定孔4内设有一根螺栓2;固定体5设置在固定孔4内螺栓2外部的空间中,其是由高强度螺纹锁固剂凝固后形成;方形钢板3覆盖在基础本体1的顶面上,且中间部位和边缘部位分别由螺栓2及原基础固定螺栓6将其固定在基础本体1上。
所述的方形钢板3的厚度为30mm。
所述的固定孔4的直径为100mm,深度为900mm。
现将本发明提供的旧断路器更换成新断路器用基础施工方法阐述如下:
(一)首先拆除原引线及旧断路器,然后在基础本体1上原基础固定螺栓6以内的适当位置钻孔形成四个呈矩形的固定孔4,这是因为新断路器的尺寸要小于原断路器的尺寸。
(二)在每个固定孔4内利用高强度螺纹锁固剂将一根螺栓2预埋在基础本体1上。注意尤其是在冬季施工,需经48小时加热保温养护,使得标号达到95%以上,再进行设备安装。之后在方形钢板3上钻与螺栓2和原基础固定螺栓6相对应位置的八个孔,将方形钢板3套在四根螺栓2和四个原基础固定螺栓6上面并与基础本体1相连,再将这八个螺栓拧上对应螺母,即将方形钢板3与基础本体1固定,以增加固定强度,加强力矩传导,最后即可在方形钢板3上进行新断路器的安装。
Claims (3)
1.一种旧断路器更换成新断路器用基础,其特征在于:其包括基础本体(1)、四根螺栓(2)、方形钢板(3)、四个固定孔(4)和四个固定体(5);其中基础本体(1)为原断路器基础;四个固定孔(4)呈矩形形成在基础本体(1)上原基础固定螺栓(6)以内的位置,每个固定孔(4)内设有一根螺栓(2);固定体(5)设置在固定孔(4)内螺栓(2)外部的空间中,其是由高强度螺纹锁固剂凝固后形成;方形钢板(3)覆盖在基础本体(1)的顶面上,且中间部位和边缘部位分别由螺栓(2)及原基础固定螺栓(6)将其固定在基础本体(1)上。
2.根据权利要求1所述的旧断路器更换成新断路器用基础,其特征在于:所述的方形钢板(3)的厚度为30mm。
3.根据权利要求1所述的旧断路器更换成新断路器用基础,其特征在于:所述的固定孔(4)的直径为100mm,深度为900mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510179736.4A CN104821497A (zh) | 2015-04-16 | 2015-04-16 | 一种旧断路器更换成新断路器用基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510179736.4A CN104821497A (zh) | 2015-04-16 | 2015-04-16 | 一种旧断路器更换成新断路器用基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104821497A true CN104821497A (zh) | 2015-08-05 |
Family
ID=53731712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510179736.4A Pending CN104821497A (zh) | 2015-04-16 | 2015-04-16 | 一种旧断路器更换成新断路器用基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104821497A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643216A (zh) * | 2018-04-27 | 2018-10-12 | 国家电网公司 | 更换老旧隔离开关时基础不停电施工方法 |
CN109252537A (zh) * | 2018-11-01 | 2019-01-22 | 国网宁夏电力有限公司检修公司 | 特高压换流站阀厅用可调式刀闸基础 |
CN109599777A (zh) * | 2018-12-21 | 2019-04-09 | 国家电网有限公司 | 断路器支撑结构及不拆除旧基础更换断路器的方法 |
-
2015
- 2015-04-16 CN CN201510179736.4A patent/CN104821497A/zh active Pending
Non-Patent Citations (2)
Title |
---|
姜广新等: "利用原有设备基础安装新设备的经验体会", 《陶瓷》 * |
徐至钧: "《高塔基础设计与计算》", 30 November 2002 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643216A (zh) * | 2018-04-27 | 2018-10-12 | 国家电网公司 | 更换老旧隔离开关时基础不停电施工方法 |
CN109252537A (zh) * | 2018-11-01 | 2019-01-22 | 国网宁夏电力有限公司检修公司 | 特高压换流站阀厅用可调式刀闸基础 |
CN109599777A (zh) * | 2018-12-21 | 2019-04-09 | 国家电网有限公司 | 断路器支撑结构及不拆除旧基础更换断路器的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061995B (zh) | 兆瓦级风电叶片叶根螺杆预埋工艺方法 | |
CN104821497A (zh) | 一种旧断路器更换成新断路器用基础 | |
CN103066531A (zh) | 一种10千伏线路带电导线支撑架 | |
CN203644319U (zh) | 一种易拼装的led显示屏箱体 | |
CN203218756U (zh) | 一种带电更换隔离开关操作机构箱专用工具 | |
CN204651742U (zh) | 一种用于维修刀闸动触头的绝缘隔板 | |
CN202353403U (zh) | 大型冲击发电机组定子线圈修复结构 | |
CN203514323U (zh) | 一种连接部件 | |
CN202788126U (zh) | 一种锚栓式柱脚人字形构架 | |
CN203813320U (zh) | 带电更换220kV窄基塔耐张绝缘子串用工具 | |
CN103825222A (zh) | 一种带电更换220kV窄基塔耐张绝缘子串用工具 | |
CN103573005B (zh) | 一种复合材料杆塔加固装置及其加固方法 | |
CN203813334U (zh) | 用于带电更换220kV耐张绝缘子串的直角联板卡具 | |
CN103255777B (zh) | 一种柱桩及采用该柱桩的高压电线塔基座 | |
CN103825223A (zh) | 带电更换220kv窄基塔耐张绝缘子串工具及作业方法 | |
CN201656339U (zh) | 拉线门型塔带电更换二七四号铁专用卡具 | |
CN202302318U (zh) | 盘式电缆桥架 | |
CN206379793U (zh) | 大型抽水蓄能机组转子 | |
CN204706967U (zh) | 一种应用于微型电机的定子结构 | |
CN202769043U (zh) | 一种能够替代有线探棒的长效无线探棒装置 | |
CN204706779U (zh) | 一种拼接母线 | |
CN104078868B (zh) | 更换隔离开关时基础改造施工方法 | |
CN203813335U (zh) | 用于带电更换220kV耐张绝缘子串的三角联板卡具 | |
CN204506349U (zh) | 铁路货车及其车轴 | |
CN204200820U (zh) | 架空输电线路铁塔防盗脚钉 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150805 |