CN104818730A - Equipment base top embedded part and mounting method thereof - Google Patents

Equipment base top embedded part and mounting method thereof Download PDF

Info

Publication number
CN104818730A
CN104818730A CN201510275582.9A CN201510275582A CN104818730A CN 104818730 A CN104818730 A CN 104818730A CN 201510275582 A CN201510275582 A CN 201510275582A CN 104818730 A CN104818730 A CN 104818730A
Authority
CN
China
Prior art keywords
embedded part
basis
anchor bar
reserved layer
described embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510275582.9A
Other languages
Chinese (zh)
Other versions
CN104818730B (en
Inventor
王泳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201510275582.9A priority Critical patent/CN104818730B/en
Publication of CN104818730A publication Critical patent/CN104818730A/en
Application granted granted Critical
Publication of CN104818730B publication Critical patent/CN104818730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an equipment base top embedded part. The equipment base top embedded part comprises a base, two iron pads, an embedded part, a plurality of embedded part anchoring bars and reservation layers. The embedded part is arranged at the top of the base. The iron pads are respectively arranged between both ends of the embedded part and the base. The plurality of embedded part anchoring bars are arranged on the embedded part. One end of every embedded part anchoring bar penetrates the embedded part, and the other end extends into the base. The reservation layers are formed in gaps between the embedded part, the two iron pads and the base and casted with concrete. The equipment base top embedded part is simple in structure, low in cost and high in flatness. The invention also provides a mounting method of the equipment base top embedded part. The method is easy to implement, effectively meets the flatness requirements of the device base top embedded part and provides guarantee for equipment mounting.

Description

A kind of equipment Foundations top embedded part and mounting method thereof
Technical field
The present invention relates to industrial construction field of engineering technology, especially relate to a kind of equipment Foundations top embedded part and mounting method thereof.
Background technology
In existing embedded part mounting technique method; usually embedded part is fixed on equipment Foundations steel mesh reinforcement; but because concreting is vibrated; phenomenons such as usually there will be embedded part skew, tilt, embedding concrete is interior; cause equipment to install difficulty, particularly heat transmission equipment sliding end slip coefficient does not reach requirement.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of equipment Foundations top embedded part, structure is simple, and planeness is high.Present invention also offers the mounting method of top, the said equipment basis embedded part, to solve equipment top embedded part planeness problem.
The technical solution used in the present invention is:
A kind of equipment Foundations top embedded part, comprise basis, two groups of parallels groups, embedded part, some embedded part anchor bars and reserved layer, described embedded part is arranged at the top on described basis, described parallels group is respectively equipped with between the two ends of described embedded part and described basis, described embedded part is provided with some described embedded part anchor bars, one end of described embedded part anchor bar is through described embedded part, the other end of described embedded part anchor bar extend into the inside on described basis, described embedded part, space described in two groups between parallels group and described basis forms described reserved layer, concrete is cast with in described reserved layer.
Equipment Foundations top of the present invention embedded part, wherein, the thickness of described reserved layer is 5-10cm.
Equipment Foundations top of the present invention embedded part, wherein, described parallels group is made up of some plain cushion iron of same thickness.
Equipment Foundations top of the present invention embedded part, wherein, described embedded part is prepared from by steel plate.
A mounting method for equipment Foundations top embedded part, comprises the following steps:
A some described embedded part anchor bars are first fixed on the steel mesh reinforcement on described basis by ();
B () builds base concrete, the top on described basis is reserved described reserved layer and temporarily do not built, and notes embedded part anchor bar described in righting in casting process;
C (), according to the spacing of pre-buried described embedded part anchor bar, described embedded part processes suitable circular hole, the diameter of described circular hole is slightly larger than the diameter of described embedded part anchor bar;
D () sets the described parallels group of adjustment in the both sides of the described reserved layer on described basic top;
E described embedded part that () will process, penetrates in pre-buried described embedded part anchor bar, is installed on described basis;
(f) by adjustment described parallels group, guarantee that the planeness of described embedded part is up to standard, and on described embedded part parallels group described in spot welding;
G () welds described embedded part and described embedded part anchor bar;
H () formwork builds described reserved layer;
I () removes the template of described reserved layer, grow the unnecessary part of the described embedded part anchor bar of described embedded part, and adopt abrasive machine to be polished flat the end of the excision of described embedded part anchor bar with cutting machine excision.
The mounting method of equipment Foundations top of the present invention embedded part, wherein, adopts grouting material Self-leveling method to build reserved layer described in step (h).
Beneficial effect of the present invention:
Equipment Foundations top of the present invention embedded part, structure is simple, and cost is low, and planeness is high.
Equipment Foundations top of the present invention embedded part, the thickness of described reserved layer is 5-10cm, and reserved layer thickness is too little, and the parallels adjustment difficulty of parallels group is large, and thickness is too large, and parallels quantity is many, and cost is high.
Equipment Foundations top of the present invention embedded part mounting method, implement simple and convenient, effectively solve equipment top embedded part planeness problem, particularly fairly obvious to the heat transmission equipment sliding end embedded part effect that flatness requirement is very high, evade embedded part skew, inclination, the common quality defect such as in embedding concrete, installed for equipment and provide guarantee.
Accompanying drawing explanation
Fig. 1 is the structural representation of equipment Foundations top of the present invention embedded part.
Below in conjunction with specific embodiments and the drawings, the invention will be further described.
Detailed description of the invention
As shown in Figure 1, a kind of equipment Foundations top embedded part, comprise basis 1, two groups of parallels groups 2, embedded part 3, some embedded part anchor bars 4 and reserved layer 5, embedded part 3 is prepared from by steel plate, embedded part 3 is arranged at the top on basis 1, parallels 2 groups is respectively equipped with between the two ends of embedded part 3 and basis 1, parallels group 2 is made up of three blocks of plain cushion iron of same thickness, be fixedly connected by welding between embedded part 3 and parallels group 2, embedded part 3 is provided with some embedded part anchor bars 4 by being welded and fixed, one end of embedded part anchor bar 4 is through embedded part 3, the other end of embedded part anchor bar 4 extend into the inside on basis 1, embedded part 3, space between two groups of parallels groups 2 and basis 1 forms reserved layer 5, concrete is cast with in reserved layer 5, the thickness of reserved layer 5 is 5-10cm.
The mounting method of the present embodiment equipment Foundations top embedded part, comprises the following steps:
A some embedded part anchor bars 4 are first fixed on the steel mesh reinforcement on basis 1 by ();
B () builds base concrete, the reserved layer 5 in top on basis 1 is not temporarily built, and notes righting embedded part anchor bar 4 in casting process;
C (), according to the spacing of pre-buried embedded part anchor bar 4, embedded part 3 processes suitable circular hole, the diameter of described circular hole slightly larger than the diameter of embedded part anchor bar 4 so that follow-up welding;
D () sets adjustment parallels group 2 in the both sides of the reserved layer 5 on basic 1 top;
E embedded part 3 that () will process, penetrates in pre-buried embedded part anchor bar 4, is installed on basis 1;
F (), by adjustment parallels group 2, guarantees that the planeness of embedded part 3 is up to standard, and on embedded part 3 spot welding parallels group 2;
(g) welding embedded element 3 and embedded part anchor bar 4;
H () formwork builds reserved layer 5, adopt grouting material Self-leveling method to build;
I () removes the template of reserved layer 5, grow the unnecessary part of the embedded part anchor bar 4 of embedded part 3, and adopt abrasive machine to be polished flat the end of the excision of embedded part anchor bar 4 with cutting machine excision.
Above-described embodiment is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that those of ordinary skill in the art make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determines.

Claims (6)

1. an equipment Foundations top embedded part, it is characterized in that: comprise basis (1), two groups of parallels groups (2), embedded part (3), some embedded part anchor bars (4) and reserved layer (5), described embedded part (3) is arranged at the top of described basis (1), described parallels group (2) is respectively equipped with between the two ends of described embedded part (3) and described basis (1), described embedded part (3) is provided with some described embedded part anchor bars (4), one end of described embedded part anchor bar (4) is through described embedded part (3), the other end of described embedded part anchor bar (4) extend into the inside of described basis (1), described embedded part (3), space described in two groups between parallels group (2) and described basis (1) forms described reserved layer (5), concrete is cast with in described reserved layer (5).
2. equipment Foundations top according to claim 1 embedded part, is characterized in that: the thickness of described reserved layer (5) is 5-10cm.
3. equipment Foundations top according to claim 1 embedded part, is characterized in that: described parallels group (2) is made up of some plain cushion iron of same thickness.
4. equipment Foundations top according to claim 3 embedded part, is characterized in that: described embedded part (3) is prepared from by steel plate.
5. the mounting method of the equipment Foundations top embedded part described in claim 1-4 any one, is characterized in that: comprise the following steps:
A some described embedded part anchor bars (4) are first fixed on the steel mesh reinforcement of described basis (1) by ();
B () builds base concrete, the top of described basis (1) is reserved described reserved layer (5) and temporarily do not built, and notes embedded part anchor bar (4) described in righting in casting process;
C (), according to the spacing of pre-buried described embedded part anchor bar (4), at the circular hole that the upper processing of described embedded part (3) is suitable, the diameter of described circular hole is slightly larger than the diameter of described embedded part anchor bar (4);
D () sets the described parallels group (2) of adjustment in the both sides of the described reserved layer (5) on described basis (1) top;
E described embedded part (3) that () will process, penetrates in pre-buried described embedded part anchor bar (4), is installed on described basis (1);
F (), by the described parallels group (2) of adjustment, guarantees that the planeness of described embedded part (3) is up to standard, and in described embedded part (3) above parallels group (2) described in spot welding;
G () welds described embedded part (3) and described embedded part anchor bar (4);
H () formwork builds described reserved layer (5), adopt grouting material Self-leveling method to build;
I () removes the template of described reserved layer (5), grow the unnecessary part of the described embedded part anchor bar (4) of described embedded part (3) with cutting machine excision, and adopt abrasive machine to be polished flat the end of the excision of described embedded part anchor bar (4).
6. the mounting method of equipment Foundations top according to claim 5 embedded part, is characterized in that: adopt grouting material Self-leveling method to build reserved layer (5) described in step (h).
CN201510275582.9A 2015-05-26 2015-05-26 The installation method of embedded part at the top of a kind of Equipment Foundations Active CN104818730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510275582.9A CN104818730B (en) 2015-05-26 2015-05-26 The installation method of embedded part at the top of a kind of Equipment Foundations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510275582.9A CN104818730B (en) 2015-05-26 2015-05-26 The installation method of embedded part at the top of a kind of Equipment Foundations

Publications (2)

Publication Number Publication Date
CN104818730A true CN104818730A (en) 2015-08-05
CN104818730B CN104818730B (en) 2017-03-15

Family

ID=53729195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510275582.9A Active CN104818730B (en) 2015-05-26 2015-05-26 The installation method of embedded part at the top of a kind of Equipment Foundations

Country Status (1)

Country Link
CN (1) CN104818730B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718559A (en) * 2021-08-27 2021-11-30 中国二十二冶集团有限公司 Quick adjusting method for elevation of embedded part of track
CN114737596A (en) * 2022-04-18 2022-07-12 中国核工业华兴建设有限公司 Method for positioning rear annular embedded part of equipment foundation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6098020A (en) * 1983-10-31 1985-06-01 Honsyu Shikoku Renrakukiyou Kodan Pedestal on surface of ground and method of constructing said pedestal
JPH11152759A (en) * 1997-09-18 1999-06-08 Hiraki Tanimoto Foundation of columnar structure
CN101725152A (en) * 2008-10-27 2010-06-09 陆林海 Technical method for producing horizontal base
CN101787706A (en) * 2010-03-04 2010-07-28 中冶实久建设有限公司 Construction method of installing and fixing equipment basic pre-buried iron elements
CN102619236A (en) * 2012-04-26 2012-08-01 中国化学工程第四建设有限公司 Compound type ice chest foundation construction method
CN204645081U (en) * 2015-05-26 2015-09-16 中国化学工程第三建设有限公司 A kind of equipment Foundations top embedded part

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6098020A (en) * 1983-10-31 1985-06-01 Honsyu Shikoku Renrakukiyou Kodan Pedestal on surface of ground and method of constructing said pedestal
JPH11152759A (en) * 1997-09-18 1999-06-08 Hiraki Tanimoto Foundation of columnar structure
CN101725152A (en) * 2008-10-27 2010-06-09 陆林海 Technical method for producing horizontal base
CN101787706A (en) * 2010-03-04 2010-07-28 中冶实久建设有限公司 Construction method of installing and fixing equipment basic pre-buried iron elements
CN102619236A (en) * 2012-04-26 2012-08-01 中国化学工程第四建设有限公司 Compound type ice chest foundation construction method
CN204645081U (en) * 2015-05-26 2015-09-16 中国化学工程第三建设有限公司 A kind of equipment Foundations top embedded part

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
混凝土框架深梁结构大型预埋件施工;金荣建等;《包钢科技》;20090227;第35卷(第1期);第64-66页 *
金荣建等: "混凝土框架深梁结构大型预埋件施工", 《包钢科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718559A (en) * 2021-08-27 2021-11-30 中国二十二冶集团有限公司 Quick adjusting method for elevation of embedded part of track
CN114737596A (en) * 2022-04-18 2022-07-12 中国核工业华兴建设有限公司 Method for positioning rear annular embedded part of equipment foundation

Also Published As

Publication number Publication date
CN104818730B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN204435638U (en) A kind of hollow laminated floor slab
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN104818730A (en) Equipment base top embedded part and mounting method thereof
CN103615063A (en) Construction method for pouring pitched roof concrete and steel bar structure used in method
CN102535849A (en) Constructional column top concreting method
CN203867082U (en) Negative moment reinforcement protective layer control tripod
CN203285065U (en) High and low grade concrete separation device
CN204645081U (en) A kind of equipment Foundations top embedded part
JP6184709B2 (en) How to lay concrete blocks
CN201915420U (en) Foundation of temporary gate building
CN211665440U (en) CRTSIII plate type ballastless track bed plate reinforcing mesh
CN102561692A (en) Method and template for pouring concrete beam or column with embedded part at top
CN104234432B (en) Shed deckhead construction method
CN103174299A (en) An installment and construction method of laminate rubber support and flat plate slipping support
CN110700594A (en) Simple floor thickness and levelness control tool
CN207160398U (en) Wallboard hoisting structure
CN207934338U (en) A kind of cast-in-situ floor and thickness control of protection cover of rebar device
CN207295497U (en) A kind of interim steel pipe support base steel plate installation leveling structure
CN106758845B (en) Concrete structure falls beam joist device and falls beam construction method using it
CN201962948U (en) Concrete beam pouring template with embedded part at top
CN110439288B (en) Cast-in-place concrete floor thickness elevation control method
CN211286688U (en) Simple floor thickness and levelness control tool
CN204510481U (en) Shaped steel junction plate vertical in steel building
CN205116211U (en) Be applied to construction elevator base apparatus that basement roof subsides post -cast strip department
CN111379277A (en) Fixing device for box culvert connected bin pouring rubber waterstop and foam board and using method of fixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant