CN103615063A - Construction method for pouring pitched roof concrete and steel bar structure used in method - Google Patents

Construction method for pouring pitched roof concrete and steel bar structure used in method Download PDF

Info

Publication number
CN103615063A
CN103615063A CN201310673125.6A CN201310673125A CN103615063A CN 103615063 A CN103615063 A CN 103615063A CN 201310673125 A CN201310673125 A CN 201310673125A CN 103615063 A CN103615063 A CN 103615063A
Authority
CN
China
Prior art keywords
reinforcing bar
pitched roof
guiding
concrete
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310673125.6A
Other languages
Chinese (zh)
Inventor
梁振
蔡希杰
吴智伟
吴昊
胡沛钰
付新朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Original Assignee
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN PENGCHENG BUILDING GROUP CO Ltd filed Critical SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Priority to CN201310673125.6A priority Critical patent/CN103615063A/en
Publication of CN103615063A publication Critical patent/CN103615063A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a construction method for pouring pitched roof concrete and a steel bar structure used in the method. The problems that pitched roof concrete pouring is low in construction efficiency, and surface quality cannot be controlled easily are solved by the construction method positioned by means of the steel bar structure. According to the technical scheme, the steel bar structure used in the construction method for pouring the pitched roof concrete comprises a steel bar framework, a steel bar support, a cushion block, a formwork and a guide scaleplate. The guide scaleplate is composed of guide steel bars and supporting bars, the guide steel bars and the supporting bars are fixed together, the supporting bars and the steel bar framework are fixed together, and the distance between the guide steel bars and the formwork corresponds to the thickness of the poured pitched roof concrete. During construction, a scraper blade moves along the upper faces of the guide steel bars, and the surface of the concrete is scrapped flat. The construction method for pouring the pitched roof concrete and the steel bar structure used in the method are applied to concrete pitched roofs with the design grade ranging from 25-60 degrees in the construction field.

Description

A kind of bar construction of building the concrete construction method of pitched roof and use thereof
Technical field
The present invention relates to a kind of concrete construction method of roofing and bar construction of use thereof of building, relate in particular to a kind of bar construction of building the concrete construction method of pitched roof and use thereof.
Background technology
At present; in the realm of building construction; making for precast beam, plate; generally adopt and install template; assembling reinforcement; lay cushion block; guarantee the protective layer thickness of bottom principal rod, and for the control of concrete surface planeness and thickness, will rely on constructor by default absolute altitude reference point range estimation control; its construction quality is affected by human factors many; especially night work, sight line is bad, and quality and efficiency are difficult to guarantee; need to increase mortar levelling layer and make up, virtually increased construction cost.
The present invention has designed a kind of guiding scale with reinforcement fabrication, in construction, as long as operating personnel can scrape flat roof deck and guarantee concrete thickness and quality along the guiding reinforcing bar promotion scraper plate of guiding scale, has improved operating efficiency simultaneously.
Summary of the invention
The present invention has overcome shortcoming of the prior art, and a kind of bar construction of building the concrete construction method of pitched roof and use thereof is provided, and guarantees the quality of concreting, has improved efficiency.
The technical scheme that the present invention realizes goal of the invention employing is: a kind of concrete construction method of pitched roof of building, and the method comprises the following steps:
Step 1, according to construction requirement, lay the inclination template of pitched roof, colligation pitched roof reinforcing bar, Steel bar rack is set between steel bar layer, makes the cement mortar bedding block identical with concrete mix, cement mortar bedding block is arranged between pitched roof reinforcing bar and inclination template, cement mortar bedding block forms the support of pitched roof reinforcing bar in inclination template, guarantees the reinforcing bar of pitched roof and the designed distance between inclination template;
Step 2, guiding scale is set, guiding scale is comprised of lead reinforcing bar and brace rod, guiding reinforcing bar and brace rod are fixed, brace rod and pitched roof reinforcing bar are fixed, distance between guiding reinforcing bar and inclination template, with to build pitched roof concrete thickness corresponding, lead and be arranged in parallel between reinforcing bar, and the while is parallel with the inclination template of pitched roof again;
Step 3, concreting, relies on the guiding scale having fixed, and with corresponding scraper plate, along moving on the guiding reinforcing bar of adjacent guiding scale, concreting is struck off, and makes concrete thickness consistent with guiding reinforcing bar height.
The guiding reinforcing bar of guiding scale is along the vertical or horizontal setting of template, and the spacing of guiding reinforcing bar is 2-5 meters.
The present invention also provides a kind of bar construction that pitched roof concrete is used of building, its member comprises cage of reinforcement, Steel bar rack, cushion block, template, also comprise guiding scale, guiding scale consists of lead reinforcing bar and brace rod, guiding reinforcing bar and brace rod are fixed, brace rod and cage of reinforcement are fixed, and the distance between guiding reinforcing bar and template is with to build pitched roof concrete thickness corresponding.
The angle of template and horizontal plane is 25-60 °; Parallel to each other between every group of guiding reinforcing bar, 2-5 meters of spacing, and parallel with the template of pitched roof, the diameter of guiding reinforcing bar is 10-20 millimeter; Brace rod is along guiding reinforcement placement, 0.5-0.8 meter of spacing, and the quantity of the brace rod that every guiding arranges on reinforcing bar is 3-10, the diameter of brace rod is 10-20 millimeter.
The invention has the beneficial effects as follows: guarantee the quality of roofing concreting, improved efficiency, reduced cost.
Accompanying drawing explanation
Fig. 1 is pitched roof schematic diagram.
In figure, reinforcing bar 1, cushion block 2, template 3, Steel bar rack 4, guiding reinforcing bar 5, brace rod 6.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the invention will be further described.
Build the concrete construction method of pitched roof, the method comprises the following steps:
Step 1, according to construction requirement, lay the inclination template of pitched roof, colligation pitched roof reinforcing bar, Steel bar rack is set between steel bar layer, makes the cement mortar bedding block identical with concrete mix, cement mortar bedding block is arranged between pitched roof reinforcing bar and inclination template, cement mortar bedding block forms the support of pitched roof reinforcing bar in inclination template, guarantees the reinforcing bar of pitched roof and the designed distance between inclination template;
Step 2, guiding scale is set, guiding scale is comprised of lead reinforcing bar and brace rod, guiding reinforcing bar and brace rod are fixed, brace rod and pitched roof reinforcing bar are fixed, distance between guiding reinforcing bar and inclination template, with to build pitched roof concrete thickness corresponding, lead and be arranged in parallel between reinforcing bar, and the while is parallel with the inclination template of pitched roof again;
Step 3, concreting, relies on the guiding scale having fixed, and with corresponding scraper plate, along moving on the guiding reinforcing bar of adjacent guiding scale, concreting is struck off, and makes concrete thickness consistent with guiding reinforcing bar height.
The guiding reinforcing bar of guiding scale is along the vertical or horizontal setting of template, and the spacing of guiding reinforcing bar is 2-5 meters.
The present invention also provides a kind of bar construction that pitched roof concrete is used of building, its member comprises cage of reinforcement, Steel bar rack, cushion block, template, also comprise guiding scale, guiding scale consists of lead reinforcing bar and brace rod, guiding reinforcing bar and brace rod are fixed, brace rod and cage of reinforcement are fixed, and the distance between guiding reinforcing bar and template is with to build pitched roof concrete thickness corresponding.
The angle of template and horizontal plane is 25-60 °; Parallel to each other between every group of guiding reinforcing bar, 2-5 meters of spacing, and parallel with the template of pitched roof, the diameter of guiding reinforcing bar is 10-20 millimeter; Brace rod is along guiding reinforcement placement, 0.5-0.8 meter of spacing, and the quantity of the brace rod that every guiding arranges on reinforcing bar is 3-10, the diameter of brace rod is 10-20 millimeter.
According to construction requirement, install template, assembling reinforcement.During assembling reinforcement, make the cement mortar bedding block identical with concrete mix.Cushion block is arranged between pitched roof reinforcing bar and inclination template, and cement mortar bedding block forms the support of pitched roof reinforcing bar in inclination template, guarantees the reinforcing bar of pitched roof and the designed distance between inclination template, forms the topping of beam slab bottom principal rod.For fear of plate face reinforcing bar in concreting process, sink, guarantee the effective height of plate muscle, between double steel bar net, set up effective Steel bar rack (support supporting steel bar), Steel bar rack directly through being not less than φ 10.
Processing, making guiding scale.Guiding scale is comprised of lead reinforcing bar and brace rod, and its diameter is not less than φ 10, and the brace rod quantity of every guiding scale must not be less than three, and spacing is 500mm~800mm; Guiding reinforcing bar and brace rod welding, brace rod and the welding of pitched roof reinforcing bar, parallel to each other between the guiding reinforcing bar of every group of guiding scale, spacing is 3 meters; Guiding reinforcing bar and inclination template parallel its apart from to build the concrete thickness of pitched roof identical.
Concreting.Rely on the guiding scale location having fixed, the guiding reinforcing bar of guiding scale can be along the vertical or horizontal setting of template, with 4 meters of long scraper plates, above the guiding reinforcing bar of guiding scale, move, concreting is struck off, make concrete thickness consistent with guiding reinforcing bar height, complete the construction of pitched roof concrete slab.

Claims (7)

1. build the concrete construction method of pitched roof, it is characterized in that, the method comprises the following steps:
Step 1, according to construction requirement, lay the inclination template of pitched roof, colligation pitched roof reinforcing bar, Steel bar rack is set between steel bar layer, makes the cement mortar bedding block identical with concrete mix, cement mortar bedding block is arranged between pitched roof reinforcing bar and inclination template, cement mortar bedding block forms the support of pitched roof reinforcing bar in inclination template, guarantees the reinforcing bar of pitched roof and the designed distance between inclination template;
Step 2, guiding scale is set, guiding scale is comprised of lead reinforcing bar and brace rod, guiding reinforcing bar and brace rod are fixed, brace rod and pitched roof reinforcing bar are fixed, distance between guiding reinforcing bar and inclination template, with to build pitched roof concrete thickness corresponding, lead and be arranged in parallel between reinforcing bar, and the while is parallel with the inclination template of pitched roof again;
Step 3, concreting, relies on the guiding scale having fixed, and with corresponding scraper plate, along moving on the guiding reinforcing bar of adjacent guiding scale, concreting is struck off, and makes concrete thickness consistent with guiding reinforcing bar height.
2. a kind of concrete construction method of pitched roof of building according to claim 1, is characterized in that, the guiding reinforcing bar described in step 2 is along the vertical or horizontal setting of template.
3. a kind of concrete construction method of pitched roof of building according to claim 1, is characterized in that, the spacing of the adjacent guiding scale guiding reinforcing bar described in step 3 is 2-5 meters.
4. build the bar construction that pitched roof concrete is used for one kind, its member comprises cage of reinforcement, Steel bar rack, cushion block, template, it is characterized in that, also comprise guiding scale, described guiding scale consists of the reinforcing bar that leads (5) and brace rod (6), described guiding reinforcing bar (5) and brace rod (6) are fixing, and described brace rod (6) is fixing with cage of reinforcement (1), and the distance between described guiding reinforcing bar (6) and template (3) is with to build the concrete thickness of pitched roof corresponding.
5. a kind of bar construction that pitched roof concrete is used of building according to claim 4, is characterized in that, described template (3) is 25-60 ° with the angle of horizontal plane.
6. a kind of bar construction that pitched roof concrete is used of building according to claim 4, it is characterized in that, between described every group of guiding reinforcing bar (5), be arranged in parallel, and parallel with the template (3) of pitched roof, the spacing of every group of guiding scale is 2-5 meters, and the diameter of guiding reinforcing bar (5) is 10-20 millimeter.
7. a kind of bar construction that pitched roof concrete is used of building according to claim 4, it is characterized in that, described brace rod (6) is arranged along guiding reinforcing bar (5), 0.5-0.8 meter of spacing, the quantity of the upper brace rod (6) arranging of every guiding reinforcing bar (5) is 3-10, and the diameter of brace rod (6) is 10-20 millimeter.
CN201310673125.6A 2013-12-12 2013-12-12 Construction method for pouring pitched roof concrete and steel bar structure used in method Pending CN103615063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310673125.6A CN103615063A (en) 2013-12-12 2013-12-12 Construction method for pouring pitched roof concrete and steel bar structure used in method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310673125.6A CN103615063A (en) 2013-12-12 2013-12-12 Construction method for pouring pitched roof concrete and steel bar structure used in method

Publications (1)

Publication Number Publication Date
CN103615063A true CN103615063A (en) 2014-03-05

Family

ID=50165778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310673125.6A Pending CN103615063A (en) 2013-12-12 2013-12-12 Construction method for pouring pitched roof concrete and steel bar structure used in method

Country Status (1)

Country Link
CN (1) CN103615063A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298115A (en) * 2015-11-16 2016-02-03 上海建工五建集团有限公司 Construction structure for high-inclination sloping roof
CN105484434A (en) * 2015-12-16 2016-04-13 中国建筑第二工程局有限公司 Leveling course structure of large-span conical roof and construction method of leveling course structure
CN107476567A (en) * 2017-07-20 2017-12-15 北京城建远东建设投资集团有限公司 It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness
CN108590008A (en) * 2018-05-04 2018-09-28 舜杰建设(集团)有限公司 Fold shape roof system cast-in-place concrete construction method
CN109944447A (en) * 2019-04-29 2019-06-28 舜元建设(集团)有限公司 A kind of more inclined slope roof concreting methods
CN110080517A (en) * 2019-04-04 2019-08-02 上海建工二建集团有限公司 The form frame system and its construction method of concrete shell dome structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02289765A (en) * 1989-03-10 1990-11-29 Gantan Biyuut Kogyo Kk Construction method for reinforced concrete scutellum
CN2495714Y (en) * 2001-09-22 2002-06-19 强虎成 Prestressed and thermal insulation type concrete plate for sloping roof
CN101492965A (en) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 Large area cast-in-situ concrete plate flatness control method
CN202194317U (en) * 2011-08-16 2012-04-18 江西建工第一建筑有限责任公司 Guide rail structure for cast-in-site concrete slope surface
CN103122695A (en) * 2013-02-04 2013-05-29 中天建设集团有限公司 Tool for controlling pouring thickness of concrete floor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02289765A (en) * 1989-03-10 1990-11-29 Gantan Biyuut Kogyo Kk Construction method for reinforced concrete scutellum
CN2495714Y (en) * 2001-09-22 2002-06-19 强虎成 Prestressed and thermal insulation type concrete plate for sloping roof
CN101492965A (en) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 Large area cast-in-situ concrete plate flatness control method
CN202194317U (en) * 2011-08-16 2012-04-18 江西建工第一建筑有限责任公司 Guide rail structure for cast-in-site concrete slope surface
CN103122695A (en) * 2013-02-04 2013-05-29 中天建设集团有限公司 Tool for controlling pouring thickness of concrete floor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298115A (en) * 2015-11-16 2016-02-03 上海建工五建集团有限公司 Construction structure for high-inclination sloping roof
CN105484434A (en) * 2015-12-16 2016-04-13 中国建筑第二工程局有限公司 Leveling course structure of large-span conical roof and construction method of leveling course structure
CN107476567A (en) * 2017-07-20 2017-12-15 北京城建远东建设投资集团有限公司 It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness
CN108590008A (en) * 2018-05-04 2018-09-28 舜杰建设(集团)有限公司 Fold shape roof system cast-in-place concrete construction method
CN110080517A (en) * 2019-04-04 2019-08-02 上海建工二建集团有限公司 The form frame system and its construction method of concrete shell dome structure
CN109944447A (en) * 2019-04-29 2019-06-28 舜元建设(集团)有限公司 A kind of more inclined slope roof concreting methods

Similar Documents

Publication Publication Date Title
CN103615063A (en) Construction method for pouring pitched roof concrete and steel bar structure used in method
CN202194317U (en) Guide rail structure for cast-in-site concrete slope surface
CN104100092A (en) Guiderail device and method for pouring slope roof
CN105155853B (en) A kind of high-rise residential building reinforced concrete positioning construction process
CN106193589B (en) Concrete superelevation heavy type beam and overlapping board combining structure method for supporting
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN107476567A (en) It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness
CN207363251U (en) A kind of track-type facilities for being used to control the pitched roof gradient and thickness
CN103615076A (en) Concrete construction method for big-gradient sloping roof
CN105196414A (en) Prefabricated T-beam web plate rebar jig frame and prestressed T-beam construction method
CN102677895A (en) Suspended formwork pouring method for concrete foundation steps
CN201942994U (en) Bridge bearing pad
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN204531441U (en) The support frame structure levelling for concrete pavement and tool-type leveling system
CN105386447A (en) Construction method for replacement support of post-cast strip in construction site
CN204955097U (en) Prefabricated T web reinforcing bar bed -jig
CN208056471U (en) A kind of new reinforcing steel bar stirrup
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN103437549B (en) Preloading structural part for high and large formwork support system
CN103046678A (en) Method for constructing BDF (building distribution frame) hollow floorslab
CN203769332U (en) Building form or floor construction control device
CN208073000U (en) Cast-in-place reinforced concrete plate strip thickness control device
CN207934338U (en) A kind of cast-in-situ floor and thickness control of protection cover of rebar device
CN202787992U (en) Constructional column top concrete pouring structure
CN110700594A (en) Simple floor thickness and levelness control tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140305