CN104818729A - 可供大小塔吊转换的共用基础 - Google Patents

可供大小塔吊转换的共用基础 Download PDF

Info

Publication number
CN104818729A
CN104818729A CN201510277063.6A CN201510277063A CN104818729A CN 104818729 A CN104818729 A CN 104818729A CN 201510277063 A CN201510277063 A CN 201510277063A CN 104818729 A CN104818729 A CN 104818729A
Authority
CN
China
Prior art keywords
tower crane
base section
crane base
foundation
little
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510277063.6A
Other languages
English (en)
Other versions
CN104818729B (zh
Inventor
冯志法
王凯栋
刘笛
王伟
林磊
孟杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Yijian Construction Group Ltd
Original Assignee
Zhejiang Provincial Yijian Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Yijian Construction Group Ltd filed Critical Zhejiang Provincial Yijian Construction Group Ltd
Priority to CN201510277063.6A priority Critical patent/CN104818729B/zh
Publication of CN104818729A publication Critical patent/CN104818729A/zh
Application granted granted Critical
Publication of CN104818729B publication Critical patent/CN104818729B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及的可供大小塔吊转换的共用基础,包括格构柱,所述格构柱为四个分别设置在基坑的四角处,包括小塔吊基础节、大塔吊基础节和定心连接装置,所述大塔吊基础节设置在由格构柱构成的基坑内,所述小塔吊基础节插装在大塔吊基础节内,定心连接装置分别与大塔吊基础节和小塔吊基础节相连,使大塔吊基础节与小塔吊基础节共同构成回字形结构的砼平台;通过本技术方案,使大塔吊基础节和小塔吊基础节同心固定浇铸在机坑内,将小塔吊安装在小塔吊基础上,保证土方开挖阶段的材料转场、土方吊运等施工要求,一旦工程进入结构施工阶段,立刻更换符合施工要求的大塔吊,以满足施工需要,同时达到了经济效益的最大化。

Description

可供大小塔吊转换的共用基础
技术领域
本发明涉及一种塔吊基础,特别是涉及一种可供大小塔吊转换的共用基础。
背景技术
随着城市建筑不断向地下发展,地下室的层数也在不断增加,尤其是在挖掘土方受到周边环境影响较大的工程,往往需要采用竖向支护加上水平支撑的形式,此时塔吊的尽早使用能够大大加快工程的进度,同时在土方开挖和基坑支护施工阶段,出于经济效益的考虑,只需要使用小荷载塔吊,而当工程进入结构施工阶段,超重构件,超大设备的吊装则需要大荷载塔吊才能完成。
传统的塔吊基础都是按照不同的塔吊高度和荷载的不同,分别作单独的基础,对于某个施工现场,塔吊的最佳施工位置往往是唯一的,为此只能按照荷载较大的塔吊施工相应的基础,从而造成材料和工期的较大浪费和延迟。
发明内容
有鉴于此,本发明的主要目的在于提供一种可供大小塔吊转换的共用基础,扶梯气囊保护装置,通过本技术方案,施工前准确测算出挖土阶段与结构施工阶段塔吊布置最佳位置,以发挥塔吊安装以后的最大效益,在土方开挖初期制作塔吊基础,并同时将小塔吊基础节定芯安装在大塔吊基础节内后进行预埋,将小塔吊安装在小塔吊基础上,保证土方开挖阶段的材料转场、土方吊运等施工要求,一旦工程进入结构施工阶段,立刻更换符合施工要求的大塔吊,以满足施工需要,同时达到了经济效益的最大化。
为了达到上述目的,本发明的技术方案是这样实现的:一种可供大小塔吊转换的共用基础,包括格构柱,所述格构柱为四个分别设置在基坑的四角处,包括小塔吊基础节、大塔吊基础节和定心连接装置,所述大塔吊基础节设置在由格构柱构成的基坑内,所述小塔吊基础节插装在大塔吊基础节内,定心连接装置分别与大塔吊基础节和小塔吊基础节相连,使大塔吊基础节与小塔吊基础节共同构成回字形结构的砼平台。
所述定心连接装置由固定连接盘、横向连接杆和斜向连接杆构成,四个斜向连接杆的下端分别与各自对应的大塔吊基础节底部四角相连接,四个斜向连接杆的上端分别与固定连接盘相连接,四个横向连接杆的外侧端分别与小塔吊基础节的四角相连,四个横向连接杆的内侧端与固定盘相连接。
在两个相邻的格构柱上设置有水平支撑梁和剪刀撑,所述水平支撑梁和剪刀撑的两端分别固定在所对应的两个相邻的格构柱上。
采用上述技术方案后的有益效果是:一种可供大小塔吊转换的共用基础,通过本技术方案,使大塔吊基础节和小塔吊基础节同心固定浇铸在机坑内,将小塔吊安装在小塔吊基础上,保证土方开挖阶段的材料转场、土方吊运等施工要求,一旦工程进入结构施工阶段,立刻更换符合施工要求的大塔吊,以满足施工需要,同时达到了经济效益的最大化。
附图说明
图1为格构柱的结构示意图。
图2为砼平台的结构示意图。
图3为图2的俯视示意图。
图中,1格构柱、2小塔吊基础节、3大塔吊基础节、4固定连接盘、5横向连接杆、6斜向连接杆、7水平支撑梁、8剪刀撑。
具体实施方式
下面将结合附图对本发明中具体实施例作进一步详细说明。
如图1-图3所示,本发明涉及的可供大小塔吊转换的共用基础,包括格构柱1,所述格构柱1为四个分别设置在基坑的四角处,包括小塔吊基础节2、大塔吊基础节3和定心连接装置,所述大塔吊基础节3设置在由格构柱1构成的基坑内,所述小塔吊基础节2插装在大塔吊基础节3内,定心连接装置分别与大塔吊基础节3和小塔吊基础节2相连,使大塔吊基础节3与小塔吊基础节2共同构成回字形结构的砼平台。
所述定心连接装置由固定连接盘4、横向连接杆5和斜向连接杆6构成,四个斜向连接杆5的下端分别与各自对应的大塔吊基础节3底部四角相连接,四个斜向连接杆6的上端分别与固定连接盘4相连接,四个横向连接杆5的外侧端分别与小塔吊基础节2的四角相连,四个横向连接杆5的内侧端与固定连接盘4相连接。
在两个相邻的格构柱1上设置有水平支撑梁7和剪刀撑8,所述水平支撑梁7和剪刀撑8的两端分别固定在所对应的两个相邻的格构柱1上。
以上所述,仅为本发明的较佳可行实施例而已,并非用以限定本发明的范围。

Claims (3)

1.一种可供大小塔吊转换的共用基础,包括格构柱,所述格构柱为四个分别设置在基坑的四角处,其特征在于,包括小塔吊基础节、大塔吊基础节和定心连接装置,所述大塔吊基础节设置在由格构柱构成的基坑内,所述小塔吊基础节插装在大塔吊基础节内,定心连接装置分别与大塔吊基础节和小塔吊基础节相连,使大塔吊基础节与小塔吊基础节共同构成回字形结构的砼平台。
2.根据权利要求1所述的可供大小塔吊转换的共用基础,其特征在于,所述定心连接装置由固定连接盘、横向连接杆和斜向连接杆构成,四个斜向连接杆的下端分别与各自对应的大塔吊基础节底部四角相连接,四个斜向连接杆的上端分别与固定连接盘相连接,四个横向连接杆的外侧端分别与小塔吊基础节的四角相连,四个横向连接杆的内侧端与固定盘相连接。
3.根据权利要求1所述的可供大小塔吊转换的共用基础,其特征在于,在两个相邻的格构柱上设置有水平支撑梁和剪刀撑,所述水平支撑梁和剪刀撑的两端分别固定在所对应的两个相邻的格构柱上。
CN201510277063.6A 2015-05-27 2015-05-27 可供大小塔吊转换的共用基础 Active CN104818729B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510277063.6A CN104818729B (zh) 2015-05-27 2015-05-27 可供大小塔吊转换的共用基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510277063.6A CN104818729B (zh) 2015-05-27 2015-05-27 可供大小塔吊转换的共用基础

Publications (2)

Publication Number Publication Date
CN104818729A true CN104818729A (zh) 2015-08-05
CN104818729B CN104818729B (zh) 2016-05-18

Family

ID=53729194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510277063.6A Active CN104818729B (zh) 2015-05-27 2015-05-27 可供大小塔吊转换的共用基础

Country Status (1)

Country Link
CN (1) CN104818729B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106315431A (zh) * 2016-07-19 2017-01-11 中天建设集团有限公司 一种塔机双预埋节及其施工方法
CN106495028A (zh) * 2015-09-08 2017-03-15 上海宝冶集团有限公司 用于装配式建筑施工的塔吊转换方法
CN110683470A (zh) * 2019-08-22 2020-01-14 华恒建设集团有限公司 一种可供塔吊转换的共用基础及其加工方法
CN110777837A (zh) * 2019-11-01 2020-02-11 安徽同济建设集团有限责任公司 一种装配式建筑混合塔吊施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10231527A (ja) * 1997-02-19 1998-09-02 Hitachi Cable Ltd 鉄塔等の深基礎工法
CN201896318U (zh) * 2010-11-24 2011-07-13 浙江中成建工集团有限公司 塔吊基础节与钢格构柱的连接结构
CN203145038U (zh) * 2013-03-19 2013-08-21 中建保华建筑有限责任公司 格构柱式塔吊基础
CN204662486U (zh) * 2015-05-27 2015-09-23 浙江省一建建设集团有限公司 可供大小塔吊转换的共用基础

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10231527A (ja) * 1997-02-19 1998-09-02 Hitachi Cable Ltd 鉄塔等の深基礎工法
CN201896318U (zh) * 2010-11-24 2011-07-13 浙江中成建工集团有限公司 塔吊基础节与钢格构柱的连接结构
CN203145038U (zh) * 2013-03-19 2013-08-21 中建保华建筑有限责任公司 格构柱式塔吊基础
CN204662486U (zh) * 2015-05-27 2015-09-23 浙江省一建建设集团有限公司 可供大小塔吊转换的共用基础

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106495028A (zh) * 2015-09-08 2017-03-15 上海宝冶集团有限公司 用于装配式建筑施工的塔吊转换方法
CN106315431A (zh) * 2016-07-19 2017-01-11 中天建设集团有限公司 一种塔机双预埋节及其施工方法
CN110683470A (zh) * 2019-08-22 2020-01-14 华恒建设集团有限公司 一种可供塔吊转换的共用基础及其加工方法
CN110683470B (zh) * 2019-08-22 2020-12-11 华恒建设集团有限公司 一种可供塔吊转换的共用基础及其加工方法
CN110777837A (zh) * 2019-11-01 2020-02-11 安徽同济建设集团有限责任公司 一种装配式建筑混合塔吊施工方法
CN110777837B (zh) * 2019-11-01 2021-07-06 安徽同济建设集团有限责任公司 一种装配式建筑混合塔吊施工方法

Also Published As

Publication number Publication date
CN104818729B (zh) 2016-05-18

Similar Documents

Publication Publication Date Title
CN102839678B (zh) 一种提高基坑钢支撑刚度和稳定性的结构
CN104818729A (zh) 可供大小塔吊转换的共用基础
CN105442839A (zh) 一种悬挑结构模板排架的搭设方法
CN103935911A (zh) 塔吊附墙支撑结构及其施工方法
CN103452350B (zh) 装配式电子厂房及其施工方法
CN204662486U (zh) 可供大小塔吊转换的共用基础
CN105178354B (zh) 一种田字梁柱帽和无梁楼板结构体系
CN202755370U (zh) 一种提高基坑钢支撑刚度和稳定性的结构
CN102425190A (zh) 一种叠合型塔吊基础
CN203531005U (zh) 钢结构组合式塔式起重机基础结构
CN204804437U (zh) 用于建在山区的组装式铁塔基站
CN204687050U (zh) 一种预制混凝土矩形梁的模具
CN204510215U (zh) 用于基坑施工的钢平台
CN203755171U (zh) 桥梁反背拉承重施工支架
CN207244633U (zh) 基坑围护顶圈梁上砖砌挡土墙钢筋桁架加固系统
CN104164889B (zh) 可拆卸式塔吊基础
CN205975995U (zh) 现浇混凝土楼板压槽钢管支撑架
CN201809974U (zh) 玻璃钢圆柱模板装置
CN107178149A (zh) 树杈形钢骨混凝土组合结构及其施工方法
CN207130736U (zh) 一种辅助逆作施工的支模架
CN203429557U (zh) 应用在顶进地道桥施工中的锚杆后背梁
CN203768940U (zh) 一种架空输电线路角钢塔基础
CN203347110U (zh) 应用于高层建筑筏板基础施工的型钢马镫
CN103397650B (zh) 一种大型钢圆筒围堰结构
CN201778392U (zh) 贮煤筒仓钢锥壳

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant