CN104806025A - 砌体工程机电管线与线盒直埋成套施工工艺 - Google Patents
砌体工程机电管线与线盒直埋成套施工工艺 Download PDFInfo
- Publication number
- CN104806025A CN104806025A CN201510277940.XA CN201510277940A CN104806025A CN 104806025 A CN104806025 A CN 104806025A CN 201510277940 A CN201510277940 A CN 201510277940A CN 104806025 A CN104806025 A CN 104806025A
- Authority
- CN
- China
- Prior art keywords
- electromechanical pipeline
- masonry
- line box
- pipeline
- electromechanical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 title abstract description 8
- 239000011449 brick Substances 0.000 claims abstract description 28
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 5
- 238000005516 engineering process Methods 0.000 claims description 14
- 238000005452 bending Methods 0.000 claims description 3
- 239000011148 porous material Substances 0.000 claims description 3
- 238000007493 shaping process Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 2
- 230000008901 benefit Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000003902 lesion Effects 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Retaining Walls (AREA)
Abstract
本发明公开了一种砌体工程机电管线与线盒直埋成套施工工艺,包括以下步骤:(1)砌体放线、植筋及止水带模块安装;(2)机电管线安装:将机电管线、线盒提前设置到位,线盒安装需提前配管,并将管线提前弯曲到位;(3)止水带浇筑、过梁预制,切砖;(4)砌体砌筑:机电管线、线盒预留预埋居中设置,在机电管线、线盒预留空间两侧套砌条形砖或U型砖;若线盒预留洞口超过300mm,则在线盒上部设置单边过梁;若墙体厚度小于100mm,则需切U型砖或预制U型砖,以便管线埋入墙内;(5)砌筑成型:机电管线、线盒与砖之间的空隙用砌筑砂浆填实填平。本发明能够避免砌体施工后开槽、二次配管,提高工作效率,节约工期。
Description
技术领域
本发明涉及砌体工程领域,特别是涉及一种砌体工程机电管线与线盒直埋成套施工工艺。
背景技术
砌体工程广泛用于建筑工程领域,在砌体施工过程中机电管线的埋置方式,主要为开槽后埋置,采用开槽后埋置的这种方法,往往会由于操作不当而造成对墙体的大面积损伤,同时墙体损伤后的修补难度打、工艺复杂(需挂网等),同时后期抹灰空鼓、开裂风险高。
采用传统工艺施工存在以下缺陷:
1、人工费消耗量大,体现在:传统工艺在砌体上开槽进行机电配管施工,会伴随大量的补槽工作量,人工消耗为本发明施工工艺的2—3倍;
2、材料消耗量大,体现在:砌体配管后的补槽工序需要消耗大量的砼;
3、能耗大、工效低、综合成本高,体现在:砌体开槽及二次补槽会产生大量建筑垃圾,消耗水电资源,且因施工工序较多,综合成本高,整体工效低;
4、砌体质量影响,体现在:由于在砌体上开槽数量偏多,补槽后的砂浆强度不能保证完全达到要求,对墙体结构的稳定性有一定影响和质量隐患。
因此亟需提供一种对砌体工程中机电管线与线盒新型的施工工艺来解决上述问题。
发明内容
本发明所要解决的技术问题是提供一种砌体工程机电管线与线盒直埋成套施工工艺,能够避免二次开槽、修补,提高工效。
为解决上述技术问题,本发明采用的一个技术方案是:提供一种砌体工程机电管线与线盒直埋成套施工工艺,包括以下步骤:
(1)砌体放线、植筋及止水带模块安装;
(2)机电管线安装:将机电管线、线盒提前设置到位,线盒安装需提前配管,由下引上的机电管线在砌体前将其接至一定高度位置,由上引下的机电管线在墙体砌筑后留有一定的长度,并将管线提前弯曲到位;
(3)止水带浇筑、过梁预制,切砖;
(4)砌体砌筑:机电管线、线盒预留预埋居中设置,在机电管线、线盒预留空间两侧套砌条形砖或U型砖;若线盒预留洞口超过300mm,则在线盒上部设置单边过梁;若墙体厚度小于100mm,则需切U型砖或预制U型砖,以便管线埋入墙内;
(5)砌筑成型:机电管线、线盒与砖之间的空隙用砌筑砂浆填实填平。
在本发明一个较佳实施例中,在步骤(4)中,机电管线、线盒预留空间为机电管线、线盒周边5—10mm孔隙区域,以保证机电管线、线盒均居中设置在砌体预留空间中。
在本发明一个较佳实施例中,对尚未确定安装的机电管线与线盒采用预制块,先在砌体上预留洞后再安装线盒。
本发明的有益效果是:本发明通过对砌体工程与机电安装工程配合施工,避免了砌体施工后开槽、二次配管等工作,降低了材料损耗与人工成本,提高了工作效率,节约工期,保障施工质量,同时也达到了绿色施工的要求,在住宅工程、工业厂房、商业办公楼等公共建筑砌体工程较为复杂、工程量大的工程施工中有着良好的应用前景。
附图说明
图1是本发明施工工艺中机电管线预埋的示意图。
图2是本发明施工工艺中线盒直埋与单边过梁的示意图。
图3是本发明施工工艺中100mm墙体中设置U型砖的示意图。
附图中各部件的标记如下:1、砌体,2、机电管线,3、线盒,4、U型砖,5、单边过梁。
具体实施方式
下面结合附图对本发明的较佳实施例进行详细阐述,以使本发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围做出更为清楚明确的界定。
请参阅图1和图2,本发明实施例包括:
一种砌体工程机电管线与线盒直埋成套施工工艺,包括以下步骤:
(1)砌体1放线、植筋及止水带模块安装;
(2)机电管线2安装:将机电管线2、线盒3提前设置到位,线盒3安装需提前配管,由下引上的机电管线2在砌体1前将其接至一定高度位置,由上引下的机电管线2在墙体砌筑后留有一定的长度,并将管线提前弯曲到位,避免后期安装线盒3造成的二次开槽,因开关线盒3需安装在墙体其中一面,必须提前准确定位并弯曲调节完成;
(3)止水带浇筑、过梁预制,切砖;
(4)砌体1砌筑:机电管线2、线盒3预留预埋居中设置,在机电管线2、线盒3预留空间两侧套砌条形砖或U型砖4,管线不居中无法进行预埋工作,其中机电管线2、线盒3预留空间为机电管线2、线盒3周边5—10mm孔隙区域,以便后期抹灰对线盒3进行上下、左右调节;若线盒3预留洞口超过300mm,则在线盒3上部设置单边过梁5,以便管线穿过;若墙体厚度小于100mm,则需切U型砖4或预制U型砖4,以便管线埋入墙内;对尚未确定安装的机电管线2与线盒3采用预制块,先在砌体1上预留洞后再安装线盒3;
(5)砌筑成型:机电管线2、线盒3与砖之间的空隙用砌筑砂浆填实填平。
本发明通过对砌体工程与机电安装工程配合施工,避免了砌体1施工后开槽、二次配管等工作,降低了材料损耗与人工成本,提高了工作效率,节约工期,保障施工质量,同时也达到了绿色施工的要求,在住宅工程、工业厂房、商业办公楼等公共建筑砌体工程较为复杂、工程量大的工程施工中有着良好的应用前景。
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (3)
1.一种砌体工程机电管线与线盒直埋成套施工工艺,包括以下步骤:
(1)砌体放线、植筋及止水带模块安装;
(2)机电管线安装:将机电管线、线盒提前设置到位,线盒安装需提前配管,由下引上的机电管线在砌体前将其接至一定高度位置,由上引下的机电管线在墙体砌筑后留有一定的长度,并将管线提前弯曲到位;
(3)止水带浇筑、过梁预制,切砖;
(4)砌体砌筑:机电管线、线盒预留预埋居中设置,在机电管线、线盒预留空间两侧套砌条形砖或U型砖;若线盒预留洞口超过300mm,则在线盒上部设置单边过梁;若墙体厚度小于100mm,则需切U型砖或预制U型砖,以便管线埋入墙内;
(5)砌筑成型:机电管线、线盒与砖之间的空隙用砌筑砂浆填实填平。
2.根据权利要求1所述的砌体工程机电管线与线盒直埋成套施工工艺,其特征在于,在步骤(4)中,机电管线、线盒预留空间为机电管线、线盒周边5—10mm孔隙区域。
3.根据权利要求1所述的砌体工程机电管线与线盒直埋成套施工工艺,其特征在于,对尚未确定安装的机电管线与线盒采用预制块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510277940.XA CN104806025A (zh) | 2015-05-26 | 2015-05-26 | 砌体工程机电管线与线盒直埋成套施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510277940.XA CN104806025A (zh) | 2015-05-26 | 2015-05-26 | 砌体工程机电管线与线盒直埋成套施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104806025A true CN104806025A (zh) | 2015-07-29 |
Family
ID=53691188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510277940.XA Pending CN104806025A (zh) | 2015-05-26 | 2015-05-26 | 砌体工程机电管线与线盒直埋成套施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104806025A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107916789A (zh) * | 2017-10-27 | 2018-04-17 | 江苏南通三建集团股份有限公司 | 一种混凝土空心砌块墙体穿管嵌盒的方法 |
CN108331346A (zh) * | 2017-12-22 | 2018-07-27 | 广州市时代控股集团有限公司 | 执行户内管线集成结构的方法 |
CN109586204A (zh) * | 2018-12-24 | 2019-04-05 | 成都建工第二建筑工程有限公司 | 用于安装二次配管的固定结构及安装二次配管的方法 |
CN110792200A (zh) * | 2019-09-25 | 2020-02-14 | 江苏兴厦建设工程集团有限公司 | 一种无需后期剔打的砌体施工方法及其包管结构 |
CN110924692A (zh) * | 2019-12-02 | 2020-03-27 | 中建三局第三建设工程有限责任公司 | 砌体管线直埋施工方法 |
CN112343242A (zh) * | 2020-12-03 | 2021-02-09 | 中建一局集团建设发展有限公司 | 一种用于砌体结构包裹机电线管的包管装置及其施工方法 |
CN115162607A (zh) * | 2022-09-08 | 2022-10-11 | 中铁建设集团有限公司 | 一种砌筑配管组件及其同步施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996016238A1 (en) * | 1994-11-07 | 1996-05-30 | Megawall Corporation | Modular precast wall system with mortar joints |
CN101247029A (zh) * | 2008-03-27 | 2008-08-20 | 成都市第四建筑工程公司 | 在墙体上配线管、线盒的施工方法 |
CN103061515A (zh) * | 2012-12-29 | 2013-04-24 | 陕西省第三建筑工程公司 | 混凝土空心砌块填充墙预埋pvc电线管穿管安装方法 |
CN103321436A (zh) * | 2013-07-10 | 2013-09-25 | 成都市第八建筑工程公司 | 建筑砖砌体上线盒预安装施工方法及其预安装支架 |
CN104343239A (zh) * | 2014-08-20 | 2015-02-11 | 荣盛建设工程有限公司 | 加气混凝土填充墙打孔暗敷设电气穿线管施工工艺 |
-
2015
- 2015-05-26 CN CN201510277940.XA patent/CN104806025A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996016238A1 (en) * | 1994-11-07 | 1996-05-30 | Megawall Corporation | Modular precast wall system with mortar joints |
CN101247029A (zh) * | 2008-03-27 | 2008-08-20 | 成都市第四建筑工程公司 | 在墙体上配线管、线盒的施工方法 |
CN103061515A (zh) * | 2012-12-29 | 2013-04-24 | 陕西省第三建筑工程公司 | 混凝土空心砌块填充墙预埋pvc电线管穿管安装方法 |
CN103321436A (zh) * | 2013-07-10 | 2013-09-25 | 成都市第八建筑工程公司 | 建筑砖砌体上线盒预安装施工方法及其预安装支架 |
CN104343239A (zh) * | 2014-08-20 | 2015-02-11 | 荣盛建设工程有限公司 | 加气混凝土填充墙打孔暗敷设电气穿线管施工工艺 |
Non-Patent Citations (1)
Title |
---|
吕建: "浅谈房屋建筑土建工程配合电气安装工程的施工", 《科技传播》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107916789A (zh) * | 2017-10-27 | 2018-04-17 | 江苏南通三建集团股份有限公司 | 一种混凝土空心砌块墙体穿管嵌盒的方法 |
CN108331346A (zh) * | 2017-12-22 | 2018-07-27 | 广州市时代控股集团有限公司 | 执行户内管线集成结构的方法 |
CN109586204A (zh) * | 2018-12-24 | 2019-04-05 | 成都建工第二建筑工程有限公司 | 用于安装二次配管的固定结构及安装二次配管的方法 |
CN109586204B (zh) * | 2018-12-24 | 2024-04-19 | 成都建工第二建筑工程有限公司 | 用于安装二次配管的固定结构及安装二次配管的方法 |
CN110792200A (zh) * | 2019-09-25 | 2020-02-14 | 江苏兴厦建设工程集团有限公司 | 一种无需后期剔打的砌体施工方法及其包管结构 |
CN110924692A (zh) * | 2019-12-02 | 2020-03-27 | 中建三局第三建设工程有限责任公司 | 砌体管线直埋施工方法 |
CN112343242A (zh) * | 2020-12-03 | 2021-02-09 | 中建一局集团建设发展有限公司 | 一种用于砌体结构包裹机电线管的包管装置及其施工方法 |
CN115162607A (zh) * | 2022-09-08 | 2022-10-11 | 中铁建设集团有限公司 | 一种砌筑配管组件及其同步施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806025A (zh) | 砌体工程机电管线与线盒直埋成套施工工艺 | |
CN103061515B (zh) | 混凝土空心砌块填充墙预埋pvc电线管穿管安装方法 | |
CN100592593C (zh) | 在墙体上配线管、线盒的施工方法 | |
CN104746772B (zh) | 灰渣混凝土空心隔墙板的防裂施工方法 | |
CN203420403U (zh) | 一种基于线盒与线管安装预制砌块的填充墙砌筑结构 | |
CN107546635A (zh) | 一种剪力墙上预埋电力接线盒的施工方法 | |
CN203229972U (zh) | 一种地下室外墙后浇带预制封堵挂板 | |
CN102071771B (zh) | 建筑废渣免烧结预埋管线槽砖及其使用方法 | |
CN204753783U (zh) | 预制砼雨污水检查井装置 | |
CN204252323U (zh) | 住宅墙体干法施工内装结构 | |
CN104455757A (zh) | 一种下水管组件及其安装方法 | |
CN206636132U (zh) | 一种垫层找平装置 | |
CN104988995A (zh) | 墙体内线盒与配电箱洞口处防开裂的方法 | |
CN210563409U (zh) | 一种临墙吊洞施工结构 | |
CN210563394U (zh) | 一种预留洞口快捷吊洞结构 | |
CN207098567U (zh) | 电缆沟的可滑动式电缆支撑件 | |
CN211369166U (zh) | 一种预制式卫生间隔墙 | |
CN109113213A (zh) | 一种低碳节能建筑防水墙体 | |
CN205259430U (zh) | 一种安装专用砌块 | |
CN208280385U (zh) | 一种多功能轻质隔墙板的连接构造 | |
CN208039307U (zh) | 一种新型双通道预制混凝土管廊结构 | |
CN205863837U (zh) | 一种暗装线盒 | |
KR100784987B1 (ko) | 매립박스 설치용 트렌치형 블록 | |
CN213710347U (zh) | 一种预制墙体模板节点结构 | |
CN110607858A (zh) | 一种预制式卫生间隔墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150729 |
|
RJ01 | Rejection of invention patent application after publication |