CN104790399A - Construction material feeding and conveying method for slope construction - Google Patents

Construction material feeding and conveying method for slope construction Download PDF

Info

Publication number
CN104790399A
CN104790399A CN201510126823.3A CN201510126823A CN104790399A CN 104790399 A CN104790399 A CN 104790399A CN 201510126823 A CN201510126823 A CN 201510126823A CN 104790399 A CN104790399 A CN 104790399A
Authority
CN
China
Prior art keywords
slideway
slope
material loading
sliding hopper
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510126823.3A
Other languages
Chinese (zh)
Inventor
兰泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Original Assignee
Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance filed Critical Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Priority to CN201510126823.3A priority Critical patent/CN104790399A/en
Publication of CN104790399A publication Critical patent/CN104790399A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a construction material feeding and conveying method for slope construction. The method comprises the steps that firstly, a position suitable for installation of a sliding way is selected on a slope construction site; secondly, the sliding way and a feeding sliding hopper are manufactured; manufactured sliding way sections are laid in sequence from bottom to top and fixed to a slope through buckles, and supporting objects are placed in gaps, so that installation is stable, and deformation is avoided; thirdly, a winch is arranged on the upper portion of the slope and corresponds to the sliding way in position, the feeding sliding hopper is placed in the sliding way, and a drag hook of the feeding sliding hopper is connected with a steel wire rope; in operation, the winch pulls the feeding sliding hopper with loads to ascend to a preset position, and materials are discharged by opening a side door of the feeding sliding hopper; an empty cart is returned to the bottom of the slope for reloading, and the operation is conducted circularly in this way. The method has the advantages that the construction materials can be placed at any place along the sliding way, the sliding way is modified through a scaffold, cost is low, and reinforcing is easy; compared with a current conveying mode, safety is greatly improved; the construction material feeding and conveying method is suitable for construction material feeding of peripheral slope construction of roads, railways and building structures.

Description

The method of building materials material loading conveying in slope construction
Technical field
The present invention relates to elevator, traction, the load device orbited, furthermore relate to building materials feeding conveying method.
Background technology
In slope construction process, the mode of movement of the building materials material loading of concrete and rubble and so on has artificial transmission usually, large-scale crane hangs to send and adds cableway conveying with hoist engine.Artificial transmission is wasted time and energy, inefficiency, and crane hangs and send potential safety hazard many, and it is not very high that hoist engine adds the not high and carrying capacity of cableway safety.Therefore building materials material loading is a technical barrier always.There is no better way up to now to solve.
At present, the patent application relating to building materials material loading only has No. 201310539375.0 " a kind of slope engineering feeding devices " 1, this device adopts the mode of ascending/decending and domatic slip to carry out transport material, draw plate by lifting gear, rope, discharge control apparatus, stripper drag-line, barrel of cement, barrel of cement, stripper form, lifting gear is connected by rope with barrel of cement, barrel of cement is arranged on barrel of cement and draws on plate, barrel of cement is provided with discharge control apparatus and stripper, stripper is connected on discharge control apparatus by stripper drag-line.Although this device may be used for slope engineering material loading, Structure of need is complicated, install cumbersome lifting gear, and the lifting of barrel of cement still has potential safety hazard.
Summary of the invention
The object of the present invention is to provide the method for building materials material loading conveying in a kind of slope construction, to solve a difficult problem for slope construction building materials material loading and to reduce potential safety hazard.
The method of building materials material loading conveying in the slope construction that inventor provides, comprises the following steps: first at the scene of slope construction, selects to be suitable for the position of installing slideway, cleaning foreign material and weeds; Then slideway and material loading sliding hopper is made; The segmentation slideway made from bottom to top is laid successively, with fastener, slideway is fixed on side slope, having gap to be encased inside supporter, install firm, prevent from bending distortion in carry process; On side slope top, part corresponding to slideway installs hoist engine afterwards, is placed among slideway, connects the drag hook of material loading sliding hopper with wire rope by prefabricated material loading sliding hopper; During operation, hoist engine pulls the material loading sliding hopper of load to rise to precalculated position, opens the side-door discharge of material loading sliding hopper; Empty wagons is put back at the bottom of slope, again feeds, and so circulates.
Above-mentioned slideway is made up of two steel pipes and junction plate, and the two ends of junction plate are welded on two steel pipes and form one section of slideway, and the connection of each segmentation adopts welding or riveted joint, forms slideway overall, and adopts universal fastening to be fixed on side slope face.
Above-mentioned material loading sliding hopper is made up of the case that struggles against, roller and drag hook, is provided with roller at the bottom of bucket case, and both sides have and the side door of switch can be beneficial to discharging; Described roller is spill, totally 4, and before and after point, two groups are arranged at the bottom of bucket case, and during use, the roller of material loading sliding hopper is on slideway; Drag hook is fixed in bucket case one end upwards.
Inventor points out: the feeding device of the inventive method, and two steel pipes of slideway must be installed firmly, especially needs to prevent from bending distortion in carry process.
In slope construction of the present invention, the method for building materials material loading conveying has the following advantages: all can throw in arbitrarily building materials material in slideway any position along the line, adopts original scaffold repacking slideway, cost low, reinforces easily; Compared with the mode of movement of existing material material loading, safety improves greatly.Be applicable to the building materials material loading of slope construction around mountain highway, railway and construction of structures.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the method for building materials material loading conveying in slope construction; Fig. 2 is slideway assembling schematic diagram, and Fig. 3 is slideway schematic cross-section, and Fig. 4 is material loading sliding hopper structural representation.
In figure: 1 is slideway, 2 is material loading sliding hopper, and 3 is wire rope, and 4 is hoist engine, and 5 is steel pipe, and 6 is junction plate, and 7 is bucket case, and 8 is roller, and 9 is drag hook, and 10 is side door, and 11 is fastener, and 12 is supporter.
Detailed description of the invention
Embodiment
First at the scene of slope construction, select to be suitable for the position of installing slideway, cleaning foreign material and weeds;
Then slideway as shown in Figure 2 and the material loading sliding hopper shown in Fig. 2 is made: slideway is made up of the junction steel plate of two diameters of the common scaffold commonly used to be the steel pipe of φ 48mm and thickness be 3mm, and the two ends of junction plate are welded on two steel pipes and form one section of slideway; Material loading sliding hopper is made up of the case that struggles against, roller and drag hook, divides two groups, front and back to be provided with 4 convex rollers at the bottom of bucket case, and both sides have and the side door of switch can be beneficial to discharging; The affixed drag hook in bucket case one end upwards;
Adopt universal fastening to be fixed on by slideway on side slope face, having gap to be encased inside supporter, install firm, prevent from bending distortion in carry process;
On side slope top, part corresponding to slideway installs the hoist engine that motor power (output) is 7.5kW afterwards, is placed among slideway by prefabricated material loading sliding hopper, connects the drag hook of material loading sliding hopper with the wire rope that diameter is φ 10mm;
Install, carry out idle test, determine normal operation, do not run limit, then carry out load test, until running status meets the requirements, can put into operation;
During material loading, hoist engine pulls the material loading sliding hopper of load to rise to and subscribes position, opens the side-door discharge of material loading sliding hopper; Empty wagons is put back at the bottom of slope, again feeds, and so circulates.

Claims (3)

1. a method for building materials material loading conveying in slope construction, is characterized in that comprising the following steps: first at the scene of slope construction, selects to be suitable for the position of installing slideway, cleaning foreign material and weeds; Then slideway and material loading sliding hopper is made; The segmentation slideway made from bottom to top is laid successively, with fastener, slideway is fixed on side slope, having gap to be encased inside supporter, install firm, prevent from bending distortion in carry process; On side slope top, part corresponding to slideway installs hoist engine afterwards, is placed among slideway, connects the drag hook of material loading sliding hopper with wire rope by prefabricated material loading sliding hopper; During operation, hoist engine pulls the material loading sliding hopper of load to rise to precalculated position, opens the side-door discharge of material loading sliding hopper; Empty wagons is put back at the bottom of slope, again feeds, and so circulates.
2. the method for claim 1, is characterized in that described slideway is made up of two steel pipes and junction plate, and the two ends of junction plate are welded on two steel pipes and form one section of slideway, and the connection of each segmentation adopts welding or riveted joint, forms slideway overall; Described fastener is universal fastening.
3. the method for claim 1, is characterized in that described material loading sliding hopper is made up of the case that struggles against, roller and drag hook, is provided with roller at the bottom of bucket case, and both sides have and the side door of switch can be beneficial to discharging; Described roller is spill, totally 4, and before and after point, two groups are arranged at the bottom of bucket case, and during use, the roller of material loading sliding hopper is on slideway; Drag hook is fixed in bucket case one end upwards.
CN201510126823.3A 2015-03-23 2015-03-23 Construction material feeding and conveying method for slope construction Pending CN104790399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510126823.3A CN104790399A (en) 2015-03-23 2015-03-23 Construction material feeding and conveying method for slope construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510126823.3A CN104790399A (en) 2015-03-23 2015-03-23 Construction material feeding and conveying method for slope construction

Publications (1)

Publication Number Publication Date
CN104790399A true CN104790399A (en) 2015-07-22

Family

ID=53555554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510126823.3A Pending CN104790399A (en) 2015-03-23 2015-03-23 Construction material feeding and conveying method for slope construction

Country Status (1)

Country Link
CN (1) CN104790399A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268630A (en) * 2017-07-06 2017-10-20 中交路桥建设有限公司 A kind of side slope protection construction material transport system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2513950Y (en) * 2001-12-13 2002-10-02 北京华林特装车有限公司 Vehicle for collecting classified refuse
CN102060199A (en) * 2010-12-16 2011-05-18 山西太行建设开发有限公司 Transportation method for constructing high mountain building
CN203269274U (en) * 2013-05-31 2013-11-06 中国葛洲坝集团股份有限公司 Slope section rail type conveying device
CN103523721A (en) * 2013-11-04 2014-01-22 肖栋 Feeding device used for slope surface project
CN203624403U (en) * 2013-12-18 2014-06-04 中铁十二局集团第一工程有限公司 Rail guided trolley for conveying materials for high-slope pitching

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2513950Y (en) * 2001-12-13 2002-10-02 北京华林特装车有限公司 Vehicle for collecting classified refuse
CN102060199A (en) * 2010-12-16 2011-05-18 山西太行建设开发有限公司 Transportation method for constructing high mountain building
CN203269274U (en) * 2013-05-31 2013-11-06 中国葛洲坝集团股份有限公司 Slope section rail type conveying device
CN103523721A (en) * 2013-11-04 2014-01-22 肖栋 Feeding device used for slope surface project
CN203624403U (en) * 2013-12-18 2014-06-04 中铁十二局集团第一工程有限公司 Rail guided trolley for conveying materials for high-slope pitching

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268630A (en) * 2017-07-06 2017-10-20 中交路桥建设有限公司 A kind of side slope protection construction material transport system and method

Similar Documents

Publication Publication Date Title
CN207513158U (en) Concrete stack shell constructing device
CN102109067B (en) Inner punched pipe construction device and construction method of long-distance sleeve
CN107795122A (en) Concrete stack shell constructing device and construction method
CN109505243A (en) Cable-stayed bridge combination beam bridge floor anti-cracking method
CN107130524A (en) Steel case arch bridge faces across pre-splicing rear anchor pushing tow system and method
CN108426094A (en) A kind of push pipe poling construction equipment and its method
CN107255188A (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN103216030A (en) Method for splicing and connecting precast reinforced concrete floor slabs within span
CN104790399A (en) Construction material feeding and conveying method for slope construction
RU157233U1 (en) RING CONCRETE LOADER
CN211058339U (en) Telescopic discharge apparatus of high-rise building
CN204530713U (en) The building materials feeding device of slope construction
CN101723238A (en) Clamp for capturing pipe pile die
CN108625881A (en) Two grommets with mobile arc track are to reinforcing steel bar laying trolley and laying method
CN201501421U (en) Pipeline transportation vehicle for construction site
CN207362867U (en) A kind of soft layer construction elevator processing infrastructure
CN110055905A (en) A kind of reinforcement means of novel fabricated bricklaying donor
CN101603379A (en) The mounting method of storehouse-top steel girder
CN218715197U (en) Shaped steel roof beam pours device
CN220336479U (en) Concrete spreader
CN212289878U (en) Simple device for transportation and construction of prefabricated ditch cable groove of railway roadbed
CN110374102A (en) Supporting anchorage cable and supporting construction
CN218145306U (en) Quick hoist and mount hoist of sewer line
CN204401594U (en) A kind of floating mat device for laying geotextile
CN211337685U (en) A supplementary overlapping conveyer of ripple culvert pipe for water conservancy culvert

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150722

WD01 Invention patent application deemed withdrawn after publication