CN211058339U - Telescopic discharge apparatus of high-rise building - Google Patents

Telescopic discharge apparatus of high-rise building Download PDF

Info

Publication number
CN211058339U
CN211058339U CN201921221653.7U CN201921221653U CN211058339U CN 211058339 U CN211058339 U CN 211058339U CN 201921221653 U CN201921221653 U CN 201921221653U CN 211058339 U CN211058339 U CN 211058339U
Authority
CN
China
Prior art keywords
deck
motor
level
building
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921221653.7U
Other languages
Chinese (zh)
Inventor
周泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Jiawang Tairui Agricultural Technology Co ltd
Original Assignee
Xuzhou Jiawang Tairui Agricultural Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Jiawang Tairui Agricultural Technology Co ltd filed Critical Xuzhou Jiawang Tairui Agricultural Technology Co ltd
Priority to CN201921221653.7U priority Critical patent/CN211058339U/en
Application granted granted Critical
Publication of CN211058339U publication Critical patent/CN211058339U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a telescopic discharge apparatus of high-rise building relates to building technical field, including the building outer wall, one side fixed mounting of building outer wall has the deck guide way, one side middle part of building outer wall is equipped with the one-level deck, one side top of building outer wall is equipped with hoisting motor, the bottom on one-level deck is equipped with the deck motor, and the hole that leaks has all been seted up to the lower surface on all decks. The utility model relates to a telescopic discharge apparatus of high-rise building, through set up on the building outer wall the deck guide way with hoisting motor dispatches this discharge apparatus and removes between different floors, realizes the quick transportation of material, replaces the manpower to transport building material, and the construction material is automatic to be drawn into indoorly, solves the problem that the deck motor intake increases the trouble life time of deck motor can discharge the rainwater that stores up in the deck fast, extension deck life.

Description

Telescopic discharge apparatus of high-rise building
Technical Field
The utility model relates to a building technical field specifically is a telescopic discharge apparatus of high-rise building.
Background
During construction of a high-rise building, due to the fact that building materials are lacked or construction wastes are generated, the building materials are often required to be conveyed, the building materials can be conveyed out of a building wall body to be matched with other conveying tools in a construction site for transferring, the telescopic unloading device can provide a safety platform for conveying the materials, and workers can convey the materials or the wastes lacked in the construction site by standing on the telescopic unloading device fixed outside the building wall body; the prior telescopic unloading device is fixed on the outer wall of a building through a rope or a bolt, and is manually operated; the telescopic unloading device is mostly fixed on an outer wall, is inconvenient to move and disassemble, is particularly inconvenient to move and disassemble, has higher construction risk coefficient when floors are required to be replaced, cannot directly switch positions among all floors, is difficult and dangerous to operate by manpower, is installed outdoors, has no drainage device, is easy to corrode after being used for a long time, has reduced safety performance, is inconvenient to use, and is not beneficial to popularization and use, so that the telescopic unloading device for the high-rise building is necessary to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a telescopic discharge apparatus of high-rise building to the current discharge apparatus who proposes in solving above-mentioned background art can't be directly change over position, manual operation danger, do not have drainage device's problem between each floor.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a telescopic unloading device for a high-rise building comprises a building outer wall, wherein a deck guide groove is fixedly installed on one side of the building outer wall, a first-level deck is arranged in the middle of one side of the building outer wall, two sides of the first-level deck are in sliding connection with the inner side of the deck guide groove through deck sliders, a lifting motor is arranged at the top of one side of the building outer wall, a lifting motor base is fixedly connected to the middle of the lifting motor, a lifting motor wheel is fixedly connected to the shaft of the lifting motor, a lifting lug is welded to the upper end of the first-level deck and is fixedly connected with the lifting motor wheel through a lifting steel cable, a deck motor is arranged at the bottom of the first-level deck, a deck motor base is fixedly connected to the upper portion of the deck motor, a deck motor wheel is fixedly connected to the shaft of the deck motor, and a deck steel, the one end fixedly connected with stay cord stake lug of deck motor wheel is kept away from to the deck cable wire, the stay cord stake has been welded to one side of stay cord lug, the one-level deck spout has been seted up to the inboard bottom on one-level deck, the inside sliding connection on one-level deck has the second grade deck, the outside bottom on second grade deck is equipped with the second grade deck pulley, the second grade deck spout has been seted up to the inboard bottom on second grade deck, the inboard sliding connection on second grade deck has tertiary deck, the outside bottom on tertiary deck is equipped with tertiary deck pulley, the upper end of stay cord stake and the lower part fixed connection on tertiary deck.
Optionally, the number of the deck guide grooves is two, and the distance between the two deck guide grooves is equal to the width of the first-level deck.
Optionally, the lower surfaces of the first-level deck, the second-level deck and the third-level deck are provided with water leakage holes, and the water leakage holes are distributed in a rectangular array mode.
Optionally, the first-stage deck sliding groove is connected with the second-stage deck pulley in a sliding manner, the second-stage deck sliding groove is connected with the third-stage deck pulley in a sliding manner, and the upper surface and the lower surface of the first-stage deck sliding groove and the upper surface and the lower surface of the second-stage deck sliding groove are both concave.
Optionally, the width and height of the secondary deck are both smaller than the width and height of the primary deck, and the width and height of the tertiary deck are both smaller than the width and height of the secondary deck.
Optionally, the nominal diameter of said hoisting cable is 16mm, and the load carrying safety of said hoisting cable is 4538 kg.
Optionally, the length of the first-stage deck sliding chute is smaller than that of the first-stage deck, and the length of the second-stage deck sliding chute is smaller than that of the second-stage deck.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up the deck motor, replace the manpower to transport building material, pull the deck withdrawal, the construction material on the deck is automatic to be drawn into indoorly, on the one hand, alleviates labour personnel's burden, also ensures constructor's safety simultaneously, and on the other hand, the deck moves steadily fast, ensures the complete transportation of material.
2. The utility model discloses a set up deck guide way and hoisting motor on building wall, can be according to job site schedule, dispatch this telescopic discharge apparatus and remove between different floors, can realize the rapid transit of building material and the safe transportation of construction waste material, solve the problem of unable conversion between the floor.
3. The utility model discloses a having seted up many holes that leak on the deck surface, can discharging the rainwater that stores up in the deck fast, can not lead to the corrosion of deck internal surface to rust, extension deck life, secondly, through setting up the backplate in deck both sides, prevent that the goods from depositing the shakiness and drop from the deck, in addition, the deck motor sets up at deck lower surface, solves the waterproof problem of motor, increases the trouble-free live time of motor, reinforcing equipment operation continuity and reliability.
Drawings
FIG. 1 is a schematic front view of the structure of the present invention;
FIG. 2 is a schematic top view of the structure of the present invention;
FIG. 3 is a schematic side view of the structure of the present invention;
FIG. 4 is a perspective view of the primary deck structure of the present invention;
FIG. 5 is a front sectional view of the deck structure of the present invention;
in the figure: 1. building exterior walls; 2. a hoisting motor base; 3. a hoisting motor; 4. a hoist motor wheel; 5. a hoisting cable; 6. a deck guide way; 7. hoisting lifting lugs; 8. a first-level deck; 9. a first-level deck chute; 10. a deck motor base; 11. a deck motor; 12. a first motor wheel; 13. a deck wire rope; 14. a secondary deck; 15. a secondary deck pulley; 16. a secondary deck chute; 17. a third deck; 18. a third-stage deck pulley; 19. pulling a rope pile; 20. a rope pulling pile lifting lug; 21. a water leakage hole; 22. a deck slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The utility model provides a telescopic unloading device for high-rise buildings as shown in figures 1-5, which comprises a building outer wall 1, wherein one side of the building outer wall 1 is fixedly provided with a deck guide groove 6, the middle part of one side of the building outer wall 1 is provided with a first-level deck 8, two sides of the first-level deck 8 are connected with the inner side of the deck guide groove 6 through a deck slider 22 in a sliding way, the number of the deck guide grooves 6 is two, the space between the two deck guide grooves 6 is equal to the width of the first-level deck 8, one side top of the building outer wall 1 is provided with a hoisting motor 3, the middle part of the hoisting motor 3 is fixedly connected with a hoisting motor base 2, a hoisting motor wheel 4 is fixedly connected on the shaft of the hoisting motor 3, the upper end of the first-level deck 8 is welded with a hoisting lug 7, the hoisting lug 7 is fixedly connected with the hoisting motor wheel 4 through, 4538kg is loaded safely on the load of the crane cable 5, the telescopic unloading device can be dispatched to move between different floors according to the schedule of a construction site by arranging the deck guide groove 6 and the crane motor 3 on the building outer wall 1, the problem that the floors cannot be converted is solved by dispatching the telescopic unloading device to move between different floors, the bottom of the primary deck 8 is provided with the deck motor 11, the construction materials are transported by replacing manpower by arranging the deck motor 11, the construction materials are automatically pulled into a room, on one hand, the burden of workers is lightened, meanwhile, the safety of the workers is ensured, on the other hand, the deck motor 11 operates quickly and stably, the complete transportation of the materials is ensured, the upper part of the deck motor 11 is fixedly connected with the deck motor base 10, the shaft of the deck motor 11 is fixedly connected with the deck motor wheel 12, one side of the deck motor wheel 12 is fixedly connected with the deck cable 13, a pull rope pile lifting lug 20 is fixedly connected to one end, far away from the deck motor wheel 12, of the deck steel cable 13, a pull rope pile 19 is welded to one side of the pull rope pile lifting lug 20, a first-stage deck sliding groove 9 is formed in the bottom of the inner side of the first-stage deck 8, a second-stage deck 14 is slidably connected to the inside of the first-stage deck 8, a second-stage deck pulley 15 is arranged at the bottom of the outer side of the second-stage deck 14, a second-stage deck sliding groove 16 is formed in the bottom of the inner side of the second-stage deck 14, a third-stage deck pulley 18 is arranged at the bottom of the outer side of the third-stage deck 17, the upper end of the pull rope pile 19 is fixedly connected with the lower portion of the third-stage deck 17, the upper surface and the lower surface of the first-stage deck sliding groove 9 and the second-stage deck sliding groove 16 are both concave, the length of, the width and the height of tertiary deck 17 all are less than the width and the height of second grade deck 14, one-level deck spout 9 and 15 sliding connection of second grade deck pulley, second grade deck spout 16 and 18 sliding connection of tertiary deck pulley, one-level deck 8, the hole 21 that leaks has all been seted up to the lower surface of second grade deck 14 and tertiary deck 17, a plurality of holes 21 that leak are the rectangular array and distribute, through having seted up many holes 21 that leak on the deck surface, can discharge the rainwater that accumulates in the deck fast, can not lead to the corrosion of deck internal surface to rust, extension deck life, secondly, through set up the backplate in deck both sides, prevent that the goods from depositing the unstability and dropping from the deck, in addition, deck motor 11 sets up at one-level deck 8 lower surface, solve the waterproof problem of motor, increase deck motor 11 trouble-free life, reinforcing equipment operation continuity and reliability.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
The working principle is as follows: when the unloading device needs to move upwards, the hoisting motor 3 is electrified to operate, and the hoisting motor wheel 4 rotates, so that the hoisting steel cable 5 is wound and shortened, and the primary deck 8, the secondary deck 14 and the tertiary deck 17 are driven to integrally move upwards; when the unloading device needs to be parked when the unloading device is operated to a proper position, the hoisting motor 3 is powered off, the hoisting motor wheel 4 stops rotating, the hoisting steel cable 5 is kept still, and the primary deck 8, the secondary deck 14 and the tertiary deck 17 are stably parked outside the building; when the unloading device needs to operate downwards, the hoisting motor 3 is electrified to operate, the hoisting motor wheel 4 rotates reversely, so that the hoisting steel cable 5 moves downwards, and the primary deck 8, the secondary deck 14 and the tertiary deck 17 integrally operate downwards; when materials need to be unloaded and transported into a building, the deck motor 11 is electrified to operate, the deck motor wheel 12 rotates to enable the deck steel cable 13 to be retracted and shortened, the third-level deck 17 with the building construction materials moves towards the building outer wall 1 direction, the second-level deck 14 is pushed to retract, and finally the automatic transportation of the building materials is completed; when the discharging device needs to be extended, the secondary deck 14 and the tertiary deck 17 are pushed to run outwards.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a telescopic discharge apparatus of high-rise building, includes building outer wall (1), its characterized in that: a deck guide groove (6) is fixedly installed on one side of the building outer wall (1), a first-level deck (8) is arranged in the middle of one side of the building outer wall (1), two sides of the first-level deck (8) are in sliding connection with the inner side of the deck guide groove (6) through deck sliding blocks (22), a lifting motor (3) is arranged at the top of one side of the building outer wall (1), a lifting motor base (2) is fixedly connected to the middle of the lifting motor (3), a lifting motor wheel (4) is fixedly connected to the shaft of the lifting motor (3), a lifting lug (7) is welded to the upper end of the first-level deck (8), the lifting lug (7) is fixedly connected with the lifting motor wheel (4) through a lifting steel cable (5), a deck motor (11) is arranged at the bottom of the first-level deck (8), and a deck motor base (10) is fixedly connected to the upper portion of the, the improved structure of the novel high-speed transmission line is characterized in that a deck motor wheel (12) is fixedly connected to the shaft of the deck motor (11), a deck steel cable (13) is fixedly connected to one side of the deck motor wheel (12), a stay cord pile lifting lug (20) is fixedly connected to one end, far away from the deck motor wheel (12), of the deck steel cable (13), a stay cord pile (19) is welded to one side of the stay cord pile lifting lug (20), a primary deck sliding groove (9) is formed in the bottom of the inner side of the primary deck (8), a secondary deck (14) is slidably connected to the inner side of the primary deck (8), a secondary deck pulley (15) is arranged at the bottom of the outer side of the secondary deck (14), a secondary deck sliding groove (16) is formed in the bottom of the inner side of the secondary deck (14), a tertiary deck (17) is slidably connected to the inner side of the secondary, the upper end of the stay cord pile (19) is fixedly connected with the lower part of the third-level deck (17).
2. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
the number of the deck guide grooves (6) is two, and the distance between the two deck guide grooves (6) is equal to the width of the first-level deck (8).
3. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
the lower surface of one-level deck (8), second grade deck (14) and tertiary deck (17) has all been seted up and has been leaked water hole (21), and is a plurality of it distributes to leak water hole (21) is the rectangle array.
4. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
one-level deck spout (9) and second grade deck pulley (15) sliding connection, second grade deck spout (16) and tertiary deck pulley (18) sliding connection, the upper and lower face of one-level deck spout (9) and second grade deck spout (16) is the concave type.
5. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
the width and the height of the secondary deck (14) are smaller than those of the primary deck (8), and the width and the height of the tertiary deck (17) are smaller than those of the secondary deck (14).
6. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
the nominal diameter of the hoisting steel cable (5) is 16mm, and the load safety of the hoisting steel cable (5) is 4538 kg.
7. The telescopic discharging device for high-rise buildings according to claim 1, characterized in that:
the length of the first-stage deck sliding groove (9) is smaller than that of the first-stage deck (8), and the length of the second-stage deck sliding groove (16) is smaller than that of the second-stage deck (14).
CN201921221653.7U 2019-07-31 2019-07-31 Telescopic discharge apparatus of high-rise building Expired - Fee Related CN211058339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921221653.7U CN211058339U (en) 2019-07-31 2019-07-31 Telescopic discharge apparatus of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921221653.7U CN211058339U (en) 2019-07-31 2019-07-31 Telescopic discharge apparatus of high-rise building

Publications (1)

Publication Number Publication Date
CN211058339U true CN211058339U (en) 2020-07-21

Family

ID=71589504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921221653.7U Expired - Fee Related CN211058339U (en) 2019-07-31 2019-07-31 Telescopic discharge apparatus of high-rise building

Country Status (1)

Country Link
CN (1) CN211058339U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111960121A (en) * 2020-08-17 2020-11-20 李福忠 Lime unloading equipment for construction
CN114352020A (en) * 2022-01-12 2022-04-15 中交二公局第一工程有限公司 BIM-based distribution device for high-rise building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111960121A (en) * 2020-08-17 2020-11-20 李福忠 Lime unloading equipment for construction
CN114352020A (en) * 2022-01-12 2022-04-15 中交二公局第一工程有限公司 BIM-based distribution device for high-rise building
CN114352020B (en) * 2022-01-12 2023-03-14 中交二公局第一工程有限公司 BIM-based distribution device for high-rise building

Similar Documents

Publication Publication Date Title
CN211058339U (en) Telescopic discharge apparatus of high-rise building
CN109113353B (en) Building construction receiving platform system with lifting function
CN210858024U (en) Discharging platform with liftable hole part
CN102777048A (en) Vertical transportation device
CN218371437U (en) Portable metal pipeline hoists hoisting device
CN208039864U (en) The attached lift-type discharging platform of Guiding Support Elevating Scaffold
CN204609308U (en) A kind of passage limited position concrete rail transporter
CN216446539U (en) Sliding type discharging platform
CN213774378U (en) Assembled building safety construction platform
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN213923658U (en) Conveying device for lifting materials in super high-rise building floor
CN212201325U (en) Telescopic string tube
CN203768789U (en) Combined type steel trestle for enabling roller compacted concrete to be stored in bin
CN210239157U (en) Discharging platform with sliding plate
CN113529724A (en) Foundation pit concrete pouring construction method
CN219585704U (en) Pipe conveying device for building construction
CN110759248A (en) Auxiliary replacing device for main pump motor of hydraulic station
CN212336759U (en) A installation mechanism that slides for building assembled structure
CN211997080U (en) Improved movable type lifting hopper
CN217297055U (en) Hoisting accessory for construction
CN219261791U (en) Epitaxial material transportation platform for high-rise building construction
CN208056656U (en) Building machinery engineering hopper
CN215285696U (en) Gallows of cooperation assembled integration roofing construction bulk material handling
CN217676533U (en) Small-sized manual hoisting and transporting device
CN215402823U (en) Retractable lifting machine device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200721

Termination date: 20210731

CF01 Termination of patent right due to non-payment of annual fee