CN104790289A - 一种钢复合psc波纹钢板u型简支梁桥及连续梁桥 - Google Patents
一种钢复合psc波纹钢板u型简支梁桥及连续梁桥 Download PDFInfo
- Publication number
- CN104790289A CN104790289A CN201510093743.2A CN201510093743A CN104790289A CN 104790289 A CN104790289 A CN 104790289A CN 201510093743 A CN201510093743 A CN 201510093743A CN 104790289 A CN104790289 A CN 104790289A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel wire
- block
- concrete
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
- E01D2101/285—Composite prestressed concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2014-0062897 | 2014-05-26 | ||
KR1020140062897A KR101455747B1 (ko) | 2014-05-26 | 2014-05-26 | 강합성 psc 파형강판 u거더 단순교 및 연속교 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104790289A true CN104790289A (zh) | 2015-07-22 |
Family
ID=52288373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510093743.2A Pending CN104790289A (zh) | 2014-05-26 | 2015-03-03 | 一种钢复合psc波纹钢板u型简支梁桥及连续梁桥 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR101455747B1 (ko) |
CN (1) | CN104790289A (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316554A (zh) * | 2018-04-19 | 2018-07-24 | 上海欧本钢结构有限公司 | 一种钢波纹甲壳与预应力混凝土组合梁及其施工方法 |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101606135B1 (ko) | 2014-06-18 | 2016-03-24 | 우경기술주식회사 | 강합성 psc 트러스 u거더 단순교 및 연속교 |
CN106087711B (zh) * | 2016-08-09 | 2017-11-21 | 湖南联智桥隧技术有限公司 | 波腹工梁-钢砼顶板-体外预应力组合t型简支梁 |
CN112962453A (zh) * | 2021-02-03 | 2021-06-15 | 江西龙正科技发展有限公司 | 新型超高强度混凝土uhpc轻型组合桥面 |
CN114753562A (zh) * | 2022-04-25 | 2022-07-15 | 交通运输部公路科学研究所 | 一种平面网格预应力片及加固方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000017612A (ja) * | 1998-06-29 | 2000-01-18 | Ps Corp | 波形鋼板ウエブ桁及び波形鋼板ウエブ桁橋の施工方法 |
KR20060114973A (ko) * | 2005-05-03 | 2006-11-08 | 주식회사 기주건설 | 교량구조물의 내진보강용 충격완화장치 |
CN101793002A (zh) * | 2010-03-29 | 2010-08-04 | 中铁二院工程集团有限责任公司 | 铁路钢桁梁斜拉桥整体复合式索梁锚固结构 |
CN202247664U (zh) * | 2011-06-10 | 2012-05-30 | 广东工业大学 | 提高混凝土箱梁、t梁抗剪承载力的外贴钢板、型钢结构 |
CN104088221A (zh) * | 2014-07-31 | 2014-10-08 | 长安大学 | 一种基于钢桁架与组合桥面板的t形板桁节段预制单元 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100800393B1 (ko) * | 2007-09-14 | 2008-02-01 | 노윤근 | 강합성 콘크리트 u거더 |
KR101084397B1 (ko) * | 2011-06-09 | 2011-11-18 | 주식회사 인터컨스텍 | 연속교에 사용되는 프리캐스트 콘크리트를 이용한 강박스 합성거더와 이의 제작방법 |
KR101169012B1 (ko) * | 2011-09-20 | 2012-07-26 | 우경기술주식회사 | Psc 박스 거더 및 이의 시공방법 |
-
2014
- 2014-05-26 KR KR1020140062897A patent/KR101455747B1/ko active IP Right Grant
-
2015
- 2015-03-03 CN CN201510093743.2A patent/CN104790289A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000017612A (ja) * | 1998-06-29 | 2000-01-18 | Ps Corp | 波形鋼板ウエブ桁及び波形鋼板ウエブ桁橋の施工方法 |
KR20060114973A (ko) * | 2005-05-03 | 2006-11-08 | 주식회사 기주건설 | 교량구조물의 내진보강용 충격완화장치 |
CN101793002A (zh) * | 2010-03-29 | 2010-08-04 | 中铁二院工程集团有限责任公司 | 铁路钢桁梁斜拉桥整体复合式索梁锚固结构 |
CN202247664U (zh) * | 2011-06-10 | 2012-05-30 | 广东工业大学 | 提高混凝土箱梁、t梁抗剪承载力的外贴钢板、型钢结构 |
CN104088221A (zh) * | 2014-07-31 | 2014-10-08 | 长安大学 | 一种基于钢桁架与组合桥面板的t形板桁节段预制单元 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316554A (zh) * | 2018-04-19 | 2018-07-24 | 上海欧本钢结构有限公司 | 一种钢波纹甲壳与预应力混凝土组合梁及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
KR101455747B1 (ko) | 2014-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790289A (zh) | 一种钢复合psc波纹钢板u型简支梁桥及连续梁桥 | |
Billington et al. | A precast segmental substructure system for standard bridges | |
CN102220739B (zh) | 一种波形钢腹板预应力混凝土连续箱梁及施工方法 | |
CN103046463B (zh) | 装配式马鞍壳形底板连续箱梁桥及其建造方法 | |
CN104988844A (zh) | 二次张拉预应力装配式波形钢腹板组合梁及其施工方法 | |
CN103938546A (zh) | 简支变连续施工方法及其结构 | |
CN105781099A (zh) | 可移动组合式单侧大模板结构及施工方法 | |
CN103938533A (zh) | 简支变连续结构及其施工方法 | |
CN111172864A (zh) | 装配式一体化墩柱盖梁组合结构及其施工方法 | |
CN209493826U (zh) | 混凝土节段预制桥梁临时拼接构造 | |
CN106284046A (zh) | 桥梁钢砼平弯组合梁制作方法 | |
KR100727114B1 (ko) | 하로교 제작용 프리캐스트 세그먼트와 이를 이용한 하로교제작방법 | |
CN111206488A (zh) | 大跨变宽波形腹板钢箱-混凝土连续梁桥及施工方法 | |
CN103290777A (zh) | 内置斜腿刚架预应力混凝土变截面箱梁桥及其施工方法 | |
KR101582599B1 (ko) | 교각 연속지점부를 거더 연결형 코핑부로 형성하는 교량 시공 방법 | |
CN205531426U (zh) | 一种既有建筑增设电梯的连接装置 | |
KR20160073710A (ko) | 프리스트레스가 도입된 대편심의 강-콘크리트 합성 박스거더, 이를 이용한 교량 및 강-콘크리트 합성 박스거더의 다경간 연속구조 | |
CN102409603A (zh) | 双层钢桁混凝土叠合拱结构及其施工方法 | |
CN112982139A (zh) | 一种宽幅大跨混合梁矮塔斜拉桥体系及其施工方法 | |
CN202644415U (zh) | 桥梁顶升用环形牛腿式抱柱梁 | |
CN105239497A (zh) | 一种预应力混凝土组合桁架梁 | |
CN104911986A (zh) | 钢复合型psc桁架u型简支梁桥及连续梁桥 | |
CN211547345U (zh) | 一种基于螺栓连接的装配式钢-uhpc组合结构 | |
CN103669193A (zh) | 一种横向拼装波形钢腹板组合t梁及施工方法 | |
CN107142830A (zh) | 钢管腹板预应力钢混组合主梁结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150722 |