CN104787652A - 摩擦式提升机尾绳更换方法 - Google Patents
摩擦式提升机尾绳更换方法 Download PDFInfo
- Publication number
- CN104787652A CN104787652A CN201510191248.5A CN201510191248A CN104787652A CN 104787652 A CN104787652 A CN 104787652A CN 201510191248 A CN201510191248 A CN 201510191248A CN 104787652 A CN104787652 A CN 104787652A
- Authority
- CN
- China
- Prior art keywords
- rope
- new
- tail rope
- old
- tail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/02—Installing or exchanging ropes or cables
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明是一种摩擦式提升机尾绳更换方法,用新绳缠绕层与层之间夹入铁板的方法取代了木楔顶绳的方法,在缠新绳时,在每层绳之间按120°均匀放置3块与卷筒长度相当的6mm厚铁板,下放新绳时因铁板的作用,使上层绳无法陷入下层绳缝隙并且不会出现新绳刮蹭连接装置的问题,此方法投入使用后较大程度地提高了安全系数,节约了放新绳和收旧绳时间。完成两根尾绳仅需10小时左右,从而大大缩短了停产检修时间(18小时左右)。
Description
技术领域
本发明涉及一种摩擦式提升机尾绳更换方法。
背景技术
随着黄金矿业经营形势的日益严峻,对提升系统检修的时间及安全性能标准要求越来越高。摩擦式提升机尾绳的现有更换方法是通过在井口稳车上缠绕新绳实现的。在井口稳车上缠绕新绳时,因新绳与稳车牵引绳之间需使用卸扣及板卡进行连接,在缠绕新绳时为了保证新绳缠绕整齐,同时避免新绳与卸扣或者板卡相刮蹭,需用辅助材料定位。定位方法是将连接装置置于稳车滚筒一侧,缠绕新绳接近连接装置时用木楔及方木顶住新绳,使其与连接装置保持一定距离,此方法缠绕新绳时无问题,但下放新绳时往往因为木楔及方木顶产生位移导致新绳垮塌、木楔脱落,上层绳急速陷入下层缝隙,落差导致下放新绳跳绳严重,甚至会出现刮蹭新绳的问题,安全系数较低。
现有的尾绳更换方法还有一个缺点,由于仅能将每根新绳一端做头,停产检修时将已做头端新绳由井口借助井口导向轮放绳,新绳经井底带至装载站换绳位置,将箕斗停至装载站换绳位置,此时罐笼在井口以上,实测剩余新绳需要长度,将稳车上剩余的新绳根据实测长度做头,两根尾绳更换完毕合计用时较长(一般约28小时左右)。
发明内容
本发明所要解决的技术问题是提供一种摩擦式提升机尾绳更换方法,第一、大幅度缩短停产检修时间,提高提升机工作效率;第二、有效避免了新绳刮蹭连接装置的问题,用以提高更换操作的安全系数。
本发明的技术方案如下:
摩擦式提升机尾绳更换方法,其特征在于它包括提升机正常运行期间的准备步骤和提升机停机状态下的更换步骤:
其中所述的准备步骤如下:
1)、首先将两根新尾绳分别缠绕至设在井口侧的两台稳车上,然后将其中一根新尾绳的绳头做头并安装尾绳旋转器总成;
2)、首先将两根新尾绳分别沿井筒一角从井口下放至井底不同深度处,在井口将剩余的新尾绳锁闭,以便于能将两根新尾绳剩余的绳头导出,然后在井筒中将下放的新尾绳进行临时固定;
3)、将两根剩余绳头做头并安装旋转器杯体;
其中所述的更换步骤如下:
1)、首先解除井底箕斗侧稳车对应的新绳旋转器的铁丝,自下而上依次解除井筒内所有两根新绳的临时固定装置,使井筒内新绳处于自由状态;然后井口稳车拉紧新绳,解除对新绳的锁闭;
2)、将靠箕斗侧稳车新绳旋转器与靠稳车侧旧尾绳连接,同时将旧尾绳割断,罐笼慢下同时稳车慢下,直至新绳旋转器被带至装载站换绳位置;
3)、首先利用井底水平以上钢梁借助导链将新尾绳的旋转器锁住,箕斗慢上将旧尾绳上板卡撤掉,箕斗慢下,将箕斗下全部旧尾绳从井底收回,然后将旧尾绳割断;
4)、罐笼慢下至井口,借助罐笼于新尾绳下放使用的导向轮下端打板卡,同时于罐笼与箕斗间4米高度处钢梁上悬挂起吊绳扣,借助起吊绳扣下端与卸扣连接,卸扣与板卡连接,实现钢梁上的起吊绳扣与新尾绳连接,稳车慢下,将新尾绳锁于井口箕斗侧一角,然后安装第一根新尾绳旋转器总成;
5)、井口放吊桥并用木板封井口,利用箕斗侧罐道梁、绳扣、卸扣和板卡,锁旧尾绳,旧尾绳锁好后将罐笼侧旧旋转器下旧尾绳割断,同时将新尾绳旋转器总成安装到位,将旧尾绳绳头与稳车连接、拉紧稳车,将旧尾绳上的绳扣、卸扣和板卡撤除,准备收旧绳,井口罐笼慢上将安装好的新尾绳拉紧,拆除封井口的木板,拆除新尾绳上的绳扣、卸扣和板卡,井口第一根新绳更换完毕;
6)、罐笼慢上至满足换绳高度位置,箕斗侧拆卸旧旋转器总成,安装新尾绳,同时井口稳车开始运转回收井筒中第一根旧尾绳,首先封装载站水平井口,拆卸旧旋转器总成,后将新尾绳旋转器安装到位;
7)、撤掉步骤5)所设木板,预留出罐笼慢上时新尾绳移动空间,罐笼慢上撤掉锁新绳的绳扣及板卡,完成此根新绳更换,至此第一根尾绳全部更换完毕;
8)、同样办法完成另一根尾绳更换。
本发明的积极效果在于:
第一、本发明的方法中,用新绳缠绕层与层之间夹入铁板的方法取代了木楔顶绳的方法,在缠新绳时,在每层绳之间按120°均匀放置3块与卷筒长度相当的6mm厚铁板,下放新绳时因铁板的作用,使上层绳无法陷入下层绳缝隙并且不会出现新绳刮蹭连接装置的问题,此方法投入使用后较大程度地提高了安全系数,节约了放新绳和收旧绳时间。
第二、精确定位同根新尾绳另一端做头位置。利用提升机编码器实际运行显示的两个数值差对新尾绳进行长度预留及校验,大大缩短了人工测量所需的时间。
第三、采用本发明的方法,两根尾绳更换,放新绳、确定每根新绳另一端做头位置以及另一端做头等工作均在日常生产时分段完成,不占用停机维修时间,最终完成两根尾绳仅需10小时左右,从而大大缩短了停产检修时间(18小时左右)。按照提升机提升矿石产生的效益进行计算,每斗提升矿石12.5T,187.5T/小时,18小时共提升矿量约3375T,每吨品位按2.5g计算,黄金价额253元/克,去掉克金成本203元/克,纯利润为50元/克,合计多创造效益为42万余元。
具体实施方式
山东黄金矿业(玲珑)有限公司分多个矿区,摩擦式提升机分布较广,本发明的尾绳更换方法特别适合矿山摩擦式圆钢丝尾绳运行方式的提升机。以下结合申请人公司下属九曲运修车间+255技措井尾绳更换工艺详细说明本发明。
一、准备工作:
1、利用非检修时间首先将两根新尾绳分别缠绕至井口两台10t稳车(即凿井绞车)上,完成后将两根尾绳其中一个绳头做头并安装尾绳旋转器总成。
2、在不影响正常生产的情况下,利用每天巡检时间将两根尾绳分别沿井筒一角从井口下放至井底(+255至-295),在井口将剩余的尾绳借用板卡等辅材锁绳,以便于能将两根尾绳剩余的绳头导出,在井筒中将下放的尾绳临时固定。
3、将两根剩余绳头做头并安装旋转器杯体。剩余绳头是指:所更换的竖井有两个容器(罐笼、箕斗),尾绳总数量为两根;每根尾绳的一端由一个专用尾绳连接器与一个容器连接,另一端由另一个专用尾绳连接器与另一个容器连接;分别将两根尾绳的一端做头并安装专用尾绳连接器下放至井底,每根尾绳均剩余一个绳头尚缠绕在井口稳车的卷筒上。本发明描述为“两根剩余绳头”。
二、尾绳更换工艺:
1、箕斗卸配重,并重新加配重4t,井底检修人员及井口两名人员到达井底装载站,解除井底箕斗侧稳车对应的新绳旋转器的铁丝,罐笼自下而上借助罐笼解除井筒内所有临时捆绑两根新绳设施,使井筒内新绳处于自由状态。罐笼至井口。井口稳车拉紧新绳,解除井口锁新绳的钢丝绳扣、尾绳板卡、卸扣。
2、旧绳带新绳。井底人员至井底利用一付旧式尾绳板卡、绳扣、卸扣将靠箕斗侧稳车新绳旋转器与靠稳车侧旧尾绳连接,同时将旧尾绳割断(割前将旧尾绳头用铁丝固定一下),罐笼慢下同时稳车慢下(注意过罐笼、箕斗侧尾绳隔网时状态;注意井底与井口的密切联系确保稳车及罐笼运行速度相当),直至新绳旋转器被带至装载站换绳位置。
3 、利用井底水平以上钢梁借助1t导链将新尾绳的旋转器锁住,箕斗慢上将旧首绳上板卡撤掉,箕斗慢下,将箕斗下全部旧尾绳从井底收回,割断。
4、罐笼慢下至井口,借助罐笼于新尾绳下放使用的导向轮下端打板卡,同时于罐笼与箕斗间4米高度处钢梁上悬挂起吊绳扣,借助起吊绳扣下端与卸扣连接,卸扣与板卡连接,实现钢梁上的起吊绳扣与新尾绳连接,稳车慢下,将新尾绳锁于井口箕斗侧一角,然后安装第一根新尾绳旋转器总成。
5 、井口放吊桥(靠箕斗侧一组)并用木板封井口(注意留出新尾绳移动空间)。利用箕斗侧罐道梁、20米长∮15.5绳扣、10t卸扣、板卡,锁旧尾绳(旧尾绳预留足够绳头,准备与10t稳车连接),旧尾绳锁好,将罐笼侧旧旋转器下旧尾绳割断,同时将新尾绳旋转器总成安装到位,将旧尾绳绳头与10t稳车连接、拉紧稳车,将旧尾绳上的∮15.5绳扣、10t卸扣、板卡撤除,准备收旧绳,井口罐笼慢上将安装好的新尾绳拉紧,拆除封井口的木板等设施,拆除新尾绳上的∮15.5绳扣、10t卸扣、板卡,井口第一根新绳更换完毕。
6、 罐笼慢上至+261.29水平,箕斗旋转器销孔恰好至-295水平以上约1.65米满足换绳高度位置,开始箕斗侧拆卸旧旋转器总成,安装新尾绳工作,同时井口10t稳车开始运转回收井筒中第一根旧尾绳,首先封装载站水平井口,拆卸旧旋转器总成,后将新尾绳旋转器安装到位。
7、撤掉部分木板,预留出罐笼慢上时新尾绳移动空间,罐笼慢上撤掉锁新绳的绳扣及板卡,完成此根新绳更换,至此第一根尾绳全部更换完毕。
8、同样办法完成另一根尾绳更换。
Claims (1)
1.摩擦式提升机尾绳更换方法,其特征在于它包括提升机正常运行期间的准备步骤和提升机停机状态下的更换步骤:
其中所述的准备步骤如下:
1)、首先将两根新尾绳分别缠绕至设在井口侧的两台稳车上,然后将其中一根新尾绳的绳头做头并安装尾绳旋转器总成;
2)、首先将两根新尾绳分别沿井筒一角从井口下放至井底不同深度处,在井口将剩余的新尾绳锁闭,以便于能将两根新尾绳剩余的绳头导出,然后在井筒中将下放的新尾绳进行临时固定;
3)、将两根剩余绳头做头并安装旋转器杯体;
其中所述的更换步骤如下:
1)、首先解除井底箕斗侧稳车对应的新绳旋转器的铁丝,自下而上依次解除井筒内所有两根新绳的临时固定装置,使井筒内新绳处于自由状态;然后井口稳车拉紧新绳,解除对新绳的锁闭;
2)、将靠箕斗侧稳车新绳旋转器与靠稳车侧旧尾绳连接,同时将旧尾绳割断,罐笼慢下同时稳车慢下,直至新绳旋转器被带至装载站换绳位置;
3)、首先利用井底水平以上钢梁借助导链将新尾绳的旋转器锁住,箕斗慢上将旧尾绳上板卡撤掉,箕斗慢下,将箕斗下全部旧尾绳从井底收回,然后将旧尾绳割断;
4)、罐笼慢下至井口,借助罐笼于新尾绳下放使用的导向轮下端打板卡,同时于罐笼与箕斗间4米高度处钢梁上悬挂起吊绳扣,借助起吊绳扣下端与卸扣连接,卸扣与板卡连接,实现钢梁上的起吊绳扣与新尾绳连接,稳车慢下,将新尾绳锁于井口箕斗侧一角,然后安装第一根新尾绳旋转器总成;
5)、井口放吊桥并用木板封井口,利用箕斗侧罐道梁、绳扣、卸扣和板卡,锁旧尾绳,旧尾绳锁好后将罐笼侧旧旋转器下旧尾绳割断,同时将新尾绳旋转器总成安装到位,将旧尾绳绳头与稳车连接、拉紧稳车,将旧尾绳上的绳扣、卸扣和板卡撤除,准备收旧绳,井口罐笼慢上将安装好的新尾绳拉紧,拆除封井口的木板,拆除新尾绳上的绳扣、卸扣和板卡,井口第一根新绳更换完毕;
6)、罐笼慢上至满足换绳高度位置,箕斗侧拆卸旧旋转器总成,安装新尾绳,同时井口稳车开始运转回收井筒中第一根旧尾绳,首先封装载站水平井口,拆卸旧旋转器总成,后将新尾绳旋转器安装到位;
7)、撤掉步骤5)所设木板,预留出罐笼慢上时新尾绳移动空间,罐笼慢上撤掉锁新绳的绳扣及板卡,完成此根新绳更换,至此第一根尾绳全部更换完毕;
8)、同样办法完成另一根尾绳更换。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510191248.5A CN104787652B (zh) | 2015-04-22 | 2015-04-22 | 摩擦式提升机尾绳更换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510191248.5A CN104787652B (zh) | 2015-04-22 | 2015-04-22 | 摩擦式提升机尾绳更换方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104787652A true CN104787652A (zh) | 2015-07-22 |
CN104787652B CN104787652B (zh) | 2016-03-09 |
Family
ID=53552911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510191248.5A Active CN104787652B (zh) | 2015-04-22 | 2015-04-22 | 摩擦式提升机尾绳更换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104787652B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081836A (zh) * | 2016-08-31 | 2016-11-09 | 山东黄金矿业(玲珑)有限公司 | 竖井首绳和尾绳更换方法 |
CN106241580A (zh) * | 2016-09-13 | 2016-12-21 | 太原科技大学 | 一种恒锁绳力连续小冲击收放绳装置及方法 |
CN108394800A (zh) * | 2018-03-28 | 2018-08-14 | 徐州九益科技有限公司 | 立井提升机尾绳更换工艺 |
CN109110624A (zh) * | 2018-09-26 | 2019-01-01 | 河北峪耳崖黄金矿业有限责任公司 | 一种摩擦式卷扬首绳更换装置及其使用方法 |
CN110451392A (zh) * | 2019-08-31 | 2019-11-15 | 山东黄金矿业(玲珑)有限公司 | 落地式多绳摩擦提升机天轮轴瓦更换方法 |
CN111792500A (zh) * | 2020-07-27 | 2020-10-20 | 山东黄金矿业(玲珑)有限公司 | 落地式摩擦提升机尾绳更换方法 |
CN113697628A (zh) * | 2021-08-31 | 2021-11-26 | 铜陵有色金属集团股份有限公司 | 副井提升系统重故障应急机械开车方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3720291A (en) * | 1970-08-27 | 1973-03-13 | I Ivanov | Apparatus for and method of replacing cables in multicable lifting devices |
CN101311099A (zh) * | 2008-06-07 | 2008-11-26 | 徐州市工大三森科技有限公司 | 立井摩擦提升调绳装置及调绳方法 |
CN101391721A (zh) * | 2008-10-27 | 2009-03-25 | 兖州煤业股份有限公司 | 塔式摩擦提升机更换提升钢丝绳新工艺 |
CN101417765A (zh) * | 2008-11-22 | 2009-04-29 | 太原理工大学 | 提升机首绳同步连续更换装置 |
RU2409513C1 (ru) * | 2009-12-07 | 2011-01-20 | Федеральное агентство по образованию Государственное образовательное учреждение высшего профессионального образования "Норильский индустриальный институт" | Способ замены канатов шахтной подъемной установки со шкивом трения и устройство для его осуществления |
-
2015
- 2015-04-22 CN CN201510191248.5A patent/CN104787652B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3720291A (en) * | 1970-08-27 | 1973-03-13 | I Ivanov | Apparatus for and method of replacing cables in multicable lifting devices |
CN101311099A (zh) * | 2008-06-07 | 2008-11-26 | 徐州市工大三森科技有限公司 | 立井摩擦提升调绳装置及调绳方法 |
CN101391721A (zh) * | 2008-10-27 | 2009-03-25 | 兖州煤业股份有限公司 | 塔式摩擦提升机更换提升钢丝绳新工艺 |
CN101417765A (zh) * | 2008-11-22 | 2009-04-29 | 太原理工大学 | 提升机首绳同步连续更换装置 |
RU2409513C1 (ru) * | 2009-12-07 | 2011-01-20 | Федеральное агентство по образованию Государственное образовательное учреждение высшего профессионального образования "Норильский индустриальный институт" | Способ замены канатов шахтной подъемной установки со шкивом трения и устройство для его осуществления |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081836A (zh) * | 2016-08-31 | 2016-11-09 | 山东黄金矿业(玲珑)有限公司 | 竖井首绳和尾绳更换方法 |
CN106241580A (zh) * | 2016-09-13 | 2016-12-21 | 太原科技大学 | 一种恒锁绳力连续小冲击收放绳装置及方法 |
CN108394800A (zh) * | 2018-03-28 | 2018-08-14 | 徐州九益科技有限公司 | 立井提升机尾绳更换工艺 |
CN109110624A (zh) * | 2018-09-26 | 2019-01-01 | 河北峪耳崖黄金矿业有限责任公司 | 一种摩擦式卷扬首绳更换装置及其使用方法 |
CN110451392A (zh) * | 2019-08-31 | 2019-11-15 | 山东黄金矿业(玲珑)有限公司 | 落地式多绳摩擦提升机天轮轴瓦更换方法 |
CN110451392B (zh) * | 2019-08-31 | 2021-04-27 | 山东黄金矿业(玲珑)有限公司 | 落地式多绳摩擦提升机天轮轴瓦更换方法 |
CN111792500A (zh) * | 2020-07-27 | 2020-10-20 | 山东黄金矿业(玲珑)有限公司 | 落地式摩擦提升机尾绳更换方法 |
CN113697628A (zh) * | 2021-08-31 | 2021-11-26 | 铜陵有色金属集团股份有限公司 | 副井提升系统重故障应急机械开车方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104787652B (zh) | 2016-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104787652B (zh) | 摩擦式提升机尾绳更换方法 | |
CN105016184B (zh) | 立井多绳摩擦提升机提升钢丝绳更换工艺 | |
CN102042031B (zh) | 一种煤矿主井装载峒室胶带运输机更换胶带工艺 | |
CN204251168U (zh) | 多绳摩擦轮提升机首绳无稳车更换系统 | |
CN101723219B (zh) | 矿井单绳提升平衡轮制动绳防坠罐装置 | |
CN107150945B (zh) | 井塔式四绳摩擦提升机首绳更换方法 | |
CN105460759B (zh) | 一种主井绞车尾绳更换的方法 | |
CN102139832A (zh) | 具备纵横向行走功能的门式起重装置及吊装方法 | |
CN106315426B (zh) | 一种装配建筑用平头式塔机安装、顶升方法 | |
CN107585668A (zh) | 副井、混合井尾绳更换施工工艺 | |
CN102030270A (zh) | 一种桥式吊车更换钢丝绳的辅助工具及方法 | |
CN106044574A (zh) | 同步更换铸造起重机龙门梁及钢丝绳的方法 | |
CN102530694A (zh) | 一种塔式多绳摩擦提升机首绳更换方法 | |
CN107724256A (zh) | 斜拉索换索工艺 | |
CN205555796U (zh) | 一种电梯的轿厢升降装置 | |
CN102061681B (zh) | 固定双吊点悬臂轨道式桁吊安装方法 | |
CN101318606A (zh) | 一种多绳摩擦式提升机串绳方法 | |
CN115479749A (zh) | 一种船厢最小扰度变形的入水式升船机船厢调平试验方法 | |
CN104528506B (zh) | 一种矿井提升机及其脱钩试验方法 | |
CN110921473A (zh) | 一种矿井主提升箕斗更换的方法 | |
CN102108694B (zh) | 闸坝式水电站工程中门机轨道梁的吊装方法 | |
CN113716436A (zh) | 竖井摩擦式提升机提升容器更换方法 | |
CN112627405A (zh) | 一种变截面轨道系统幕墙安装施工方法 | |
CN207434821U (zh) | 一种可升降式甩车场托轮组合装置 | |
CN116902735A (zh) | 一种矿井提升系统的罐道绳更换方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |