CN104763150A - Construction method of assembled type prefabricated laminated slab for building - Google Patents

Construction method of assembled type prefabricated laminated slab for building Download PDF

Info

Publication number
CN104763150A
CN104763150A CN201510167557.9A CN201510167557A CN104763150A CN 104763150 A CN104763150 A CN 104763150A CN 201510167557 A CN201510167557 A CN 201510167557A CN 104763150 A CN104763150 A CN 104763150A
Authority
CN
China
Prior art keywords
construction
construction method
template
superimposed sheet
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510167557.9A
Other languages
Chinese (zh)
Inventor
冯贵情
陈波
颜有光
彭明先
蒋华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huashi Green House Building Materials Co Ltd
Original Assignee
Sichuan Huashi Green House Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huashi Green House Building Materials Co Ltd filed Critical Sichuan Huashi Green House Building Materials Co Ltd
Priority to CN201510167557.9A priority Critical patent/CN104763150A/en
Publication of CN104763150A publication Critical patent/CN104763150A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a construction method of an assembled type prefabricated laminated slab for a building, which has high efficiency. The construction method comprises the following steps: step S11: providing a construction plane; distributing a plurality of construction points which are arranged into a matrix are distributed along the X and Y directions along engineering column screen cloth; setting column steel bars on the construction points and mounting a column template to surround the column steel bars; step S12: erecting a bracket between the two adjacent construction points in the X direction; mounting a main beam template is arranged on the bracket and mounting a beam steel bar in the main beam template; step S13: erecting a bracket between the two adjacent construction points in the Y direction, and mounting a secondary beam component on the bracket; step S14: mounting prefabricated slabs on the two adjacent brackets in the X direction; and step S15: erecting a bracket between the two adjacent construction points in the Y direction, and mounting a secondary beam component on the bracket. The construction method of the assembled type prefabricated laminated slab for the building has the advantages that the efficiency is high and the labor cost is saved.

Description

A kind of assembled architecture construction method of prefabricated superimposed sheet
[technical field]
The present invention relates to assembled architecture field, refer in particular to the construction method of a kind of assembled architecture with prefabricated superimposed sheet.
[background technology]
Along with the development of modern industrial technology, building house can machine produce like that, manufactures in batch completely.As long as prefabricated units are transported to building-site erection.But the good integrity of cast-in-place building is not had completely by the building that prefabricated units assemble up.Adopt prefabricated units both to meet structural integrity requirement, also can reduce on-the-spot a large amount of falsework operation, reduce operation, the reduction of erection time, reduce construction costs.
In the architectural process of heavy construction, because building area is excessive, tower crane working range cannot cover work plane completely and elevating capacity is limited, the lifting of the precast plate in prefabricated units becomes new construction Difficulties, in order to overcome this problem, a kind of small lifting equipment can be utilized, at the operated within range that tower crane cannot cover, this equipment can run on floor, has carried out the installation of precast plate.But utilize small lifting equipment to carry out the existing problem of construction to be, in the middle of work progress, efficiency is not high, and each step cannot be interted and carries out, and causes the delay in man-hour.
[summary of the invention]
For overcoming the technical problem of building large-scale assembled architecture inefficiency at present, the invention provides a kind of efficiency high assembled architecture construction method of prefabricated superimposed sheet, comprising:
Step S11: a construction plane is provided, along X, Y-direction is arranged to multiple construction point of matrix, and construction point arranges post reinforcing bar, builds column template and is surrounded by post reinforcing bar, and build post concrete;
Step S12: set up support between two adjacent in the X direction construction point, support is installed girder template and beam steel;
Step S13: set up support between two adjacent in the Y direction construction point, time beam installed by support;
Step S14: precast plate installed by two adjacent in the X direction supports; And
Step S15: set up support between two adjacent in the Y direction construction point, time beam installed by support.
Preferably, comprise further:
Step S16: build girder, bean column node concrete.
Preferably, step S13, step S14, step S15 adopt cross-layer small lifting equipment to construct, and the height of this cross-layer small lifting equipment is higher than the floor height built.
Preferably, in step s 12, when girder template is installed, first the girder template of bottom surface is installed, mounting rail reinforcing bar in the girder template of bottom surface, the girder template of two sides is finally just installed.
Preferably, this precast plate is a trough slab, and this trough slab comprises a web and two vertical ribs, and two vertical ribs are shaped in web, and the closed at both ends of trough slab is formed a square notch by two vertical ribs.
Preferably, at least four suspension hooks are provided with in trough slab.
The present invention also provides a kind of assembled architecture construction method of prefabricated superimposed sheet, comprising:
Step S21: a construction plane is provided, along X, Y-direction is arranged to multiple construction point of matrix, and construction point arranges post reinforcing bar, and post reinforcing bar surrounds by erection column template;
Step S22: set up support between two adjacent in the x, y direction respectively construction point, support is installed girder template and reinforcing bar, then build post, beam concrete, remove post, beam forms after concrete strength meets the demands, forms post and beam; And
Step S23: install precast plate between two adjacent in the Y direction beams.
Preferably, step S23 adopts and constructs with layer small lifting equipment.
Preferably, after its later layer beam column concrete strength reaches requirement, tear beam, column template and support open, lay this layer of overlapping layers reinforced mesh, then build this stacked conjunction layer concrete.
Preferably, in step S22: during mounting rail template, first install the beam forms of bottom surface, mounting rail reinforcing bar on the beam forms of bottom surface, finally just installs the beam forms of two sides.
Relative to prior art,
1. a kind of assembled architecture of the present invention by the construction method of prefabricated superimposed sheet when reaching certain scale, due to without the need to setting up full hall scaffold, a large amount of circulation material, time and cost of labor can be saved, prefabricated superimposed sheet after shaping appearance effect is good, without the need to carrying out again plastering, the finishing work such as furred ceiling, save manpower, constructional materials cost in a large number.
2. the present invention compared with prior art have passed step S13, and rapid S14, step S15, use precast plate in a large number, and engineering time is greatly reduced.
3. a kind of assembled architecture of the present invention with the construction method of prefabricated superimposed sheet adopt tower crane and small lifting equipment with the use of, facing the larger building of building area (as logistics warehouse, product production line factory building etc.) with the addition of small lifting equipment beyond the tower crane radius of clean-up, both working in coordination makes the efficiency of assembling more improve.
[accompanying drawing explanation]
Fig. 1 is the flow chart of a kind of assembled architecture of first embodiment of the invention construction method of prefabricated superimposed sheet.
Fig. 2 is the schematic diagram of a kind of assembled architecture of first embodiment of the invention construction method step S11 of prefabricated superimposed sheet.
Fig. 3 is the schematic diagram of a kind of assembled architecture of first embodiment of the invention construction method step S12 of prefabricated superimposed sheet.
Fig. 4 is the construction method step S11 of a kind of assembled architecture of first embodiment of the invention with prefabricated superimposed sheet, the schematic diagram of S12, S13, S14, S15.
Fig. 5 is the V place enlarged drawing of Fig. 4.
Fig. 6 is the structural representation of the prefabricated superimposed sheet of first embodiment of the invention.
Fig. 7 is the flow chart of a kind of assembled architecture of second embodiment of the invention construction method of prefabricated superimposed sheet.
Fig. 8 is the schematic diagram of a kind of assembled architecture of second embodiment of the invention construction method step S21 of prefabricated superimposed sheet.
Fig. 9 is the schematic diagram of a kind of assembled architecture of second embodiment of the invention construction method step S22 of prefabricated superimposed sheet.
Figure 10 is the construction method step S21 of a kind of assembled architecture of second embodiment of the invention with prefabricated superimposed sheet, the schematic diagram of S22, S23.
[detailed description of the invention]
In order to make object of the present invention, technical scheme and advantage are clearly understood, below in conjunction with accompanying drawing and embodiment, are further elaborated to the present invention.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
A kind of assembled architecture of the first embodiment of the present invention is that cross-layer is installed by the construction method of prefabricated superimposed sheet: what the mode that cross-layer is installed utilized is cross-layer small lifting equipment, its height is higher than floor height, cross-layer small lifting equipment runs on this layer, installs the precast plate (during lifting, component gravity center, suspension hook are within the scope of base) of the last layer of this layer.
Refer to Fig. 1, a kind of assembled architecture of the first embodiment of the present invention is as follows by the construction method of prefabricated superimposed sheet:
Step S11: post reinforcing bar 10 is set, post reinforcing bar 10 surrounds by erection column template 11, and builds post concrete;
Step S12: set up support 13, support 13 is installed girder template 12 and reinforcing bar (not shown);
Step S13: set up support 13, time beam 15 installed by support 13;
Step S14: install precast plate 16 on the support 13 of girder template 12 correspondence;
Step S15: set up support 13, time beam 15 installed by support 13;
Step S16: build girder, bean column node concrete, it is built end face and flushes with this Rotating fields design elevation; And
Step S17: repeat above-mentioned steps, carry out the construction of next floor.
The detailed step of above-mentioned construction method is as follows:
Step S11: refer to Fig. 2, Fig. 4 and Fig. 5, there is provided a construction plane 101, this construction plane 101 is a horizontal plane, in construction plane 101 along X, Y-direction is arranged to the construction point 102 of matrix, each construction point 102 arranges multiple post reinforcing bar 10, and then post reinforcing bar 10 surrounds by erection column template 11 in the vertical direction, forms the cavity that the cuboid of opening is left at a top, and close proximity between the corresponding side of each column template 11, then builds post concrete.
Step S12: refer to Fig. 3, Fig. 4 and Fig. 5, set up support 13 between adjacent two construction point 102 in the X direction, the top of this support 13 is parallel to horizontal plane, and lower end is butted on construction plane 101.Install girder template 12 at the top of support 13, this girder template 12 and plane-parallel, at the inner mounting rail reinforcing bar of girder template 12, the two ends of this beam steel are inserted in corresponding post reinforcing bar 10.When girder template 12 is installed, first the girder template 12 of bottom surface is installed, mounting rail reinforcing bar in the girder template 12 of bottom, the girder template 12 of two sides is finally just installed.Support 13 in the middle of this step can once set up, also can gradation erection according to demand.
Step S13: refer to Fig. 4 and Fig. 5, sets up support 13 between adjacent two construction point 102 in the Y direction, and support 13 directly installs prefabricated secondary beam 15, and the height of this beam 15 end face is equal with the top of girder template 12.
Step S14: refer to Fig. 4 and Fig. 5, between the support 13 of two row's girder template 12 correspondences in the Y direction, precast plate 16 is installed, utilize cross-layer small lifting equipment 14 erecting plate 16, this cross-layer small lifting equipment 14 height is higher than floor height, equipment runs on this layer, the precast plate 16 of the last layer of this layer is installed, refer to Fig. 6, this precast plate 16 comprises web 161 and two vertical ribs 162, two vertical ribs 162 are shaped in web 161, the closed at both ends of precast plate 16 is formed a square notch by two vertical ribs 162, the notch of precast plate 16 down, at least four suspension hooks 163 are provided with in precast plate 16, suspension hook 163 is bending " several " font, and it is symmetrical.The shape of this suspension hook 163 is not construed as limiting, and " several " font is only done to illustrate, also can be barb-shaped other shapes such as grade, meets load during handling.The latter half of suspension hook 163 is embedded in the concrete of trough slab, the exposed outside at trough slab of its first half.Suspension hook 163 can be connected with the hook (non-label) of small lifting equipment when lifting, lifting precast plate 16, two of precast plate 16 vertical ribs 162 be distinguished framves on two corresponding supports 13.During lifting, the center of gravity of precast plate 16, suspension hook 163 are in base (non-label) scope of small lifting equipment.
Step S15: every four adjacent construction point 102 are called a grid, often install the precast plate 16 of a grid, then carry out the construction of time beam 15, installs precast plate 16 and time beam 15 successively along construction direction.
Step S16: lay this layer of overlapping layers reinforced mesh (not shown) on grid, then casting beams, bean column node and this floor plate overlapping layers concrete, flush with this Rotating fields design elevation.
Above-mentioned step S16 can adopt in another way: first casting beams and bean column node concrete, and flushes with the absolute altitude of precast plate 16, carries out next layer of construction after concrete strength meets.
Meanwhile, after its later layer structural strength meets the demands striking 13, tear column template 11 and beam forms 12 open, re-lay this layer of overlapping layers reinforced mesh (not shown), cast-in-place whole flooring overlapping layers (not shown).
The second embodiment of the present invention is for install with layer: what the mode of installing with layer utilized is same layer small lifting equipment, it is not highly higher than floor height, run on this layer with layer small lifting equipment, the precast plate (during lifting, component inside edge is outer in base scope) of this layer is installed.
Refer to Fig. 7 and Fig. 9, second embodiment of the invention comprises the following steps:
Step S21: post reinforcing bar 20 is set, post reinforcing bar 20 surrounds by erection column template 21;
Step S22: set up support 23, then mounting rail template 22, at beam forms 22 inner mounting rail reinforcing bar (not shown), then build post, beam concrete;
Step S23: install precast plate 26; And
Step S24: repeat above-mentioned steps, carry out the construction of next floor.
The detailed step of above-mentioned construction method is as follows:
S21: refer to Fig. 8 and Figure 10, one construction plane 201 is provided, this construction plane 201 is a horizontal plane, this construction plane 201 is along X, Y-direction is arranged to the construction point 202 of matrix, each construction point 202 arranges multiple post reinforcing bar 20, then post reinforcing bar 20 surrounds by erection column template 21 in the vertical direction, form the cavity that the cuboid of an opening is arranged at a top, and close proximity between the corresponding side of each column template 21.
S22: refer to Fig. 9 and Figure 10, set up multiple support 23 between two adjacent in the x, y direction post reinforcing bars 20, the top of this support 23 is parallel to horizontal plane, and lower end is butted on construction plane 201.In the top mounting rail template 22 of support 23, during mounting rail template 22, first install the beam forms 22 of bottom, mounting rail reinforcing bar (not shown) on the beam forms 22 of bottom, finally just installs the beam forms 22 of two sides.Then at the inner colligation beam steel of beam forms 22, the two ends of this beam steel are inserted in corresponding post reinforcing bar 20, first build post, beam concrete, after concrete intensity enough supports, remove column template 21, beam forms 22, thus form the general frame of post and beam.
S23: refer to Figure 10, installs precast plate 16, installs precast plate 16, utilize same layer small lifting equipment 27 to install precast plate 16 between the support 23 of beam forms 22 correspondence.This with layer small lifting equipment 27 height lower than floor height, this layer is run on layer small lifting equipment 27, (the present embodiment adopts the precast plate 16 described in the first embodiment to install the precast plate 16 of this layer, the frame for movement mentioned refers to view and the numbering of the precast plate 16 that first embodiment of the invention provides), the suspension hook 163 of precast plate 16 can be connected with hook when lifting, by two of precast plate 16 vertical rib 162 two beams that frame is adjacent in the Y direction respectively.During lifting, precast plate 16 inside edge is outside base scope.
Precast plate is installed in step S23 carry out after beam column concrete strength meets the demands and only removes side form and not load-bearing striking; Step S23 installs precast plate and also can meet the demands at beam column concrete strength and carry out after stripping and support.
After concrete strength meets, carry out one deck construction thereafter, meanwhile, after superstructure intensity meets, tear support 23 open, lay this layer of overlapping layers reinforced mesh, cast-in-place whole flooring overlapping layers.
Relative to prior art, the invention has the advantages that:
1. a kind of assembled architecture of the present invention by the construction method of prefabricated superimposed sheet when reaching certain scale, due to without the need to setting up full hall scaffold, a large amount of circulation material, time and cost of labor can be saved, prefabricated superimposed sheet after shaping appearance effect is good, without the need to carrying out again plastering, the finishing work such as furred ceiling, save manpower, constructional materials cost in a large number.
2. the present invention is compared with prior art by step S13, step S14, step S15, and a large amount of use precast plate 16 and time beam 15, make engineering time greatly reduce.
3. a kind of assembled architecture of the present invention with the construction method of prefabricated superimposed sheet adopt tower crane and small lifting equipment 14 with the use of, facing the larger building of building area (as logistics warehouse, product production line factory building etc.) with the addition of small lifting equipment 14 beyond the tower crane radius of clean-up, both working in coordination makes the efficiency of assembling more improve.
The foregoing is only preferred application example of the present invention, not in order to limit the present invention, all any amendments done within principle of the present invention, equivalent replacement and improvement etc. all should comprise within protection scope of the present invention.

Claims (10)

1. an assembled architecture construction method for prefabricated superimposed sheet, is characterized in that, comprising:
Step S11: a construction plane is provided, along X, Y-direction is arranged to multiple construction point of matrix, and construction point arranges post reinforcing bar, and post reinforcing bar surrounds by erection column template, and builds post concrete;
Step S12: set up support between two adjacent in the X direction construction point, support is installed girder template and reinforcing bar;
Step S13: set up support between two adjacent in the Y direction construction point, time beam installed by support;
Step S14: prefabricated superimposed sheet installed by two adjacent in the X direction supports; And
Step S15: set up support between two adjacent in the Y direction construction point, time beam installed by support.
2. a kind of assembled architecture construction method of prefabricated superimposed sheet as claimed in claim 1, is characterized in that, comprise further:
Step S16: casting beams and bean column node concrete.
3. a kind of assembled architecture as claimed in claim 2 construction method of prefabricated superimposed sheet, it is characterized in that: step S13, step S14, step S15 adopt cross-layer small lifting equipment to construct, the height of this cross-layer small lifting equipment is higher than the floor height built.
4. a kind of assembled architecture construction method of prefabricated superimposed sheet as claimed in claim 1, is characterized in that, in step s 12, when girder template is installed, first the girder template of bottom surface is installed, mounting rail reinforcing bar in the girder template of bottom surface, the girder template of two sides is finally just installed.
5. a kind of assembled architecture as claimed in claim 1 construction method of prefabricated superimposed sheet, it is characterized in that: this precast plate is a trough slab, this trough slab comprises a web and two vertical ribs, and two vertical ribs are shaped in web, and the closed at both ends of trough slab is formed a square notch by two vertical ribs.
6. a kind of assembled architecture construction method of prefabricated superimposed sheet as claimed in claim 5, is characterized in that: be provided with at least four suspension hooks in trough slab.
7. an assembled architecture construction method for prefabricated superimposed sheet, comprising:
Step S21: a construction plane is provided, along X, Y-direction is arranged to multiple construction point of matrix, and construction point arranges post reinforcing bar, and post reinforcing bar surrounds by erection column template;
Step S22: set up support between two adjacent in the x, y direction construction point, mounting rail template on support, at the inner mounting rail reinforcing bar of beam forms, then builds post, beam concrete; And
Step S23: install precast plate between two adjacent in the Y direction supports.
8. a kind of assembled architecture construction method of prefabricated superimposed sheet as claimed in claim 7, is characterized in that: step S23 adopts and constructs with layer small lifting equipment.
9. a kind of assembled architecture as claimed in claim 7 construction method of prefabricated superimposed sheet, it is characterized in that: tear support enough afterwards open until concrete strength, tear column template open, tear girder template open, lay this layer of overlapping layers reinforced mesh, then use the whole flooring overlapping layers of concrete casting.
10. a kind of assembled architecture as claimed in claim 7 construction method of prefabricated superimposed sheet, it is characterized in that, in step S22: when girder template is installed, first the girder template of bottom surface is installed, mounting rail reinforcing bar in the girder template of bottom surface, finally just installs the girder template of two sides.
CN201510167557.9A 2015-04-01 2015-04-01 Construction method of assembled type prefabricated laminated slab for building Pending CN104763150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510167557.9A CN104763150A (en) 2015-04-01 2015-04-01 Construction method of assembled type prefabricated laminated slab for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510167557.9A CN104763150A (en) 2015-04-01 2015-04-01 Construction method of assembled type prefabricated laminated slab for building

Publications (1)

Publication Number Publication Date
CN104763150A true CN104763150A (en) 2015-07-08

Family

ID=53645213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510167557.9A Pending CN104763150A (en) 2015-04-01 2015-04-01 Construction method of assembled type prefabricated laminated slab for building

Country Status (1)

Country Link
CN (1) CN104763150A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514141A (en) * 2016-06-16 2017-12-26 中国十七冶集团有限公司 A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam
CN113027022A (en) * 2021-03-18 2021-06-25 青岛腾远设计事务所有限公司 Fully-precast concrete plate cap component and construction method thereof
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247288A (en) * 1998-03-02 1999-09-14 Okumura Corp Column-beam main bar pre-assembled hollow precast concrete column unit and column constructing method using this column unit
CN201474291U (en) * 2009-08-14 2010-05-19 刘江华 Modular assembly construction template device
CN102383590A (en) * 2011-07-11 2012-03-21 雷灿波 Combined system of split building template
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN203924432U (en) * 2014-05-14 2014-11-05 四川华西绿舍建材有限公司 Prestressing force groove-shaped laminated board structural system
CN104234428A (en) * 2014-09-25 2014-12-24 管金平 Construction technology for columns, beams and plates of assembled monolithic structure of building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247288A (en) * 1998-03-02 1999-09-14 Okumura Corp Column-beam main bar pre-assembled hollow precast concrete column unit and column constructing method using this column unit
CN201474291U (en) * 2009-08-14 2010-05-19 刘江华 Modular assembly construction template device
CN102383590A (en) * 2011-07-11 2012-03-21 雷灿波 Combined system of split building template
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN203924432U (en) * 2014-05-14 2014-11-05 四川华西绿舍建材有限公司 Prestressing force groove-shaped laminated board structural system
CN104234428A (en) * 2014-09-25 2014-12-24 管金平 Construction technology for columns, beams and plates of assembled monolithic structure of building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙耀祖等: "高层建筑框架结构柱与梁板采用不同强度等级混凝土浇捣的施工方法与措施", 《建筑施工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514141A (en) * 2016-06-16 2017-12-26 中国十七冶集团有限公司 A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam
CN107514141B (en) * 2016-06-16 2019-06-21 中国十七冶集团有限公司 A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam
CN113027022A (en) * 2021-03-18 2021-06-25 青岛腾远设计事务所有限公司 Fully-precast concrete plate cap component and construction method thereof
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Similar Documents

Publication Publication Date Title
CN104563384A (en) Structural heat-preservation decoration integrated large-size prefabricated outer wall-hung plate and manufacturing method thereof
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN103031917A (en) Reinforced concrete prefabricated laminated slab with truss rib
CN106193292A (en) A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN105952062A (en) Prefabricated floor slab reinforcement cage member, floor slab, member assembling method and floor slab construction method
CN105089178A (en) Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN103306483B (en) The industrial construction method of building
CN104763150A (en) Construction method of assembled type prefabricated laminated slab for building
CN111733873A (en) Construction method of assembled subway station
KR20200032316A (en) Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support
CN102888894A (en) Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN107975165B (en) Laminated wall structure and manufacturing method thereof
CN104533097A (en) Recursive stair type construction method for fabricated multi-layer building
CN104060841A (en) Large-span steel girder installation construction method
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN204959795U (en) Self -supporting does not have row no mould basement flat slab floor
CN102787717B (en) Self-supporting combined steel template construction method
CN208219844U (en) A kind of prefabrication system
CN110869568B (en) Improvements in reinforced concrete wall modules for building ventilation in general and special industrial building systems
CN105113541A (en) Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same
CN203034657U (en) Reinforced concrete prefabricated laminated slab with truss rib
KR20200107332A (en) The Simultaneous Construction Method for Wall and Slab of Building
CN105926820B (en) Construction method for precast beam steel support plate resistance mesh combined floor
CN211949131U (en) Combined upper-chord corrugated web ribbed secondary beam floor system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150708

RJ01 Rejection of invention patent application after publication