KR20200107332A - The Simultaneous Construction Method for Wall and Slab of Building - Google Patents

The Simultaneous Construction Method for Wall and Slab of Building Download PDF

Info

Publication number
KR20200107332A
KR20200107332A KR1020190026300A KR20190026300A KR20200107332A KR 20200107332 A KR20200107332 A KR 20200107332A KR 1020190026300 A KR1020190026300 A KR 1020190026300A KR 20190026300 A KR20190026300 A KR 20190026300A KR 20200107332 A KR20200107332 A KR 20200107332A
Authority
KR
South Korea
Prior art keywords
floor slab
building
reinforcement
installation
constructing
Prior art date
Application number
KR1020190026300A
Other languages
Korean (ko)
Inventor
김기영
Original Assignee
김기영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김기영 filed Critical 김기영
Priority to KR1020190026300A priority Critical patent/KR20200107332A/en
Publication of KR20200107332A publication Critical patent/KR20200107332A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/161Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic

Abstract

The present invention relates to a method for simultaneously constructing wall and floor slabs of a building structure and, more particularly, to a method for simultaneously constructing wall and floor slabs of a building structure in which a plurality of steel pillars are formed on the ground or floor slab. The method comprises: a support rod installation step of erecting a plurality of support rods on the ground or floor slab; a beam installation step of installing a beam for an upper floor slab supported on an upper portion of the support rod; a wall reinforcement arrangement step of arranging reinforcement at a wall installation location; a deck plate installation step of installing a deck plate on an upper portion of the beam after or at the same time as the wall reinforcement arrangement step; and a concrete placing step of simultaneously forming the wall and the upper floor slab by placing concrete on an upper surface of the deck plate and the wall reinforcement, respectively. Accordingly, by first constructing the beam for the upper floor slab using the support rod without waiting for the completion of the wall, a construction period can be innovatively shortened by simultaneously constructing the wall and the upper floor slab.

Description

건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법{The Simultaneous Construction Method for Wall and Slab of Building}The Simultaneous Construction Method for Wall and Slab of Building

본 발명은, 건축 구조물의 벽체 및 바닥 슬래브 시공방법에 관한 것으로서, 특히, 벽체의 완성을 기다릴 필요 없이 지지봉을 이용하여 상면 바닥 슬래브용 빔을 먼저 시공함으로써 벽체와 상면 바닥 슬래브를 동시에 시공하여 공사기간을 혁신적으로 단축할 수 있는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법에 관한 것이다. The present invention relates to a method of constructing a wall and a floor slab of a building structure, and in particular, by first constructing a beam for the upper floor slab using a support rod without waiting for the completion of the wall, the wall and the upper floor slab are simultaneously constructed and the construction period It relates to a simultaneous construction method of walls and floor slabs of architectural structures that can innovatively shorten the structure.

일반적으로 건축 구조물은 그 사용하는 재질에 따라서 철골 구조물과 철근(철골 콘트리트) 콘크리트 구조물로 대별되며, 구조형식에 따라서는 라멘구조물과 전단벽식 구조물로 대별된다. In general, architectural structures are roughly classified into steel structures and reinforced (steel concrete) concrete structures according to the materials used, and are roughly divided into ramen structures and shear wall structures depending on the structure type.

라멘구조물은 기둥과 보와 슬래브로 이루어진 구조물을 말하고, 전단벽식 구조물은 벽체와 슬래브로 이루어진 구조물을 말하는데, 전단벽식 구조물의 대표적인 예로는 아파트를 들 수 있다. The ramen structure refers to a structure composed of columns, beams, and slabs, and the shear wall structure refers to a structure composed of a wall and a slab, and a typical example of a shear wall type structure is an apartment.

종래의 이러한 전단벽식 구조물의 시공방법을 도 4를 참조하여 살펴보면, 먼저, (a)에 도시된 바와 같이 지면 또는 바닥 슬래브(100)에 다수의 철골기둥(200)을 세운 후, 벽체 형성위치에 벽체철근(33)을 배근하고(b 참조), 임베디드 플레이트(50)를 고정한 후에(c참조), 벽체 거푸집을 형성하여 콘크리트를 타설하여 벽체(30)를 형성한다(d 참조). Looking at the conventional construction method of such a shear wall structure with reference to FIG. 4, first, as shown in (a), after erecting a plurality of steel pillars 200 on the ground or floor slab 100, the wall formation position After reinforcing the wall reinforcement 33 (see b), fixing the embedded plate 50 (see c), forming a wall formwork and pouring concrete to form the wall 30 (see d).

이후, 상면 바닥 슬래브용 빔 또는 거더(20)를 설치하고(e 참조), 데크 플레이트(40)를 설치(f 참조)한 후에, 전기, 배관, 철근 등의 매립 작업을 수행한 후(g 참조), 거푸집을 형성하여 콘크리트를 타설하여 상면 바닥 슬래브(101)를 완성한다. Thereafter, after installing the beam or girder 20 for the upper floor slab (see e), installing the deck plate 40 (see f), and performing the reclaiming work for electricity, piping, rebar, etc. (see g) ), by forming a formwork and pouring concrete to complete the upper floor slab 101.

그러나, 이러한 종래의 건축 구조물의 벽체 및 바닥 슬래브 시공방법은, 벽체를 먼저 완성한 후에야 상면 바닥 슬래브를 시공할 수 있는 구조이기 때문에, 벽체철근 배근 및 거푸집 설치, 임베디드 플레이트 설치, 벽체 콘크리트 타설 및 양생에 많은 시간이 소요되어 전체적인 공사기간이 길어지는 문제점이 있고, 이로 인해 공사효율이 저하되고, 인건비 등 공사비용이 증가하는 문제점이 있다. However, the conventional method of constructing wall and floor slab of a building structure is a structure in which the upper floor slab can be constructed only after the wall is completed first, so it is suitable for reinforcing wall reinforcement and installing formwork, installing embedded plates, pouring concrete and curing walls. There is a problem that the overall construction period is lengthened because it takes a lot of time, and there is a problem in that construction efficiency decreases and construction cost such as labor costs increases.

특히, 지진 등 재연재해의 발생 빈도가 잦아지고, 건물의 고층화가 진행되면서 공사기간 단축과 이로인한 공사비용이 절감이 더욱 시급한 실정이다. In particular, as the frequency of recurrence disasters such as earthquakes increases, and the construction of high-rise buildings progresses, it is more urgent to shorten the construction period and reduce construction costs.

공개특허공보 제2003-0082668호Publication Patent Publication No. 2003-0082668

본 발명의 목적은, 벽체의 완성을 기다릴 필요 없이 지지봉을 이용하여 상면 바닥 슬래브용 빔을 먼저 시공함으로써 벽체와 상면 바닥 슬래브를 동시에 시공하여 공사기간을 혁신적으로 단축할 수 있는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법을 제공하는 데 있다. An object of the present invention is to construct a beam for a top floor slab using a support rod first without having to wait for the completion of the wall, thereby simultaneously constructing the wall and the top floor slab, thereby reducing the construction period innovatively. It is to provide a method of simultaneous slab construction.

또한, 본 발명의 다른 목적은, 지지봉(10)이 잭서포트(Jack Support)로 마련되는 경우에는, 지지봉 상단의 높이 조절이 가능하므로, 필요에 따라 빔의 레벨(높이) 조절이 언제든지 가능한 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법을 제공하는 데 있다. In addition, another object of the present invention is, when the support bar 10 is provided as a jack support, the height of the top of the support bar can be adjusted, so that the level (height) of the beam can be adjusted at any time as needed. It is to provide a simultaneous construction method of wall and floor slab of

또한, 본 발명의 다른 목적은, 임베디드 플레이트가 빔의 전단부에 고정되므로, 벽체 철근 배근단계와 동시에 빔에의 고정작업을 수행할 수 있고, 이후 벽체 콘크리트 타설과 동시에 임베디드 플레이트의 일단이 벽체에 매립 고정되므로 시공성 및 고정 안정성을 더욱 향상시킬 수 있는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법을 제공하는 데 있다. In addition, another object of the present invention is that since the embedded plate is fixed to the front end of the beam, it is possible to perform the fixing work on the beam at the same time as the reinforcing wall reinforcement step, and afterwards, one end of the embedded plate is placed on the wall at the same time as the wall concrete The purpose is to provide a simultaneous construction method of wall and floor slab of a building structure that can further improve workability and fixing stability because it is embedded and fixed.

상기 목적은, 본 발명의 일실시예에 따라, 지면 또는 바닥 슬래브에 다수의 철골기둥이 형성된 건축 구조물에서, 상기 지면 또는 바닥 슬래브에 복수의 지지봉을 세우는 지지봉 설치단계와; 상기 지지봉의 상부에 지지되는 상면 바닥 슬래브용 빔을 설치하는 빔 설치단계와; 벽체 설치위치에 철근을 배근하는 벽체철근 배근단계와; 상기 벽체철근 배근단계 후 또는 동시에 상기 빔의 상부에 데크 플레이트를 설치하는 데크 플레이트 설치단계와; 상기 벽체철근 및 상기 데크 플레이트 상면에 각각 콘크리트를 타설하여 상기 벽체 및 상기 상면 바닥 슬래브를 동시에 형성하는 콘크리트 타설단계;를 포함하는 건축 구조물의 벽체 및 바닥 슬래브 시공방법에 의해 달성된다. The object is, in accordance with an embodiment of the present invention, in a building structure in which a plurality of steel pillars are formed on the ground or floor slab, a support rod installation step of erecting a plurality of support rods on the ground or floor slab; A beam installation step of installing a beam for an upper floor slab supported on an upper portion of the support rod; A wall reinforcement step of reinforcing reinforcement at the wall installation location; A deck plate installation step of installing a deck plate on the top of the beam after or at the same time after the wall reinforcement step; A concrete pouring step of simultaneously forming the wall and the upper floor slab by placing concrete on the upper surface of the wall reinforcement and the deck plate, respectively.It is achieved by the wall and floor slab construction method of a building structure including.

여기서, 상기 테크 플레이트 설치단계는, 상기 데크 플레이트에 철근, 전기 또는 배관 중 하나 이상을 포함하는 설비를 매립하는 설비매립단계를 더 포함할 수 있다. Here, the step of installing the tech plate may further include a step of burying a facility including at least one of reinforcing bars, electricity, or pipes in the deck plate.

또한, 상기 빔 설치단계는, 상기 벽체를 향하는 상기 빔의 선단에 임베디드 플레이트(Embeded plate)를 고정하는 단계를 더 포함할 수 있다. In addition, the beam installation step may further include fixing an embedded plate to a tip of the beam facing the wall.

한편, 상기 지지봉은, 상단의 높이 조절이 가능한 잭서포트(Jack Support)로 마련되는 것이 바람직하다. On the other hand, the support bar is preferably provided with a jack support (Jack Support) capable of adjusting the height of the upper end.

이 경우, 상기 지지봉은 상기 벽체 설치위치로부터 1.8 ~2.4 m 이격되어 설치되도록 할 수 있다. In this case, the support rod may be installed 1.8 to 2.4 m away from the wall installation position.

상기 콘크리트 타설단계 후에, 상기 지지봉을 해체하는 지지봉 해체단계를 더 포함할 수 있다. After the concrete placing step, it may further include a support bar disassembly step of dismantling the support bar.

따라서, 본 발명에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법에 따르면, 벽체의 완성을 기다릴 필요 없이 지지봉을 이용하여 상면 바닥 슬래브용 빔을 먼저 시공함으로써 벽체와 상면 바닥 슬래브를 동시에 시공하여 공사기간을 혁신적으로 단축할 수 있다. Therefore, according to the simultaneous construction method of the wall and the floor slab of a building structure according to the present invention, by first constructing the beam for the upper floor slab using the support rod without waiting for the completion of the wall, the construction period of the wall and the upper floor slab simultaneously Can be shortened innovatively.

또한, 지지봉(10)이 잭서포트(Jack Support)로 마련되는 경우에는, 지지봉 상단의 높이 조절이 가능하므로, 필요에 따라 빔의 레벨(높이) 조절이 언제든지 가능하다. In addition, when the support bar 10 is provided as a jack support, the height of the upper end of the support bar can be adjusted, so that the level (height) of the beam can be adjusted at any time as necessary.

또한, 임베디드 플레이트가 빔의 전단부에 고정되므로, 벽체 철근 배근단계와 동시에 빔에의 고정작업을 수행할 수 있고, 이후 벽체 콘크리트 타설과 동시에 임베디드 플레이트의 일단이 벽체에 매립 고정되므로 시공성 및 고정 안정성을 더욱 향상시킬 수 있다. In addition, since the embedded plate is fixed to the front end of the beam, it is possible to fix the beam at the same time as the wall reinforcement step, and since the end of the embedded plate is embedded and fixed to the wall at the same time as the wall concrete is poured, workability and stability of fixation Can be further improved.

도 1은, 본 발명에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법의 흐름도,
도 2는, 도 1에 도시된 시공방법의 공정도,
도 3은, 도 2에 도시된 (b)의 측면도,
도 4는, 종래의 건국 구조물의 벽체 및 바닥 슬래브 시공방법의 공정도이다.
1 is a flow chart of a method for simultaneously constructing a wall and a floor slab of a building structure according to the present invention,
Figure 2 is a process diagram of the construction method shown in Figure 1,
Figure 3 is a side view of (b) shown in Figure 2,
4 is a flow chart of a conventional method for constructing a wall and a floor slab of a construction structure.

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 구체적으로 설명한다. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1을 참조하면, 본 발명의 일실시예에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법은, 지지봉 설치단계(S11)와, 상면 바닥 슬래브용 빔을 설치하는 빔 설치단계(S13)와, 벽체철근 배근단계(S15)와, 상기 빔 상부에 데크 플레이트를 설치하는 단계(S17)와, 상기 벽체철근 및 상기 데크 플레이트 상면에 각각 콘크리트를 타설하는 단계(S19)를 포함한다. Referring to Figure 1, the simultaneous construction method of a wall and a floor slab of a building structure according to an embodiment of the present invention, a support rod installation step (S11), a beam installation step (S13) of installing a beam for the upper floor slab, Reinforcing the wall reinforcement step (S15), installing a deck plate on the top of the beam (S17), and placing concrete on the upper surface of the wall reinforcement and the deck plate (S19).

여기서, 상기 데크 플레이트에 설비를 매립하는 설비매립단계(S18)와, 상기 빔의 선단에 임베디드 플레이트를 고정하는 단계(S14)와, 상기 지지봉을 해체하는 단계(S20)를 더 포함할수 있다. Here, it may further include a facility burying step (S18) of burying the facility in the deck plate, fixing the embedded plate to the tip of the beam (S14), and disassembling the support bar (S20).

이에, 본 발명에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법은, 벽체의 완성을 기다릴 필요 없이 지지봉을 이용하여 상면 바닥 슬래브용 빔을 먼저 시공함으로써 벽체와 상면 바닥 슬래브를 동시에 시공하여 공사기간을 혁신적으로 단축할 수 있다. Therefore, the simultaneous construction method of the wall and the floor slab of a building structure according to the present invention is to reduce the construction period by simultaneously installing the wall and the upper floor slab by first constructing the beam for the upper floor slab using a support rod without having to wait for the completion of the wall. It can be shortened innovatively.

설명에 앞서, 본 발명에서 벽체와 상면 바닥 슬래브를 '동시에' 형성한다는 것은, 시간적으로 완전히 일치하는 의미로 제한되는 것이 아니라, 벽체 및 상면 바닥 슬래브 형성단계가 직렬적, 순차적 순서로 수행되는 것이 아닌 병렬적으로 수행된다는 의미로 해석되어야 한다. Prior to the description, in the present invention, the formation of the wall and the upper floor slab ``at the same time'' is not limited to the meaning that is completely coincident in time, and the steps of forming the wall and the upper floor slab are not performed in a serial or sequential order. It should be interpreted to mean that it is performed in parallel.

이는, 구체적으로 본 발명에 있어서, 상기 빔 설치단계(S13), 임베디드 플데크 플레이트 고정단계(S13), 데크 플레이트 설치단계(S17) 및 설비매립단계(S18)가 벽체 콘크리트 타설단계(S19)보다 선행하여 수행된다는 것을 의미한다. Specifically, in the present invention, the beam installation step (S13), the embedded plate deck plate fixing step (S13), the deck plate installation step (S17) and the facility landfill step (S18) are more than the wall concrete placing step (S19). It means that it is done in advance.

이하, 각 단계 별로 설명한다. Hereinafter, each step will be described.

먼저, 도 1의 (a) 및 (b)와 같이, 지면 또는 바닥 슬래브(100)에 다수의 철골기둥(200)이 형성된 건축 구조물에서, 상기 지면 또는 바닥 슬래브(100)에 복수의 지지봉(10)을 설치한다(S11). First, in a building structure in which a plurality of steel pillars 200 are formed on the ground or floor slab 100, as shown in FIG. 1(a) and (b), a plurality of support rods 10 are provided on the ground or floor slab 100 ) Is installed (S11).

여기서, "지면 또는 바닥 슬래브"라 함은, 본 발명에 따른 시공방법이 "지면" 즉 아파트와 같은 주거용 건축물이나 빌딩과 같은 상업용 건축물의 지하 주자창과 같이 최하층의 지면 바닥위에 설치되는 벽체 및 상면 바닥 슬래브 시공에 적용됨은 물론, "바닥 슬래브" 즉 다층 건물의 1층 이상 바닥 슬래브 위에 설치되는 벽체 및 상면 바닥슬래브 시공에 모두 적용된다는 것을 의미한다. Here, the term "ground or floor slab" means that the construction method according to the present invention is "ground", that is, a wall and an upper floor installed on the ground floor of the lowest floor, such as an underground main window of a residential building such as an apartment or a commercial building such as a building. It is applied not only to slab construction, but also to "floor slab", that is, it is applied to both the wall and upper floor slab installed on one or more floor slabs of multi-storey buildings.

지지봉(10)은 상부에 설치되는 빔(20) 및 데크 플레이트(40)와, 전기, 설비나 철근 및 콘크리트의 타설 무게를 버틸 수 있는 강도를 지니고 있어야 하며, 잭 서포트(Jack Support), H 빔 또는 철골 등 공지된 다양한 종류의 것이 제한 없이 사용될 수 있다. The support bar 10 must have strength to withstand the weight of the beam 20 and the deck plate 40 installed on the top, and the weight of electricity, equipment, reinforcement, and concrete, and Jack Support, H-beam Or, a variety of known types such as steel frame may be used without limitation.

예를 들어, 지지봉(10)이 잭서포트(Jack Support)로 마련되는 경우에는, 지지봉(10) 상단의 높이 조절이 가능하므로, 필요에 따라 빔(20)의 레벨(높이) 조절이 언제든지 가능하다는 장점이 있다. For example, if the support bar 10 is provided as a jack support, the height of the upper end of the support bar 10 can be adjusted, so that the level (height) of the beam 20 can be adjusted at any time as necessary. There is an advantage.

한편, 지지봉(10)의 상단은 빔(20)의 하부면에, 그리고 지지봉(10)의 하단은 지면 또는 바닥 슬래브(100)에 고정하여 지지가 견고히 되도록 하며, 벽체(30) 및 상면 바닥 슬래브(101)의 콘크리트 양생이 끝난 후에는 지지봉(10)을 다시 해체할 수 있도록 한다. On the other hand, the upper end of the support rod 10 is fixed to the lower surface of the beam 20, and the lower end of the support rod 10 is fixed to the ground or the floor slab 100 so that the support is solid, the wall 30 and the upper floor slab After curing the concrete in (101), the support rod (10) can be disassembled again.

상기 지지봉(10)은 도 3에 도시된 바와 같이, 벽체 설치위치(31)로부터 소정의 이격거리(S)를 두고 설치되는 것이 바람직하다. The support rod 10 is preferably installed at a predetermined distance (S) from the wall installation location 31, as shown in FIG.

이로 인해, 벽체(30)와 지지봉(10) 사이로 다른 공정을 수행하는 작업자들이 통행하거나, 작업차량이 통행할 수 있는 공간을 확보할 수 있다. For this reason, between the wall 30 and the support rod 10, it is possible to secure a space through which workers performing other processes pass or through which a working vehicle can pass.

상기 이격거리(S)는 필요에 따라 다양하게 조정이 가능하며, 예를 들어, 지지봉(10)이 상기 벽체(30) 설치위치(31)로부터 1.8 ~ 2.4m 이격되어 설치될 수 있다. The separation distance (S) can be variously adjusted as needed, and for example, the support rod 10 may be installed at a distance of 1.8 to 2.4 m from the installation position 31 of the wall 30.

상기 지지봉(10)의 상부에 지지되는 상면 바닥 슬래브(101)용 빔(20)(또는 거더)을 설치한다(S13)(도 2의 b참조). A beam 20 (or a girder) for the top floor slab 101 supported on the upper part of the support bar 10 is installed (S13) (see b of FIG. 2).

즉, 본 발명에 따른 시공방법은 벽체철근(33)을 배근하기 전이나, 또는 벽체철근(33)을 배근하는 작업과 동시에 상면 바닥 슬래브(101)용 빔(20)을 지지봉(10)을 이용하여 설치할 수 있으므로 공사기간을 단축할 수 있다는 장점이 있다. That is, the construction method according to the present invention uses the support rod 10 for the beam 20 for the upper floor slab 101 before or at the same time as the reinforcement of the wall reinforcement 33 or the reinforcement of the wall reinforcement 33 Since it can be installed, the construction period can be shortened.

빔 설치단계(S13)는, 도 3에 도시된 바와 같이, 상기 벽체(30)를 향하는 상기 빔(20)의 선단에 임베디드 플레이트(50)(Embeded plate)를 고정하는 단계를 포함할 수 있다(S14). The beam installation step (S13) may include fixing the embedded plate 50 to the tip of the beam 20 facing the wall 30, as shown in FIG. 3 ( S14).

종래 시공방법의 경우 임베디드 플레이트(50)는, 벽체철근(33) 배근, 임베디드 플레이트(50)의 고정 및 벽체(30) 콘크리트 타설 그리고, 빔(20)과의 고정이라는 4단계를 거쳐야 한다. In the case of the conventional construction method, the embedded plate 50 must undergo four steps: reinforcing the wall reinforcement 33, fixing the embedded plate 50, placing the concrete in the wall 30, and fixing the beam 20.

그러나, 본 발명에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법에 의하면, 임베디드 플레이트(50)가 빔(20)의 전단부에 고정되므로, 벽체철근(33) 배근단계와 동시에 빔(20)에의 고정작업을 수행할 수 있고, 이후 벽체(30) 콘크리트 타설과 동시에 임베디드 플레이트(50)의 일단이 벽체(30)에 매립 고정되므로 시공성 및 고정 안정성이 향상되는 효과가 있다. However, according to the simultaneous construction method of the wall and the floor slab of the building structure according to the present invention, since the embedded plate 50 is fixed to the front end of the beam 20, the wall reinforcement 33 and the beam 20 The fixing operation can be performed, and since one end of the embedded plate 50 is embedded and fixed in the wall 30 at the same time as the wall 30 is poured into concrete, there is an effect of improving workability and fixing stability.

벽체 설치위치(31)에 철근을 배근한다(S15)(도 2의 c참조). Reinforcement is placed in the wall installation location 31 (S15) (see c of FIG. 2).

이 단계에서 벽체철근(33)에 전술한 임베디드 플레이트(50)를 고정하는 단계가 수행될 수 있으며, 벽체철근(33)에 콘크리트 타설을 위한 거푸집을 설치하는 단계도 포함된다. In this step, the step of fixing the above-described embedded plate 50 to the wall reinforcement 33 may be performed, and a step of installing a formwork for placing concrete on the wall reinforcement 33 is also included.

상기 벽체철근 배근단계(S15) 후 또는 동시에 상기 빔(20)의 상부에 데크 플레이트(40)를 설치한다(S17). After the wall reinforcement step (S15) or at the same time to install the deck plate 40 on the upper portion of the beam (20) (S17).

빔(20)이 설치된 후에는, 벽체(30) 시공단계와 상면 바닥 슬래브(101) 시공단계는 전술한 바와 같이, 각각 병렬적으로 진행된다. 따라서 어느 하나의 시공단계가 다른 하나에 시공단계에 영향을 주지 아니하므로 어느 하나의 시공단계 완료를 기다릴 필요가 없어 공사기간을 단축할 수 있게 된다. After the beam 20 is installed, the wall 30 construction step and the upper floor slab 101 construction step are performed in parallel, respectively, as described above. Therefore, since one construction step does not affect the other construction step, there is no need to wait for the completion of one construction step, so the construction period can be shortened.

상기 데크 플레이트(40) 설치단계(S17)는, 상기 데크 플레이트(40)에 철근, 전기 또는 배관 중 하나 이상을 포함하는 설비를 매립하는 설비매립단계(S18)를 포함할 수 있다(도 2의 d 참조). The installation step (S17) of the deck plate 40 may include a facility burying step (S18) of burying a facility including at least one of reinforcement, electricity, or pipe in the deck plate 40 (Fig. 2). d).

추가로, 상면 바닥 슬래브(101)에 콘크리트 타설을 위한 거푸집 형성단계를 추가로 수행할 수 있다. In addition, a step of forming a formwork for pouring concrete on the upper floor slab 101 may be additionally performed.

벽체철근(33) 및 상기 데크 플레이트(40) 상면에 각각 콘크리트를 타설하여 상기 벽체(30) 및 상기 상면 바닥 슬래브(101)를 동시에 형성한다(S19). Concrete is poured on the upper surface of the wall reinforcement 33 and the deck plate 40 to form the wall 30 and the upper floor slab 101 at the same time (S19).

상기 콘크리트 타설단계(S19) 이후에, 상기 지지봉(10)을 해체하는 지지봉 해체단계(S20)를 더 포함한다. After the concrete placing step (S19), it further includes a support bar disassembly step (S20) of dismantling the support bar (10).

따라서, 본 발명에 따른 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법에 따르면, 벽체의 완성을 기다릴 필요 없이 지지봉을 이용하여 상면 바닥 슬래브용 빔을 먼저 시공함으로써 벽체와 상면 바닥 슬래브를 동시에 시공하여 공사기간을 혁신적으로 단축할 수 있다. Therefore, according to the simultaneous construction method of the wall and the floor slab of a building structure according to the present invention, by first constructing the beam for the upper floor slab using the support rod without waiting for the completion of the wall, the construction period of the wall and the upper floor slab simultaneously Can be shortened innovatively.

또한, 지지봉(10)이 잭서포트(Jack Support)로 마련되는 경우에는, 지지봉(10) 상단의 높이 조절이 가능하므로, 필요에 따라 빔(20)의 레벨(높이) 조절이 언제든지 가능하다는 장점이 있다. In addition, when the support bar 10 is provided as a jack support, the height of the top of the support bar 10 can be adjusted, so that the level (height) of the beam 20 can be adjusted at any time as needed. have.

또한, 임베디드 플레이트가 빔의 전단부에 고정되므로, 벽체 철근 배근단계와 동시에 빔에의 고정작업을 수행할 수 있고, 이후 벽체 콘크리트 타설과 동시에 임베디드 플레이트의 일단이 벽체에 매립 고정되므로 시공성 및 고정 안정성을 더욱 향상시킬 수 있다. In addition, since the embedded plate is fixed to the front end of the beam, it is possible to fix the beam at the same time as the wall reinforcement step, and since the end of the embedded plate is embedded and fixed to the wall at the same time as the wall concrete is poured, workability and stability of fixation Can be further improved.

즉, 종래와 같이 임베디드 플레이트가 먼저 벽체에 타설될 경우 그 설치위치를 변경할 수 없으므로 상면 바닥 슬래브를 지지하기 위한 빔의 설치시 수평 조절이 매우 어렵거나 불가능한 문제가 있으나, 본 발명에 따른 시공방법은 임베디드 플레이트가 고정된 상태가 아니므로 잭서포트 등을 이용하여 타설전에는 언제든지 용이하게 수평 조절이 가능하다. That is, when the embedded plate is first placed on the wall, as in the related art, since the installation location cannot be changed, horizontal adjustment is very difficult or impossible when installing the beam to support the upper floor slab, but the construction method according to the present invention Since the embedded plate is not in a fixed state, it can be easily horizontally adjusted at any time before pouring using a jack support or the like.

또한, 시공이 완료된 후에는 지지봉을 해체하여 재 사용할 수 있어 시공효율성 향상과 동시에 시공비용을 절감할 수 있다는 장점이 있다. In addition, after the construction is completed, the support rod can be disassembled and reused, thereby improving construction efficiency and reducing construction costs.

S11 : 지지봉 설치단계
S13: 빔 설치단계
S14 : 임베디드 플레이트 고정단계
S15 : 벽체철근 배근단계
S17 : 데크 플레이트 설치단계
S18 : 설비매립단계
S19 : 콘크리트 타설단계
S20 : 지지봉 해체단계
100 : 지면 또는 바닥 슬래브 101 : 상면 바닥 슬래브
200 : 철골기둥
10 : 지지봉 20 : 빔
30 : 벽체 31 : 벽체 설치위치
33 : 벽체철근 40 : 데크 플레이트
50 : 임베디드 플레이트
S11: Support rod installation step
S13: Beam installation step
S14: Embedded plate fixing step
S15: Wall reinforcement step
S17: Deck plate installation step
S18: Facility reclamation stage
S19: Concrete pouring step
S20: Support bar disassembly step
100: ground or floor slab 101: upper floor slab
200: steel pillar
10: support rod 20: beam
30: wall 31: wall installation location
33: wall reinforcement 40: deck plate
50: embedded plate

Claims (6)

지면 또는 바닥 슬래브에 다수의 철골기둥이 형성된 건축 구조물에서,
상기 지면 또는 바닥 슬래브에 복수의 지지봉을 세우는 지지봉 설치단계와;
상기 지지봉의 상부에 지지되는 상면 바닥 슬래브용 빔을 설치하는 빔 설치단계와;
벽체 설치위치에 철근을 배근하는 벽체철근 배근단계와;
상기 벽체철근 배근단계 후 또는 동시에 상기 빔의 상부에 데크 플레이트를 설치하는 데크 플레이트 설치단계와;
상기 벽체철근 및 상기 데크 플레이트 상면에 각각 콘크리트를 타설하여 상기 벽체 및 상기 상면 바닥 슬래브를 동시에 형성하는 콘크리트 타설단계;를 포함하는 건축 구조물의 벽체 및 바닥 슬래브 시공방법.
In a building structure in which a number of steel pillars are formed on the ground or floor slab,
A support rod installation step of erecting a plurality of support rods on the ground or floor slab;
A beam installation step of installing a beam for an upper floor slab supported on an upper portion of the support rod;
A wall reinforcement step of reinforcing reinforcement at the wall installation location;
A deck plate installation step of installing a deck plate on an upper portion of the beam after or at the same time after the wall reinforcement step;
Concrete placing step of simultaneously forming the wall and the upper floor slab by placing concrete on the upper surface of the wall reinforcement and the deck plate, respectively. A method of constructing a wall and a floor slab of a building structure including.
제1항에 있어서,
상기 테크 플레이트 설치단계는, 상기 데크 플레이트에 철근, 전기 또는 배관 중 하나 이상을 포함하는 설비를 매립하는 설비매립단계를 더 포함하는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법.
The method of claim 1,
The tech plate installation step is a method of simultaneously constructing a wall and a floor slab of a building structure, further comprising a facility burying step of burying a facility including one or more of reinforcement, electricity, or pipe in the deck plate.
제1항에 있어서,
상기 빔 설치단계는, 상기 벽체를 향하는 상기 빔의 선단에 임베디드 플레이트(Embeded plate)를 고정하는 단계를 포함하는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법.
The method of claim 1,
The beam installation step is a method of simultaneously constructing a wall and a floor slab of a building structure, comprising fixing an embedded plate to a tip of the beam facing the wall.
제1항에 있어서,
상기 지지봉은, 상단의 높이 조절이 가능한 잭서포트(Jack Support)로 마련되는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법.
The method of claim 1,
The support rod is a method of simultaneously constructing a wall and a floor slab of a building structure provided with a jack support capable of adjusting the height of the upper end.
제1항에 있어서,
상기 지지봉은 상기 벽체 설치위치로부터 1.8 ~2.4 m 이격되어 설치되는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법.
The method of claim 1,
The support rod is a method of simultaneously installing a wall and a floor slab of a building structure that is installed 1.8 to 2.4 m apart from the wall installation location.
제1항에 있어서,
상기 콘크리트 타설단계 후에, 상기 지지봉을 해체하는 지지봉 해체단계를 더 포함하는 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법.
The method of claim 1,
After the concrete pouring step, the simultaneous construction method of the wall and the floor slab of a building structure further comprising the step of disassembling the support bar of dismantling the support bar.
KR1020190026300A 2019-03-07 2019-03-07 The Simultaneous Construction Method for Wall and Slab of Building KR20200107332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190026300A KR20200107332A (en) 2019-03-07 2019-03-07 The Simultaneous Construction Method for Wall and Slab of Building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190026300A KR20200107332A (en) 2019-03-07 2019-03-07 The Simultaneous Construction Method for Wall and Slab of Building

Publications (1)

Publication Number Publication Date
KR20200107332A true KR20200107332A (en) 2020-09-16

Family

ID=72670177

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190026300A KR20200107332A (en) 2019-03-07 2019-03-07 The Simultaneous Construction Method for Wall and Slab of Building

Country Status (1)

Country Link
KR (1) KR20200107332A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482394A (en) * 2021-08-06 2021-10-08 中建三局集团(深圳)有限公司 Structural beam plate back-jacking reinforcing method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030082668A (en) 2002-04-18 2003-10-23 한봉길 Construction method for SRC structured high rise building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030082668A (en) 2002-04-18 2003-10-23 한봉길 Construction method for SRC structured high rise building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482394A (en) * 2021-08-06 2021-10-08 中建三局集团(深圳)有限公司 Structural beam plate back-jacking reinforcing method

Similar Documents

Publication Publication Date Title
AU2013101343A4 (en) Methods, systems and components for multi-storey building construction
CN105649360A (en) Integral assembling type building system and installing method
CN106150060B (en) Construction method based on assembled wall-connecting piece exterior wall scaffold system
CN106193292A (en) A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
KR20200107332A (en) The Simultaneous Construction Method for Wall and Slab of Building
CN112681511B (en) Reinforced concrete structure construction method using section steel to replace part of reinforcing steel bars
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
EP1799936A1 (en) Method and apparatus for construction
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
KR100650134B1 (en) Early remove support method
JP6710064B2 (en) Seismic isolation retrofit construction method and building construction
KR20200032316A (en) Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support
KR101409249B1 (en) Top Down Construction method Using Method Of Steel Hybrid Girder Construction
AU2013101345A4 (en) Methods, systems and components for multi-storey building construction
AU2013101347A4 (en) Methods, systems and components for multi-storey building construction
KR20160050516A (en) Downward construction method for hybrid structure system using a temporary bracket and a long span deck
RU2617813C2 (en) The method of erection of prefabricated multi-storey reinforced concrete frame of a building
KR102269141B1 (en) Deck plate wall installation method using underground pavement
CN215594550U (en) Disassembly-free laminated slab
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
JP3644606B2 (en) Installation method of formwork support in reverse placement method
RU2308587C1 (en) Method for timber floor structure reconstruction
KR20050081138A (en) A construction system of the concret structure
AU2013101346A4 (en) Methods, systems and components for multi-storey building construction

Legal Events

Date Code Title Description
E601 Decision to refuse application