CN104762967A - Improved anchor rod static pressure pile sealing device and construction method - Google Patents
Improved anchor rod static pressure pile sealing device and construction method Download PDFInfo
- Publication number
- CN104762967A CN104762967A CN201510173864.8A CN201510173864A CN104762967A CN 104762967 A CN104762967 A CN 104762967A CN 201510173864 A CN201510173864 A CN 201510173864A CN 104762967 A CN104762967 A CN 104762967A
- Authority
- CN
- China
- Prior art keywords
- pile
- anchoring
- shaped steel
- stake
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
Abstract
The invention relates to an improved anchor rod static pressure pile sealing device. A pile hole of a rectangular pyramid structure is reserved in the middle of a foundation, a pile pressing frame is installed on the part, corresponding the part above the pile hole, of the foundation, the two ends of the pile pressing frame are fixedly installed on the foundation through vertical anchor rods, a section steel beam is transversely installed on the pile pressing frame, a jack is installed on the lower end face of the section steel beam, and the jack and a prefabricated pile under the pile hole are coaxially arranged. The anchor rod static pressure pile sealing device is characterized in that an anchoring framework assembly is installed between the jack and the prefabricated pile and comprises vertical force transmission section steel and transverse anchoring section steel. According to the anchor rod static pressure pile sealing device, by means of the combination of the anchoring framework assembly and a rectangular anchoring iron piece, the pile pressing frame and the jack can be directly replaced after pipe striking is finished, the construction period is effectively shortened, and the circulating rate of construction machines is increased. The anchor rod static pressure pile sealing device is simple in structure, construction is convenient, the circulating rate of the construction machines is increased, and the project machine cost is saved.
Description
Technical field
The invention belongs to the realm of building construction, relate to static pressed pile, especially a kind of envelope stake device of anchor jacked pile of improvement and construction method.
Background technology
Anchor jacked pile because of its easy construction and higher carrying can be provided very to be soon widely used in structure foundation is reinforced, correction and the engineering such as foundation underpinning.Seal stake when anchor jacked pile unloads, the spring-back effect of pile body is easy to cause building to produce additional settlement.Traditional does not unload envelope stake technology, and reaching at work progress the envelope pile concrete requirement of strength being enough to bear pre-counterforce at least needs seven days, overlong time, extends the service time of equipment to a certain extent.Also exist in addition envelope stake complete after top, basis epirelief pile cover need be set affect the shortcoming such as clear height and using function.
Through retrieval, find one section of patent document relevant to present patent application: anchor jacked pile precharge pressure envelope stake device, notification number (CN102605785A), disclosed in this patent, content is: the bottom of left side pre embedded bolt (8.1) and right side pre embedded bolt (8.2) is embedded in piling basis (7), top is by left side attaching nut (6.1), right side attaching nut (6.2) correspondence and left side high tensile reinforcement (4.1), the bottom on right side high tensile reinforcement (4.2) connects, left side high tensile reinforcement (4.1), the top on right side high tensile reinforcement (4.2) through secondary beam (2.1) on the left of piling hole by the first high tensile reinforcement anchored end (1.1), second high tensile reinforcement anchored end (1.2) to be fixed on the left of piling hole on secondary beam (2.1), piling jack (10) is provided with on the top of static pressed pile (9), piling jack (10) is provided with girder (3), and on the left of piling hole, on the right side of secondary beam (2.1) and piling hole, secondary beam (2.2) is pressed on girder (3).
Contrasted by technical characteristic, the above-mentioned open source literature existence envelope stake cycle is long, operation rate of machinery is low, seal the shortcomings such as stake somewhat expensive and envelope stake inconvenience.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, the envelope stake device providing a kind of anchor jacked pile of improvement not unload and construction method, the method not only makes sedimentation be effectively controlled, solve tradition do not unload envelope stake in pile cover give prominence to the structure difficult problem affecting clear height, and greatly improve the turnover rate of construction machinery, save project cost.
The solution of the present invention is achieved in that
A kind of envelope stake device of anchor jacked pile of improvement, in the stake holes of the reserved tetragonous cone table structure in middle part, basis, to pile driving frame being installed in the basis above stake holes, these pile driving frame both ends are packed on basis by vertical anchor pole, horizontal mount type girder steel on described pile driving frame, jack is installed in this section steel beam lower surface, preformed pile below this jack and described stake holes is coaxially arranged, it is characterized in that: install anchoring skeleton component between described jack and preformed pile, this anchoring skeleton component comprises vertical power transmission shaped steel and horizontal anchoring shaped steel;
The vertical power transmission shaped steel vertically arranged is installed, the horizontal anchoring shaped steel of upper end horizontally set one of this vertical power transmission shaped steel in the top of described preformed pile;
The vertical symmetry of left and right hole wall of described stake holes is shaped with the shaped steel detent corresponding with described horizontal anchoring shaped steel, in the middle part of the stake holes hole wall at this shaped steel detent place, longitudinal symmetry is shaped with two Anchoring recess, rectangle anchoring ironware is installed in this Anchoring recess, these two Anchoring recess are perpendicular with all shaped steel detents and be communicated with, and described shaped steel detent, Anchoring recess are all communicated with stake holes.
And, between described vertical power transmission shaped steel and preformed pile, lower steel plate is installed, between this horizontal anchoring shaped steel and jack, installs steel plate.
And described horizontal anchoring shaped steel and vertical power transmission shaped steel are i iron or H profile steel.
And described horizontal anchoring shaped steel and vertical power transmission shaped steel are solidly installed.
An envelope pile construction method for the anchor jacked pile of improvement, comprises the steps:
Before step one, piling during concreting basis, reserve shaped steel detent and Anchoring recess at stake holes hole wall;
Step 2, start piling, piling until final section time, anchoring skeleton component is set
Namely at the top vertical of preformed pile, vertical power transmission shaped steel is installed, then horizontal anchoring shaped steel is placed in vertical power transmission shaped steel upper surface and along the shaped steel detent of stake holes, then continue to press down by jack, until the top of anchoring skeleton component is positioned at the Anchoring recess of stake holes with upper/lower positions;
Step 3, rectangle anchoring ironware is arranged on stake holes Anchoring recess in and fixing, then remove jack, pile driving frame and section steel beam, carry out the envelope stake operation of lower road.
And, also comprise step 4, when carrying out envelope stake, in the bar planting of stake holes hole wall surrounding, and bar planting reinforcement welding is reticulated.
And the described bar planting degree of depth is more than or equal to 15 times of reinforcing bar, bar planting easily adopts III grade of steel, bar planting diameter 18-25mm, single wall bar planting 1-2 layer, every layer of 1-3 root.
Advantage of the present invention and good effect are:
1, apparatus of the present invention pass through the combination of anchoring skeleton component and rectangle anchoring ironware, directly pile driving frame and jack can be cemented out, effectively shorten construction period, and improve construction machinery turnover rate after making piling.
2, the horizontal anchoring shaped steel in apparatus of the present invention with overlap together with full weld between vertical power transmission shaped steel, effectively improve the stability of construction.
3, the inventive method adopts and does not unload envelope pile constructing process, solves a difficult problem for the clear height deficiency produced because of the use of epirelief pile cover.
4, the inventive method makes additional settlement obtain effective control in construction period, and preformed pile timely and effectively must play bearing capacity effect in the very first time.
Carry out bar planting in stake holes wall surrounding when 5, sealing stake in the inventive method, and bar planting reinforcement welding is reticulated, can better play stressed effect with bar planting after Concrete Structure sclerosis.
6, simple, the easy construction of structure of the present invention, improves the turnover rate of construction machinery, has saved project machine cost.
Accompanying drawing explanation
Fig. 1 is Construction State figure of the present invention;
Fig. 2 is the sectional view of stake holes in the present invention;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is that the A-A of Fig. 3 is to sectional view;
Fig. 5 is the perspective view of stake holes of the present invention;
Fig. 6 is bar planting structural representation of the present invention.
In accompanying drawing: 1-pile driving frame, 2-section steel beam, 3-jack, 4-basis, the vertical anchor pole of 5-, 6-upper steel plate, 7-rectangle anchoring ironware, the horizontal anchoring shaped steel of 8-, the vertical power transmission shaped steel of 9-, 10-lower steel plate, 11-preformed pile, 12-stake holes, 13-shaped steel detent, 14-Anchoring recess, 15-bar planting.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by specific embodiment, the invention will be further described.
A kind of envelope stake device of anchor jacked pile of improvement, as shown in Figure 1, the stake holes 12 of reserved tetragonous cone table structure in the middle part of basis 4, to pile driving frame 1 being installed in the basis above stake holes, these pile driving frame both ends are packed on basis by vertical anchor pole 5, horizontal mount type girder steel 2 on described pile driving frame, jack 3 is installed in this section steel beam lower surface, and the preformed pile 11 below this jack and described stake holes is coaxially arranged.
Innovative point of the present invention is:
Install anchoring skeleton component between described jack and preformed pile, this anchoring skeleton component comprises vertical power transmission shaped steel 9 and horizontal anchoring shaped steel 8.
In the process of piling, when piling is depressed into final section, the one vertical power transmission shaped steel vertically arranged is installed at the top of preformed pile, between vertical power transmission shaped steel and preformed pile, lower steel plate 10 is installed, the horizontal anchoring shaped steel of upper surface horizontally set one of described vertical power transmission shaped steel, described horizontal anchoring shaped steel and vertical power transmission shaped steel are i iron or H profile steel, install steel plate 6 between this horizontal anchoring shaped steel and jack.
The structure of described stake holes as shown in Figures 2 to 4, the vertical symmetry of the left and right hole wall of this stake holes is shaped with the shaped steel detent 13 corresponding with described horizontal anchoring shaped steel, in the middle part of the stake holes hole wall at this shaped steel detent place, longitudinal symmetry is shaped with two Anchoring recess 14, rectangle anchoring ironware 7 is installed in this Anchoring recess, these two Anchoring recess are perpendicular with described shaped steel detent and be communicated with, and described shaped steel detent, Anchoring recess are all communicated with stake holes.
An envelope pile construction method for the anchor jacked pile of improvement, comprises the steps:
Before step one, piling during concreting basis, reserve shaped steel detent and Anchoring recess at stake holes hole wall;
Step 2, start piling, piling until final section time, anchoring skeleton component is set;
Namely at the top vertical of preformed pile, vertical power transmission shaped steel is installed, then horizontal anchoring shaped steel is placed in vertical power transmission shaped steel upper surface and along the shaped steel detent of stake holes, then continue to press down by jack, until the top of anchoring skeleton component is positioned at the Anchoring recess of stake holes with upper/lower positions;
Step 3, rectangle anchoring ironware is arranged on stake holes Anchoring recess in and fixing, then remove jack, pile driving frame and section steel beam, carry out the envelope stake operation of lower road.
Carry out bar planting 15 in stake holes wall surrounding in envelope stake process, as shown in Figure 6, and bar planting reinforcement welding is reticulated, can better play stressed effect with bar planting after Concrete Structure sclerosis.
Principle of the present invention is:
In the not unloading port of this improvement, anchoring needs to arrange shaped steel detent and Anchoring recess at stake holes hole wall, when piling is depressed into final section, anchoring skeleton component is placed at preformed pile top, utilize Pile feeder that the anchoring skeleton component be connected with preformed pile is depressed into below the Anchoring recess of stake holes hole wall, by placing rectangle anchoring ironware in Anchoring recess, thus anchoring skeleton component is blocked, the object of jack and pile driving frame can be removed after thus achieving piling.
Construction precautions:
1. anchor jacked pile needs the welding quality, pile body verticality, idle hours etc. that strictly control stake in work progress.And it is long to configure rational single stake in advance, to avoid increasing extra work because cutting stake;
2. when constructing to final section stake, need adopt Pile feeder that preformed pile is suppressed Anchoring recess top, general control absolute altitude is Anchoring recess absolute altitude+2cm to+5cm; Need cut stake for the stake cannot delivering to design elevation, stake face of cutting needs smooth solid, so that anchoring skeleton component is laid steadily;
3. by the specification of the horizontal anchoring shaped steel of Cross section calculation gained, vertical power transmission shaped steel, and vertical power transmission shaped steel and horizontal anchoring steel welding are connected into anchoring skeleton component.Welding should adopt J422 welding rod, vertical power transmission shaped steel and horizontal anchoring shaped steel contact position full weld even.There is the carried out weld seam detection of particular/special requirement to engineering and do corresponding preservative treatment;
4. take out Pile feeder, and the qualified anchoring skeleton component welded is put into reserved stake holes by realizing reserved shaped steel detent.Need foreign material garbage-cleaning in hole clean before placement, in order to avoid impact envelope quality of pile;
5. use jack that anchoring skeleton component is delivered to Anchoring recess position, after voltage stabilizing 1-2min, adopt rectangle anchor ironware to be anchored in Anchoring recess.When reserved anchor groove, Anchoring recess height can suitably amplify, so that anchorage point is made the appropriate adjustments by the mode of increase and decrease anchoring piece size;
6. when reserved stake holes form removal, dabbing cleaning treatment is done to stake holes, after piled anchor is solid, secondary cleaning is carried out to stake holes, check whether hole wall exists loosening concrete and with iron brush outwash hole wall;
7. carry out bar planting to hole wall surrounding, bar planting Shen Du≤15D (D is bar diameter), bar planting easily adopts III grade of steel, bar planting diameter 18-25mm; General single wall bar planting 1-2 layer, every layer of 1-3 root, concrete bar planting quantity depending on bearing capacity of single pile and preformed hole size, to the stressed weak parts such as shaped steel detent should arrange multistory reinforced and and surrounding bar planting be welded into steel mesh reinforcement to strengthen globality;
8. seal stake operation to construct immediately after above-mentioned operation completes, permit of no delay.Envelope pile concrete adopts the impervious slightly expanded concrete of high-grade early-strength or high strength early-strength grouting material.For existing in envelope stake process, percolating water situation is appropriate to the occasion carries out envelope stake several times, layer by layer sealing carry out the process of constuction joint;
9. seal after stake completes and construction plant is cleared up in time.Clean out rear appointment special messenger Continuous Observation 4-6 month hole wall surrounding and whether there is percolating water phenomenon, find that percolating water phenomenon processes in time.
For above-mentioned operation need point out following some:
1. when basis or base plate thickness comparatively Bao Shike vertical power transmission shaped steel is not set, directly employing horizontal anchoring shaped steel anchoring;
2. can arrange the vertical power transmission shaped steel of Two bors d's oeuveres when designing pre-counterforce and being larger, horizontal anchoring shaped steel can arrange bidirectional anchoring, and during bidirectional anchoring, shaped steel detent needs the two-way setting of forethought;
3. for ensureing that in stake holes, static pressed pile can better play a role in basis, respectively sets up 4 additional bars on reserved Anchoring recess top and bottom.
It is emphasized that; embodiment of the present invention is illustrative; instead of it is determinate; therefore the present invention includes the embodiment be not limited to described in detailed description of the invention; every other embodiments drawn by those skilled in the art's technical scheme according to the present invention, belong to the scope of protection of the invention equally.
Claims (7)
1. the envelope stake device of the anchor jacked pile improved, in the stake holes of the reserved tetragonous cone table structure in middle part, basis, to pile driving frame being installed in the basis above stake holes, these pile driving frame both ends are packed on basis by vertical anchor pole, horizontal mount type girder steel on described pile driving frame, jack is installed in this section steel beam lower surface, preformed pile below this jack and described stake holes is coaxially arranged, it is characterized in that: install anchoring skeleton component between described jack and preformed pile, this anchoring skeleton component comprises vertical power transmission shaped steel and horizontal anchoring shaped steel;
The vertical power transmission shaped steel vertically arranged is installed, the horizontal anchoring shaped steel of upper end horizontally set one of this vertical power transmission shaped steel in the top of described preformed pile;
The vertical symmetry of left and right hole wall of described stake holes is shaped with the shaped steel detent corresponding with described horizontal anchoring shaped steel, in the middle part of the stake holes hole wall at this shaped steel detent place, longitudinal symmetry is shaped with two Anchoring recess, rectangle anchoring ironware is installed in this Anchoring recess, these two Anchoring recess are perpendicular with all shaped steel detents and be communicated with, and described shaped steel detent, Anchoring recess are all communicated with stake holes.
2. the envelope stake device of the anchor jacked pile of improvement according to claim 1, is characterized in that: install lower steel plate between described vertical power transmission shaped steel and preformed pile, installs steel plate between this horizontal anchoring shaped steel and jack.
3. the envelope stake device of the anchor jacked pile of improvement according to claim 1 and 2, is characterized in that: described horizontal anchoring shaped steel and vertical power transmission shaped steel are i iron or H profile steel.
4. the envelope stake device of the anchor jacked pile of improvement according to claim 1 and 2, is characterized in that: described horizontal anchoring shaped steel and vertical power transmission shaped steel are solidly installed.
5. an envelope pile construction method for the anchor jacked pile that any one as described in Claims 1-4 is improved, is characterized in that: comprise the steps:
Before step one, piling during concreting basis, reserve shaped steel detent and Anchoring recess at stake holes hole wall;
Step 2, start piling, piling until final section time, anchoring skeleton component is set
Namely at the top vertical of preformed pile, vertical power transmission shaped steel is installed, then horizontal anchoring shaped steel is placed in vertical power transmission shaped steel upper surface and along the shaped steel detent of stake holes, then continue to press down by jack, until the top of anchoring skeleton component is positioned at the Anchoring recess of stake holes with upper/lower positions;
Step 3, rectangle anchoring ironware is arranged on stake holes Anchoring recess in and fixing, then remove jack, pile driving frame and section steel beam, carry out the envelope stake operation of lower road.
6. the envelope pile construction method of the anchor jacked pile of improvement according to claim 5, is characterized in that: also comprise step 4, when carrying out envelope stake, in the bar planting of stake holes hole wall surrounding, and is reticulated by bar planting reinforcement welding.
7. the envelope pile construction method of the anchor jacked pile of improvement according to claim 6, is characterized in that: the described bar planting degree of depth is more than or equal to 15 times of reinforcing bar, and bar planting easily adopts III grade of steel, bar planting diameter 18-25mm, single wall bar planting 1-2 layer, every layer of 1-3 root.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510173864.8A CN104762967B (en) | 2015-04-14 | 2015-04-14 | The envelope stake device of the anchor jacked pile of a kind of improvement and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510173864.8A CN104762967B (en) | 2015-04-14 | 2015-04-14 | The envelope stake device of the anchor jacked pile of a kind of improvement and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104762967A true CN104762967A (en) | 2015-07-08 |
CN104762967B CN104762967B (en) | 2016-08-24 |
Family
ID=53645034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510173864.8A Active CN104762967B (en) | 2015-04-14 | 2015-04-14 | The envelope stake device of the anchor jacked pile of a kind of improvement and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104762967B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442604A (en) * | 2015-12-23 | 2016-03-30 | 江苏鼎达建筑新技术有限公司 | Static pressure pile counterforce device and construction method thereof |
CN109837898A (en) * | 2019-03-13 | 2019-06-04 | 中电建建筑集团有限公司 | A kind of anchor jacked pile precharge pressure envelope piling method |
CN112302000A (en) * | 2020-11-09 | 2021-02-02 | 中交四航局港湾工程设计院有限公司 | Precast pile foundation structure and intelligent auxiliary construction method |
CN112323798A (en) * | 2020-09-24 | 2021-02-05 | 安徽省建筑科学研究设计院 | Prefabricated pipe pile static pressure construction device and method integrating positioning and pile sealing |
CN114561949A (en) * | 2022-03-18 | 2022-05-31 | 四川华远建设工程有限公司 | Improved pile sealing device for anchor rod static pressure pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101240533A (en) * | 2007-12-28 | 2008-08-13 | 吴如军 | Pile foundation reinforcement prestressing pile locking method |
JP4191495B2 (en) * | 2003-01-08 | 2008-12-03 | 鹿島建設株式会社 | Steel pipe pile method |
CN101397796A (en) * | 2008-09-12 | 2009-04-01 | 葛培中 | Construction method of prestressed anchor rod static pressure pile |
CN202559355U (en) * | 2012-05-09 | 2012-11-28 | 云南省建筑科学研究院 | Pre-pressing pile sealing device for anchor rod static pile |
CN202644531U (en) * | 2012-04-01 | 2013-01-02 | 江苏东南特种技术工程有限公司 | Pressure-preloading pile sealing device for static pressure pile of anchor rod |
CN104358260A (en) * | 2014-11-29 | 2015-02-18 | 宋双阳 | Preloaded pressure pile sealing working device of anchor rod static pressure pile |
CN204551470U (en) * | 2015-04-14 | 2015-08-12 | 中天建设集团有限公司 | A kind of envelope stake device of anchor jacked pile of improvement |
-
2015
- 2015-04-14 CN CN201510173864.8A patent/CN104762967B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4191495B2 (en) * | 2003-01-08 | 2008-12-03 | 鹿島建設株式会社 | Steel pipe pile method |
CN101240533A (en) * | 2007-12-28 | 2008-08-13 | 吴如军 | Pile foundation reinforcement prestressing pile locking method |
CN101397796A (en) * | 2008-09-12 | 2009-04-01 | 葛培中 | Construction method of prestressed anchor rod static pressure pile |
CN202644531U (en) * | 2012-04-01 | 2013-01-02 | 江苏东南特种技术工程有限公司 | Pressure-preloading pile sealing device for static pressure pile of anchor rod |
CN202559355U (en) * | 2012-05-09 | 2012-11-28 | 云南省建筑科学研究院 | Pre-pressing pile sealing device for anchor rod static pile |
CN104358260A (en) * | 2014-11-29 | 2015-02-18 | 宋双阳 | Preloaded pressure pile sealing working device of anchor rod static pressure pile |
CN204551470U (en) * | 2015-04-14 | 2015-08-12 | 中天建设集团有限公司 | A kind of envelope stake device of anchor jacked pile of improvement |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442604A (en) * | 2015-12-23 | 2016-03-30 | 江苏鼎达建筑新技术有限公司 | Static pressure pile counterforce device and construction method thereof |
CN105442604B (en) * | 2015-12-23 | 2017-08-08 | 江苏鼎达建筑新技术有限公司 | Static pressed pile counterforce device and its construction method |
CN109837898A (en) * | 2019-03-13 | 2019-06-04 | 中电建建筑集团有限公司 | A kind of anchor jacked pile precharge pressure envelope piling method |
CN112323798A (en) * | 2020-09-24 | 2021-02-05 | 安徽省建筑科学研究设计院 | Prefabricated pipe pile static pressure construction device and method integrating positioning and pile sealing |
CN112323798B (en) * | 2020-09-24 | 2022-02-18 | 安徽省建筑科学研究设计院 | Prefabricated pipe pile static pressure construction device and method integrating positioning and pile sealing |
CN112302000A (en) * | 2020-11-09 | 2021-02-02 | 中交四航局港湾工程设计院有限公司 | Precast pile foundation structure and intelligent auxiliary construction method |
CN112302000B (en) * | 2020-11-09 | 2021-05-25 | 中交四航局港湾工程设计院有限公司 | Precast pile foundation structure and intelligent auxiliary construction method |
CN114561949A (en) * | 2022-03-18 | 2022-05-31 | 四川华远建设工程有限公司 | Improved pile sealing device for anchor rod static pressure pile |
Also Published As
Publication number | Publication date |
---|---|
CN104762967B (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104762967A (en) | Improved anchor rod static pressure pile sealing device and construction method | |
CN203145038U (en) | Latticed column type tower crane foundation | |
CN103882869A (en) | Inclined supporting pile structure for foundation pit support and construction method thereof | |
CN101876160B (en) | Method for installing bracket used for in-situ casting concrete continuous girder bridge on soft soil foundation | |
CN201770942U (en) | Support for soft soil foundation cast-in-place concrete continuous beam bridge | |
CN205975658U (en) | Steel platform tower crane foundation | |
CN204080822U (en) | A kind of foundation pit stope support structure | |
CN204551470U (en) | A kind of envelope stake device of anchor jacked pile of improvement | |
CN104358260A (en) | Preloaded pressure pile sealing working device of anchor rod static pressure pile | |
CN203768914U (en) | Foundation pit bracing diagonal support pile structure | |
CN206769047U (en) | A kind of steel lattice column and bored concrete pile attachment structure | |
CN205591212U (en) | Multi -functional precast tubular pile | |
CN112302007B (en) | Pile bearing frame for pile foundation and construction method | |
CN209873811U (en) | Subway major structure medium plate also serves as temporary supporting structure | |
CN204510215U (en) | For the steel platform of foundation pit construction | |
CN200985510Y (en) | Anchored exterior-protected construction | |
CN206545218U (en) | A kind of reinforcement type ground and basis | |
CN111894036B (en) | Construction method for additionally arranging basement on strip-shaped foundation building | |
CN204875851U (en) | Underground structure's antidetonation reinforced structure | |
CN204298819U (en) | Anchor jacked pile precharge pressure envelope stake equipment | |
CN110106903B (en) | Anti-seismic corrosion-resistant building pile foundation | |
CN209323528U (en) | A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure | |
CN113047810A (en) | Multifunctional grouting nozzle | |
CN201785779U (en) | Reinforcing apparatus of the turbine pedestal beam in heat power plant | |
CN103835290A (en) | Pile foundation structure suitable for marine soft soil and design method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |