CN104762928A - Construction method of pull-rod-free pier body template of dolphin pier - Google Patents

Construction method of pull-rod-free pier body template of dolphin pier Download PDF

Info

Publication number
CN104762928A
CN104762928A CN201510107778.7A CN201510107778A CN104762928A CN 104762928 A CN104762928 A CN 104762928A CN 201510107778 A CN201510107778 A CN 201510107778A CN 104762928 A CN104762928 A CN 104762928A
Authority
CN
China
Prior art keywords
template
pier
pier body
layer
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510107778.7A
Other languages
Chinese (zh)
Inventor
单勤
范俊武
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201510107778.7A priority Critical patent/CN104762928A/en
Publication of CN104762928A publication Critical patent/CN104762928A/en
Pending legal-status Critical Current

Links

Abstract

Disclosed is a construction method of a pull-rod-free pier body template of a dolphin pier. Every 16 cm height of pier body is divided into five layers for machining and construction of a steel template according to the positions of a pier body steel apron and a mooring recess; every first layer of template is 2.0 m + 0.5 m, every second layer of template is 2.0 + 0.5 m, every third layer of template is 2.85 + 0.5 m, every fourth layer of template is 3.2 m + 0.5 m, and every fifth layer of template is 3.95 m; different template models are adopted at different corresponding heights of the pier body template respectively; the same model of template is only used once on every pier body and is detached to move to the corresponding working surface of the next pier body. According to the construction method of the pull-rod-free pier body template of the dolphin pier, the construction process of the pull-rod-free truss type pier body template is safe and convenient and high in construction efficiency; the surface of concrete after form removal is free of hole reserved through a pull rod and accordingly the durability of the concrete is ensured and the same color of the appearance of the concrete is achieved; the common fault of the quality of the concrete is reduced, the turnover efficiency of the template is improved, and the engineering cost input is reduced due to the design of a positioning guide template.

Description

Dolphin non pull rod type pier body formwork construction method
Technical field
The invention belongs to dolphin technical field, particularly relate to a kind of dolphin non pull rod type pier body formwork construction method.
Background technology
Along with the development of engineering construction, template deformation requirement when not only having concreting to various high tower, high pier, construction period, also more and more stricter to the requirement of the presentation quality of tower body, pier shaft, also more and more higher to requirement attractive in appearance.Current tower body, pier construction traditional method are: in the construction of tower body, pier shaft adopt through in body to the template of drawing rod-pulling type, although the processing of this template is simple, template is relatively light, but formwork integral rigidity is little, need with to pull bar during construction, to such an extent as to concrete surface draw-bar eye is many, process loaded down with trivial details, concrete surface unsightly, and after pull bar corrosion, the etching channels of reinforcing bar in concrete structure will be formed, have in the engineering of particular/special requirement reinforced steel bar rust preventing inapplicable in ocean engineering or some.
Non pull rod type pier body formwork have easy accessibility, improve template turnover, without scaffold construction, do not need to adopt other steel and to pull bar, after form removal, on pier shaft nothing to pulling eye, outward appearance comparatively adopts features such as the pier shaft of pull bar are attractive in appearance.Such as, approach channel engineering on Changzhou key water control project three line four line, arrange dolphin 55 altogether, point A, B two berthing space arrange, wherein A district (in boat 0+253.0-0+578.0) is close to ship lock and adjusts suitable section, and arrange 28 dolphins (respectively arranging 14 on the left of Third-Line Shiplock and on the right side of four line ship lock), B district (in boat 1+094.0-1+774.0) is near entrance erea, arrange 27 dolphins, adjacent two pier center distance are 25.0 meters.Dolphin pier shaft is variable cross-section, the pier shaft two sides gradient is 1:0.1, pier shaft back slope is 1:0.2,2 row steel guard timbers are provided with at side, pier shaft facade forward position 28.50 ~ 16.50m elevation, steel guard timber projective structure surface 5cm, and a mooring tabernacle is had every 1.85m in 19.30 ~ 26.7m elevation, tabernacle is recessed structures surface 100cm.
Summary of the invention
The object of the present invention is to provide a kind of construction method of dolphin non pull rod type pier body formwork.
The technical solution used in the present invention is:
A kind of construction method of dolphin non pull rod type pier body formwork, according to pier shaft steel guard timber and mooring tabernacle position, pier shaft high for 16m is divided into 5 layers of processing and construction carrying out steel form, first floor template is 2.0m+0.5m, second layer template is 2.0+0.5m, third layer template is 2.85+0.5m, 4th layer of template is 3.2m+0.5m, layer 5 template is 3.95m, the different respective heights of pier body formwork all adopts different template models, same model template only uses once at each pier shaft, then removes and moves on the corresponding work plane of next pier shaft; During the upper mould of construction, the 0.5m template of lower one deck template of having constructed is as locating guiding template, make that a whole set of flowing water steel form is segmented to be applied on adjacent some piers, the template of removing last pier shaft carries out polishing on ground, after oiling, next pier shaft of direct lifting is constructed, and every one deck template is divided into four pieces, and each face die plate of pier shaft is a monoblock, there being the position of steel guard timber to arrange the projecting surface board slot with the identical modulus of steel guard timber built-in fitting, during construction, built-in fitting and steel facing are adjacent to.
The construction method of described dolphin non pull rod type pier body formwork, does not arrange template to steel guard timber position, directly slots in template according to built-in fitting size, during construction directly by installation of embedded parts in relevant position, take corresponding mortar leakage prevention measure in outside.
The construction method of described dolphin non pull rod type pier body formwork, truss junction outside template connects with flange, levels truss in single form is with Bolted angle connection, at firm panel and vertical framework seam crossing, long 13cm is set, the triangular form rubber strip grouting of wide 1cm, grouting rubber strip adopts nail nail to be fixed on the lumps of wood of the 10# channel-section steel of vertical framework side; Firm panel and levels cross form stitching portion are arranged to negative and positive faulting of slab ends and are overlapped, and add double-sided tape mortar leakage prevention when constructing at edge joint position.
Beneficial effect of the present invention, the present invention is without pull bar truss pier formwork, and in work progress, safe ready, efficiency of construction are high; After form removal, concrete surface does not have hole that pull bar is left a blank, and ensure that concrete durability, makes pier shaft concrete appearance solid colour yet; The design of locating guiding template decreases common fault of concrete quality, improves all transfer efficients of template, decreases engineering cost input.
Detailed description of the invention
A kind of construction method of dolphin non pull rod type pier body formwork, according to pier shaft steel guard timber and mooring tabernacle position, pier shaft high for 16m is divided into 5 layers of processing and construction carrying out steel form, first floor template is 2.0m+0.5m, second layer template is 2.0+0.5m, third layer template is 2.85+0.5m, 4th layer of template is 3.2m+0.5m, layer 5 template is 3.95m, the different respective heights of pier body formwork all adopts different template models, same model template only uses once at each pier shaft, then removes and moves on the corresponding work plane of next pier shaft; During the upper mould of construction, the 0.5m template of lower one deck template of having constructed is as locating guiding template, make that a whole set of flowing water steel form is segmented to be applied on adjacent some piers, the template of removing last pier shaft carries out polishing on ground, after oiling, next pier shaft of direct lifting is constructed, and every one deck template is divided into four pieces, and each face die plate of pier shaft is a monoblock, there being the position of steel guard timber to arrange the projecting surface board slot with the identical modulus of steel guard timber built-in fitting, during construction, built-in fitting and steel facing are adjacent to.Template is not arranged to steel guard timber position, directly slots in template according to built-in fitting size, during construction directly by installation of embedded parts in relevant position, take corresponding mortar leakage prevention measure in outside.Truss junction outside template connects with flange, levels truss in single form is with Bolted angle connection, at firm panel and vertical framework seam crossing, long 13cm is set, the triangular form rubber strip grouting of wide 1cm, grouting rubber strip adopts nail nail to be fixed on the lumps of wood of the 10# channel-section steel of vertical framework side; Firm panel and levels cross form stitching portion are arranged to negative and positive faulting of slab ends and are overlapped, and add double-sided tape mortar leakage prevention when constructing at edge joint position.

Claims (3)

1. the construction method of dolphin non pull rod type pier body formwork, it is characterized in that, according to pier shaft steel guard timber and mooring tabernacle position, pier shaft high for 16m is divided into 5 layers of processing and construction carrying out steel form, first floor template is 2.0m+0.5m, second layer template is 2.0+0.5m, third layer template is 2.85+0.5m, 4th layer of template is 3.2m+0.5m, layer 5 template is 3.95m, the different respective heights of pier body formwork all adopts different template models, and same model template only uses once at each pier shaft, then removes and moves on the corresponding work plane of next pier shaft; During the upper mould of construction, the 0.5m template of lower one deck template of having constructed is as locating guiding template, make that a whole set of flowing water steel form is segmented to be applied on adjacent some piers, the template of removing last pier shaft carries out polishing on ground, after oiling, next pier shaft of direct lifting is constructed, and every one deck template is divided into four pieces, and each face die plate of pier shaft is a monoblock, there being the position of steel guard timber to arrange the projecting surface board slot with the identical modulus of steel guard timber built-in fitting, during construction, built-in fitting and steel facing are adjacent to.
2. the construction method of dolphin non pull rod type pier body formwork according to claim 1, it is characterized in that, template is not arranged to steel guard timber position, directly slots in template according to built-in fitting size, during construction directly by installation of embedded parts in relevant position, take mortar leakage prevention measure in outside.
3. the construction method of dolphin non pull rod type pier body formwork according to claim 1 and 2, it is characterized in that, truss junction outside template connects with flange, levels truss in single form is with Bolted angle connection, at firm panel and vertical framework seam crossing, long 13cm is set, the triangular form rubber strip grouting of wide 1cm, grouting rubber strip adopts nail nail to be fixed on the lumps of wood of the 10# channel-section steel of vertical framework side; Firm panel and levels cross form stitching portion are arranged to negative and positive faulting of slab ends and are overlapped, and add double-sided tape mortar leakage prevention when constructing at edge joint position.
CN201510107778.7A 2015-03-12 2015-03-12 Construction method of pull-rod-free pier body template of dolphin pier Pending CN104762928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510107778.7A CN104762928A (en) 2015-03-12 2015-03-12 Construction method of pull-rod-free pier body template of dolphin pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510107778.7A CN104762928A (en) 2015-03-12 2015-03-12 Construction method of pull-rod-free pier body template of dolphin pier

Publications (1)

Publication Number Publication Date
CN104762928A true CN104762928A (en) 2015-07-08

Family

ID=53644995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510107778.7A Pending CN104762928A (en) 2015-03-12 2015-03-12 Construction method of pull-rod-free pier body template of dolphin pier

Country Status (1)

Country Link
CN (1) CN104762928A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4003209A (en) * 1972-07-31 1977-01-18 Jackson Gary A Pier construction
CN88200297U (en) * 1988-01-12 1988-08-24 重庆市第三建筑工程公司 Climbing rising type formwork
CN201850508U (en) * 2010-06-11 2011-06-01 中国建筑股份有限公司 Non-strut bridge pier template
CN102619172A (en) * 2012-04-20 2012-08-01 中铁十三局集团第四工程有限公司 Without pull rod construction device and construction method for large-cross-section solid rectangular pier column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4003209A (en) * 1972-07-31 1977-01-18 Jackson Gary A Pier construction
CN88200297U (en) * 1988-01-12 1988-08-24 重庆市第三建筑工程公司 Climbing rising type formwork
CN201850508U (en) * 2010-06-11 2011-06-01 中国建筑股份有限公司 Non-strut bridge pier template
CN102619172A (en) * 2012-04-20 2012-08-01 中铁十三局集团第四工程有限公司 Without pull rod construction device and construction method for large-cross-section solid rectangular pier column

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
伊成研: "桁架式大型墩身模板的设计与施工", 《经营管理者》 *
帅旭东: "无拉杆模板在客运专线桥墩施工中的应用", 《铁道建筑》 *
管弦: "无体内拉杆模板的设计", 《建材世界》 *

Similar Documents

Publication Publication Date Title
WO2021228189A1 (en) Reusable post-cast strip support replacement force transfer device and construction method therefor
CN101886374B (en) Groove bottom-reinforced fully lined debris flow drainage groove and construction method thereof
CN105926936A (en) Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN105970916A (en) Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN102383403B (en) Combined gate-type dry dock door
CN111691574A (en) Prefabricated assembly type shear wall vertical joint connecting structure and construction method thereof
CN103572874A (en) Method for constructing reinforced concrete composite floor slab of steel frame house
CN102155006B (en) Steel structure open web combined dam
CN206090617U (en) Novel assembled piping lane
CN205804779U (en) A kind of splash guard
CN104762928A (en) Construction method of pull-rod-free pier body template of dolphin pier
CN204570446U (en) The T-shaped simply supported beam of a kind of precast assembly
CN104295093B (en) Between frame construction twin columns, deformation joint builds the construction method of formwork system
CN204662715U (en) A kind of reinforced type fabricated shear wall structure with shear key
CN203782670U (en) Floating box platform for over-water construction
CN105804242A (en) Latticed column facilitating piercing of reinforcement bar at reversely constructed column-beam joint
CN203420359U (en) Rigid connection joint connected through beam columns and capable of bearing overlarge loads in steel structure support system
CN205677237U (en) Square stiffened column assembled variable area template system
CN102605945B (en) Manufacturing method of big wood formwork
CN210597271U (en) H-shaped steel sheet pile
CN211735477U (en) A tower crane foundation structure for bridge tower construction
CN205329872U (en) Interim closing means in floor post -cast strip of foldable circulated use
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN204097885U (en) For the combined steel board fixing structure of ring road bridge anti-collision wall construction
CN203487802U (en) Slant self-climbing protection screen unit system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150708

RJ01 Rejection of invention patent application after publication