CN104759856B - Coke dry quenching boiler shell upper cone makes and installation method - Google Patents
Coke dry quenching boiler shell upper cone makes and installation method Download PDFInfo
- Publication number
- CN104759856B CN104759856B CN201510192502.3A CN201510192502A CN104759856B CN 104759856 B CN104759856 B CN 104759856B CN 201510192502 A CN201510192502 A CN 201510192502A CN 104759856 B CN104759856 B CN 104759856B
- Authority
- CN
- China
- Prior art keywords
- hanger
- steel plate
- fan
- wire rope
- dry quenching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B39/00—Cooling or quenching coke
- C10B39/02—Dry cooling outside the oven
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a kind of coke dry quenching boiler shell upper cone to make and installation method, comprise the steps: to become coke dry quenching boiler shell upper cone setting-out fan-shaped model, make the profile drawing fan-shaped model in plane by actual ratio;Steel plate is paved with whole fan-shaped gage profile, and welds formation fan-shaped steel plate;Arranging 4 hangers on fan-shaped steel plate, middle two hangers are connected with hoist lifting hook by steel wire rope, and two, both sides hanger is connected with hoist lifting hook by chain block and steel wire rope;After fan-shaped steel plate is lifted by crane by crane, arranging 3 hangers inside fan-shaped steel plate, 3 hangers, by pulley, chain block and the gathering of steel wire rope regulation fan-shaped steel plate lower end, form taper steel plate;Taper Plate Welding is made coke dry quenching boiler shell upper cone, the lifting of coke dry quenching boiler shell upper cone is docked with coke dry quenching furnace housing straight section, complete to install.This method makes the integral assembling of coke dry quenching boiler shell upper cone the most just can carry out, it is not necessary to sets up temporary platform, has saved time, manpower and material.
Description
Technical field
The present invention relates to a kind of structure steel fabrication and installation method, particularly relate to a kind of coke dry quenching boiler shell upper cone and make and installation method.
Background technology
Coke dry quenching boiler shell is the vertical cell body of circular cross-section, and shell is formed by steel plate and section steel manufacture, and middle and top is cone shape, and other is straight tube shape.The furnace shell of existing cone shape makes and installation method makes generally according to veneer reeling machine roll bending ability and on-the-spot steel plate wide point three ~ tetra-circle blanking, and after the layering assembly of ground, then other furnace shells of integral hoisting and coke dry quenching furnace dock.This construction method, steel plate loss big (drawing measuring and calculating loss is 7%), splicing welding joint is many;When layering is assembled, each layer frustum need to be set up temporary weld operating platform when being mutually butted, not only waste time and energy;And because the most of welding job of workmen completes in high-altitude, there is certain potential safety hazard, the construction speed of whole upper cone is affected the biggest.Therefore we make and installation method in the urgent need to a kind of new coke dry quenching boiler shell upper cone, big to solve steel plate loss, improve construction speed.
Summary of the invention
It is an object of the invention to provide a kind of coke dry quenching boiler shell upper cone to make and installation method, the method uses crane the huge sector that raw sheet material level is spliced to be sling, huge sector is uniformly encircled into frustum, it is no longer necessary to set up temporary platform, whole cone one-shot forming, efficiency of construction is high, and the proportion of goods damageds of steel plate the most greatly reduce.
The present invention is achieved in that
A kind of coke dry quenching boiler shell upper cone makes and installation method, comprises the steps:
Step one, it is coke dry quenching boiler shell upper cone setting-out according to CAD diagram, reserved semi auto cutting machine line of cut width
Making 1:1 in plane, coke dry quenching boiler shell upper cone is carried out setting-out, be specially and coke dry quenching boiler shell upper cone setting-out is become a fan-shaped model, make the profile drawing fan-shaped model in plane by actual ratio;
Step 2, steel plate is carried out CAD plane typesetting to steel plate according to the profile in step one it is paved with whole fan-shaped gage profile, and reserved semi auto cutting machine line of cut width;
Step 3, the steel plate in step 2 is welded, form fan-shaped steel plate;
Step 4, suspension centre is set
In the one side of fan-shaped steel plate, one end uniform ring near short arc sets 4 hangers (4 hangers use with fan-shaped steel plate and are welded to connect), and described 4 hangers are followed successively by the first hanger, the second hanger, the 3rd hanger, the 4th hanger;
Second hanger is connected with hoist lifting hook by the first steel wire rope;3rd hanger is connected with hoist lifting hook by the second steel wire rope;First hanger passes sequentially through the first chain block, the 3rd steel wire rope is connected with hoist lifting hook;4th hanger passes sequentially through the second chain block, the 4th steel wire rope is connected with hoist lifting hook;
The length of the first steel wire rope and the second steel wire rope is equal, and the length of the 3rd steel wire rope and the 4th steel wire rope is equal, and the 3rd steel wire rope is than the first length of steel rope;
Step 5, lifting splicing
Being sling by the fan-shaped steel plate being installed on hanger and steel wire rope with crane, crane gradually hooks up, and the second hanger and the 3rd hanger are gradually higher than the first hanger and the 4th hanger, and the first chain block regulates the height of the first hanger, the height of the second chain block regulation the 4th hanger;
After fan-shaped steel plate is sling, suitable for reading adjacent, gradually surround cone;At this moment, the 5th hanger, the 6th hanger and the 7th hanger are welded in fan-shaped steel plate lower inside;Being provided with pulley on described 5th hanger, one end of the 5th steel wire rope is connected with the 6th hanger, and the other end of the 5th steel wire rope is connected by the 3rd chain block and the 7th hanger after pulley;
Operate the 3rd chain block, make fan-shaped steel plate end opening gradually in draw close to adjacent, fan-shaped steel plate forms tapered steel plate;
Fall to taper steel plate make in plane, and by location-plate, taper steel plate is fixed in making plane, make bottom taper steel plate and positive round is formed on top;
Use layout butt joint that taper steel plate opening part is welded, complete the making of coke dry quenching boiler shell upper cone;
Step 6, the coke dry quenching boiler shell upper cone in step 5 is sling, make coke dry quenching boiler shell upper cone dock with coke dry quenching furnace housing straight section, complete the installation of coke dry quenching boiler shell upper cone.
In step 6, coke dry quenching furnace housing straight section and coke dry quenching boiler shell upper cone carry out butt welding after being corrected by wedge, and coke dry quenching boiler shell upper cone connects with top backing ring, and then directly integral hoisting has been welded with furnace shell direct tube section to absolute altitude 28.7m, and furnace shell binds.
Further scheme is: the length of the 3rd steel wire rope is 1.2 ~ 1.5 times of the length of the first steel wire rope.
Further scheme is: described 5th hanger is positioned at the middle and lower part of fan-shaped steel plate, and the 6th hanger is near fan-shaped steel plate left side, and the 7th hanger is near fan-shaped steel plate right edge.
The present invention mainly provides the benefit that: the integral assembling of coke dry quenching boiler shell upper cone the most just can be carried out, it is not necessary to sets up temporary platform, has saved time, manpower and material, has improve work efficiency;Simplify making and the installation of whole coke dry quenching boiler shell upper cone, improve fabrication and installation efficiency of construction;Because the most just completing the integral assembling of coke dry quenching boiler shell upper cone, it is to avoid the work high above the ground in existing method, decrease the potential safety hazard of coke dry quenching boiler shell upper cone fabrication and installation;Coke dry quenching boiler shell upper cone one-shot forming, intensity is high, can improve the service life of coke dry quenching boiler shell upper cone;Sectorial area after coke dry quenching boiler shell upper cone entirety setting-out is very big, and the tiling of whole of steel plate i.e. decreases weld seam quantity, is again downhand welding, and the proportion of goods damageds of steel plate are substantially reduced, and drops to 2.3% from drawing measuring and calculating loss from 7%.
Accompanying drawing explanation
Fig. 1 is the structural representation of coke dry quenching boiler shell upper cone;
Fig. 2 is step one schematic diagram;
Fig. 3 is step 2 schematic diagram;
Fig. 4 is the fan-shaped steel plate schematic diagram setting 4 hangers;
Fig. 5 is the connection diagram of fan-shaped steel plate and hoist lifting hook;
Fig. 6 is that crane is sling the schematic diagram of fan-shaped steel plate;
Fig. 7 is the schematic diagram that fan-shaped steel plate is fabricated to taper steel plate;
Fig. 8 is coke dry quenching boiler shell upper cone and coke dry quenching furnace housing straight section docking structure schematic diagram.
In figure: 1. coke dry quenching boiler shell upper cone;2. fan-shaped model;3. steel plate;4-1. the first steel wire rope;4-2. the second steel wire rope;4-3. the 3rd steel wire rope;4-4. the 4th steel wire rope;4-5. the 5th steel wire rope;5-1. the first chain block;5-2. the second chain block;5-3. the 3rd chain block;7. pulley;8. location-plate;9. jigsaw butt joint;10. make plane;11. coke dry quenching boiler shell straight sections;12. hoist lifting hooks;A. the first hanger;B. the second hanger;C. the 3rd hanger;D. the 4th hanger;E. the 5th hanger;F. the 6th hanger;G. the 7th hanger;14. fan-shaped steel plates;15. taper steel plates.
Detailed description of the invention
The present invention is described further below in conjunction with the accompanying drawings.
Seeing Fig. 1-Fig. 8, a kind of coke dry quenching boiler shell upper cone makes and installation method, comprises the steps:
Step one, it is coke dry quenching boiler shell upper cone 1 setting-out according to CAD diagram, reserved semi auto cutting machine line of cut width
Making 1:1 in plane 10, coke dry quenching boiler shell upper cone 1 is carried out setting-out, be specially and coke dry quenching boiler shell upper cone 1 setting-out is become a fan-shaped model 2, make the profile drawing fan-shaped model 2 in plane 10 by actual ratio;
Step 2, steel plate 3 that specification is 10mm*2000mm*6000mm is carried out CAD plane typesetting to steel plate 3 according to the profile in step one it is paved with whole fan-shaped model 2 profile, and reserved semi auto cutting machine line of cut width;
Step 3, the steel plate 3 in step 2 is welded, form fan-shaped steel plate 14;
Step 4, suspension centre is set
One side at fan-shaped steel plate 14, one end uniform ring near short arc sets 4 hangers (4 hangers use with fan-shaped steel plate 14 and are welded to connect), described 4 hangers are followed successively by the first hanger A, the second hanger B, the 3rd hanger C, the 4th hanger D, determine the direction of 4 hangers according to corresponding first hanger A, the second hanger B, the 3rd hanger C, the Impact direction of steel wire rope of the 4th hanger D;
Second hanger B is connected with hoist lifting hook 12 by the first steel wire rope 4-1;3rd hanger C is connected with hoist lifting hook 12 by the second steel wire rope 4-2;First hanger A passes sequentially through the first chain block 5-1, the 3rd steel wire rope 4-3 is connected with hoist lifting hook 12;4th hanger D passes sequentially through the second chain block 5-2, the 4th steel wire rope 4-4 is connected with hoist lifting hook 12;
The length of the first steel wire rope 4-1 and the second steel wire rope 4-2 is equal, and the length of the 3rd steel wire rope 4-3 and the 4th steel wire rope 4-4 is equal, and the 3rd steel wire rope 4-3 is longer than the first steel wire rope 4-1;In order to reach good lifting effect, make fan-shaped steel plate 14 form taper steel plate 15, the Design of length of the 3rd steel wire rope 4-3 is become 1.3 times of length of the first steel wire rope 4-1;
Step 5, lifting splicing
With crane, the fan-shaped steel plate 14 being installed on hanger and steel wire rope is sling, crane gradually hooks up, second hanger B and the 3rd hanger C gradually regulates the height of the first hanger A, the height of the second chain block 5-2 regulation the 4th hanger D higher than the first hanger A and the 4th hanger D, the first chain block 5-1;
After fan-shaped steel plate 14 is sling, suitable for reading adjacent, gradually surround cone;At this moment, the 5th hanger E, the 6th hanger F and the 7th hanger G are welded in fan-shaped steel plate 14 lower inside;Being provided with pulley 7 on described 5th hanger E, one end of the 5th steel wire rope 4-5 is connected with the 6th hanger F, and the other end of the 5th steel wire rope 4-5 is connected by the 3rd chain block 5-3 and the 7th hanger G after pulley 7;For the ease of drawing close of fan-shaped steel plate 14 bottom, make fan-shaped steel plate 14 perfect formation taper steel plate 15,5th hanger E is arranged on the middle and lower part of fan-shaped steel plate 14, and the 6th hanger F is positioned close to fan-shaped steel plate 14 left side, and the 7th hanger G is positioned close to fan-shaped steel plate 14 right edge;
Operate the 3rd chain block 5-3, make fan-shaped steel plate 14 end opening gradually in draw close to adjacent, fan-shaped steel plate 14 forms tapered steel plate 15;
Falling to taper steel plate 15 make in plane 10, and be fixed on by taper steel plate 15 in making plane 10 by location-plate 8, elastic outer of taper steel plate 15, location-plate 8 is close to by tapered steel plate 15, makes bottom taper steel plate 15 and positive round is formed on top;
Use layout butt joint 9 that taper steel plate 15 opening part is welded, complete the making of coke dry quenching boiler shell upper cone 1;
Step 6, the coke dry quenching boiler shell upper cone 1 in step 5 is sling, make coke dry quenching boiler shell upper cone 1 dock with coke dry quenching furnace housing straight section 11, complete the installation of coke dry quenching boiler shell upper cone 1.
In step 6, coke dry quenching furnace housing straight section 11 and coke dry quenching boiler shell upper cone 1 carry out butt welding after being corrected by wedge, coke dry quenching boiler shell upper cone 1 connects with top backing ring, and then directly integral hoisting has been welded with furnace shell direct tube section to absolute altitude 28.7m, and furnace shell binds.
The Application Example being only the present invention described above, the interest field that certainly can not limit the present invention with this, therefore change according to the equivalence that scope of the present invention patent is made, still belong to protection scope of the present invention.
Claims (3)
1. a coke dry quenching boiler shell upper cone makes and installation method, it is characterised in that comprise the steps:
Step one, coke dry quenching boiler shell upper cone is carried out setting-out making in plane
Coke dry quenching boiler shell upper cone setting-out is become a fan-shaped model, makes the profile drawing fan-shaped model in plane by actual ratio;
Step 2, steel plate is paved with whole fan-shaped gage profile, and reserved semi auto cutting machine line of cut width according to profile typesetting to the steel plate in step one;
Step 3, the steel plate in step 2 is welded, form fan-shaped steel plate;
Step 4, suspension centre is set
In the one side of fan-shaped steel plate, one end uniform ring near short arc sets 4 hangers, and described 4 hangers are followed successively by the first hanger, the second hanger, the 3rd hanger, the 4th hanger;
Second hanger is connected with hoist lifting hook by the first steel wire rope;3rd hanger is connected with hoist lifting hook by the second steel wire rope;First hanger passes sequentially through the first chain block, the 3rd steel wire rope is connected with hoist lifting hook;4th hanger passes sequentially through the second chain block, the 4th steel wire rope is connected with hoist lifting hook;
The length of the first steel wire rope and the second steel wire rope is equal, and the length of the 3rd steel wire rope and the 4th steel wire rope is equal, and the 3rd steel wire rope is than the first length of steel rope;
Step 5, lifting splicing
Being sling by the fan-shaped steel plate being installed on hanger and steel wire rope with crane, crane gradually hooks up, and the second hanger and the 3rd hanger are gradually higher than the first hanger and the 4th hanger, and the first chain block regulates the height of the first hanger, the height of the second chain block regulation the 4th hanger;
After fan-shaped steel plate is sling, suitable for reading adjacent, gradually surround cone;At this moment, the 5th hanger, the 6th hanger and the 7th hanger are welded in fan-shaped steel plate lower inside;Being provided with pulley on described 5th hanger, one end of the 5th steel wire rope is connected with the 6th hanger, and the other end of the 5th steel wire rope is connected by the 3rd chain block and the 7th hanger after pulley;
Operating the 3rd chain block, make fan-shaped steel plate end opening gradually draw close to adjacent, fan-shaped steel plate forms taper steel plate;
Fall to taper steel plate make in plane, and by location-plate, taper steel plate is fixed in making plane, make bottom taper steel plate and positive round is formed on top;
Use layout butt joint that taper steel plate opening part is welded, complete the making of coke dry quenching boiler shell upper cone;
Step 6, the coke dry quenching boiler shell upper cone in step 5 is sling, make coke dry quenching boiler shell upper cone dock with coke dry quenching furnace housing straight section, complete the installation of coke dry quenching boiler shell upper cone.
2. coke dry quenching boiler shell upper cone as claimed in claim 1 makes and installation method, it is characterised in that: the length of the 3rd steel wire rope is 1.2 ~ 1.5 times of the length of the first steel wire rope.
3. coke dry quenching boiler shell upper cone as claimed in claim 1 makes and installation method, it is characterised in that: described 5th hanger is positioned at the middle and lower part of fan-shaped steel plate, and the 6th hanger is near fan-shaped steel plate left side, and the 7th hanger is near fan-shaped steel plate right edge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510192502.3A CN104759856B (en) | 2015-04-22 | 2015-04-22 | Coke dry quenching boiler shell upper cone makes and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510192502.3A CN104759856B (en) | 2015-04-22 | 2015-04-22 | Coke dry quenching boiler shell upper cone makes and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104759856A CN104759856A (en) | 2015-07-08 |
CN104759856B true CN104759856B (en) | 2017-01-04 |
Family
ID=53642125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510192502.3A Active CN104759856B (en) | 2015-04-22 | 2015-04-22 | Coke dry quenching boiler shell upper cone makes and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104759856B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108127279B (en) * | 2017-12-26 | 2020-09-01 | 中国化学工程第三建设有限公司 | One-step cone forming method |
CN109675972A (en) * | 2018-12-29 | 2019-04-26 | 南通远洋船舶配套有限公司 | A kind of quick molding method of large scale cone |
CN110666249A (en) * | 2019-09-27 | 2020-01-10 | 芜湖中集瑞江汽车有限公司 | Tank body beveling blanking process |
CN111468243B (en) * | 2020-04-07 | 2022-07-12 | 五冶集团上海有限公司 | Hoisting method of vertical mill cone |
CN112008280A (en) * | 2020-08-28 | 2020-12-01 | 上海宝冶集团有限公司 | Manufacturing method of rectangular flue elbow |
CN113279588A (en) * | 2021-07-07 | 2021-08-20 | 浙江天地环保科技股份有限公司 | Conical tank top manufacturing and mounting structure and method |
CN113979280B (en) * | 2021-11-08 | 2024-04-05 | 重庆钢铁集团建设工程有限公司 | Cone cover manufacturing and processing method |
CN115673694B (en) * | 2023-01-03 | 2023-03-03 | 内江东工设备制造股份有限公司 | Manufacturing method of oversized steel bifurcated pipe |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5323529A (en) * | 1992-12-10 | 1994-06-28 | American Mechanical Services, Inc. | Heat exchanger bundle extractor assembly and method |
CN101760208A (en) * | 2008-11-25 | 2010-06-30 | 中冶成工上海五冶建设有限公司 | Method for installing coke dry quenching slot shell |
CN102241995B (en) * | 2010-05-11 | 2014-10-01 | 五冶集团上海有限公司 | Dry quenching expansion joint firebrick structure construction technology |
CN103087731B (en) * | 2011-10-27 | 2016-03-02 | 鞍钢建设集团有限公司 | A kind of Laser measurement installation method of coke dry quenching furnace furnace shell |
CN202336699U (en) * | 2011-11-07 | 2012-07-18 | 中国一冶集团有限公司 | Coke dry quenching boiler shell assembling and installing mould |
-
2015
- 2015-04-22 CN CN201510192502.3A patent/CN104759856B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104759856A (en) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104759856B (en) | Coke dry quenching boiler shell upper cone makes and installation method | |
CN106760841A (en) | A kind of construction method of buckling restrained brace structure | |
CN104195948A (en) | Bridge hanging pipeline pushing installation and construction method | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN104801836A (en) | Offshore wind power generation jacket foundation flange installation method | |
CN103206075A (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN115162594A (en) | Construction method based on BIM floor support plate process deepening | |
CN105888227B (en) | Superelevation is tubaeform steel structure exterior finish operation platform and its building method | |
CN203820287U (en) | Composite steel carrying pole for hoisting roof tiles of steel structure workshops | |
CN103791156B (en) | LARGE DIAMETER FRP pipeline superaltitude method for rapidly mounting | |
CN103495793A (en) | Improved construction method for hoisting and welding large-tonnage cast steel component complex joints | |
CN109702387A (en) | A kind of stayed bridge pylon cable inner lining steel construction manufacturing method | |
CN206308626U (en) | Operating platform for installing hanging basket at top of pier body of pier | |
CN103883156A (en) | Multidirectional yoke plate for tower assembling with derricks in mountainous area | |
CN206057094U (en) | The slow test loading system of beam slab after the completion of a kind of erection for high-altitude | |
CN105421251A (en) | Plate-girder jacking support mechanism and plate-girder jacking support tool | |
CN113146109B (en) | Manufacturing method of eccentric jacket | |
CN212026147U (en) | Steel lining template at bottom of arc door support hinge girder for deep hole working of dam | |
CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
CN205932883U (en) | Pitshaft driving cage | |
CN111519910B (en) | Multi-angle large-slope steel column hoisting method and protection frame body assembly used in cooperation with same | |
CN203222981U (en) | Suspended platform for steel reinforced concrete cantilever structure construction | |
CN110735557B (en) | Large-scale tower body weightless dumping method | |
CN206220547U (en) | A kind of operating platform for steel structure column installation | |
CN208965999U (en) | A kind of packaged type lighting roof operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |