CN106760841A - A kind of construction method of buckling restrained brace structure - Google Patents
A kind of construction method of buckling restrained brace structure Download PDFInfo
- Publication number
- CN106760841A CN106760841A CN201611091456.9A CN201611091456A CN106760841A CN 106760841 A CN106760841 A CN 106760841A CN 201611091456 A CN201611091456 A CN 201611091456A CN 106760841 A CN106760841 A CN 106760841A
- Authority
- CN
- China
- Prior art keywords
- restrained brace
- buckling restrained
- buckling
- gusset plate
- transport
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 52
- 238000009434 installation Methods 0.000 claims abstract description 21
- 238000007689 inspection Methods 0.000 claims abstract description 6
- 238000005260 corrosion Methods 0.000 claims abstract description 5
- 238000002360 preparation method Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 230000004224 protection Effects 0.000 claims description 12
- 239000003351 stiffener Substances 0.000 claims description 12
- 238000013461 design Methods 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- GNFTZDOKVXKIBK-UHFFFAOYSA-N 3-(2-methoxyethoxy)benzohydrazide Chemical compound COCCOC1=CC=CC(C(=O)NN)=C1 GNFTZDOKVXKIBK-UHFFFAOYSA-N 0.000 claims description 3
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 229910052799 carbon Inorganic materials 0.000 claims description 2
- 230000015271 coagulation Effects 0.000 claims 1
- 238000005345 coagulation Methods 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 238000003466 welding Methods 0.000 description 14
- 238000010586 diagram Methods 0.000 description 5
- 230000007547 defect Effects 0.000 description 4
- 238000001514 detection method Methods 0.000 description 4
- 238000012790 confirmation Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 239000004744 fabric Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000007799 cork Substances 0.000 description 2
- 238000013016 damping Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009659 non-destructive testing Methods 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000009966 trimming Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000011490 mineral wool Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention is a kind of construction method of buckling restrained brace structure, and the buckling restrained brace is located in the frame structure that beam and column is constituted;It is as follows including step:Step one:Preparation of construction;Step 2:Installation of embedded parts;Step 3:The installation of gusset plate;Include the blanking of the determination and gusset plate to node board size;Step 4:The transport of buckling restrained brace, including buckling restrained brace vertical direction transport and the transport of horizontal direction;Step 5:The lifting of buckling restrained brace be connected;Step 6:The inspection of connecting node;Step 7:Anti-corrosion flame-proof finishing.The present invention solves the technical problem that traditional construction method requires that construction site the higher, construction period is long and safe mass is low.
Description
Technical field
The present invention relates to a kind of construction method of buckling restrained brace structure.
Background technology
With the fast development of China's economy, the scale of public building is increasing, and function is increasingly particular about, to building
Aesthetic more and more higher, various unconventional structure designs are more and more, and great difficulty is brought to structure construction.Scientific Research Building is built
Modern design, it is various using function complexity, function and moulding attractive in appearance are used to meet building, the complexity of engineering structure is more next
Higher, also increasing difficulty is big for construction technology.In a certain engineering, building structure is higher to the requirement of vibration damping anti-seismic performance, is
Increase vibration damping anti-seismic performance, buckling restrained brace BRB structures are employed during design.Meanwhile, in construction due to there is Architecture Field
Narrow and small, the deep basal pit operation in ground, urgent structure duration, complex structural designs, safe mass requirement higher engineering feature, according to biography
The buckling restrained brace construction method of system cannot just overcome these technical problems.Therefore, this to technical work just in the urgent need to entering
Row is assaulted fortified position, and accomplishes scheme optimization, energy guiding construction conscientiously.
The content of the invention
It is an object of the invention to provide a kind of construction method of buckling restrained brace structure, traditional construction method is solved
The technical problem that the higher, construction period is long and safe mass is low is required to construction site.
To achieve the above object, the present invention is adopted the following technical scheme that.
A kind of construction method of buckling restrained brace structure, the buckling restrained brace is located at the frame structure that beam and column is constituted
In;It is as follows including step.
Step one:Preparation of construction.
Step 2:Installation of embedded parts.
Step 3:The installation of gusset plate;Include the blanking of the determination and gusset plate to node board size.
Step 4:The transport of buckling restrained brace, including buckling restrained brace vertical direction transport and the transport of horizontal direction.
When being transported using tower crane, the transport of vertical direction and the transportation resources of horizontal direction are as follows.
Step a, the protection network at the tower crane offside of demolition of buildings, buckling restrained brace floor position to be installed.
Step b, top is installed on the floor of buckling restrained brace to be installed, near the floor edge for removing protection network side
Portion is provided with the bearing tripod and dolly of roller bearing.
Step c, is sling buckling restrained brace with the direction perpendicular to side of buildings using tower crane.
Step d, rotates tower arm first by one end feeding building of buckling restrained brace, is placed on bearing tripod.
Step e, unties buckling restrained brace into the hanging belt one of one end in building, and the end is connected with dolly.
Step f, buckling restrained brace is pulled using dolly in the horizontal direction, treats that buckling restrained brace enters length in building and reaches
To more than half, the hanging belt one of the buckling restrained brace other end is untied.
Step g, at horizontal transport buckling restrained brace to position to be installed.
When being transported using hoist engine, by the use of the elevator in building as transport channel, the transport of vertical direction and
The transportation resources of horizontal direction is as follows.
Step A, buckling restrained brace floor to be installed is fixed on by hoist engine.
Step B, is provided with the support of assembly pulley at the top of installation directly over elevator.
Step C, wears hoist cable, and hoist cable is connected with buckling restrained brace one end on hoist engine and assembly pulley.
Step D, buckling restrained brace is inclined sling using hoist engine.
Step E, treats that buckling restrained brace rises to buckling restrained brace floor to be installed, and buckling restrained brace is positioned over
Horizontal transporter, and transport to position to be installed.
Step 5:The lifting of buckling restrained brace be connected.
Step 6:The inspection of connecting node.
Step 7:Anti-corrosion flame-proof finishing.
Preferably, when having around the buckling restrained brace filling wall, also including step 9 buckling restrained brace with fill out
Fill the connection of wall.
Preferably, installation of embedded parts is specific as follows described in step 2:Installation of embedded parts position is first marked according to design drawing
Put;Built-in fitting is hoisted to buckling restrained brace floor to be installed again, reinforcing bar colligation is carried out after being in place;Then check again
Built-in fitting position, it is errorless after carry out concreting.
Preferably, the determination of the node board size installed to band in step 3 is specifically, according to story height, buckling-restrained
The type of support, length, the established angle of buckling restrained brace, floor length of putting more energy into and welded gaps determine buckling restrained brace
Lower end and the connecting node of corresponding gusset plate to be installed position;And buckling restrained brace is determined in the same way
The position of upper end and the connecting node of corresponding gusset plate to be installed;The size of each gusset plate to be installed is done corresponding record,
Numbering, as node board size to be installed;
When carrying out blanking, groove shape is being made by the termination that gusset plate is connected with built-in fitting to gusset plate in step 3.
Preferably, the method for buckling restrained brace lifting is to be installed at buckling restrained brace position to be installed in step 5
Lifting tripod and jack one;Hanging belt two is tied up in buckling restrained brace to be installed;Tripod cooperation jack is lifted utilizing
One is installed.
Preferably, suspension hook method is specifically, first respectively in structural beams two under buckling restrained brace lifting uses beam in step 5
Crab-bolt is beaten in side;The two ends of lifting rope are separately fixed in the crab-bolt of structural beams both sides again;One is connected on the lifting rope at beam bottom to fall
Chain two, installation of slinging is carried out using jack two.
Preferably, the two ends of buckling restrained brace are made groove shape in step 5, and are welded to connect between gusset plate.
Preferably, along the axial direction of buckling restrained brace, on buckling restrained brace and gusset plate it is connected with ribbed stiffener;It is described
One end of ribbed stiffener is welded to connect on gusset plate, and the other end of ribbed stiffener is welded to connect on buckling restrained brace.
Preferably, including buckling restrained brace with filling wall is parallel intersect when connection and buckling restrained brace with filling wall
Connection when intersecting vertically.
Preferably, buckling restrained brace with filling wall is parallel intersect when, set one layer on support zone, parallel metope direction
Steel fabric sheet;The steel fabric sheet steel wire and nailing and the wall connecting for filling wall;Buckling restrained brace is vertical with filling wall
Connection when intersecting is, filling wall is built at buckling restrained brace 50mm positions, and the 50mm above buckling restrained brace
Lintel is done at place, then the filling flexible material in filling wall, the space between lintel and buckling restrained brace.
Beneficial effects of the present invention are as follows.
1st, in the present invention in step 3 using two kinds of transportation resources of tower crane buckling restrained brace, in order to us according to applying
The actual conditions at work scene are selected, and are more beneficial for the transport of buckling restrained brace.
2nd, step 3 uses tower crane vertical transport buckling restrained brace in the present invention, by buckling restrained brace with perpendicular to building
The vertical handling in direction of thing side is built, then coordinates the dolly for moving horizontally that buckling restrained brace is transported into position to be installed, this
A whole set of transportation resources causes that the damage that buckling restrained brace is received in transportation is smaller, and easy construction, greatly subtracts
The construction period is lacked.
3rd, step 3 uses hoist engine vertical transport buckling restrained brace in the present invention, this solves due to construction
Place it is small and cause construction inconvenience technical problem.
4th, the lifting of buckling restrained brace is coordinated to fall with being connected to give using lifting tripod in step 5 of the present invention
Chain and using structural beams coordinate jack construct two kinds of different situations under construction method, in order to we according to actual conditions more
Rationally use construction method.
5th, step 5 is strict using lifting belt construction when jack is coordinated using lifting tripod in the present invention, it is to avoid
Due to not enough, the problem of the security incident for occurring using non-skid feature caused by the construction such as steel wire rope, chain.
5th, crab-bolt is directly set in structural beams when using coordinating jack to construct using structural beams in step 7 of the present invention
Buckling restrained brace is lifted, is constructed using existing structure, reduce construction equipment, shortened the duration and subtract
Construction cost is lacked.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 be in the present invention using tower crane vertical transport buckling restrained brace when schematic diagram.
Fig. 2 be in the present invention using hoist engine vertical transport buckling restrained brace when schematic diagram.
Fig. 3 is to coordinate jack to lift the schematic diagram of buckling restrained brace using lifting tripod in step 4 of the invention.
Fig. 4 is that utilization structural beams of the invention coordinate jack to lift the schematic diagram of buckling restrained brace.
Fig. 5 is buckling restrained brace and gusset plate structural representation to be connected in the present invention.
Schematic diagram when Fig. 6 is the buckling restrained brace structure construction filling wall in the present invention.
Reference:1- buckling restrained braces, 2- jacks one, 3- gusset plates, 4- protection networks, 5- bearings tripod,
6- hanging belts one, 7- tower cranes, 8- dollies, 9- hoist engines, 10- elevators, 11- supports, 12- hoist cables, 13- fillings
Wall, 14- liftings tripod, 15- structural beams, 16- crab-bolts, 17- lifting ropes, 18- jacks two, 19- ribbed stiffeners, 20- liftings
Band two, α-established angle.
Specific embodiment
Project profile in the present embodiment:The total land area 14585.24m of project2, total construction scope 80498m2(Wherein
Upper area is 50748m2, underground area is 29750m2), 13 layers of ground, 3 layers of underground, building height 60m, F3/B3 and underground
Profile is highlightedly gone up on two layers of building periphery, forms pure underground structure, and a traffic core is respectively arranged in this engineering thing both sides, with reference to friendship
Logical core arrangement shear wall, forms frame shear wall structure.
There is following engineering difficult point in the project subject structure construction in the present embodiment:Engineering is located in inner city in three rings,
Conveniently situation, social benefit effect is big, while narrow field, the engineering scale of construction are big, the structure duration is urgent, safe mass requirement
Height, deep basal pit operation, complex structural designs, construction organization difficulty be big etc., and engineering characteristic is notable.
The bearing of buckling restrained brace is first installed in main structure construction(Or connector), after the completion for the treatment of agent structure,
The installation of buckling restrained brace is carried out again.
As shown in figures 1 to 6, the construction method of this buckling restrained brace structure, the buckling restrained brace 1 be located at beam and
In the frame structure that post is constituted;It is as follows including step.
Step one:Preparation of construction.
Step 2:Installation of embedded parts.
Step 3:The installation of gusset plate 3;Include the blanking of the determination and gusset plate 3 to the size of gusset plate 3.
Step 4:The transport of buckling restrained brace 1, including the vertical direction of buckling restrained brace 1 transport and the fortune of horizontal direction
It is defeated.
When being transported using tower crane 7, the transport of vertical direction and the transportation resources of horizontal direction are as follows.
Step a, the protection network 4 at the offside of tower crane 7 of demolition of buildings, the floor position of buckling restrained brace to be installed 1.
Step b, installs on the floor of buckling restrained brace to be installed 1, near the floor edge for removing the side of protection network 4
Top is provided with the bearing tripod 5 and dolly 8 of roller bearing.
Step c, is sling buckling restrained brace 1 with the direction perpendicular to side of buildings using tower crane 7.
Step d, rotates tower arm first by one end feeding building of buckling restrained brace 1, is placed on bearing tripod 5.
Step e, unties buckling restrained brace 1 and enters the hanging belt 1 of one end in building, and the end is connected with dolly 8.
Step f, buckling restrained brace 1 is pulled using dolly 8 in the horizontal direction, treats that buckling restrained brace 1 enters long in building
Degree reaches more than half, is that length reaches 3/4 into building in the present embodiment, unties the lifting of the other end of buckling restrained brace 1
Band 1.
Step g, at horizontal transport buckling restrained brace 1 to position to be installed.
When being transported using hoist engine 9, by the use of the elevator 10 in building as transport channel, the transport of vertical direction
Transportation resources with horizontal direction is as follows.
Step A, the floor of buckling restrained brace to be installed 1 is fixed on by hoist engine 9, and the anchor point of wire rope hoist 9 can be prior
It is pre-buried.
Step B, is provided with the support 11 of assembly pulley at the top of installation directly over elevator 10.
Step C, wears hoist cable 12, and hoist cable 12 and the one end of buckling restrained brace 1 are connected on hoist engine 9 and assembly pulley
Connect.
Step D, buckling restrained brace 1 is inclined sling using hoist engine 9.
Step E, treats that buckling restrained brace 1 rises to buckling restrained brace floor to be installed, and buckling restrained brace 1 is placed
In horizontal transporter, and transport to position to be installed.
In the present embodiment, during using 9 vertical transport of hoist engine, the weight of antecedent ground buckling restrained brace 1 to various
Lifting carries out mechanics check computation with equipment such as hoist engine 9, hoist cable 12 etc., to ensure to use safety.
Step 5:The lifting of buckling restrained brace 1 be connected;Detailed process is that the model of buckling restrained brace 1 confirms → section
The point size of the plate 3 and length dimension confirmations → blanking of buckling restrained brace 1 → groove prepares → and preliminary lifting is in place → fine setting, accurately
Confirmation → welding → ultrasonic examination → defect processing is fixed → checked in contraposition → spot welding.
Step 6:The inspection of connecting node.
Step 7:Anti-corrosion flame-proof finishing.
In the present embodiment, when having filling wall 13 around the buckling restrained brace 1, also including the buckling-restrained branch of step 9
Support 1 and the connection for filling wall 13.
In the present embodiment, installation of embedded parts is specific as follows described in step 2:Built-in fitting peace is first marked according to design drawing
Holding position, the built-in fitting is 25mm steel plates, and 16 diameter 16mm, 500mm Reinforced hooks long are welded at the steel plate back side;Built-in fitting
Steel plate alignd with gusset plate 3, and with gusset plate 3 in the same plane;Built-in fitting scene is hoisted to be installed using tower crane
Buckling restrained brace floor, reinforcing bar colligation is carried out after being in place, and carries out interim fixation, prevents built-in fitting to be shifted over;
After reinforcing bar colligation is complete, check built-in fitting position again, it is errorless after carry out concreting;During concreting, built-in fitting position
Vibration compacting is answered at place, can be consolidated with the use of crooked chisel, and built-in fitting should not be encountered when vibrating;According to field demand, can be in built-in fitting
On begin to rehearse gas port, it is ensured that vibration compacting.
In other embodiments, built-in fitting can also carry out handling according to practice of construction situation using other hanging devices.
In the present embodiment, the determination of the size of gusset plate 3 installed to band in step 3 is specifically, according to story height, bend
Song constraint supports 1 type, length, the established angle α of buckling restrained brace 1, the plate length of ribbed stiffener 19 and welded gaps to determine
The position of the lower end of buckling restrained brace 1 and the connecting node of corresponding gusset plate to be installed 3;And determine in the same way
The position of the upper end of buckling restrained brace 1 and the connecting node of corresponding gusset plate to be installed 3;To each gusset plate 3 to be installed
Size does corresponding record, numbering, used as the size of gusset plate 3 to be installed;Blanking is being carried out to gusset plate 3 in step 3
When, the termination that gusset plate 3 is connected with built-in fitting is made groove shape.
The gusset plate 3 that will be processed is transported to each installation node by construction drawing and setting-out numbering, after confirmation, by having put
Good axis carries out spot welding and fixes, and per pass weld seam is fixed at spot welding two, per director 2cm, welds 1/3 mother metal thickness high, spot welding position
Must not be located in the dead angle that angle grinder cannot be polished to, the same gusset plate 3 at the two ends of buckling restrained brace 1 should be located at same putting down
In face, after tentatively fixing, should be checked using vertical messenger wire, because size for connection is smaller, blank size can not reserve welding and receive
Contracting amount.
In the present embodiment, blanking uses NC Flame Cutting or machine cuts;Groove using numerical control surface trimming lathe or
Semi auto cutting machine is processed, application angle grinder polishing after cutting.
In the present embodiment, stacking and keeping before transportation to buckling restrained brace 1 are required:Buckling restrained brace 1 is transported
Can be unloaded using tower crane or other small lifting equipments after to scene, the laydown area of buckling restrained brace 1 should be clean smooth, and
Cork a tree, used in making timber for boats on pad, stacks the number of plies and must not exceed four layers, stacks mode and is stacked using intersection groined type is overlapped, every layer of buckling-restrained branch
Cork a tree, used in making timber for boats is padded between support 1.
In the present embodiment, the gusset plate 3 and buckling restrained brace at the two ends of buckling restrained brace 1 are measured using laser range finder
Gap length between 1 solder side, and the processing factory of buckling restrained brace 1 is fed back to according to measured data, adjust flexing about in time
Bundle branch supports 1 length to meet installation dimension requirement.
In the present embodiment, the method for the lifting of buckling restrained brace 1 is in step 5, at buckling restrained brace position to be installed
Lifting tripod 14 and jack 1 are installed;Hanging belt 2 20 is tied up in buckling restrained brace to be installed 1;Using three pin of lifting
Frame 14 coordinates jack 1 to be installed, and steel wire rope must not be used during lifting, and reliably anti-skidding arranging should be taken in lifting
Apply, it is ensured that lifting stabilization, when being installed at end bay, should be taken into account safety in production factor.
In the present embodiment, suspension hook method is specifically, first respectively in structure under the lifting of buckling restrained brace 1 uses beam in step 5
Crab-bolt 16 is beaten in the both sides of beam 15;The two ends of lifting rope 17 are separately fixed in the crab-bolt 16 of the both sides of structural beams 15 again;In hanging for beam bottom
A jack 2 18 is connected on rope 17, installation of slinging is carried out using jack 2 18.
In the present embodiment, the two ends of buckling restrained brace 1 are made groove shape in step 5, and are welded between gusset plate 3
Connection, specific welding requirements is as follows.
(1)Buckling restrained brace 1 is tentatively welded and fixed with gusset plate 3, and carries out physical dimension, axial location to component and enter
Row detection, carries out penetration weld and connects after meeting the requirements.
(2)Weld Quality Inspection grade is one-level, it is desirable to which bevel, butt weld and T-shaped weld seam are full penetration weld,
And require that 100% carries out ultrasonic examination.
(3)The welder for participating in weld job should carry out weld job in the welder qualification test quality certification term of validity, forbid without card
It is on duty.
(4)Rainy day forbids outdoor weld job, when wind speed is more than 10m/s, it is necessary to take draught exclusion device, and temperature is less than -5 DEG C
When should take preheating and Insulation.
(5)Welding rod should be preheated before, 200 DEG C of temperature, time 2 h, and welding rod will be placed in incubator when using
(Bucket)It is interior.
In the present embodiment, first welded one time in weld seam side using the welding rods of φ 3.2 when built-in fitting is welded with gusset plate, it
Afterwards in opposite side elder generation back chipping, reuse the welding rods of φ 3.2 and weld one time.And so on until welding is completed.
(6)Welding is finished, and welder answers the slag on trimming surface and the splash of both sides.Weld appearance quality is checked,
Face of weld is answered pore-free, slag inclusion, crackle, overlap and is the defects such as fusion.
In the present embodiment, the inspection of step 6 connecting node uses Non-Destructive Testing;Specific requirement is nondestructive testing personnel palpus
Take appointment with certificate, welding completes 24 and as a child carries out flaw detection afterwards, should be by steel in the range of the flaw detection weld seam each 150mm in both sides before flaw detection
The polishing of structure surface is clean;Ultrasonic examination performs GB11345-89 standards.It was found that when exceeding the defect that specification is allowed, it is necessary to carry out
Reprocess.After ultrasonic wave positioning, defect is cleared up with carbon arc air gouging, carburized layer is polished with angle grinder afterwards, will by technique
Ask and rewelded, same position number of rewelding is no more than twice.
In the present embodiment, anti-corrosion flame-proof finishing concrete foundation is in step 7:Buckling restrained brace 1 should be according to tied mechanism
Difference, design have different fire protection requirements.When system is constrained using clean steel, then flameproof protection, and its fire-protection rating should be done
It is equal to corresponding conventional steel brace.There is heat-proof quality not using packing material in packing material constraint system, and sleeve
During incendiary material, free telescopic section and head plate must do flameproof protection, and sleeve can not do flameproof protection;When filling material in sleeve
When material is without heat-proof quality, free telescopic section, head plate and sleeve all should mineral wool protections;Buckling restrained brace 1 is by design
It is required that carry out conventional maintenance, requirement for anticorrosion referring to《Code for acceptance of construction quality of steel structures》Relevant rule in GB50205
It is fixed.
In the present embodiment, along the axial direction of buckling restrained brace 1, it is connected with buckling restrained brace 1 and gusset plate 3 and is put more energy into
Rib 19;One end of the ribbed stiffener 19 is welded to connect on gusset plate 3, and the other end of ribbed stiffener 19 is welded to connect buckling-restrained
In support 1.
In the present embodiment, including buckling restrained brace 1 with filling wall 13 is parallel intersect when connection and buckling restrained brace 1
Connection when being intersected vertically with filling wall 13.
Wall 13 is parallel intersect with filling for buckling restrained brace 1, constructional column and filling when the both sides of buckling restrained brace 1 of constructing
During horizontal tension rib in the body of wall 13, it is connected with support both sides steel tie using connection clip, it is ensured that tension rib is elongated.Work as construction
When post reinforcing bar encounters gusset plate, constructional column reinforcing bar can be directly welded on the end face ribbed stiffener 19 of gusset plate.During wall plastering,
Layer of steel wire mesh sheet is set on support zone, parallel metope direction;The steel fabric sheet steel wire and nailing and filling wall 13
Wall connecting, galvanized steel wire netting zinc-coated wire and nailing are fixed with wall, it is ensured that wall plastering does not ftracture.Buckling restrained brace
1 is with the connection filled when wall 13 intersects vertically, and filling wall 13 is built extremely at the 50mm positions of buckling restrained brace 1, and
Lintel is done at the top 50mm of buckling restrained brace 1, wall 13, filling flexible material between lintel and buckling restrained brace is subsequently filled
Closure.
Claims (10)
1. a kind of construction method of buckling restrained brace structure, the buckling restrained brace(1)Positioned at the framework that beam and column is constituted
In structure;It is characterised in that it includes step is as follows:
Step one:Preparation of construction;
Step 2:Installation of embedded parts;
Step 3:Gusset plate(3)Installation;Include to gusset plate(3)The determination of size and gusset plate(3)Blanking;
Step 4:Buckling restrained brace(1)Transport, including buckling restrained brace(1)The transport of vertical direction and horizontal direction
Transport;
When using tower crane(7)During transport, the transport of vertical direction and the transportation resources of horizontal direction are as follows,
Step a, the tower crane of demolition of buildings(7)Offside, buckling restrained brace to be installed(1)Protection network at floor position(4);
Step b, in buckling restrained brace to be installed(1)Floor on, near remove protection network(4)Install at the floor edge of side
Top is provided with the bearing tripod of roller bearing(5)And dolly(8);
Step c, using tower crane(7)By buckling restrained brace(1)Sling with the direction perpendicular to side of buildings;
Step d, rotates tower arm first by buckling restrained brace(1)One end feeding building in, be placed in bearing tripod(5)On;
Step e, unties buckling restrained brace(1)The hanging belt one of one end in into building(6), and by the end and dolly(8)It is connected
Connect;
Step f, using dolly(8)Buckling restrained brace is pulled in the horizontal direction(1), treat buckling restrained brace(1)Into in building
Length reaches more than half, unties buckling restrained brace(1)The hanging belt one of the other end(6);
Step g, horizontal transport buckling restrained brace(1)At to position to be installed;
When using hoist engine(9)During transport, using the elevator in building(10)As transport channel, the transport of vertical direction
Transportation resources with horizontal direction is as follows,
Step A, by hoist engine(9)It is fixed on buckling restrained brace to be installed(1)Floor;
Step B, in elevator(10)Surface is installed by the support that top is provided with assembly pulley(11);
Step C, in hoist engine(9)With hoist cable is worn on assembly pulley(12), and by hoist cable(12)With buckling restrained brace(1)One end
Connection;
Step D, using hoist engine(9)By buckling restrained brace(1)Inclination is sling;
Step E, treats buckling restrained brace(1)Buckling restrained brace floor to be installed is risen to, by buckling restrained brace(1)Place
In on horizontal transporter, and transport to position to be installed;
Step 5:Buckling restrained brace(1)Lifting be connected;
Step 6:The inspection of connecting node;
Step 7:Anti-corrosion flame-proof finishing.
2. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:When the flexing
Constraint support(1)Surrounding has filling wall(13)When, also including step 9 buckling restrained brace(1)With filling wall(13)Connection.
3. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:Institute in step 2
State installation of embedded parts specific as follows:Installation of embedded parts position is first marked according to design drawing;Built-in fitting is hoisted to again to be installed
Buckling restrained brace floor, reinforcing bar colligation is carried out after being in place;Then check built-in fitting position again, it is errorless after carry out coagulation
Soil is poured.
4. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:It is right in step 3
Gusset plate to be installed(3)The determination of size is specifically, according to story height, buckling restrained brace(1)Type, length, bend
Song constraint support(1)Established angle(α), ribbed stiffener(19)Plate length and welded gaps determine buckling restrained brace(1)Under
End and corresponding gusset plate to be installed(3)Connecting node position;And buckling restrained brace is determined in the same way(1)
Upper end and corresponding gusset plate to be installed(3)Connecting node position;To each gusset plate to be installed(3)Size do accordingly
Record, numbering, as gusset plate to be installed(3)Size;
To gusset plate in step 3(3)When carrying out blanking, by gusset plate(3)The termination being connected with built-in fitting is made groove
Shape.
5. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:Bent in step 5
Song constraint support(1)The method of lifting is to install lifting tripod at buckling restrained brace position to be installed(14)With jack one
(2);By hanging belt two(20)Tie up in buckling restrained brace to be installed(1);Tripod is lifted utilizing(14)Coordinate jack one(2)
Installed.
6. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:Bent in step 5
Song constraint support(1)Lifting is using suspension hook method under beam specifically, first respectively in structural beams(15)Crab-bolt is beaten in both sides(16);To hang again
Rope(17)Two ends be separately fixed at structural beams(15)The crab-bolt of both sides(16)On;In the lifting rope at beam bottom(17)Upper connection one is fallen
Chain two(18), using jack two(18)Carry out installation of slinging.
7. a kind of construction method of buckling restrained brace structure according to claim 1, it is characterised in that:Bent in step 5
Song constraint support(1)Two ends be made groove shape, and and gusset plate(3)Between be welded to connect.
8. a kind of construction method of buckling restrained brace structure according to claim 7, it is characterised in that:Along buckling-restrained
Support(1)Axial direction, in buckling restrained brace(1)And gusset plate(3)On be connected with ribbed stiffener(19);The ribbed stiffener(19)'s
One end is welded to connect in gusset plate(3)On, ribbed stiffener(19)The other end be welded to connect in buckling restrained brace(1)On.
9. a kind of construction method of buckling restrained brace structure according to claim 2, it is characterised in that:Including flexing about
Bundle branch is supportted(1)With filling wall(13)Connection and buckling restrained brace when parallel intersecting(1)With filling wall(13)When intersecting vertically
Connection.
10. a kind of construction method of buckling restrained brace structure according to claim 9, it is characterised in that:It is buckling-restrained
Support(1)With filling wall(13)When parallel intersecting, layer of steel wire mesh sheet is set on support zone, parallel metope direction;The steel
Silk netting steel wire and nailing and filling wall(13)Wall connecting;Buckling restrained brace(1)With filling wall(13)Intersect vertically
When connection be, fill wall(13)Build to apart from buckling restrained brace(1)At 50mm positions, and in buckling restrained brace(1)On
At square 50mm, parallel to buckling restrained brace(1)Length direction do lintel, then filling wall(13), lintel and flexing about
Bundle branch is supportted(1)Between space in filling flexible material.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611091456.9A CN106760841A (en) | 2016-12-01 | 2016-12-01 | A kind of construction method of buckling restrained brace structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611091456.9A CN106760841A (en) | 2016-12-01 | 2016-12-01 | A kind of construction method of buckling restrained brace structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106760841A true CN106760841A (en) | 2017-05-31 |
Family
ID=58915370
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611091456.9A Pending CN106760841A (en) | 2016-12-01 | 2016-12-01 | A kind of construction method of buckling restrained brace structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106760841A (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108086697A (en) * | 2018-01-10 | 2018-05-29 | 中国建筑第八工程局有限公司 | A kind of built-in fitting lifting accurate-location device and lifting precise positioning method |
| CN110905220A (en) * | 2019-12-17 | 2020-03-24 | 中航天建设工程集团有限公司 | Installation and construction method of anti-buckling energy dissipation brace of reinforced concrete structure |
| CN111042538A (en) * | 2019-11-26 | 2020-04-21 | 上海宝冶集团有限公司 | Hoisting and mounting method of buckling restrained brace |
| CN113340549A (en) * | 2021-06-10 | 2021-09-03 | 上海建工集团股份有限公司 | A evaluation device for buckling restrained brace construction effect |
| CN113432557A (en) * | 2021-06-10 | 2021-09-24 | 上海建工集团股份有限公司 | Assessment method for construction effect of buckling restrained brace |
| CN114031002A (en) * | 2021-11-03 | 2022-02-11 | 上海建工七建集团有限公司 | Tower crane wall-attached connecting piece dismounting device and method |
| CN114925427A (en) * | 2022-05-19 | 2022-08-19 | 中国建筑第二工程局有限公司 | Buckling restrained brace design method based on BIM |
| CN115434553A (en) * | 2022-07-28 | 2022-12-06 | 中铁八局集团建筑工程有限公司 | An installation method of buckling-restrained brace |
| CN115822117A (en) * | 2022-11-30 | 2023-03-21 | 中冶(上海)钢结构科技有限公司 | Construction method for steel structure buckling restrained brace |
| CN116927340A (en) * | 2023-07-31 | 2023-10-24 | 南通蓝科减震科技有限公司 | Flexible connection structure of buckling restrained brace and filling wall and construction method thereof |
| CN117166774A (en) * | 2023-08-31 | 2023-12-05 | 兴泰建设集团有限公司 | Construction method of structural anti-seismic buckling restrained brace energy dissipater |
| CN117418704A (en) * | 2023-11-13 | 2024-01-19 | 中建八局第三建设有限公司 | A construction method suitable for installation and construction of buckling restraint supports in limited or narrow spaces |
| CN121110965A (en) * | 2025-11-12 | 2025-12-12 | 兴泰建设集团有限公司 | A method for installing embedded parts in a buckling-restrained brace |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07279251A (en) * | 1994-04-11 | 1995-10-24 | Kaoru Taneichi | Building construction method and bracing plate |
| JPH0913509A (en) * | 1995-07-04 | 1997-01-14 | Sekisui Chem Co Ltd | Temporary reinforcing braces and method for correcting inclination of wall panel using the braces |
| CN201102883Y (en) * | 2007-07-17 | 2008-08-20 | 赵建忠 | Steel cable sliding and lifting device |
| CN101672071A (en) * | 2009-09-17 | 2010-03-17 | 同济大学 | Vertical reinforced concrete component-connection node of buckling-restrained brace |
| US20130074440A1 (en) * | 2011-03-29 | 2013-03-28 | Cameron John Black | Geometric connecting assembly and method for braced frame connections |
| CN203269274U (en) * | 2013-05-31 | 2013-11-06 | 中国葛洲坝集团股份有限公司 | Slope section rail type conveying device |
| CN203392766U (en) * | 2013-07-17 | 2014-01-15 | 中国建筑第六工程局有限公司 | Lightweight lifting bracket arranged on roof |
| CN103643800A (en) * | 2013-12-12 | 2014-03-19 | 中建二局第三建筑工程有限公司 | Lifting installation system for buckling restrained supporting member and construction method thereof |
| CN205442496U (en) * | 2016-03-28 | 2016-08-10 | 中国二十冶集团有限公司 | High -rise building roof curtain lifting device |
-
2016
- 2016-12-01 CN CN201611091456.9A patent/CN106760841A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07279251A (en) * | 1994-04-11 | 1995-10-24 | Kaoru Taneichi | Building construction method and bracing plate |
| JPH0913509A (en) * | 1995-07-04 | 1997-01-14 | Sekisui Chem Co Ltd | Temporary reinforcing braces and method for correcting inclination of wall panel using the braces |
| CN201102883Y (en) * | 2007-07-17 | 2008-08-20 | 赵建忠 | Steel cable sliding and lifting device |
| CN101672071A (en) * | 2009-09-17 | 2010-03-17 | 同济大学 | Vertical reinforced concrete component-connection node of buckling-restrained brace |
| US20130074440A1 (en) * | 2011-03-29 | 2013-03-28 | Cameron John Black | Geometric connecting assembly and method for braced frame connections |
| CN203269274U (en) * | 2013-05-31 | 2013-11-06 | 中国葛洲坝集团股份有限公司 | Slope section rail type conveying device |
| CN203392766U (en) * | 2013-07-17 | 2014-01-15 | 中国建筑第六工程局有限公司 | Lightweight lifting bracket arranged on roof |
| CN103643800A (en) * | 2013-12-12 | 2014-03-19 | 中建二局第三建筑工程有限公司 | Lifting installation system for buckling restrained supporting member and construction method thereof |
| CN205442496U (en) * | 2016-03-28 | 2016-08-10 | 中国二十冶集团有限公司 | High -rise building roof curtain lifting device |
Non-Patent Citations (1)
| Title |
|---|
| 漫想时光: "屈曲约束支撑安装施工工法", 《HTTPS://WENKU.BAIDU.COM/VIEW/536BDC620C22590103029D08.HTML》 * |
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108086697B (en) * | 2018-01-10 | 2023-09-01 | 中国建筑第八工程局有限公司 | Precise positioning device and precise positioning method for embedded part hoisting |
| CN108086697A (en) * | 2018-01-10 | 2018-05-29 | 中国建筑第八工程局有限公司 | A kind of built-in fitting lifting accurate-location device and lifting precise positioning method |
| CN111042538A (en) * | 2019-11-26 | 2020-04-21 | 上海宝冶集团有限公司 | Hoisting and mounting method of buckling restrained brace |
| CN110905220A (en) * | 2019-12-17 | 2020-03-24 | 中航天建设工程集团有限公司 | Installation and construction method of anti-buckling energy dissipation brace of reinforced concrete structure |
| CN110905220B (en) * | 2019-12-17 | 2024-06-04 | 中航天建设工程集团有限公司 | Reinforced concrete structure buckling-restrained energy-dissipation brace installation construction method |
| CN113340549A (en) * | 2021-06-10 | 2021-09-03 | 上海建工集团股份有限公司 | A evaluation device for buckling restrained brace construction effect |
| CN113432557A (en) * | 2021-06-10 | 2021-09-24 | 上海建工集团股份有限公司 | Assessment method for construction effect of buckling restrained brace |
| CN113340549B (en) * | 2021-06-10 | 2022-12-06 | 上海建工集团股份有限公司 | A evaluation device for buckling restrained brace construction effect |
| CN114031002A (en) * | 2021-11-03 | 2022-02-11 | 上海建工七建集团有限公司 | Tower crane wall-attached connecting piece dismounting device and method |
| CN114925427A (en) * | 2022-05-19 | 2022-08-19 | 中国建筑第二工程局有限公司 | Buckling restrained brace design method based on BIM |
| CN114925427B (en) * | 2022-05-19 | 2022-12-13 | 中国建筑第二工程局有限公司 | Buckling restrained brace design method based on BIM |
| CN115434553A (en) * | 2022-07-28 | 2022-12-06 | 中铁八局集团建筑工程有限公司 | An installation method of buckling-restrained brace |
| CN115822117A (en) * | 2022-11-30 | 2023-03-21 | 中冶(上海)钢结构科技有限公司 | Construction method for steel structure buckling restrained brace |
| CN116927340A (en) * | 2023-07-31 | 2023-10-24 | 南通蓝科减震科技有限公司 | Flexible connection structure of buckling restrained brace and filling wall and construction method thereof |
| CN117166774A (en) * | 2023-08-31 | 2023-12-05 | 兴泰建设集团有限公司 | Construction method of structural anti-seismic buckling restrained brace energy dissipater |
| CN117166774B (en) * | 2023-08-31 | 2025-02-07 | 兴泰建设集团有限公司 | A construction method for structural seismic buckling restrained brace energy dissipator |
| CN117418704A (en) * | 2023-11-13 | 2024-01-19 | 中建八局第三建设有限公司 | A construction method suitable for installation and construction of buckling restraint supports in limited or narrow spaces |
| CN121110965A (en) * | 2025-11-12 | 2025-12-12 | 兴泰建设集团有限公司 | A method for installing embedded parts in a buckling-restrained brace |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105649332B (en) | A kind of construction method for building beam slab | |
| CN101858161B (en) | Construction method of low-temperature double-wall storage tanks | |
| CN103669900B (en) | Integral reinforcement construction method for outer barrel wall of chimney | |
| CN106703416A (en) | Lifting method of steel structure roof truss pulling bar in narrow space | |
| CN101956457A (en) | Method for constructing rectangular steel pipe concrete column | |
| CN103643800B (en) | The erection & lift system of buckling-restrained bracing member and construction method thereof | |
| CN106193590B (en) | Concrete-type steel form Construction of Supporting method | |
| CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
| CN108678752A (en) | Shaft equipment rapid installation process | |
| WO2023025325A1 (en) | Construction method for corrugated pipe to pass through pipeline by means of rail sliders in small underground space | |
| CN107165281A (en) | A kind of high-altitude long-span overhung steel platform mould bases construction | |
| CN207844890U (en) | A kind of hoisting fixture for building curtain wall | |
| CN110905261A (en) | Ultra-large-span closed stock ground structure for multiple material piling and taking machines and construction method thereof | |
| CN118407618A (en) | A method for lifting a large-span hyperbolic hub node steel structure grid | |
| CN117862719A (en) | A method and equipment for manufacturing and installing a square pile foundation steel cage | |
| CN204643604U (en) | Door-shaped hanging bracket waterborne | |
| CN203430066U (en) | Closed protective platform for core tube | |
| CN116005646A (en) | Abnormal-shaped underground diaphragm wall reinforcement cage and hoisting construction method thereof | |
| CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
| CN113957805B (en) | Installation device and method for bridge under-hanging water supply and drainage pipeline | |
| CN205932883U (en) | Shaft construction cage | |
| CN109378767A (en) | A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable | |
| CN107114288B (en) | A method for constructing a net cage floating pipe frame | |
| CN107542273B (en) | Construction method of core column towering mast | |
| CN106759278B (en) | A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170531 |
|
| WD01 | Invention patent application deemed withdrawn after publication |