CN104746510B - 一种型钢插入定位装置及其施工方法 - Google Patents

一种型钢插入定位装置及其施工方法 Download PDF

Info

Publication number
CN104746510B
CN104746510B CN201510129493.3A CN201510129493A CN104746510B CN 104746510 B CN104746510 B CN 104746510B CN 201510129493 A CN201510129493 A CN 201510129493A CN 104746510 B CN104746510 B CN 104746510B
Authority
CN
China
Prior art keywords
shaped steel
pipe
groove guide
guide pile
positioning pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510129493.3A
Other languages
English (en)
Other versions
CN104746510A (zh
Inventor
李元武
尹伟
张纯为
杨笑非
徐彬
宣震鹰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanjian Construction Group Co Ltd
Original Assignee
Great Wall Zhejiang Province Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Zhejiang Province Construction Group Co Ltd filed Critical Great Wall Zhejiang Province Construction Group Co Ltd
Priority to CN201510129493.3A priority Critical patent/CN104746510B/zh
Publication of CN104746510A publication Critical patent/CN104746510A/zh
Application granted granted Critical
Publication of CN104746510B publication Critical patent/CN104746510B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种型钢插入定位装置及其施工方法,定位装置包括沟槽定位桩、型钢定位管和定位螺栓;施工方法包括以下步骤:1)在型钢上标示轴线;2)布置沟槽定位桩;3)在型钢定位管上画出定位轴线,将型钢定位管固定在沟槽定位桩上;4)进行型钢插入施工,将型钢插入型钢定位管中间位置;5)完成步骤4)后,松开定位螺栓,将型钢定位管移至下一位置,再次进行型钢插入施工;6)连续两根型钢插入完成后,将整个定位装置移至下一区域,重复进行步骤1)‑步骤5)的型钢插入施工。本发明的型钢定位管和沟槽定位桩通过定位螺栓固定,保证型钢插入时不会发生偏差。

Description

一种型钢插入定位装置及其施工方法
技术领域
本发明属于建筑施工技术领域,特别涉及一种型钢插入定位装置及其施工方法。
背景技术
根据《型钢水泥土搅拌墙技术规程》的规定,型钢水泥土搅拌桩型钢插入平面位置的允许偏差为:平行于基坑边线方向为50mm,垂直于基坑边线方向为10mm,型心转角允许偏差为3度;《深基坑工程施工安全技术规范》规定,型钢水泥土搅拌墙型钢的插入必须采用牢固的定位导向架。而目前的施工场所在安放型钢时,一般根据设计图纸和测量控制点放出桩位,桩心距用油漆做好标记,保证搅拌桩定位准确;然后根据基坑围护内边控制线开挖导向沟,并在沟槽边设置搅拌桩定位型钢,标出搅拌桩位置和型钢插入位置。这种方法不仅工序繁琐,而且十分容易出现超过允许的偏差值,影响施工质量。
发明内容
本发明的第一个目的是为了提供一种结构简单、无需配套设备就可提高型钢插入施工质量的型钢插入定位装置。
本发明的第二个目的是为了提供一种操作便捷,可保证型钢插入位置准确性的型钢插入施工方法。
为实现第一个目的,本发明的技术方案是:一种型钢插入定位装置,其特征在于:它包括沟槽定位桩、型钢定位管和定位螺栓;所述沟槽定位桩具有两根,沟槽定位桩上表面固定着若干定位螺杆;所述型钢定位管为“井”字形,由两根纵向管和两根横向管组成,所述两根横向管置于两根纵向管中间,横向管两端分别焊接在两根纵向管上;所述两根纵向管互相平行,且均与两根横向管垂直;所述纵向管两端均具有定位槽;所述型钢定位管置于两根沟槽定位桩上方,型钢定位管的纵向管与沟槽定位桩互相垂直;所述沟槽定位桩上的定位螺杆穿过纵向管两端的定位槽,通过定位螺栓固定;所述型钢定位管的纵向管和横向管构成一个长方形,所述长方形的尺寸与待插入型钢的径向截面的尺寸一致。
进一步地,所述沟槽定位桩上表面的定位螺杆具有4个,分为两组,每组定位螺杆的间距与型钢定位管同一端的两个定位槽的间距一致。
为实现第二个目的,本发明的技术方案是:一种型钢插入施工方法,其特征在于:包括以下步骤:
1)在型钢需要插入的工法桩上标示工法桩纵向轴线和工法桩横向轴线;
2)将两根沟槽定位桩布置到工法桩两侧,并控制沟槽定位桩与工法桩纵向轴线的距离;在沟槽定位桩上画出第一定位轴线,所述第一定位轴线与工法桩横向轴线位于同一直线;
3)在型钢定位管居中的长方形四边画出第二、第三定位轴线,将型钢定位管两端的定位槽套入沟槽定位桩的定位螺杆上,并再次将第二、第三定位轴线分别与工法桩纵向轴线和工法桩横向轴线校准,校准完成后,紧固定位螺栓,将型钢定位管固定在沟槽定位桩上;
4)进行型钢插入施工,将型钢插入型钢定位管居中的长方形内;
5)完成步骤4)位置的型钢插入后,松开定位螺栓,将型钢定位管移至下一位置,再次校准轴线后,紧固定位螺栓,进行型钢插入施工;
6)连续两根型钢插入完成后,将整个定位装置移至下一区域,重复进行步骤1)-步骤5)的型钢插入施工。
本发明的型钢定位管中间具有一个由纵向管和横向管构成的长方形,这个长方形的尺寸与要插入的型钢径向截面的尺寸相匹配;型钢定位管和沟槽定位桩通过定位螺栓固定,保证型钢插入时不会发生偏差;同时,型钢定位管的定位槽为长槽孔,可以根据型钢的径向截面尺寸,对型钢定位管和沟槽定位桩的位置进行调节后,再通过固定螺栓固定。
附图说明
以下结合附图和本发明的实施方式来做进一步详细说明。
图1为本发明的结构示意图。
图2为本发明的工作步骤1)示意图。
图3为本发明的工作步骤2)示意图。
图4为本发明的工作步骤3)示意图。
图5为本发明的工作步骤5)示意图。
具体实施方式
参见附图。本实施例包括沟槽定位桩1、型钢定位管2和定位螺栓3;所述沟槽定位桩1具有两根,沟槽定位桩1上表面固定着若干定位螺杆11;所述型钢定位管2为“井”字形,由两根纵向管21和两根横向管22组成,所述两根横向管22置于两根纵向管21中间,横向管22两端分别焊接在两根纵向管21上;所述两根纵向管21互相平行,且均与两根横向管22垂直;所述纵向管21两端均具有定位槽23;所述型钢定位管2置于两根沟槽定位桩1上方,型钢定位管2的纵向管21与沟槽定位桩1互相垂直;所述沟槽定位桩1上的定位螺杆11穿过纵向管21两端的定位槽23,通过定位螺栓3固定。
本实施例以常见的三轴搅拌桩,内插型钢4,插入数量为插二跳一为例,包括以下步骤:
1)在三轴搅拌机完成搅拌后,现场重新标示工法桩5的纵向轴线51和横向轴线52,如图2所示;
2)将两根沟槽定位桩1布置到工法桩5两侧,并控制沟槽定位桩1与工法桩纵向轴线51的距离;在沟槽定位桩1上画出第一定位轴线12,所述第一定位轴线12与工法桩横向轴线52位于同一直线,如图3所示;
3)在型钢定位管2居中的长方形四边画出第二定位轴线24、第三定位轴线25,将型钢定位管2两端的定位槽23套入沟槽定位桩1的定位螺杆11上,并再次将第二定位轴线24、第三定位轴线25分别与工法桩纵向轴线51和工法桩横向轴线52校准,校准完成后,紧固定位螺栓3,将型钢定位管2固定在沟槽定位桩1上,如图4所示;
4)进行型钢4插入施工,将型钢4插入型钢定位管2居中的长方形内;
5)完成步骤4)位置的型钢4插入后,松开定位螺栓3,将型钢定位管2移至下一位置,再次校准轴线后,紧固定位螺栓3,进行型钢4插入施工,如图5所示;
6)连续两根型钢4插入完成后,将整个定位装置移至下一区域,重复进行步骤1)-步骤5)的型钢4插入施工。

Claims (3)

1.一种型钢插入定位装置,其特征在于:它包括沟槽定位桩、型钢定位管和定位螺栓;所述沟槽定位桩具有两根,沟槽定位桩上表面固定着若干定位螺杆;所述型钢定位管为“井”字形,由两根纵向管和两根横向管组成,所述两根横向管置于两根纵向管中间,横向管两端分别焊接在两根纵向管上;所述两根纵向管互相平行,且均与两根横向管垂直;所述纵向管两端均具有定位槽;所述型钢定位管置于两根沟槽定位桩上方,型钢定位管的纵向管与沟槽定位桩互相垂直;所述沟槽定位桩上的定位螺杆穿过纵向管两端的定位槽,通过定位螺栓固定;所述型钢定位管的纵向管和横向管构成一个长方形,所述长方形的尺寸与待插入型钢的径向截面的尺寸一致。
2.如权利要求1所述的型钢插入定位装置,其特征在于:所述沟槽定位桩上表面的定位螺杆具有4个,分为两组,每组定位螺杆的间距与型钢定位管同一端的两个定位槽的间距一致。
3.一种利用权利要求1所述定位装置的型钢插入施工方法,其特征在于:包括以下步骤:
1)在型钢需要插入的工法桩上标示工法桩纵向轴线和工法桩横向轴线;
2)将两根沟槽定位桩布置到工法桩两侧,并控制沟槽定位桩与工法桩纵向轴线的距离;在沟槽定位桩上画出第一定位轴线,所述第一定位轴线与工法桩横向轴线位于同一直线;
3)在型钢定位管居中的长方形四边画出第二、第三定位轴线,将型钢定位管两端的定位槽套入沟槽定位桩的定位螺杆上,并再次将第二、第三定位轴线分别与工法桩纵向轴线和工法桩横向轴线校准,校准完成后,紧固定位螺栓,将型钢定位管固定在沟槽定位桩上;
4)进行型钢插入施工,将型钢插入型钢定位管居中的长方形内;
5)完成步骤4)位置的型钢插入后,松开定位螺栓,将型钢定位管移至下一位置,再次校准轴线后,紧固定位螺栓,进行型钢插入施工;
6)连续两根型钢插入完成后,将整个定位装置移至下一区域,重复进行步骤1)-步骤5)的型钢插入施工。
CN201510129493.3A 2015-03-24 2015-03-24 一种型钢插入定位装置及其施工方法 Active CN104746510B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510129493.3A CN104746510B (zh) 2015-03-24 2015-03-24 一种型钢插入定位装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510129493.3A CN104746510B (zh) 2015-03-24 2015-03-24 一种型钢插入定位装置及其施工方法

Publications (2)

Publication Number Publication Date
CN104746510A CN104746510A (zh) 2015-07-01
CN104746510B true CN104746510B (zh) 2016-08-24

Family

ID=53586711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510129493.3A Active CN104746510B (zh) 2015-03-24 2015-03-24 一种型钢插入定位装置及其施工方法

Country Status (1)

Country Link
CN (1) CN104746510B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476288B (zh) * 2017-08-04 2019-07-02 安徽信息工程学院 一种无碳小车比赛用直线下桩装置
CN109537909A (zh) * 2018-11-06 2019-03-29 金川集团股份有限公司 一种型钢拼接的调整工具
CN111119184A (zh) * 2020-01-17 2020-05-08 中国建筑第四工程局有限公司 一种地下连续墙芯桩定位导向装置及定位导向方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63521A (ja) * 1986-06-18 1988-01-05 Totsuki Kogyo Kk ソイルモルタル柱列杭の鋼材挿入工法
CN201598638U (zh) * 2009-12-11 2010-10-06 上海强劲基础工程有限公司 一种三轴搅拌桩施工用型钢对点器
CN101864765A (zh) * 2010-06-30 2010-10-20 东南大学 基于双向搅拌的smw施工工法及三轴搅拌设备
KR20110128510A (ko) * 2010-05-24 2011-11-30 (주)지승컨설턴트 일체식 교대 교량을 위한 기초 말뚝의 일렬 정렬용 항타 가이드장치
CN202416321U (zh) * 2012-01-04 2012-09-05 广东中匠工程建设有限公司 一种浅水中振动沉桩施工用简易导向架
CN202899124U (zh) * 2012-11-08 2013-04-24 中国地质工程集团公司深圳分公司 用于smw工法桩机的移动定位装置
CN204551433U (zh) * 2015-03-24 2015-08-12 浙江省长城建设集团有限公司 一种型钢插入定位装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63521A (ja) * 1986-06-18 1988-01-05 Totsuki Kogyo Kk ソイルモルタル柱列杭の鋼材挿入工法
CN201598638U (zh) * 2009-12-11 2010-10-06 上海强劲基础工程有限公司 一种三轴搅拌桩施工用型钢对点器
KR20110128510A (ko) * 2010-05-24 2011-11-30 (주)지승컨설턴트 일체식 교대 교량을 위한 기초 말뚝의 일렬 정렬용 항타 가이드장치
CN101864765A (zh) * 2010-06-30 2010-10-20 东南大学 基于双向搅拌的smw施工工法及三轴搅拌设备
CN202416321U (zh) * 2012-01-04 2012-09-05 广东中匠工程建设有限公司 一种浅水中振动沉桩施工用简易导向架
CN202899124U (zh) * 2012-11-08 2013-04-24 中国地质工程集团公司深圳分公司 用于smw工法桩机的移动定位装置
CN204551433U (zh) * 2015-03-24 2015-08-12 浙江省长城建设集团有限公司 一种型钢插入定位装置

Also Published As

Publication number Publication date
CN104746510A (zh) 2015-07-01

Similar Documents

Publication Publication Date Title
CN104746510B (zh) 一种型钢插入定位装置及其施工方法
CN205088681U (zh) 一种快速校正钢护筒中心的定位装置
CN103243911A (zh) 建筑竖井内管道钢制套管整体定型一次就位施工方法
CN105095540B (zh) 一种井间相对位置关系的法面扫描解析方法
CN204551433U (zh) 一种型钢插入定位装置
CN102926548B (zh) 一种在钢筋混凝土表面后置式预埋钢板的钻洞定位方法
CN205421311U (zh) 一种地脚螺栓定位安装工具
CN102435179B (zh) 核岛内部微网基准点的建立方法及其测量观测平台
CN207351367U (zh) 箍筋间距控制仪
CN104801994B (zh) 钢板钻孔定位装置
CN204703186U (zh) 一种预埋螺栓定位安装装置
CN107869309A (zh) 小井斜情况下的井眼轨迹控制方法及装置
CN206428698U (zh) 一种导管架基础精定位及临时锁定装置
CN201598638U (zh) 一种三轴搅拌桩施工用型钢对点器
CN202582550U (zh) 便于精确定位的多功能测量装置
CN206245743U (zh) 模板锁口装置及加固体系
CN214575145U (zh) 一种钢筋工程定位装置
CN209509535U (zh) 一种可准确定位的预埋套管装置
CN104989101B (zh) 卸料平台施工方法
CN214169135U (zh) 预留孔定位装置
CN205776316U (zh) 定位模板
CN214466559U (zh) 一种管道井成排管道预埋固定装置
CN205604252U (zh) 型钢插入定位装置
CN220117598U (zh) 一种构造柱植筋定位装置
CN215615338U (zh) 一种多孔数匹配垂直钻孔装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Yuanwu

Inventor after: Yin Wei

Inventor after: Zhang Chunwei

Inventor after: Yang Xiaofei

Inventor after: Xu Bin

Inventor after: Xuan Zhenying

Inventor before: Li Yuanwu

Inventor before: Yi Wei

Inventor before: Zhang Chunwei

Inventor before: Yang Xiaofei

Inventor before: Xu Bin

Inventor before: Xuan Zhenying

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310016 Great Wall Building, No. 60 Leiting Road, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang three Construction Group Co., Ltd.

Address before: 310016 Great Wall Building, Wangjiang East Road, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee before: Great Wall, Zhejiang Province construction group Co., Ltd