CN104746446A - 一种桥隧相连防坠石的缓冲结构 - Google Patents

一种桥隧相连防坠石的缓冲结构 Download PDF

Info

Publication number
CN104746446A
CN104746446A CN201510043044.7A CN201510043044A CN104746446A CN 104746446 A CN104746446 A CN 104746446A CN 201510043044 A CN201510043044 A CN 201510043044A CN 104746446 A CN104746446 A CN 104746446A
Authority
CN
China
Prior art keywords
open cut
tunnel
cut tunnel
bridge
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510043044.7A
Other languages
English (en)
Other versions
CN104746446B (zh
Inventor
王峥峥
朱长安
张哲�
郭翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201510043044.7A priority Critical patent/CN104746446B/zh
Publication of CN104746446A publication Critical patent/CN104746446A/zh
Application granted granted Critical
Publication of CN104746446B publication Critical patent/CN104746446B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明属于桥梁与隧道工程技术领域,涉及到一种桥隧相连防坠石的缓冲结构。隧道洞口处明洞及桥上明洞设置为三级:第一级明洞位于洞顶山体陡崖正下方,将原有明洞按原状恢复,不作承重构件,在新增套拱与原有明洞之间设置泡沫材料缓冲层。第二级明洞处于桥上,洞顶设计上为塌落物扩散堆积区;第三级明洞在二级明洞之后,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在第三级明洞直墙设置通风窗,保持足够的纵向间距。本发明的效果和益处是:在地质条件薄弱的隧道口处,可以有效的保护隧道明洞的安全,减少风化块石坠落对明洞的损毁。

Description

一种桥隧相连防坠石的缓冲结构
技术领域
本发明属于桥梁与隧道工程技术领域,涉及到一种桥隧相连防坠石的缓冲结构。
背景技术
当桥梁与隧道具有相互影响时,相应的桥梁端点、隧道洞口与桥隧之间的连接路段统称为桥隧连接部分,简称为桥隧连接。在山岭地区,由于桥梁端点与隧道洞门间距离较近时,在设计施工方面必须考虑两者之间的相互影响。
由于在施工以及运营期间,有不可抗拒的自然因素影响,以及在运营期间有车辆行驶的扰动,虽然隧道上方的岩体经过加固处理,但是仍旧不可避免的会有落石现象的产生,严重影响隧道明洞的安全稳定,同时也是车辆行驶极大的干扰以及危险因素。
发明内容
本发明要解决的技术问题是在洞门山体坡面陡立,岩石风化裂隙发育的地质条件下,防止风化块石脱离山体坠落,将隧道明洞砸坏,保护隧道口以及行驶车辆的安全。
本发明的技术方案是:一种桥隧相连防坠石的缓冲结构,隧道洞口处明洞及桥上明洞设置为三级:将原有明洞作为第一级明洞,位于洞顶山体陡崖正下方,不添加承重构件;在新增套拱与第一级明洞之间设置泡沫材料缓冲层。第二级明洞处于桥上,洞顶设有塌落物扩散堆积区;第三级明洞与第二级明洞相连,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在第三级明洞直墙设置通风窗,保持足够的纵向间距。第一级明洞和第二级明洞之间设有出口洞门,第二级明洞与第一级明洞的主体结构之间设有伸缩缝,第三级明洞和第二级明洞的主体结构之间设有变形缝。第三级明洞基底与隧道洞门处桥台基础相连接,第三级明洞洞口即为桥上明洞洞口。明洞顶拱部铺装从外到内依次为泡沫材料缓冲层,新增设承载套拱,防水层,粉煤灰填筑,粘土隔水层,顶面铺设混凝土预制块。第三级明洞外围由加强边墙保护。
本发明的效果和益处是:在地质条件薄弱的隧道口处,可以有效的保护隧道明洞的安全,减少风化块石坠落对明洞的损毁。
附图说明
图1是缓冲结构断面图
图2是缓冲结构立面图
图中:1泡沫材料缓冲层;2新增设承载套拱;3防水层;4粉煤灰填筑;
5粘土隔水层;6顶面铺设混凝土预制块;7加强边墙;
8隧道门洞处桥台基础;9出口洞门;10山体陡崖;11变形缝;
12桥上明洞洞口;13通风窗;14伸缩缝。
具体实施方式
以下结合附图和技术方案,进一步说明本发明的具体实施方式。
本发明的技术方案是隧道洞口处明洞及桥上明洞设置为三级:第一级明洞位于洞顶山坡面正下方,将原有明洞按原状恢复,不作承重构件,在套拱与原有明洞之间设置12cm厚的泡沫材料缓冲层。第二级明洞为桥上8m,洞顶设计上为0.80m塌落物扩散堆积区;第三级明洞16m,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在明洞直墙设置2x0.6m的通风窗,纵向间距2m。
一级明洞和二级明洞之间为出口洞门,二级明洞和一级明洞主体结构之间设立伸缩缝,三级明洞和二级明洞主体结构之间设立变形缝。第三级明洞基底与隧道洞门处桥台基础相连接,三级明洞洞口即为桥上明洞洞口。明洞顶拱部铺装从下到上依次为泡沫材料缓冲层,新增设承载套拱,防水层,粉煤灰填筑,粘土隔水层,顶面铺设混凝土预制块。三级明洞外围由加强边墙保护。

Claims (2)

1.一种桥隧相连防坠石的缓冲结构,其特征在于,隧道洞口处明洞及桥上明洞设置为三级:将原有明洞作为第一级明洞,新增套拱与第一级明洞之间设置泡沫材料缓冲层;第二级明洞处于桥上,洞顶设有塌落物扩散堆积区;第三级明洞与第二级明洞相连,第三级明洞的直墙上设置通风窗;第一级明洞和第二级明洞之间设有出口洞门,第二级明洞与第一级明洞的主体结构之间设有伸缩缝,第三级明洞和第二级明洞的主体结构之间设有变形缝;第三级明洞基底与隧道洞门处桥台基础相连接,第三级明洞洞口即为桥上明洞洞口;明洞顶拱部铺装从外到内依次为泡沫材料缓冲层、新增设承载套拱、防水层、粉煤灰填筑和粘土隔水层,顶面铺设混凝土预制块。
2.根据权利要求1所述的桥隧相连防坠石的缓冲结构,其特征在于,所述的第三级明洞外围通过加强边墙保护。
CN201510043044.7A 2015-01-26 2015-01-26 一种桥隧相连防坠石的缓冲结构 Active CN104746446B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510043044.7A CN104746446B (zh) 2015-01-26 2015-01-26 一种桥隧相连防坠石的缓冲结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510043044.7A CN104746446B (zh) 2015-01-26 2015-01-26 一种桥隧相连防坠石的缓冲结构

Publications (2)

Publication Number Publication Date
CN104746446A true CN104746446A (zh) 2015-07-01
CN104746446B CN104746446B (zh) 2016-11-09

Family

ID=53586649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510043044.7A Active CN104746446B (zh) 2015-01-26 2015-01-26 一种桥隧相连防坠石的缓冲结构

Country Status (1)

Country Link
CN (1) CN104746446B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU168145U1 (ru) * 2016-07-14 2017-01-19 Владимир Каурбекович Царикаев Лавинобезопасное сооружение горной автомобильной дороги
RU168977U1 (ru) * 2016-07-14 2017-03-01 Владимир Каурбекович Царикаев Устройство для защиты горной автодороги от лавинной массы
CN108425296A (zh) * 2018-04-28 2018-08-21 中铁二院重庆勘察设计研究院有限责任公司 一种用于上下层重叠铁路线上的明洞结构
CN108797405A (zh) * 2018-06-27 2018-11-13 重庆水利电力职业技术学院 一种桥隧相连防坠石的缓冲结构
CN108868813A (zh) * 2018-06-27 2018-11-23 西南交通大学 一种铁路隧道缓冲结构
CN111997087A (zh) * 2020-07-15 2020-11-27 中铁第一勘察设计院集团有限公司 桥隧路一体化明洞结构及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046524A (ja) * 1996-08-06 1998-02-17 Morimura Kosan Kk 防風フェンス材
CN101644034A (zh) * 2009-08-24 2010-02-10 长安大学 隧道间连接桥梁用防雪棚
CN101666070A (zh) * 2009-09-16 2010-03-10 布鲁克(成都)工程有限公司 用于隔离防护飞石或落石的柔性棚洞
CN202073047U (zh) * 2011-04-29 2011-12-14 中铁二院工程集团有限责任公司 既有电化铁路增建明洞构造
CN202440768U (zh) * 2012-01-05 2012-09-19 中铁第一勘察设计院集团有限公司 一种大风区封闭式混凝土防风预制拼装明洞

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046524A (ja) * 1996-08-06 1998-02-17 Morimura Kosan Kk 防風フェンス材
CN101644034A (zh) * 2009-08-24 2010-02-10 长安大学 隧道间连接桥梁用防雪棚
CN101666070A (zh) * 2009-09-16 2010-03-10 布鲁克(成都)工程有限公司 用于隔离防护飞石或落石的柔性棚洞
CN202073047U (zh) * 2011-04-29 2011-12-14 中铁二院工程集团有限责任公司 既有电化铁路增建明洞构造
CN202440768U (zh) * 2012-01-05 2012-09-19 中铁第一勘察设计院集团有限公司 一种大风区封闭式混凝土防风预制拼装明洞

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU168145U1 (ru) * 2016-07-14 2017-01-19 Владимир Каурбекович Царикаев Лавинобезопасное сооружение горной автомобильной дороги
RU168977U1 (ru) * 2016-07-14 2017-03-01 Владимир Каурбекович Царикаев Устройство для защиты горной автодороги от лавинной массы
CN108425296A (zh) * 2018-04-28 2018-08-21 中铁二院重庆勘察设计研究院有限责任公司 一种用于上下层重叠铁路线上的明洞结构
CN108425296B (zh) * 2018-04-28 2024-04-05 中铁二院重庆勘察设计研究院有限责任公司 一种用于上下层重叠铁路线上的明洞结构
CN108797405A (zh) * 2018-06-27 2018-11-13 重庆水利电力职业技术学院 一种桥隧相连防坠石的缓冲结构
CN108868813A (zh) * 2018-06-27 2018-11-23 西南交通大学 一种铁路隧道缓冲结构
CN108797405B (zh) * 2018-06-27 2020-06-19 重庆水利电力职业技术学院 一种桥隧相连防坠石的缓冲结构
CN111997087A (zh) * 2020-07-15 2020-11-27 中铁第一勘察设计院集团有限公司 桥隧路一体化明洞结构及其施工方法
CN111997087B (zh) * 2020-07-15 2021-12-07 中铁第一勘察设计院集团有限公司 桥隧路一体化明洞结构及其施工方法

Also Published As

Publication number Publication date
CN104746446B (zh) 2016-11-09

Similar Documents

Publication Publication Date Title
CN104746446A (zh) 一种桥隧相连防坠石的缓冲结构
CN103321230B (zh) 在运行浅埋地铁长距离穿越场地中的深大基坑开挖方法
CN102704957B (zh) 一种用于浅埋大型地下结构建造的棚架法
CN110318770A (zh) 一种公路隧道半明半暗进洞施工方法
CN105569674A (zh) 用于软弱破碎高温含水地层中的隧道结构
CN105041349A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法
CN103206219A (zh) 偏压状态下明暗交界段隧道进洞开挖支护结构及施工工法
CN107130613A (zh) 大跨隧道正穿既有挡墙的支挡结构及其施工方法
CN110617067A (zh) 一种极软弱围岩隧道全断面边界超前管棚低风险施工方法
CN105370289A (zh) 一种复杂环境既有管线超长浅埋暗挖施工方法
KR20180118009A (ko) 복층터널공법
AU2020202743B2 (en) Strip support method by using filler and residual coal pillar in irregular goaf
CN105156114A (zh) 一种交岔点处巷道的扩修及加固方法
CN106988760A (zh) 易滑地层隧道洞口加固构造及施工方法
CN102410031A (zh) 桩墙法建造地下空间结构
CN204940298U (zh) 一种基坑工程的复合围护结构
CN202227287U (zh) 高速铁路护桥棚洞结构
CN209780907U (zh) 偏压地形组合隧道的洞口段结构
CN105156130B (zh) 一种隧道施工免支护安全施工方法
CN110486062A (zh) 一种软土中机械暗挖多层多跨地下工程的方法
CN106522983B (zh) 防治强吸水膨胀软岩巷道底鼓的方法
CN214887086U (zh) 坡面泥石流导排式明洞结构
CN207260185U (zh) 一种道改隐形盖挖桥梁式结构
CN109915165B (zh) 双侧近接偏压隧道洞口段结构及其施工方法
CN204356707U (zh) 一种拱形t梁棚洞结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant