CN104746446B - 一种桥隧相连防坠石的缓冲结构 - Google Patents
一种桥隧相连防坠石的缓冲结构 Download PDFInfo
- Publication number
- CN104746446B CN104746446B CN201510043044.7A CN201510043044A CN104746446B CN 104746446 B CN104746446 B CN 104746446B CN 201510043044 A CN201510043044 A CN 201510043044A CN 104746446 B CN104746446 B CN 104746446B
- Authority
- CN
- China
- Prior art keywords
- open cut
- tunnel
- cut tunnel
- bridge
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims abstract description 8
- 238000009825 accumulation Methods 0.000 claims abstract description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 6
- 230000004888 barrier function Effects 0.000 claims description 4
- 239000004927 clay Substances 0.000 claims description 4
- 239000010881 fly ash Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000005728 strengthening Methods 0.000 claims description 3
- 239000000758 substrate Substances 0.000 claims description 3
- 238000009792 diffusion process Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 3
- 230000003313 weakening effect Effects 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
本发明属于桥梁与隧道工程技术领域,涉及到一种桥隧相连防坠石的缓冲结构。隧道洞口处明洞及桥上明洞设置为三级:第一级明洞位于洞顶山体陡崖正下方,将原有明洞按原状恢复,不作承重构件,在新增套拱与原有明洞之间设置泡沫材料缓冲层。第二级明洞处于桥上,洞顶设计上为塌落物扩散堆积区;第三级明洞在二级明洞之后,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在第三级明洞直墙设置通风窗,保持足够的纵向间距。本发明的效果和益处是:在地质条件薄弱的隧道口处,可以有效的保护隧道明洞的安全,减少风化块石坠落对明洞的损毁。
Description
技术领域
本发明属于桥梁与隧道工程技术领域,涉及到一种桥隧相连防坠石的缓冲结构。
背景技术
当桥梁与隧道具有相互影响时,相应的桥梁端点、隧道洞口与桥隧之间的连接路段统称为桥隧连接部分,简称为桥隧连接。在山岭地区,由于桥梁端点与隧道洞门间距离较近时,在设计施工方面必须考虑两者之间的相互影响。
由于在施工以及运营期间,有不可抗拒的自然因素影响,以及在运营期间有车辆行驶的扰动,虽然隧道上方的岩体经过加固处理,但是仍旧不可避免的会有落石现象的产生,严重影响隧道明洞的安全稳定,同时也是车辆行驶极大的干扰以及危险因素。
发明内容
本发明要解决的技术问题是在洞门山体坡面陡立,岩石风化裂隙发育的地质条件下,防止风化块石脱离山体坠落,将隧道明洞砸坏,保护隧道口以及行驶车辆的安全。
本发明的技术方案是:一种桥隧相连防坠石的缓冲结构,隧道洞口处明洞及桥上明洞设置为三级:将原有明洞作为第一级明洞,位于洞顶山体陡崖正下方,不添加承重构件;在新增设承载套拱与第一级明洞之间设置泡沫材料缓冲层。第二级明洞处于桥上,洞顶设有塌落物扩散堆积区;第三级明洞与第二级明洞相连,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在第三级明洞直墙设置通风窗,保持足够的纵向间距。第一级明洞和第二级明洞之间设有出口洞门,第二级明洞与第一级明洞的主体结构之间设有伸缩缝, 第三级明洞和第二级明洞的主体结构之间设有变形缝。第三级明洞基底与隧道洞口处桥台基础相连接,第三级明洞洞口即为桥上明洞洞口。明洞顶拱部铺装从下到上依次为泡沫材料缓冲层,新增设承载套拱,防水层,粉煤灰填筑,粘土隔水层,顶面铺设混凝土预制块。第三级明洞外围由加强边墙保护。
本发明的效果和益处是:在地质条件薄弱的隧道口处,可以有效的保护隧道明洞的安全,减少风化块石坠落对明洞的损毁。
附图说明
图1是缓冲结构断面图
图2是缓冲结构立面图
图中:1泡沫材料缓冲层;2新增设承载套拱;3防水层;4粉煤灰填筑;
5粘土隔水层;6顶面铺设混凝土预制块;7加强边墙;
8隧道门洞处桥台基础;9出口洞门;10山体陡崖;11变形缝;
12桥上明洞洞口;13通风窗;14伸缩缝。
具体实施方式
以下结合附图和技术方案,进一步说明本发明的具体实施方式。
本发明的技术方案是隧道洞口处明洞及桥上明洞设置为三级:第一级明洞位于洞顶山坡面正下方,将原有明洞按原状恢复,不作承重构件,在套拱与原有明洞之间设置12cm厚的泡沫材料缓冲层。第二级明洞为桥上8m,洞顶设计上为0.80m塌落物扩散堆积区;第三级明洞16m,为弱化隧道洞口处光线明暗变化及山沟内横风对行车的侧向影响,在明洞直墙设置2x0.6m的通风窗,纵向间距2m。
一级明洞和二级明洞之间为出口洞门,二级明洞和一级明洞主体结构之间设立伸缩缝,三级明洞和二级明洞主体结构之间设立变形缝。第三级明洞基底 与隧道洞门处桥台基础相连接,三级明洞洞口即为桥上明洞洞口。明洞顶拱部铺装从下到上依次为泡沫材料缓冲层,新增设承载套拱,防水层,粉煤灰填筑,粘土隔水层,顶面铺设混凝土预制块。三级明洞外围由加强边墙保护。
Claims (2)
1.一种桥隧相连防坠石的缓冲结构,其特征在于,隧道洞口处明洞及桥上明洞设置为三级:将原有明洞作为第一级明洞,新增设承载套拱与第一级明洞之间设置泡沫材料缓冲层;第二级明洞处于桥上,洞顶设有塌落物扩散堆积区;第三级明洞与第二级明洞相连,第三级明洞的直墙上设置通风窗;第一级明洞和第二级明洞之间设有出口洞门,第二级明洞与第一级明洞的主体结构之间设有伸缩缝,第三级明洞和第二级明洞的主体结构之间设有变形缝;第三级明洞基底与隧道洞口处桥台基础相连接,第三级明洞洞口即为桥上明洞洞口;明洞顶拱部铺装从下到上依次为泡沫材料缓冲层、新增设承载套拱、防水层、粉煤灰填筑和粘土隔水层,顶面铺设混凝土预制块。
2.根据权利要求1所述的桥隧相连防坠石的缓冲结构,其特征在于,所述的第三级明洞外围通过加强边墙保护。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510043044.7A CN104746446B (zh) | 2015-01-26 | 2015-01-26 | 一种桥隧相连防坠石的缓冲结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510043044.7A CN104746446B (zh) | 2015-01-26 | 2015-01-26 | 一种桥隧相连防坠石的缓冲结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104746446A CN104746446A (zh) | 2015-07-01 |
CN104746446B true CN104746446B (zh) | 2016-11-09 |
Family
ID=53586649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510043044.7A Active CN104746446B (zh) | 2015-01-26 | 2015-01-26 | 一种桥隧相连防坠石的缓冲结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104746446B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU168145U1 (ru) * | 2016-07-14 | 2017-01-19 | Владимир Каурбекович Царикаев | Лавинобезопасное сооружение горной автомобильной дороги |
RU168977U1 (ru) * | 2016-07-14 | 2017-03-01 | Владимир Каурбекович Царикаев | Устройство для защиты горной автодороги от лавинной массы |
CN108425296B (zh) * | 2018-04-28 | 2024-04-05 | 中铁二院重庆勘察设计研究院有限责任公司 | 一种用于上下层重叠铁路线上的明洞结构 |
CN108868813B (zh) * | 2018-06-27 | 2019-07-30 | 西南交通大学 | 一种铁路隧道缓冲结构 |
CN108797405B (zh) * | 2018-06-27 | 2020-06-19 | 重庆水利电力职业技术学院 | 一种桥隧相连防坠石的缓冲结构 |
CN111997087B (zh) * | 2020-07-15 | 2021-12-07 | 中铁第一勘察设计院集团有限公司 | 桥隧路一体化明洞结构及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1046524A (ja) * | 1996-08-06 | 1998-02-17 | Morimura Kosan Kk | 防風フェンス材 |
CN101644034B (zh) * | 2009-08-24 | 2011-07-20 | 长安大学 | 隧道间连接桥梁用防雪棚 |
CN101666070B (zh) * | 2009-09-16 | 2012-12-19 | 布鲁克(成都)工程有限公司 | 用于隔离防护飞石或落石的柔性棚洞 |
CN202073047U (zh) * | 2011-04-29 | 2011-12-14 | 中铁二院工程集团有限责任公司 | 既有电化铁路增建明洞构造 |
CN202440768U (zh) * | 2012-01-05 | 2012-09-19 | 中铁第一勘察设计院集团有限公司 | 一种大风区封闭式混凝土防风预制拼装明洞 |
-
2015
- 2015-01-26 CN CN201510043044.7A patent/CN104746446B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104746446A (zh) | 2015-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746446B (zh) | 一种桥隧相连防坠石的缓冲结构 | |
CN105317459B (zh) | 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法 | |
CN104389610B (zh) | 一种穿越运营高速公路隧道超短台阶施工方法 | |
CN205977229U (zh) | 一种适用于偏压条件的连拱隧道非齐平洞口结构 | |
CN110318770A (zh) | 一种公路隧道半明半暗进洞施工方法 | |
CN107130613A (zh) | 大跨隧道正穿既有挡墙的支挡结构及其施工方法 | |
CN110617067B (zh) | 一种极软弱围岩隧道全断面边界超前管棚低风险施工方法 | |
CN202227287U (zh) | 高速铁路护桥棚洞结构 | |
CN104061000B (zh) | 触壁下沉通道式隧道中隔墙及其建造方法 | |
CN109578007B (zh) | 穿越高角度逆冲富水富砂断层隧道开挖及排水施工方法 | |
CN105370289A (zh) | 一种复杂环境既有管线超长浅埋暗挖施工方法 | |
CN106988760A (zh) | 易滑地层隧道洞口加固构造及施工方法 | |
CN111594168B (zh) | 一种岩矸配合成形的伪采空层支护限沉回采方法 | |
CN107964971B (zh) | 一种采用pba工法施工的地铁车站的降水方法 | |
CN203755320U (zh) | 破碎岩带区域边坡加固结构 | |
CN105386779A (zh) | 浅埋岩层中修建大型地下结构物的拱柱法 | |
CN205400758U (zh) | 一种便于暗挖隧道快速穿越侵限管线区域的临时支护体系 | |
CN105156130B (zh) | 一种隧道施工免支护安全施工方法 | |
CN116537794A (zh) | 一种浅埋暗挖三洞大断面隧道下穿既有铁路组合施工方法 | |
CN109356622A (zh) | 一种处理隧洞冒顶的结构及实施方法 | |
CN109026141A (zh) | 基于充填治理空区预留功能通道的方法 | |
CN106149631B (zh) | 高山窄谷拱坝崩塌型边坡处理方法 | |
CN109958456B (zh) | 一种在无自稳能力的地层中建造隧道的超前加固施工方法 | |
CN203925505U (zh) | 一种地下工程的初期支护结构和施工结构 | |
CN207647514U (zh) | 一种盾构隧道竖井端头加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |