CN104741771A - Method and tool for forming tunnel type hole - Google Patents
Method and tool for forming tunnel type hole Download PDFInfo
- Publication number
- CN104741771A CN104741771A CN201510161440.XA CN201510161440A CN104741771A CN 104741771 A CN104741771 A CN 104741771A CN 201510161440 A CN201510161440 A CN 201510161440A CN 104741771 A CN104741771 A CN 104741771A
- Authority
- CN
- China
- Prior art keywords
- friction head
- instrument
- workpiece
- head
- interlude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K20/00—Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
- B23K20/12—Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding
- B23K20/1215—Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding for other purposes than joining, e.g. built-up welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26F—PERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
- B26F1/00—Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
- B26F1/26—Perforating by non-mechanical means, e.g. by fluid jet
Abstract
The invention discloses a method and a tool for forming a tunnel type hole. The tool is composed of a middle section, a handle portion and a friction head; one end of the middle section is integrally connected with the handle portion, while the other end of the middle section is integrally connected with the friction head; the section of the friction head is inverted T-shaped, and the friction head is composed of a neck portion and a head portion; the outer diameter of the neck portion is smaller than the outer diameter of the head portion; the middle section is integrally connected with the friction head; an annular groove is formed between the axial end faces of the friction head and the middle section. The tool has the advantages of high preparation efficiency and low cost.
Description
Technical field
The present invention relates to a kind of method and the instrument of preparing tunnel defect, be applicable to prepare tunnel defect in metal material and part plasticity nonmetallic materials.
Background technology
The metal blocks structure of the well-regulated tunnel defect of inner band has very important using value at specific industrial circle.If inside is with the coldplate of Water-cooling circulating groove, with the EGR etc. of oil circuit, this class formation is widely used in the field such as electronics, Aeronautics and Astronautics, and the pressure for high heating position cools fast.At present, the method preparing tunnel hole in bulk metal material mainly contains following several: the first, utilize milling machine to process groove, then form passage with metallic plate capping, welding, welding procedure can select the kinds of processes such as soldering, electron beam welding, Laser Welding, friction stir welding.When selecting soldering processes, local brazing filler metal erosion may be occurred, occur non-seam drainage, and the solder run off can blocking channel.And when selecting other welding manners, although can avoid the shortcoming of soldering, multiple operations such as whole process need groove milling, processing cover plate, capping, welding just can complete, efficiency is not high.The second, metal casting inner void can also adopt core to be shaped, if but oil circuit is elongated, complicated time, core is easily broken, manufacture difficulty, and be difficult to after casting cleaning.The third, foundry goods built-in pipe, shapes pipeline and is preset to casting mould, then cast.The method cost is lower, although substantially can meet cooling requirements, channel flows can be subject to the restriction of copper pipe sectional area, and the gap between copper pipe and matrix needs to fill, larger heat dissipation region can not be formed, the requirement of some heat dissipation structure part cannot be met.Above three aspects are technical problems that the manufacturing process of metal current coldplate faces, the efficiency that employing traditional handicraft prepares metal cooling board is lower, and add the production cost of structural member to a certain extent, eliminate by technological innovation the important topic that these unfavorable factors are these research fields.
Summary of the invention
The object of the invention is to, a kind of method and instrument preparing tunnel defect that a kind of preparation efficiency is higher and cost is low is provided.
The technical scheme solved the problems of the technologies described above is as follows:
The instrument of tunnel defect prepared by a kind of workpiece, this instrument is made up of interlude, shank and friction head, one end and the shank of interlude connect as one, the other end and the friction head of interlude connect as one, the cross section of friction head is in the font of falling T, and friction head is made up of neck and head, and the external diameter of neck is less than the external diameter of head, after interlude and friction head connect as one, between friction head and the axial end of interlude, form an annular groove.
Preferably, the surface of described instrument is coated with face coat at least in part, and described face coat is made up of the composition of following parts by weight: 1 part, the aliphatic acid that the alkoxyl tertiary amine 1 part that chromium nitride 5-10 part, green silicon carbide 3-5 part, boron carbide 3-5 part, iron oxide 2-3 part, phenolic resins 2-5 part, barium sulfate 1-3 part, mica powder 1-2 part, carbon number are 12-18, carbon number are 6-12, carbon number are fatty alcohol 1 part and water 8-10 part of 7-12.
Preferably, the thickness of face coat is 0.05-0.2mm.
Preferably, described interlude is made up of the first cylindrical section, conical section and the second cylindrical section, one end and the shank of the first cylindrical section connect as one, and the other end of the first cylindrical section and one end of conical section connect as one, and the other end of conical section and one end of friction head connect as one.
Prepare the method for tunnel defect, the friction head of the instrument of High Rotation Speed is penetrated on workpiece wall, according to predetermined movement track, fiction stir is carried out to workpiece, friction head and friction of workpiece produce the plasticize that heat makes around friction head, under the pressure effect that friction head produces, inside workpiece material is extruded and is cut and comes off, and is combined with pace when friction head rotates, make surface metal seam, and form continuous print tunnel defect at material internal.
Have employed such scheme, friction head of the present invention, after design, applies the power to workpiece surface flowing to inside workpiece plastifying material, and plastifying material is extruded, and the material extruded will be cut by friction head shoulder and come off.Meanwhile, by regulating rotary speed and the pace of friction head, making to utilize friction head " work " type structure neck to produce friction stir welding to material and connecing effect, making surface metal seam.The technique of hinge structure, its processing technology is for soldering processes, and without the need to passing through multiple operations such as cover plate, capping, welding again, established technology is simplified, and makes working (machining) efficiency obtain raising.Technique opposing metallic cast-internal hole of the present invention adopts core to be shaped, because it carries out fiction stir according to predetermined movement track to workpiece, and during to elongated, complicated path, easily can will process required tunnel on workpiece, owing to there is no core, therefore there is not the cleaning problem of postorder.Technique of the present invention for foundry goods built-in pipe, because in process, it is open type, therefore, instrument and processed tunnel obtain heat radiation adding in process under air cooling effect, there is not the problem that gap needs to fill, therefore, it is possible to meet the requirement of quick heat radiating.
In sum, instrument of the present invention and preparation method, overcoming traditional handicraft, to prepare the efficiency of metal cooling board lower, and add the problem of production cost of structural member to a certain extent.
Figure of description
Fig. 1 is the schematic diagram of instrument of the present invention;
Detailed description of the invention
With reference to Fig. 1, the instrument of tunnel defect prepared by a kind of workpiece, this instrument is made up of interlude, shank 1 and friction head.One end and the shank 1 of interlude connect as one, and the other end and the friction head of interlude connect as one.Described interlude is made up of the first cylindrical section 2, conical section 3 and the second cylindrical section 4, one end and the shank 1 of the first cylindrical section 2 connect as one, the other end of the first cylindrical section 2 and one end of conical section 3 connect as one, and the other end of conical section 3 and one end of friction head connect as one.Friction head is made up of neck 5 and head 6, and the external diameter of neck 5 is less than the external diameter of head 6, and the cross section of friction head is in the font of falling T.After interlude and friction head connect as one, between friction head and the axial end of interlude, form an annular groove 7.The material of head of creating friction can select hard metal material.
Because instrument is directly rubbed in the course of the work, in order to improve the service life of instrument, be coated with face coat at least in part on the surface of described instrument, described face coat is made up of the composition of following parts by weight: 1 part, the aliphatic acid that the alkoxyl tertiary amine 1 part that chromium nitride 5-10 part, green silicon carbide 3-5 part, boron carbide 3-5 part, iron oxide 2-3 part, phenolic resins 2-5 part, barium sulfate 1-3 part, mica powder 1-2 part, carbon number are 12-18, carbon number are 6-12, carbon number are fatty alcohol 1 part and water 8-10 part of 7-12.Described alkoxyl tertiary amine be selected from ethyoxyl tallow amine, ethyoxyl coconut amine, ethyoxyl ether amine, ethoxy propylene diamines one or more, described aliphatic acid is n-nonanoic acid and/or sad, and described fatty alcohol is octanol and/or decyl alcohol.The thickness of face coat is 0.05-0.2mm.The thickness of face coat is 0.05-0.2mm.In the present invention, the surface of friction head 2 needs all coating upper surface coatings, and remainder, such as interlude, can be coated with upper surface coating on the axial end be connected with friction head.
For device of the present invention, utilization is obtained in order to make it, provide a kind of method preparing tunnel defect on workpiece, the friction head of the instrument of High Rotation Speed is penetrated on workpiece 8 wall, according to predetermined movement track, fiction stir is carried out to workpiece, drilling instrument rotates at material internal, movement, friction head and friction of workpiece produce the plasticize that heat makes around friction head, under the pressure effect that friction head produces, inside workpiece material is extruded and is cut and comes off, and the material extruded will be cut by friction head shoulder and come off.Friction head is combined with pace when rotating, and utilizes friction head neck to produce agitating friction welding effect to workpiece, makes surface metal seam.Principle accordingly, friction head according to both custom made aperture orbiting motions, thus forms continuous print tunnel defect at material internal.This method is applicable at the block materials such as metal, plastics inner, can complete and prepare tunnel defect, significantly improve working (machining) efficiency at one in-process.
Claims (5)
1. prepared by a workpiece instrument of tunnel defect, it is characterized in that: this instrument is made up of interlude, shank and friction head, one end and the shank of interlude connect as one, the other end and the friction head of interlude connect as one, friction head is made up of neck and head, and the external diameter of neck is less than the external diameter of head, and the cross section of friction head is in the font of falling T, after interlude and friction head connect as one, between friction head and the axial end of interlude, form an annular groove.
2. prepared by a kind of workpiece according to claim 1 the instrument of tunnel defect, it is characterized in that: the surface of described instrument is coated with face coat at least in part, described face coat is made up of the composition of following parts by weight: 1 part, the aliphatic acid that the alkoxyl tertiary amine 1 part that chromium nitride 5-10 part, green silicon carbide 3-5 part, boron carbide 3-5 part, iron oxide 2-3 part, phenolic resins 2-5 part, barium sulfate 1-3 part, mica powder 1-2 part, carbon number are 12-18, carbon number are 6-12, carbon number are fatty alcohol 1 part and water 8-10 part of 7-12.
3. prepared by a kind of workpiece according to claim 2 the instrument of tunnel defect, it is characterized in that: the thickness of face coat is 0.05-0.2mm.
4. a kind of instrument preparing tunnel defect on workpiece according to claims 1 to 3 any one, it is characterized in that: described interlude is made up of the first cylindrical section, conical section and the second cylindrical section, one end and the shank of the first cylindrical section connect as one, the other end of the first cylindrical section and one end of conical section connect as one, and the other end of conical section and one end of friction head connect as one.
5. adopt instrument described in Claims 1-4 any one on workpiece, prepare the method for tunnel defect, it is characterized in that: the friction head of the instrument of High Rotation Speed is penetrated on workpiece wall, according to predetermined movement track, fiction stir is carried out to workpiece, friction head and friction of workpiece produce the plasticize that heat makes around friction head, under the pressure effect that friction head produces, inside workpiece material is extruded and is cut and comes off, friction head is combined with pace when rotating, make surface metal seam, and form continuous print tunnel defect at material internal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510161440.XA CN104741771A (en) | 2015-04-03 | 2015-04-03 | Method and tool for forming tunnel type hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510161440.XA CN104741771A (en) | 2015-04-03 | 2015-04-03 | Method and tool for forming tunnel type hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104741771A true CN104741771A (en) | 2015-07-01 |
Family
ID=53582336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510161440.XA Pending CN104741771A (en) | 2015-04-03 | 2015-04-03 | Method and tool for forming tunnel type hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104741771A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109226836A (en) * | 2018-11-20 | 2019-01-18 | 曾广训 | A kind of novel curved hole drill bit and processing method |
CN109434273A (en) * | 2018-12-24 | 2019-03-08 | 广东省焊接技术研究所(广东省中乌研究院) | A kind of tool and method manufacturing micro-channel |
CN112548314A (en) * | 2020-12-01 | 2021-03-26 | 昆山万洲特种焊接有限公司 | Ultrasonic-assisted stirring friction tunnel forming method |
CN113751858A (en) * | 2021-10-11 | 2021-12-07 | 哈尔滨工业大学(威海) | Double-shaft-shoulder friction-stir tunnel forming method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1147961A (en) * | 1997-08-04 | 1999-02-23 | Showa Alum Corp | Manufacture of plate type heat pipe |
CN1900575A (en) * | 2001-02-02 | 2007-01-24 | 三菱重工业株式会社 | Integrated piping plate, machining method for same, machining apparatus for same, and machining equipment for same |
CN102036779A (en) * | 2008-05-20 | 2011-04-27 | 日本轻金属株式会社 | Method for producing heat exchanger plate, and heat exchanger plate |
US20110180587A1 (en) * | 2008-06-26 | 2011-07-28 | Edison Welding Institute, Inc. | Friction stir welding tool |
CN103551722A (en) * | 2008-02-21 | 2014-02-05 | 日本轻金属株式会社 | Method of manufacturing heat transfer plate |
-
2015
- 2015-04-03 CN CN201510161440.XA patent/CN104741771A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1147961A (en) * | 1997-08-04 | 1999-02-23 | Showa Alum Corp | Manufacture of plate type heat pipe |
CN1900575A (en) * | 2001-02-02 | 2007-01-24 | 三菱重工业株式会社 | Integrated piping plate, machining method for same, machining apparatus for same, and machining equipment for same |
CN103551722A (en) * | 2008-02-21 | 2014-02-05 | 日本轻金属株式会社 | Method of manufacturing heat transfer plate |
CN102036779A (en) * | 2008-05-20 | 2011-04-27 | 日本轻金属株式会社 | Method for producing heat exchanger plate, and heat exchanger plate |
US20110180587A1 (en) * | 2008-06-26 | 2011-07-28 | Edison Welding Institute, Inc. | Friction stir welding tool |
Non-Patent Citations (2)
Title |
---|
卢艳光 等: "《人造板及其制品质量监督检验实务》", 31 July 2014 * |
王福贞,马文存: "《气相沉积应用技术》", 31 January 2007 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109226836A (en) * | 2018-11-20 | 2019-01-18 | 曾广训 | A kind of novel curved hole drill bit and processing method |
CN109434273A (en) * | 2018-12-24 | 2019-03-08 | 广东省焊接技术研究所(广东省中乌研究院) | A kind of tool and method manufacturing micro-channel |
CN112548314A (en) * | 2020-12-01 | 2021-03-26 | 昆山万洲特种焊接有限公司 | Ultrasonic-assisted stirring friction tunnel forming method |
CN113751858A (en) * | 2021-10-11 | 2021-12-07 | 哈尔滨工业大学(威海) | Double-shaft-shoulder friction-stir tunnel forming method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3213863A1 (en) | Electric melting method for forming metal structure | |
CN102240860B (en) | Method and equipment for manufacturing gradient material mould | |
CN104741771A (en) | Method and tool for forming tunnel type hole | |
CN102240861B (en) | Method and equipment for manufacturing gradient functional structure | |
CN103273190B (en) | Static double-shaft-shoulder stirring friction head used for stirring friction welding machine | |
CN108165982A (en) | A kind of method that superelevation rate laser melting coating prepares nickel-base antiwear anti-corrosion coating | |
CN102069172A (en) | Composite casting method of aluminum cooling plate | |
CN104385023B (en) | Inner cooling damping heat-shrinkable tool bar device | |
CN102179637B (en) | Manufacturing method and equipment of unequal-section bimetal transmission part | |
CN111468720A (en) | Method for manufacturing radial centralizing sliding bearing static ring | |
CN104625012A (en) | Injection head of die-casting machine | |
CN105855310A (en) | High-stability spiral inner cooling hole alloy bar material device | |
CN108118334A (en) | A kind of method that superelevation rate laser melting coating prepares cobalt-based wear-and corrosion-resistant coating | |
KR20130074030A (en) | Manufacturing method for base structure and base structure manufactured by the same | |
CN106392468B (en) | A kind of metal increasing material manufacturing method of deep-hole parts | |
CN106623488B (en) | A kind of processing method of rectangle diplopore silver-bearing copper pipe | |
CN208178688U (en) | Agitating friction welds cutter | |
CN106425304B (en) | A kind of processing technology of lubricating oil nozzle | |
CN106400004B (en) | A kind of micro- rib water cooling plant of spiral for laser melting coating nozzle | |
CN103591194A (en) | Method for manufacturing shell body of brake master cylinder | |
CN111482609B (en) | Method for manufacturing radial centralizing sliding bearing moving ring | |
Özek et al. | Investigate the effect of tool conical angle on the bushing height, wall thickness and forming in friction drilling of A7075-T651 aluminum alloy | |
Fish et al. | A high temperature polymer selective laser sintering testbed for controls research | |
CN106563780A (en) | Continuous casting method for big round billet of medium-high-carbon medium-high-alloy tool steel | |
CN105345184A (en) | Composite copper alloy wire rod formed through low-speed wire cut electrical discharge machining and manufacturing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150701 |