CN1047362A - Freeing mineral method by horizontally and vertically alternative control of blasting - Google Patents

Freeing mineral method by horizontally and vertically alternative control of blasting Download PDF

Info

Publication number
CN1047362A
CN1047362A CN 89102406 CN89102406A CN1047362A CN 1047362 A CN1047362 A CN 1047362A CN 89102406 CN89102406 CN 89102406 CN 89102406 A CN89102406 A CN 89102406A CN 1047362 A CN1047362 A CN 1047362A
Authority
CN
China
Prior art keywords
eye
ore deposit
blasting
falls
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 89102406
Other languages
Chinese (zh)
Inventor
王书宣
王坤儒
苑卫东
何晓华
贾志伟
韩志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Yu Gold Mine Ministry Of Metallurgical Industry
Maanshan Institute Of Mining Research Ministry Of Metallurgical Industry
Original Assignee
Jin Yu Gold Mine Ministry Of Metallurgical Industry
Maanshan Institute Of Mining Research Ministry Of Metallurgical Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jin Yu Gold Mine Ministry Of Metallurgical Industry, Maanshan Institute Of Mining Research Ministry Of Metallurgical Industry filed Critical Jin Yu Gold Mine Ministry Of Metallurgical Industry
Priority to CN 89102406 priority Critical patent/CN1047362A/en
Publication of CN1047362A publication Critical patent/CN1047362A/en
Pending legal-status Critical Current

Links

Images

Abstract

A kind of new ore deposit method that falls of underground mining: freeing mineral method by horizontally and vertically alternative control of blasting is applicable to the mining of middle thickness orebody.This method is the optimum organization of current practice and advanced technology.Feature is that will single level eye commonly used fall ore deposit and single going up to the eye ore deposit that falls hocketed at work plane, rub into Controlled Blasting simultaneously, this optimum organization demonstrates obvious effects, compares to eye with last with the level eye than single, the stope work efficiency proposes 30%, explosive specific charge reduces by 20%, and boulder yield reduces 50%, and the workload of arrangement stope is few, the safety factor height, reduced the rate of dilution and loss late, method is simple, can be applicable at underground mine.

Description

Freeing mineral method by horizontally and vertically alternative control of blasting
A kind of ore deposit method that falls of underground mining is applicable to the underground mining of various mineral products, is specially adapted to the middle thickness orebody mining of shallow hole shrinkage method, and this method can increase substantially work efficiency and help being beneficial to Mine Safety in Production.
The present both at home and abroad shallow hole shrinkage method in the mining, its ore falling mode that generally adopts are to beat single going up to fall ore deposit or beat the single level eye explosion ore deposit that falls of eye explosion, and explosion form commonly used is common blasting procedure.Above-mentioned common method has many weakness, go up when the common explosion of eye falls the ore deposit if adopt, the stability of serious broken ring top board ore body, on top board, form the lax band of the thick explosion of 0.6-0.9 rice, adopt down, must do a large amount of cleaning works as continuing explosion, prize the float stone of top board ore body, the danger stone on the supporting roof ore body and the secondary blasting of lump ore etc., these work efforts are time-consuming, handle 200-300 rice 2Stope often take 3-4 days, poor stability during work is followed the tracks of back production difficulty, loss late and rate of dilution height for the ore body of complex shape; When adopting the common blasting procedure of single level eye, the broken round trip degree of top board ore body is last low to eye, the lax band of explosion 0.4-0.6 rice, and roof safety is good, but driling explosion work is limited by orebody thickness, influences rock penetration performance.
In view of the foregoing, the scientific research personnel has conceived a kind of new departure, this scheme organically combines above-mentioned two kinds of methods, and rub into advanced Controlled Blasting, be combined into a kind of brand-new mining methods, this method is learnt from other's strong points to offset one's weaknesses, and demonstrates obvious superiority, in in September, 1988 and the cooperation of Jin Chang valley gold mine, carried out the research of this called after " freeing mineral method by horizontally and vertically alternative control of blasting " at the scene.
The feature of this freeing mineral method is, fetch water flat earlier in the exploitation location, explosion ore deposit one layering that falls, stamp again to eye, explosion fall ore deposit one layering fetch water again flat eye fall the ore deposit, go up to the eye ore deposit that falls again ... hocket, in the process of whole quick-fried ore deposits of rock drilling, smooth controlled blasting is adopted at peripheral position, with big pitch-row controlled blasting, both all use differential blasting on other work planes.Controlled blasting also with the improving to some extent of frequent employing, during the smooth blasting that adopts at one periphery position, concentration coefficient of holes K is increased to 1.3-1.4 by 0.8-1.0 commonly used, obtained and can control periphery preferably, do not produce the effect of lump ore again; It two adopts big pitch-row on work plane, general concentration coefficient of holes 1.0-1.2 is increased to 3.0, does to guarantee bigger explosion volume and less quick-fried sillar degree like this; Its three millisecond detonatings non-electric ms detonator helps keeping the stability of top board ore body and improves quick-fried rock quality.
Implementing this method advantage is to have reduced the workload that sled sled stone, skill are protected arrangement stopes such as danger top widely, has increased the ore deposit time that falls, and has correspondingly improved mining intensity, has increased safety factor; Adopt controlled blasting then to make profile neat, reduced lumpiness; Influenced by orebody thickness less for this method simultaneously, and economic benefit and social benefit are quite remarkable.
Invent my institute and gold mine cooperation in Jin Chang valley is implemented for this, the concrete steps of enforcement are:
1, the level eye ore deposit explosion that falls.
The level eye is from stope humanity, at first excavate cutting groove because the level eye is the layering propelling, the about 2.5-3.0 rice of the ore deposit thickness that falls of per minute layer, so needing in stope one or both ends excavation specification is length (along orebody trend) 2.5-3.0 rice, wide is the ore body horizontal breadth, height is the cutting groove of ore deposit lift height of falling, and also can utilize the original available cutting engineering of stope.
The ore deposit eye is arch along vertical orebody trend to be arranged, row and row's borehole be triangularly arranged (referring to accompanying drawing 1).The blasting parameter difference at each position, the parameters of perimeter blasting is: spacing: E=0.8-0.9 rice, minimum burden: W=0.6-0.7 rice, concentration coefficient of holes: K=E/W=1.3-1.4, borehole depth: 2.0-2.5 rice, 0.3 kilogram/meter of blashole charge closeness (ammonium nitrate-fuel oil mixture), charge constitution are the air gap charge constitution (seeing accompanying drawing 2).Borehole on other work planes except that periphery is arranged as big pitch-row borehole, parameters is: spacing: E=1.5-1.8 rice, best crushing lines of resistance: W=0.6-0.7 rice, concentration coefficient of holes: K=E/W=3, borehole depth: 2.0-2.5 rice, the blashole charge coefficient: 80%(ammonium oil), structure is a column continuous charging structure.Install after the medicine 0.2 meter of position, aperture tamping length, detonate with non-electric ms detonator, with section, use elementary errors with row between row, jumping and section using millisecond detonator, contact method is subregion bundle handle, ignition and detonation of blasting cap (seeing accompanying drawing 3).
2, go up to the eye ore deposit explosion that falls.
Borehole becomes 70-80 ° with the top board ore body, and the layering ore deposit thickness that falls is 1.6-1.7 rice, at first goes out cutting groove with the V-cut farad, utilizes perhaps that other cutting engineerings are the last scope of freedom to eye in the stope.The borehole of cutting groove arranges that by the V-cut method all the other boreholes are arranged by big pitch-row explosion requirement.Parameter is spacing: E=1.3-1.4 rice, and row's spacing: 0.7-0.8 rice, borehole depth: 2.0 meters, the blashole charge coefficient: 80%, adopt the continuous reverse geometry of column.Filling with detonating technique is: 0.2 meter in mud is filled out in the aperture, adopts millisecond detonator as far as possible, tangible unconditional available half second detonator, but same section detonator explosion 2-3 artillery salvo eye, contact method is a subregion bundle handle, and one section non-electric ms detonator two-way is ganged up, and once lights with blasting cap and detonates.
The effect that Jin Chang valley gold mine is implemented such scheme is very considerable, top board forming after the explosion, and scar is smooth, maximum irregularity degree≤0.2 meter; Explosion is to the 1/2-1/3 that the degree of depth is common explosion that influences of top board ore body; The platform flight of steps leading to a palace hall height of stubble big gun joining place is below 0.3 meter; Top board demifacet eye trace retention rate 〉=50%; Explosion rear perimeter edge scar does not have bulk danger stone, and the fritter float stone is also few; The level eye and last to eye 〉=600 millimeters boulder yield is respectively≤5% and≤7%.
Freeing mineral method by horizontally and vertically alternative control of blasting economic benefit of the present invention and social benefit are remarkable, and this method is than adopting single level eye or upward comparing to the eye freeing mineral method, and the stope work efficiency improves 30%, and explosive specific charge reduces by 20%, and boulder yield reduces 50%; Without supporting, saved timber generally speaking; This method can be reduced the loss in addition and the reduction of dilution rate, improves security, and this method is simple, can spread.
Accompanying drawing one is arranged schematic diagram for borehole
Accompanying drawing two is the charge constitution schematic diagram
Accompanying drawing three is the on line schematic diagram that detonates
The drawing reference numeral explanation:
1, periphery hole; 2, big pitch-row borehole; 3, stemming; 4, airspace; 5, plastic detonating tube; 6, powder stick; 7, millisecond detonator; 8, detonator bundle handle outside the hole; 9, propagation of explosion on-electric detonator; 10, detonator; 11, blasting cap; 12, detonating fuse.

Claims (2)

1, a kind of level eye ore deposit that falls that comprises, go up to the eye ore deposit that falls, the shallow-hole shrinkage stoping method of Controlled Blasting, it is characterized in that level eye Luo Kuang, go up to eye fall ore deposit, Controlled Blasting three's optimum organization, fetch water flat earlier in the exploitation location, explosion ore deposit one layering that falls, stamp again to the eye explosion ore deposit layering that falls, be the level eye and upward hocket to the eye ore deposit that falls, two kinds of ore falling modes all adopt Controlled Blasting, the peripheral position smooth blasting with big pitch-row cloth hole explosion, is used millisecond detonating on other work planes during explosion;
2, shallow-hole shrinkage stoping method as claimed in claim 1, the concentration coefficient of holes K that it is characterized by perimeter blasting brings up to 1.3-1.4 by 0.8-1.0 commonly used, and during big pitch-row work plane explosion, concentration coefficient of holes increases to 3.0 by 1.0-1.2.
CN 89102406 1989-05-19 1989-05-19 Freeing mineral method by horizontally and vertically alternative control of blasting Pending CN1047362A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 89102406 CN1047362A (en) 1989-05-19 1989-05-19 Freeing mineral method by horizontally and vertically alternative control of blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 89102406 CN1047362A (en) 1989-05-19 1989-05-19 Freeing mineral method by horizontally and vertically alternative control of blasting

Publications (1)

Publication Number Publication Date
CN1047362A true CN1047362A (en) 1990-11-28

Family

ID=4854681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 89102406 Pending CN1047362A (en) 1989-05-19 1989-05-19 Freeing mineral method by horizontally and vertically alternative control of blasting

Country Status (1)

Country Link
CN (1) CN1047362A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893415A (en) * 2010-04-20 2010-11-24 中矿金业股份有限公司 Blasting method by arch roof control and smooth-surface pillar control
CN102305072A (en) * 2011-07-13 2012-01-04 金诚信矿业管理股份有限公司 Inverted triangle cutting process for rapid excavation of well lane
CN104989402A (en) * 2015-05-27 2015-10-21 广东省冶金建筑设计研究院 Medium-deep hole room pillar mining method for limestone underground mine mining
CN106499396A (en) * 2017-01-18 2017-03-15 长沙有色冶金设计研究院有限公司 The thick low-angle dip ore block house column mining codes of interlayer containing barren rock in one kind
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production
CN113090261A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress
CN113090262A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893415A (en) * 2010-04-20 2010-11-24 中矿金业股份有限公司 Blasting method by arch roof control and smooth-surface pillar control
CN102305072A (en) * 2011-07-13 2012-01-04 金诚信矿业管理股份有限公司 Inverted triangle cutting process for rapid excavation of well lane
CN104989402A (en) * 2015-05-27 2015-10-21 广东省冶金建筑设计研究院 Medium-deep hole room pillar mining method for limestone underground mine mining
CN106499396A (en) * 2017-01-18 2017-03-15 长沙有色冶金设计研究院有限公司 The thick low-angle dip ore block house column mining codes of interlayer containing barren rock in one kind
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production
CN106767213B (en) * 2017-01-18 2018-06-19 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top plate ore body back production
CN106499396B (en) * 2017-01-18 2020-01-03 长沙有色冶金设计研究院有限公司 Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN113090261A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress
CN113090262A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system
CN113090262B (en) * 2021-04-14 2022-03-15 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system
CN113090261B (en) * 2021-04-14 2022-03-15 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress

Similar Documents

Publication Publication Date Title
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN105571419B (en) Blasting method capable of effectively reducing blasting boulder yield of surface mine
CN103696769B (en) Upward shrinkage spaced charging fractional blasting slot-drawing method
CN205537381U (en) Deep hole blasting simultaneous shaft -sinking's big gun hole arrangement structure in non - colliery mountain
CN105626073B (en) A kind of mining methods for reserving cutting groove based on the method for mining by the way of filling
CN106761912A (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN105019904A (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN102720500A (en) Mechanized underground mining method for sharply inclined thin ore body
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN104296609B (en) Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting
CN101266123A (en) Crushing station pit digging method
CN111502664B (en) Narrow ore body high-order section sublevel caving subsequent filling mining method
CN106150505B (en) Efficient fine blasting method for ultrathin ore body
CN1047362A (en) Freeing mineral method by horizontally and vertically alternative control of blasting
CN110219650A (en) A kind of environment remodeling stage deep hole afterwards filling mining method
CN109827484A (en) A kind of huge thick tight roof orientation presplitting of highly gassy mine loosens method
CN104879128B (en) Severe inclined thick coal seam coal winning technology based on the advanced pre- quick-fried reduction of top coal
CN103410513B (en) Uneasily mining orebody mechanization process for stoping
CN1067290A (en) Room-and-pilar type caving for mine
CN1029756C (en) Method to cut marble and granite, device to concentrate energy in hole and cutter
CN108592716A (en) A kind of method of underground stope fining blasting excavation
CN108709467A (en) It is lower that the method that vertical long hole refines explosion is replaced to fan-shaped deep hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication