CN104728524B - Mortar pump pipeline hanging device - Google Patents

Mortar pump pipeline hanging device Download PDF

Info

Publication number
CN104728524B
CN104728524B CN201310701232.5A CN201310701232A CN104728524B CN 104728524 B CN104728524 B CN 104728524B CN 201310701232 A CN201310701232 A CN 201310701232A CN 104728524 B CN104728524 B CN 104728524B
Authority
CN
China
Prior art keywords
column
mortar pump
suspender
pillar stand
hanging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310701232.5A
Other languages
Chinese (zh)
Other versions
CN104728524A (en
Inventor
田华东
杨兵
张春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Leisa Heavy Construction Machinery Co Ltd
Original Assignee
Beiqi Foton Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beiqi Foton Motor Co Ltd filed Critical Beiqi Foton Motor Co Ltd
Priority to CN201310701232.5A priority Critical patent/CN104728524B/en
Publication of CN104728524A publication Critical patent/CN104728524A/en
Application granted granted Critical
Publication of CN104728524B publication Critical patent/CN104728524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/14Hangers in the form of bands or chains

Abstract

The invention discloses a mortar pump pipeline hanging device. The mortar pump pipeline hanging device comprises a support main body which is used for being supported on the ground and a hanging part which is installed on the support main body to be used for hanging a mortar pump pipeline. The mortar pump pipeline hanging device is simple in structure, convenient to transport and assemble, can replace flexible pipe hanging manually, reducing manpower resources required during the mortar pump construction process and effectively reducing construction costs.

Description

A kind of mortar pump pipeline hanging device
Technical field
The present invention relates to technical field of engineering machinery, more particularly to a kind of mortar pump pipeline hanging device.
Background technology
In the prior art, the indoor wall mortar construction major part of building is that mortar is pumped into after corresponding floor Connecting line and shower nozzle, by shower nozzle, mortar are ejected on metope.But, due to there being the mortar of flowing in pipeline, lead to manage Road weight is larger, applies man-hour requirement one personal hand-held shower nozzle and carries out spraying operation, the cooperation shower nozzle injection of another person's hand-held pipeline Operation.The mortar spraying operation of the indoor wall mortar construction of building needs two workman's cooperations to complete, and takies more manpower Resource, construction cost is higher.
Content of the invention
It is an object of the invention to provide a kind of mortar pump pipeline hanging device is overcoming or at least to mitigate prior art Drawbacks described above.
For achieving the above object, the present invention provides a kind of mortar pump pipeline hanging device.Described mortar pump conduit hanging dress Put including rack body, it is used for supporting on the ground;And suspender, it is arranged on described rack body, for hanging Mortar pump conduit.
Preferably, described rack body includes vertically supporting the first column on the ground and the second column, institute State suspender one end and be arranged at described first column, the described suspender other end is arranged at described second column, described The suspender mount point of the suspender mount point of one column and described second column is located at sustained height.
Preferably, described first column includes being threaded connection under the first upper pillar stand and first that mode links together Column, described second column includes being threaded connection the second upper pillar stand and the second lower pillar stand that mode links together.
Preferably, described first column further includes to prevent described first upper pillar stand and the first lower pillar stand relatively rotates Locking member, described second column further includes to prevent the locking member that described second upper pillar stand and the second lower pillar stand relatively rotate.
Preferably, described first column has through hole, and the central axis upright of described through hole is in described first column Heart axis, described suspender one end is installed to the through hole of the first column, and described second column has through hole, in described through hole Heart axis is installed to the through hole of the second column perpendicular to the central axis of described second column, the described suspender other end.
Preferably, described first column has multiple through holes along short transverse, and described second column has along short transverse Multiple through holes.
Preferably, described suspender includes suspension strop and suspension strop connector, described suspension strop pass through the first column and Through hole on second column, is fixed between described first column and the second column by described suspension strop connector.
Preferably, described suspension strop is steel wire rope, and described suspension strop connector is threaded connector, described steel wire penetrating Through hole on first column and the second column, described threaded connector is screwed in the two ends of described steel wire rope to stop described steel wire Rope deviates from described first column and the second column.
Preferably, further include regulation handle, described regulation handle is inserted in the through hole of described first column, for revolving Twist described first upper pillar stand and/or the first lower pillar stand, described regulation handle is inserted in the through hole of described second column, is used for screwing Described second upper pillar stand and/or the second lower pillar stand.
Preferably, described mortar pump conduit is hung to described suspender by flexible connecting member.
Preferably, described flexible connecting member includes chain and suspender belt, and snap ring is passed through with can be relatively in one end of described chain The mode slided is connected with described suspender, and the other end of described chain is connected with described suspender belt by snap ring, and described suspender belt is used In described mortar pump conduit of slinging.
Preferably, the upper end of described first column has the first hinged upper support seat, the lower end tool of described first column There is first time hinged support base, on the ceiling, the upper end of described second column has hinged on described first upper support seat top The second upper support seat, the lower end of described second column has second time hinged support base, and described second upper support seat withstands on On ceiling.
Above-mentioned mortar pump pipeline hanging device structure is simple, is readily transported and assembles, can replace manually flexible pipe being hung Hang, reduce required human resources in mortar pump work progress, effectively reduce construction cost.
Brief description
Fig. 1 is the installment state schematic diagram of mortar pump pipeline hanging device according to an embodiment of the invention.
Fig. 2 is the schematic elevation view of the installment state of mortar pump pipeline hanging device shown in Fig. 1.
Fig. 3 is the schematic side view of the installment state of mortar pump pipeline hanging device shown in Fig. 1.
Fig. 4 is the cross-sectional schematic of threaded section of the column of mortar pump pipeline hanging device shown in Fig. 1.
Fig. 5 is the cross-sectional schematic of the upper support seat of the column of mortar pump pipeline hanging device shown in Fig. 1.
Fig. 6 is the cross-sectional schematic of the lower support base of the column of mortar pump pipeline hanging device shown in Fig. 1.
Fig. 7 is the cross-sectional schematic of the suspender mount point of mortar pump pipeline hanging device shown in Fig. 1.
Reference:
1 Ceiling 62 Sleeve
2 Upper support seat 7 Lower pillar stand
3 Upper pillar stand 8 Lower support base
4 Suspender 9 Ground
41 Welding set 10 Chain
42 Thread bush 11 Suspender belt
43 Steel wire rope 12 Pipeline
5 Regulation handle 13 Pin
6 Locking member 14 Suspender mount point
61 Lock-screw
Specific embodiment
For making purpose, technical scheme and advantage that the present invention is implemented clearer, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is further described in more detail.In the accompanying drawings, identical from start to finish or class As the label element that represents same or similar element or there is same or like function.Described embodiment is the present invention A part of embodiment, rather than whole embodiments.Embodiment below with reference to Description of Drawings is exemplary it is intended to use In the explanation present invention, and it is not considered as limiting the invention.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of not making creative work, broadly falls into the scope of protection of the invention.Under Face combines accompanying drawing and embodiments of the invention is described in detail.
In describing the invention it is to be understood that term " " center ", " longitudinal ", " horizontal ", "front", "rear", The orientation of instruction such as "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outward " or position relationship are based on accompanying drawing institute The orientation showing or position relationship, are for only for ease of the description present invention and simplify description, rather than the dress of instruction or hint indication Put or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that protecting to the present invention The restriction of scope.
Fig. 1 is the installment state schematic diagram of mortar pump pipeline hanging device according to an embodiment of the invention.Fig. 2 is Fig. 1 The schematic elevation view of the installment state of shown mortar pump pipeline hanging device.Fig. 3 is mortar pump pipeline hanging device shown in Fig. 1 The schematic side view of installment state.Fig. 4 is that the section view of threaded section of the column of mortar pump pipeline hanging device shown in Fig. 1 is shown It is intended to.Fig. 5 is the cross-sectional schematic of the upper support seat of the column of mortar pump pipeline hanging device shown in Fig. 1.Fig. 6 is shown in Fig. 1 The cross-sectional schematic of the lower support base of the column of mortar pump pipeline hanging device.Fig. 7 is mortar pump pipeline hanging device shown in Fig. 1 Suspender mount point cross-sectional schematic.
Referring to Fig. 1, mortar pump pipeline hanging device includes: rack body and suspender 4.
Referring to Fig. 2, described rack body supports on the ground, and it includes vertically supporting on the ground first to stand Post and the second column, suspender 4 one end is arranged at described first column, and suspender 4 other end is arranged on described second column Place, and the mount point that suspender 4 is located on described first column and the second column is at sustained height.
The upper end of the first column has the first hinged upper support seat, and the lower end of described first column has hinged first Lower support base, on the ceiling, the upper end of described second column has support on hinged second on described first upper support seat top Seat, the lower end of described second column has second time hinged support base, and described second upper support seat top is on the ceiling.
Advantageously, described first column and the second column are separate, are easy to flexible modulation first column and second and stand The distance between post.But, described first column and the second column can also link together.
Described first column and the second column are respectively positioned at the left and right sides of the hanging position of pipeline 12.Wherein, first stand Post includes being threaded connection the first upper pillar stand and the first lower pillar stand that mode links together, and the second column is included by screw thread The second upper pillar stand and the second lower pillar stand (in the embodiment shown in FIG., the first column and second that connected mode links together Pillar construction is identical, therefore only marks a heel post concrete structure).
Referring to Fig. 2, each column includes upper support seat 2, upper pillar stand 3, lower pillar stand 7 and lower support base 8, upper pillar stand 3 He Lower pillar stand 7 is threaded connection mode and links together, and upper support seat 2 is hinged on the upper end of upper pillar stand 3, and lower support base 8 is hinged Lower end in lower pillar stand 7.
In actual applications, can be to the supporting lower pillar stand making different lengths of upper pillar stand, between ceiling 1 and ground 9 Spacing excessive or too small in the case of be replaced by the lower pillar stand that other length meet use requirement, increase the hanging of mortar pump conduit The range of device.It is understood that can also be to the supporting upper pillar stand making different lengths of lower pillar stand.
Advantageously, upper pillar stand 3 and lower pillar stand 7 are linked together by trapezoidal thread connected mode, trapezoidal thread root of the tooth Intensity is high, and centering is good.
Advantageously, being provided with upper pillar stand 3 with the linkage section of lower pillar stand 7 prevents relative with lower pillar stand 7 turn of upper pillar stand 3 Dynamic locking member.
Referring to Fig. 3 and Fig. 4, described locking member includes two lock-screws 61 and sleeve 62, and sleeve 62 is enclosed within upper pillar stand 3 With threaded section of lower pillar stand 7 of outside, sleeve 62 is provided with tapped through hole, lock-screw 61 is screwed in tapped through hole On, the upper pillar stand part of collet threaded linkage section and lower pillar stand part, prevent relatively rotating of upper pillar stand 3 and lower pillar stand 7.Need It is noted that the locking method that locking member is not limited to locking nut shown in figure and sleeve uses cooperatively or other Meet the locking mode that locking requires, such as in threaded section of interpolation locking nut etc..
The mode that upper pillar stand 3 and lower pillar stand 7 are threaded connection links together, can be by adjusting threaded screwing The total length of depth adjustment column, makes upper support seat 2 consolidate and is supported on ceiling 1, lower support base 8 consolidates and is supported on ground On, improve the stability of column.
Upper support seat 2 and lower support base 8 are hinged at the upper and lower ends of column, can rotate, on ground 9 in certain angle And/or when ceiling 1 surface irregularity adjust support base angle, improve upright supports stability.
It may be noted that being, the articulated manner between upper support seat 2 and lower support base 8 and column can be that ball pivot can also be Hinged by pin 13, or other can meet the mode of use requirement.However, it is preferred to be by pin-hinges, The manufacturing cost of mortar pump pipeline hanging device can be reduced on the premise of meeting use requirement.
Advantageously, described first column and the second column may be configured as tubular post, in the premise not increasing column weight The lower stability improving column, the cross section of described column can be circle, triangle, square or rectangular, shown in figure The cross section of column is square.
Referring to Fig. 2, one end of suspender 4 is arranged at the suspender mount point 14 of left side column, and the other end is arranged on the right side At the suspender mount point 14 of heel post, pipeline 12 passes through chain 10 and suspender belt 11 is hanging on suspender 4.
Referring to Fig. 2 and Fig. 3, upper pillar stand 3 and lower pillar stand 7 arrange multiple suspender mount points 14 along short transverse, in figure Shown in embodiment suspender mount point 14 be along the installing hole of stem height directional spreding, column sets along short transverse Put the height regulation that multiple mount points are easy to suspender 4.
Advantageously, it is provided with orthogonal two installing holes of central axis at sustained height on column, due to upper vertical Post 3 and lower pillar stand 7 can relatively rotate, and are easy to suspender 4 in sustained height two installing holes of setting and turn an angle in column After select suitable installing hole to install.Suspender 4 includes suspension strop and suspension strop connector, and described suspension strop passes through first to stand Through hole on post and the second column, is fixed between described first column and the second column by described suspension strop connector.
Referring to Fig. 2 and Fig. 7, suspender 4 includes welding set 41, thread bush 42 and steel wire in the embodiment shown in FIG. Rope 43.Welding set 41 is welded at the two ends of steel wire rope 43, welding set 41 has external screw thread, steel wire rope 43 is placed through left and right After suspender mount point 14 on first column and the second column of both sides, thread bush 42 is screwed at welding set 41, stops steel Cord 43 departs from column.Compared with common suspension strop, steel wire rope has higher intensity and toughness, by thread bush steel wire Rope is fixed between the first column and the second column has that reliability is high and easy-to-dismount advantage.
It is pointed out that suspender 4 is not limited to above-mentioned suspension strop and the structure of suspension strop connector, other satisfactions The structure of use requirement also can, such as metallic rod, but the installation of metallic rod the direction of suspender mount point 14 is had higher will Ask, to hang pipeline preferably by steel wire rope.
Referring to Fig. 2 and Fig. 3, regulation handle 5 is provided with upper pillar stand 3, regulation handle 5 is inserted in the suspension of upper pillar stand 3 In part installing hole 14, make upper pillar stand 3 and lower pillar stand 7 relative torsion, adjust the threaded part of upper pillar stand 3 and lower pillar stand 7 Screw length, and then the total length of adjusting post.Also regulation handle 5 can be inserted in the suspender installing hole 14 on lower pillar stand 7, Rotate upper pillar stand 3 and lower pillar stand 7 simultaneously.
Pipeline 12 is hung to suspender 4 by flexible connecting member, is easy to the adjustment of pipeline 12 injection direction.
Referring to Fig. 1 and Fig. 2, flexible connecting member includes chain 10 and suspender belt 11, and pipeline 12 passes through chain 10 and hangs Band 11 hangs to steel wire rope 43, and by snap ring, (hook closed can be closed by snap ring side or open for one end of chain 10 The breach opened makes snap ring deviate from or be inserted in steel wire rope 43) it is socketed on steel wire rope 43, described snap ring can slide along steel wire rope 43, chain The other end of bar is connected with suspender belt 11 by snap ring, and suspender belt 11 is used for pipeline 12 of slinging.
It is pointed out that the structure of flexible connecting member is not limited in figure illustrated embodiment, can also be other Version, the top of such as flexible connecting member is a hook or ring, and middle part is rope or chain, bottom be a ring or Hook, mortar pump conduit 12 by through ring or hang on hook, thus mortar pump conduit is hung on suspender 4.Also For example flexible connecting member can also be the hook being set directly on mortar pump conduit 12, by hook directly by mortar pump conduit 12 are suspended on suspender 4.However, it is preferred to be in figure illustrated embodiment, sling pipeline 12 by flexible chain and suspender belt, just In the regulation of pipeline 12 mortar spray angle, suspender belt lighter in weight, it is to avoid increase steel wire rope burden.And, suspender belt and pipeline 12 Contact area larger, it is to avoid cause on pipeline indivedual point stress excessive by modes such as hooks.
The diagram embodiment of the present invention passes through two columns and pipeline hung by construction of wire rope, and its structure is simple, is easy to Transport and assembling, can replace manually pipeline being hung, and reduce required human resources in mortar pump work progress, effectively reduce Construction cost.
Pipeline is hung on a steel cord by chain, and chain two ends are Snap ring structure, can be easily from steel wire rope and suspender belt On pull down, chain is socketed on a steel cord by snap ring, and snap ring can slide easily along steel wire rope, according to pipeline institute in work progress Particular location is needed to be adjusted.
And, along the short transverse of column, to be provided with multiple suspender mount points be installing hole, the screw thread at steel wire rope two ends Set can easy removal, need adjust steel wire rope height when, pull down thread bush adjust steel wire rope setting height(from bottom) after be reinstalled Thread bush.The hinged support base of column two ends setting can rotate in certain angle, and ground is uneven at the construction field (site) In the case of still can meet use requirement.
Finally it is noted that above example, only in order to technical scheme to be described, is not intended to limit.To the greatest extent Pipe has been described in detail to the present invention with reference to the foregoing embodiments, it will be understood by those within the art that: it is still Technical scheme described in foregoing embodiments can be modified, or wherein some technical characteristics are carried out with equivalent replacing Change;And these modifications or replacement, do not make the essence of appropriate technical solution depart from the essence of various embodiments of the present invention technical scheme God and scope.

Claims (12)

1. a kind of mortar pump pipeline hanging device is it is characterised in that include:
Rack body, it is used for supporting on the ground;And
Suspender, it is arranged on described rack body, for hanging mortar pump conduit;
Described rack body includes the first column and the second column, and described suspender includes suspension strop and suspension strop connector, It is fixed between described first column and the second column by described suspension strop connector.
2. mortar pump pipeline hanging device as claimed in claim 1 is it is characterised in that described first column and the second column edge Vertical direction supports on the ground, and described suspender one end is arranged at described first column, and the described suspender other end is installed At described second column, the suspender mount point of the suspender mount point of described first column and described second column is positioned at same At one height.
3. mortar pump pipeline hanging device as claimed in claim 2 is it is characterised in that described first column is included by screw thread The first upper pillar stand and the first lower pillar stand that connected mode links together, described second column includes being threaded connection mode even The second upper pillar stand being connected together and the second lower pillar stand.
4. mortar pump pipeline hanging device as claimed in claim 3 is it is characterised in that described first column further includes to prevent The locking member that only described first upper pillar stand and the first lower pillar stand relatively rotate, described second column further includes to prevent described the The locking member that two upper pillar stands and the second lower pillar stand relatively rotate.
5. mortar pump pipeline hanging device as claimed in claim 3 is it is characterised in that described first column has through hole, institute In the central axis of described first column, described suspender one end is installed to the logical of the first column to the central axis upright stating through hole At hole, described second column has through hole, and the central axis upright of described through hole is in the central axis of described second column, described The suspender other end is installed to the through hole of the second column.
6. mortar pump pipeline hanging device as claimed in claim 5 is it is characterised in that described first column has along short transverse There are multiple through holes, described second column has multiple through holes along short transverse.
7. mortar pump pipeline hanging device as claimed in claim 6 it is characterised in that described suspension strop pass through the first column and Through hole on second column, is fixed between described first column and the second column by described suspension strop connector.
8. mortar pump pipeline hanging device as claimed in claim 7 is it is characterised in that described suspension strop is steel wire rope, described Suspension strop connector is threaded connector, the through hole on described steel wire penetrating first column and the second column, and described screw thread is even Fitting is screwed in the two ends of described steel wire rope to stop described steel wire rope from deviating from described first column and the second column.
9. mortar pump pipeline hanging device as claimed in claim 8 is it is characterised in that further including regulation handle, described Regulation handle is inserted in the through hole of described first column, is used for screwing described first upper pillar stand and/or the first lower pillar stand, described tune Section handle is inserted in the through hole of described second column, is used for screwing described second upper pillar stand and/or the second lower pillar stand.
10. mortar pump pipeline hanging device as claimed in any one of claims 1-9 wherein is it is characterised in that described mortar pump line Road is hung to described suspender by flexible connecting member.
11. mortar pump pipeline hanging devices as claimed in claim 10 are it is characterised in that described flexible connecting member includes chain And suspender belt, one end of described chain is connected with described suspender with by way of can relatively sliding by snap ring, described chain The other end is connected with described suspender belt by snap ring, and described suspender belt is used for described mortar pump conduit of slinging.
12. mortar pump pipeline hanging devices as claimed in claim 10 are it is characterised in that the upper end of described first column has The first hinged upper support seat, the lower end of described first column has first time hinged support base, described first upper support seat On the ceiling, the upper end of described second column has the second hinged upper support seat, and the lower end of described second column has on top Second time hinged support base, described second upper support seat top is on the ceiling.
CN201310701232.5A 2013-12-18 2013-12-18 Mortar pump pipeline hanging device Active CN104728524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310701232.5A CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310701232.5A CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Publications (2)

Publication Number Publication Date
CN104728524A CN104728524A (en) 2015-06-24
CN104728524B true CN104728524B (en) 2017-01-18

Family

ID=53452709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310701232.5A Active CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Country Status (1)

Country Link
CN (1) CN104728524B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111150562B (en) * 2019-11-15 2022-03-15 陕西飞机工业(集团)有限公司 Stretcher rescue equipment used on airplane
CN111874014B (en) * 2020-07-21 2021-09-14 徐州徐工矿业机械有限公司 Flexible sling with anti-falling mechanism and hinged dumper

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU885563A1 (en) * 1979-10-24 1981-11-30 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Device for erecting shotcrete roof support
CN201301716Y (en) * 2008-11-21 2009-09-02 平煤建工集团有限公司 Device for filling and injecting mud to process inverse well construction collapse area
CN103422659A (en) * 2013-08-13 2013-12-04 王永喜 Mobile spraying device for wall body

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU885563A1 (en) * 1979-10-24 1981-11-30 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Device for erecting shotcrete roof support
CN201301716Y (en) * 2008-11-21 2009-09-02 平煤建工集团有限公司 Device for filling and injecting mud to process inverse well construction collapse area
CN103422659A (en) * 2013-08-13 2013-12-04 王永喜 Mobile spraying device for wall body

Also Published As

Publication number Publication date
CN104728524A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
US10053874B2 (en) Adjustable scaffolding
CN104728524B (en) Mortar pump pipeline hanging device
CN204171987U (en) A kind of valve regulated instrument
CN104234395B (en) The dedicated auxiliary spray equipment of Mortar spraying machine
CN107128741A (en) One kind can self-discharging heavy in section steel strand wires vertical type winding equipment
CN208565819U (en) A kind of adjustable suspension and support
CN206233542U (en) It is a kind of to hang die device for jacking construction platform
CN204848023U (en) Braced system that climbing tower hung in external
CN204781895U (en) Adjustable hanging flower basket leans on guide bracket and hanging flower basket of wall distance
CN209016567U (en) A kind of assembly type cable bearer
CN207108092U (en) One kind can self-discharging heavy in section steel strand wires vertical type winding equipment
US9862578B2 (en) Tiltable and rotatable lifting pole assembly
CN204899183U (en) Hanging cradle
CN101285542B (en) Screw type regulating supporter and completed product pipelining method using the supporter
US10724563B1 (en) Truss rod coupling device
EP2985087B1 (en) Treatment of curved surfaces
CN208950429U (en) Steel tube tower used for transmission line
CN207377209U (en) A kind of indirect cool tower lifts broadening platform stent
CN207829164U (en) Bearing device is adjusted in oblique rollering steel suspension cable in a kind of super-span steel construction
CN207453437U (en) A kind of triangular truss structure builder's jack structure
CN213402276U (en) Combined hanger rod
CN201187634Y (en) Screw type regulating supporter
CN205577447U (en) Build a wall and compare device with plane
CN110409994A (en) A kind of Fang Jianyong adjustable ladder
CN104594617A (en) Suspension cable scaffold for construction of high-rise roof structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201009

Address after: No.202 Xuanfu street, Xuanhua District, Zhangjiakou, Hebei Province

Patentee after: Hebei Leisa Heavy Construction Machinery Co., Ltd

Address before: 102206 Changping District City, Shahe, Sha Yang Road, Beijing

Patentee before: BEIQI FOTON MOTOR Co.,Ltd.