CN204899183U - Hanging cradle - Google Patents

Hanging cradle Download PDF

Info

Publication number
CN204899183U
CN204899183U CN201520672964.0U CN201520672964U CN204899183U CN 204899183 U CN204899183 U CN 204899183U CN 201520672964 U CN201520672964 U CN 201520672964U CN 204899183 U CN204899183 U CN 204899183U
Authority
CN
China
Prior art keywords
hanging basket
upper hopper
chutes
slide rail
basket body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520672964.0U
Other languages
Chinese (zh)
Inventor
焦锐锋
田彦军
时扬
纪晓路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Sixth Construction Co Ltd
Original Assignee
China National Chemical Engineering Sixth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Sixth Construction Co Ltd filed Critical China National Chemical Engineering Sixth Construction Co Ltd
Priority to CN201520672964.0U priority Critical patent/CN204899183U/en
Application granted granted Critical
Publication of CN204899183U publication Critical patent/CN204899183U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hanging cradle, include: the hanging cradle slide rail, its cuboid frame construction for having an accommodation space comprises four spouts and two rectangular frame of integrated into one piece, and four spouts include that two of relative parallel arrangement go up spouts and two lower spouts, and four extreme points of two rectangular frame meet with the both ends of four spouts respectively, the hanging cradle body, it is the cuboid structure, set up in an accommodation space of hanging cradle slide rail, its with two on the top on adjacent and parallel two the first limits of spout do not be equipped with two at least guide device, its lower part with two lower spouts adjacent and parallel two second limits is equipped with the guide device of at least three handstand respectively to make hanging cradle body block in four spouts, just with four spout sliding connection, two cable suspension device to it is fixed in on the steel bearing structure to support the hanging cradle slide rail. The utility model discloses a hanging cradle makes the hanging cradle body can horizontal slip, has increased high altitude construction personnel's in the hanging cradle home range.

Description

Hanging basket
Technical field
The utility model relates to Worker carrying basket structure.More particularly, the utility model relates to a kind of hanging basket being applicable to Steel Structure Installation welding.
Background technology
In structural steelwork construction, constructor needs to be engaged in Steel Structure Installation, welding or bolted operation in high-altitude, normally set up scaffold or temporary platform for the fulcrum of constructor as work high above the ground, but, it is assembled that the installation of steel work relates to docking, welding also needs constructor to stand on different orientation to carry out weld job, simple scaffold or temporary platform limited to the bearing point of constructor, and there is potential safety hazard, be unfavorable for that constructor carries out work high above the ground preferably.
Existing Worker carrying basket relies on boom hoisting to move greatly on vertical direction and horizontal direction, constructor in the horizontal direction movement more among a small circle then generally relies on constructor from moving in hanging basket, and scope of activities has certain limitation.
Utility model content
An object of the present utility model solves at least the problems referred to above, and provide the advantage will illustrated at least below.
The utility model also has an object to be to provide a kind of work high above the ground personnel can to move in the horizontal direction during operation in hanging basket, and the hanging basket without the need to relying on boom hoisting to carry out movement.
In order to realize, according to these objects of the present utility model and other advantage, providing a kind of hanging basket, comprising:
Hanging basket slide rail, it is the cuboid frame construction with the first spatial accommodation, be made up of integrated four chutes and two rectangular frames, described four chutes comprise two upper hopper chutes and two gliding grooves of opposing parallel setting, and four end points of described two rectangular frames connect with the two ends of described four chutes respectively;
Hanging basket body, it is the rectangular structure with the second spatial accommodation, described hanging basket body is arranged in the first spatial accommodation of described hanging basket slide rail, the top on its two first limits adjacent and parallel with described two upper hopper chutes is respectively equipped with at least two guide wheel devices, the bottom of its two Second Edges adjacent and parallel with described two gliding grooves is respectively equipped with at least three guide wheel devices stood upside down, to make described hanging basket body be fastened in described four chutes, and be connected with described four slide;
Two erectings by overhang, it is fixed and is arranged on the two ends of one of them upper hopper chute on described hanging basket slide rail opposing parallelly, is fixed on steel support structure to support described hanging basket slide rail.
Preferably, described hanging basket, is provided with multiple first reinforcing rib between described two gliding grooves, is provided with multiple second reinforcing rib between described upper hopper chute and the gliding groove immediately below it.
Preferably, described hanging basket, described erecting by overhang is inverted u-shaped frame construction, comprise two the first arms and the second arm being connected two described first arms vertically arranged, described two the first arms are provided with the screwed hole matched, and the first securing member is fixed on described steel support structure to make described erecting by overhang through described screwed hole.
Preferably, described hanging basket, is provided with the 3rd reinforcing rib with described upper hopper chute between the first arm be connected and another upper hopper chute.
Preferably, described hanging basket, two the 3rd limits simultaneously vertical and adjacent with described two the first limits on described hanging basket body are respectively equipped with two for fixing described hanging basket body in the fastening devices of described two upper hopper chutes, described two upper hopper chutes are equipped with multipair first through hole, and described fastening devices comprises:
First hanger, it is arranged on described 3rd limit of described hanging basket body;
U-shaped fixed mount, it is set on described upper hopper chute, two sides of described U-shaped fixed mount are provided with the second through hole, described U-shaped fixed mount is fixed on described upper hopper chute by wherein a pair first through holes on described second through hole and described upper hopper chute by the second securing member, and described U-shaped fixed mount is provided with the second hanger towards a side of described first hanger;
Fixed band, it connects described first hanger and described second hanger.
Preferably, described hanging basket, described guide wheel device comprises three pairs of pulleys, and it is connected by pulley yoke, and described pulley yoke is fixedly connected with described hanging basket body by connector.
Preferably, described hanging basket, the bottom of described hanging basket body is provided with gripper shoe, and described gripper shoe is provided with the staggered antislip cog of transverse and longitudinal.
Barrel structure of the present utility model is simple, at least comprises following beneficial effect:
1) by arranging the erecting by overhang of hanging basket slide rail and fixing hanging basket slide rail, making hanging basket body can horizontal slip in hanging basket slide rail inside, adding the scope of activities of work high above the ground personnel in hanging basket, adding its safety;
2) multiple first reinforcing rib is set on hanging basket slide rail and the second reinforcing rib can reinforce hanging basket slide rail, prevents long-term compressive deformation, increase hanging basket safety in utilization and hanging basket self application life; And the steadiness that the 3rd reinforcing rib increases erecting by overhang and hanging basket slide rail is set;
3), time by arranging fastening devices work high above the ground personnel can being made to work in hanging basket, by fastening devices, hanging basket body is fixed on hanging basket slide rail after moving to suitable position, for its construction is provided convenience, improves the safety of work high above the ground simultaneously;
4) guide wheel device is one group with three pairs of pulleys, can strengthen the stability between hanging basket body and chute, reduces risk;
5) bottom of hanging basket body arranges antislip cog, can increase the safety of work high above the ground personnel.
Part is embodied by explanation below by other advantage of the present utility model, target and feature, part also will by research and practice of the present utility model by those skilled in the art is understood.
Accompanying drawing explanation
Fig. 1 is the structural representation of hanging basket of the present utility model;
Fig. 2 is the lateral view in a cross section of hanging basket of the present utility model;
Fig. 3 is the partial enlarged drawing of A in Fig. 2;
Fig. 4 is the structural representation of hanging basket body of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, can implements according to this with reference to manual word to make those skilled in the art.
Should be appreciated that used hereinly such as " to have ", other element one or more do not allotted in " comprising " and " comprising " term or the existence of its combination or interpolation.
As Figure 1-Figure 4, the utility model provides a kind of hanging basket, comprising:
Hanging basket slide rail 1, it is the cuboid frame construction with the first spatial accommodation, be made up of integrated four chutes and two rectangular frames, described four chutes comprise two upper hopper chutes 11 and two gliding grooves 12 of opposing parallel setting, and four end points of described two rectangular frames 13 connect with the two ends of described four chutes respectively;
Hanging basket body 2, it is the rectangular structure with the second spatial accommodation, described hanging basket body 2 is arranged in the first spatial accommodation of described hanging basket slide rail 1, the top on its two first limits adjacent and parallel with described two upper hopper chutes 11 is respectively equipped with at least two guide wheel devices 4, the bottom of its two Second Edges adjacent and parallel with described two gliding grooves 12 is respectively equipped with at least three guide wheel devices stood upside down 4, to make described hanging basket body 2 be fastened in described four chutes, and be connected with described four slide; The height of hanging basket body 2 can be arranged according to the height of people, and arranges security fence increase safety.
Two erectings by overhang 3, it is fixed and is arranged on the two ends of one of them upper hopper chute 11 on described hanging basket slide rail 1 opposing parallelly, is fixed on steel support structure, adds the safety of work high above the ground personnel in hanging basket to support described hanging basket slide rail 1.The effect of erecting by overhang is exactly make hanging basket slide rail and this physical efficiency of hanging basket relative with treating operation place fixing, with realize hanging basket slide rail can relatively-stationary hanging basket slide rail occurred level to slip, so, corresponding structure can be set according to actual needs.
The utility model, by arranging the erecting by overhang of hanging basket slide rail and fixing hanging basket slide rail, makes hanging basket body can horizontal slip in hanging basket slide rail inside, considerably increases the scope of activities of work high above the ground personnel in hanging basket, thus provides convenient.
In another kind of technical scheme, described hanging basket, multiple first reinforcing rib 14 is provided with between described two gliding grooves 12, multiple second reinforcing rib 15 is provided with between described upper hopper chute 11 and the gliding groove immediately below it 12, prevent long-term compressive deformation, increase hanging basket safety in utilization and hanging basket self application life, improve the safety of work high above the ground personnel.
In another kind of technical scheme, described hanging basket, described erecting by overhang 3 is in inverted u-shaped frame construction, comprise two the first arms and the second arm being connected two described first arms vertically arranged, described two the first arms are provided with the screwed hole matched, and the first securing member 31 is fixed on described steel support structure to make described erecting by overhang 3 through described screwed hole.Erecting by overhang 3 structure herein related to is applicable to the steel support structure having and can be locked by inverted u-shaped frame construction.In another kind of technical scheme, described hanging basket, is provided with the 3rd reinforcing rib 32 with described upper hopper chute 11 between the first arm be connected and another upper hopper chute 11, increases the steadiness between erecting by overhang and hanging basket slide rail.
In another kind of technical scheme, described hanging basket, two the 3rd limits simultaneously vertical and adjacent with described two the first limits on described hanging basket body 2 are respectively equipped with two for fixing described hanging basket body 2 in the fastening devices 5 of described two upper hopper chutes 11, described two upper hopper chutes 11 are equipped with multipair first through hole, and described fastening devices 5 comprises:
First hanger 51, it is arranged on described 3rd limit of described hanging basket body 2;
U-shaped fixed mount 52, it is set on described upper hopper chute 11, two sides of described U-shaped fixed mount 52 are provided with the second through hole, described U-shaped fixed mount 52 is fixed on described upper hopper chute 11 by wherein a pair first through holes on described second through hole and described upper hopper chute 11 by the second securing member, and described U-shaped fixed mount 52 is provided with the second hanger 53 towards a side of described first hanger 51;
Fixed band 54, it connects described first hanger 51 and described second hanger 53.
The fixed form of fastening devices 5 can be fixed on hanging basket body 2 as shown in Figure 2 upper opening and on the 3rd limit vertical with chute, also can be arranged on the side of vertical setting of hanging basket body, its objective is in order to hanging basket body 2 is fixed on hanging basket slide rail 1 relatively.
In another kind of technical scheme, described hanging basket, described guide wheel device 4 comprises three pairs of pulleys 41, and it is connected by pulley yoke 42, and described pulley yoke 42 is fixedly connected with by described first limit of connector 43 and described hanging basket body 2 or Second Edge.Three pairs of pulleys are set up in parallel, and under the prerequisite of satisfied slip, can also improve the steadiness between hanging basket body and hanging basket slide rail.
In another kind of technical scheme, described hanging basket, the bottom of described hanging basket body 2 is provided with gripper shoe 21, and described gripper shoe 21 is provided with the staggered antislip cog of transverse and longitudinal, prevents work high above the ground personnel from stepping on sliding unexpected.
Although embodiment of the present utility model is open as above, but it is not restricted to listed in manual and embodiment utilization, it can be applied to various applicable field of the present utility model completely, for those skilled in the art, can easily realize other amendment, therefore do not deviating under the universal that claim and equivalency range limit, the utility model is not limited to specific details and illustrates here and the legend described.

Claims (7)

1. a hanging basket, is characterized in that, comprising:
Hanging basket slide rail, it is the cuboid frame construction with the first spatial accommodation, be made up of integrated four chutes and two rectangular frames, described four chutes comprise two upper hopper chutes and two gliding grooves of opposing parallel setting, and four end points of described two rectangular frames connect with the two ends of described four chutes respectively;
Hanging basket body, it is the rectangular structure with the second spatial accommodation, described hanging basket body is arranged in the first spatial accommodation of described hanging basket slide rail, the top on its two first limits adjacent and parallel with described two upper hopper chutes is respectively equipped with at least two guide wheel devices, the bottom of its two Second Edges adjacent and parallel with described two gliding grooves is respectively equipped with at least three guide wheel devices stood upside down, to make described hanging basket body be fastened in described four chutes, and be connected with described four slide;
Two erectings by overhang, it is fixed and is arranged on the two ends of one of them upper hopper chute on described hanging basket slide rail opposing parallelly, is fixed on steel support structure to support described hanging basket slide rail.
2. hanging basket as claimed in claim 1, is characterized in that, be provided with multiple first reinforcing rib, be provided with multiple second reinforcing rib between described upper hopper chute and the gliding groove immediately below it between described two gliding grooves.
3. hanging basket as claimed in claim 2, it is characterized in that, described erecting by overhang is inverted u-shaped frame construction, comprise two the first arms and the second arm being connected two described first arms vertically arranged, described two the first arms are provided with the screwed hole matched, and the first securing member is fixed on described steel support structure to make described erecting by overhang through described screwed hole.
4. hanging basket as claimed in claim 3, is characterized in that, be provided with the 3rd reinforcing rib with described upper hopper chute between the first arm be connected and another upper hopper chute.
5. hanging basket as claimed in claim 4, it is characterized in that, two the 3rd limits simultaneously vertical and adjacent with described two the first limits on described hanging basket body are respectively equipped with two for fixing described hanging basket body in the fastening devices of described two upper hopper chutes, described two upper hopper chutes are equipped with multipair first through hole, and described fastening devices comprises:
First hanger, it is arranged on described 3rd limit of described hanging basket body;
U-shaped fixed mount, it is set on described upper hopper chute, two sides of described U-shaped fixed mount are provided with the second through hole, described U-shaped fixed mount is fixed on described upper hopper chute by wherein a pair first through holes on described second through hole and described upper hopper chute by the second securing member, and described U-shaped fixed mount is provided with the second hanger towards a side of described first hanger;
Fixed band, it connects described first hanger and described second hanger.
6. hanging basket as claimed in claim 5, it is characterized in that, described guide wheel device comprises three pairs of pulleys, and it is connected by pulley yoke, and described pulley yoke is fixedly connected with described hanging basket body by connector.
7. hanging basket as claimed in claim 6, it is characterized in that, the bottom of described hanging basket body is provided with gripper shoe, and described gripper shoe is provided with the staggered antislip cog of transverse and longitudinal.
CN201520672964.0U 2015-09-01 2015-09-01 Hanging cradle Expired - Fee Related CN204899183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520672964.0U CN204899183U (en) 2015-09-01 2015-09-01 Hanging cradle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520672964.0U CN204899183U (en) 2015-09-01 2015-09-01 Hanging cradle

Publications (1)

Publication Number Publication Date
CN204899183U true CN204899183U (en) 2015-12-23

Family

ID=54921370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520672964.0U Expired - Fee Related CN204899183U (en) 2015-09-01 2015-09-01 Hanging cradle

Country Status (1)

Country Link
CN (1) CN204899183U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731313A (en) * 2016-04-15 2016-07-06 中国五冶集团有限公司 Movable high-altitude construction basket
CN112646104A (en) * 2020-12-30 2021-04-13 南通紫琅生物医药科技有限公司 Preparation process of polyurethane resin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731313A (en) * 2016-04-15 2016-07-06 中国五冶集团有限公司 Movable high-altitude construction basket
CN112646104A (en) * 2020-12-30 2021-04-13 南通紫琅生物医药科技有限公司 Preparation process of polyurethane resin

Similar Documents

Publication Publication Date Title
CN204899183U (en) Hanging cradle
CN105752852A (en) Gantry crane for lifting containers
CN202936092U (en) Lifting tool of wind power tower barrel
CN107419665B (en) Large-span steel beam hoisting sling and steel beam hoisting method thereof
CN205204672U (en) Two hook crane
CN204662501U (en) A kind of pass in and out immersed tube vertical occasional passage
CN106994249A (en) A kind of sky glider system for aerial shoot Niagara recreation facility
CN105932560A (en) Power distribution cabinet convenient to repair
CN203800449U (en) Overhaul platform of equipment on transformer station pillar
CN205170234U (en) Cantilever crane
CN104934900A (en) Apparatus for maintaining electric power equipment
CN202610718U (en) Mobile lifting basket
CN103701070A (en) Ground guiding wire traveling crane
CN204823738U (en) Two roof beam electric hoist formula hoist girder orthotic devices
CN203846841U (en) Power transmission line iron tower and rest platform thereof
CN205820743U (en) A kind of power equipment Multifunctional carrying car
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN204919374U (en) Machine is maintained to cable -stay bridge
CN204569135U (en) For clamping the fixture of automobile longitudinal girder
CN205270668U (en) Reinforcement cutting shear moving platform
CN104153559B (en) Attachment type raise scaffold
CN203951101U (en) A kind of double electric pole aerial work platform
CN204059914U (en) Attachment type raise scaffold
CN203855381U (en) Movable type auxiliary ladder truck
CN204298035U (en) Ball-type dome nuclear island prestressing force hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20200901

CF01 Termination of patent right due to non-payment of annual fee