CN104728524A - Mortar pump pipeline hanging device - Google Patents

Mortar pump pipeline hanging device Download PDF

Info

Publication number
CN104728524A
CN104728524A CN201310701232.5A CN201310701232A CN104728524A CN 104728524 A CN104728524 A CN 104728524A CN 201310701232 A CN201310701232 A CN 201310701232A CN 104728524 A CN104728524 A CN 104728524A
Authority
CN
China
Prior art keywords
column
mortar pump
pillar stand
suspender
pump pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310701232.5A
Other languages
Chinese (zh)
Other versions
CN104728524B (en
Inventor
田华东
杨兵
张春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Leisa Heavy Construction Machinery Co Ltd
Original Assignee
Beiqi Foton Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beiqi Foton Motor Co Ltd filed Critical Beiqi Foton Motor Co Ltd
Priority to CN201310701232.5A priority Critical patent/CN104728524B/en
Publication of CN104728524A publication Critical patent/CN104728524A/en
Application granted granted Critical
Publication of CN104728524B publication Critical patent/CN104728524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/14Hangers in the form of bands or chains

Abstract

The invention discloses a mortar pump pipeline hanging device. The mortar pump pipeline hanging device comprises a support main body which is used for being supported on the ground and a hanging part which is installed on the support main body to be used for hanging a mortar pump pipeline. The mortar pump pipeline hanging device is simple in structure, convenient to transport and assemble, can replace flexible pipe hanging manually, reducing manpower resources required during the mortar pump construction process and effectively reducing construction costs.

Description

A kind of mortar pump pipeline hanging device
Technical field
The present invention relates to technical field of engineering machinery, particularly relate to a kind of mortar pump pipeline hanging device.
Background technique
In the prior art, the indoor wall mortar of building construction major part mortar pump is delivered to connecting pipeline and shower nozzle after corresponding floor, is ejected on metope by mortar by shower nozzle.But owing to there being the mortar of flowing in pipeline, cause pipe weight comparatively large, execute man-hour requirement one personal hand-held shower nozzle and carry out spraying operation, the hand-held pipeline of another person coordinates shower nozzle spraying operation.The mortar spraying operation of the indoor wall mortar construction of building needs two workmans to coordinate, and take more human resources, construction cost is higher.
Summary of the invention
The object of the present invention is to provide a kind of mortar pump pipeline hanging device to overcome or at least alleviate the above-mentioned defect of prior art.
For achieving the above object, the invention provides a kind of mortar pump pipeline hanging device.Described mortar pump pipeline hanging device comprises: rack body, and it is for supporting on the ground; And suspender, it is arranged on described rack body, for hanging mortar pump pipeline.
Preferably, described rack body comprises and is vertically supported on ground first column and the second column, described suspender one end is arranged on described first column place, the described suspender the other end is arranged on described second column place, and the suspender mounting points of described first column and the suspender mounting points of described second column are positioned at sustained height place.
Preferably, described first column comprises the first upper pillar stand and the first lower pillar stand that the mode of being threaded connection links together, and described second column comprises the second upper pillar stand and the second lower pillar stand that the mode of being threaded connection links together.
Preferably, described first column comprises further and prevents described first upper pillar stand and the first lower pillar stand locking element in relative rotation, and described second column comprises further and prevents described second upper pillar stand and the second lower pillar stand locking element in relative rotation.
Preferably, described first column has through hole, the central axis upright of described through hole is in the central axis of described first column, described suspender one end is installed to the through hole of the first column, described second column has through hole, the central axis upright of described through hole is in the central axis of described second column, and the described suspender the other end is installed to the through hole of the second column.
Preferably, described first column has multiple through hole along short transverse, and described second column has multiple through hole along short transverse.
Preferably, described suspender comprises suspension rope and suspension rope link, and described suspension rope, through the through hole on the first column and the second column, is fixed between described first column and the second column by described suspension rope link.
Preferably, described suspension rope is wire rope, described suspension rope link is threaded connector, and the through hole on described steel wire penetrating first column and the second column, described first column and the second column are deviate to stop described wire rope in the two ends that described threaded connector is screwed in described wire rope.
Preferably, comprise regulating handle further, described regulating handle is inserted in the through hole of described first column, for screwing described first upper pillar stand and/or the first lower pillar stand, described regulating handle is inserted in the through hole of described second column, for screwing described second upper pillar stand and/or the second lower pillar stand.
Preferably, described mortar pump pipeline is suspended from described suspender by flexible connecting member.
Preferably, described flexible connecting member comprises chain and suspender belt, one end of described chain is by snap ring can the mode of relative sliding be connected with described suspender, and the other end of described chain is connected with described suspender belt by snap ring, and described suspender belt is used for described mortar pump pipeline of slinging.
Preferably, the upper end of described first column has the first hinged upper support seat, the lower end of described first column has the first hinged lower support seat, described first upper support seat top on the ceiling, the upper end of described second column has the second hinged upper support seat, the lower end of described second column has the second hinged lower support seat, and described second upper support seat top on the ceiling.
Above-mentioned mortar pump pipeline hanging device structure is simple, is convenient to transport and assembling, can replaces manually hanging flexible pipe, reduces required human resources in mortar pump work progress, effectively reduces construction cost.
Accompanying drawing explanation
Fig. 1 is the installment state schematic diagram of mortar pump pipeline hanging device according to an embodiment of the invention.
Fig. 2 is the front elevational schematic of the installment state of the pipeline hanging device of mortar pump shown in Fig. 1.
Fig. 3 is the schematic side view of the installment state of the pipeline hanging device of mortar pump shown in Fig. 1.
Fig. 4 is the cross-sectional schematic of the section of being threaded of the column of the pipeline hanging device of mortar pump shown in Fig. 1.
Fig. 5 is the cross-sectional schematic of the upper support seat of the column of the pipeline hanging device of mortar pump shown in Fig. 1.
Fig. 6 is the cross-sectional schematic of the lower support seat of the column of the pipeline hanging device of mortar pump shown in Fig. 1.
Fig. 7 is the cross-sectional schematic of the suspender mounting points of the pipeline hanging device of mortar pump shown in Fig. 1.
Reference character:
1 Ceiling board 62 Sleeve
2 Upper support seat 7 Lower pillar stand
3 Upper pillar stand 8 Lower support seat
4 Suspender 9 Ground
41 Welding cover 10 Chain
42 Thread bush 11 Suspender belt
43 Wire rope 12 Pipeline
5 Regulating handle 13 Pin
6 Locking element 14 Suspender mounting points
61 Lock screw
Embodiment
For making object of the invention process, technological scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, the technological scheme in the embodiment of the present invention is further described in more detail.In the accompanying drawings, same or similar label represents same or similar element or has element that is identical or similar functions from start to finish.Described embodiment is the present invention's part embodiment, instead of whole embodiments.Be exemplary below by the embodiment be described with reference to the drawings, be intended to for explaining the present invention, and can not limitation of the present invention be interpreted as.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.Below in conjunction with accompanying drawing, embodiments of the invention are described in detail.
In describing the invention; it will be appreciated that; term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", "left", "right", " vertically ", " level ", " top ", " end " " interior ", " outward " etc. instruction orientation or position relationship be based on orientation shown in the drawings or position relationship; be only the present invention for convenience of description and simplified characterization; instead of instruction or imply indication device or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as limiting the scope of the invention.
Fig. 1 is the installment state schematic diagram of mortar pump pipeline hanging device according to an embodiment of the invention.Fig. 2 is the front elevational schematic of the installment state of the pipeline hanging device of mortar pump shown in Fig. 1.Fig. 3 is the schematic side view of the installment state of the pipeline hanging device of mortar pump shown in Fig. 1.Fig. 4 is the cross-sectional schematic of the section of being threaded of the column of the pipeline hanging device of mortar pump shown in Fig. 1.Fig. 5 is the cross-sectional schematic of the upper support seat of the column of the pipeline hanging device of mortar pump shown in Fig. 1.Fig. 6 is the cross-sectional schematic of the lower support seat of the column of the pipeline hanging device of mortar pump shown in Fig. 1.Fig. 7 is the cross-sectional schematic of the suspender mounting points of the pipeline hanging device of mortar pump shown in Fig. 1.
See Fig. 1, mortar pump pipeline hanging device comprises: rack body and suspender 4.
See Fig. 2, described rack body supports on the ground, it comprises and is vertically supported on ground first column and the second column, suspender 4 one end is arranged on described first column place, suspender 4 the other end is arranged on described second column place, and the mounting points that suspender 4 is positioned on described first column and the second column is positioned at sustained height place.
The upper end of the first column has the first hinged upper support seat, the lower end of described first column has the first hinged lower support seat, described first upper support seat top on the ceiling, the upper end of described second column has the second hinged upper support seat, the lower end of described second column has the second hinged lower support seat, and described second upper support seat top on the ceiling.
Advantageously, described first column and the second column separate, be convenient to the distance between free adjusting first column and the second column.But described first column and the second column also can link together.
Described first column and the second column lay respectively at the left and right sides of the hanging position of pipeline 12.Wherein, first column comprises the first upper pillar stand and the first lower pillar stand that the mode of being threaded connection links together, second column comprises the second upper pillar stand and the second lower pillar stand that the mode of being threaded connection links together (in embodiment shown in the figure, first column is identical with the second column structure, therefore only marks a heel post concrete structure).
See Fig. 2, each column comprises upper support seat 2, upper pillar stand 3, lower pillar stand 7 and lower support seat 8, upper pillar stand 3 and lower pillar stand 7 are threaded connection mode and link together, and upper support seat 2 is hinged on the upper end of upper pillar stand 3, and lower support seat 8 is hinged on the lower end of lower pillar stand 7.
In actual applications, the lower pillar stand of the supporting making different lengths of upper pillar stand can be given, spacing between ceiling board 1 and ground 9 excessive or too small be replaced by the lower pillar stand that other length meet usage requirement, increase the using scope of mortar pump pipeline hanging device.Be understandable that, also can give the upper pillar stand of the supporting making different lengths of lower pillar stand.
Advantageously, upper pillar stand 3 and lower pillar stand 7 are linked together by trapezoidal thread Placement, and trapezoidal thread root of the tooth intensity is high, and centering is good.
Advantageously, be provided with at the linkage section place of upper pillar stand 3 and lower pillar stand 7 and prevent upper pillar stand 3 and lower pillar stand 7 locking element in relative rotation.
See Fig. 3 and Fig. 4, described locking element comprises two lock screws 61 and sleeve 62, sleeve 62 is enclosed within the outside of the section of being threaded of upper pillar stand 3 and lower pillar stand 7, sleeve 62 is provided with tapped through hole, lock screw 61 is screwed on tapped through hole, the upper pillar stand part of collet threaded linkage section and lower pillar stand part, prevent relatively rotating of upper pillar stand 3 and lower pillar stand 7.It is pointed out that locking element be not limited to locking nut shown in figure and sleeve with the use of locking method, also can be locking modes that other meet locking and require, such as, add locking nut etc. in the section of being threaded.
The mode that upper pillar stand 3 and lower pillar stand 7 are threaded connection links together, by regulating the total length of the thread depth adjusting post be threaded, make upper support seat 2 firm support on ceiling board 1, lower support seat 8 firm support on the ground, improves the stability of column.
Upper support seat 2 and lower support seat 8 are hinged on the place of two ends up and down of column, can rotate in several angle, regulate the angle of supporting base when ground 9 and/or ceiling board 1 surface irregularity, improve the stability of upright supports.
It may be noted that and be, upper support seat 2 and the articulated manner between lower support seat 8 and column can be ball pivots also can be hinged by pin 13, or other can meet the mode of usage requirement.But, preferably by pin-hinges, the manufacture cost of mortar pump pipeline hanging device can be reduced under the prerequisite meeting usage requirement.
Advantageously, described first column and the second column can be set to tubular post, under the prerequisite not increasing column weight, improve the stability of column, the cross section of described column can be circle, triangle, square or rectangular, and the cross section of column shown in figure is square.
See Fig. 2, one end of suspender 4 is arranged on suspender mounting points 14 place of left side column, and the other end is arranged on suspender mounting points 14 place of right side uprights, and pipeline 12 is hanging on suspender 4 by chain 10 and suspender belt 11.
See Fig. 2 and Fig. 3, upper pillar stand 3 and lower pillar stand 7 arrange multiple suspender mounting points 14 along short transverse, in embodiment shown in the figure, suspender mounting points 14 is the mounting hole along stem height directional spreding, and column arranges along short transverse the height adjustment that multiple mounting points is convenient to suspender 4.
Advantageously, on column, sustained height place is provided with orthogonal two mounting holes of central axis, because upper pillar stand 3 and lower pillar stand 7 can relatively rotate, two mounting holes are set at sustained height and are convenient to suspender 4 after column turns an angle, select suitable mounting hole to install.Suspender 4 comprises suspension rope and suspension rope link, and described suspension rope, through the through hole on the first column and the second column, is fixed between described first column and the second column by described suspension rope link.
See Fig. 2 and Fig. 7, in embodiment shown in the figure, suspender 4 comprises welding cover 41, thread bush 42 and wire rope 43.Welding cover 41 is welded on the two ends place of wire rope 43, welding cover 41 has outside thread, wire rope 43 is through after the suspender mounting points 14 be positioned on the first column of the left and right sides and the second column, and thread bush 42 is screwed in welding cover 41 place, stops wire rope 43 to depart from column.Compared with common suspension rope, wire rope has higher intensity and toughness, by thread bush wire rope is fixed on and has the high and easy-to-dismount advantage of reliability between the first column and the second column.
It is to be noted, suspender 4 is not limited to the structure of above-mentioned suspension rope and suspension rope link, other structure meeting usage requirement also can, such as metallic rod, but the direction of the installation of metallic rod to suspender mounting points 14 has higher requirements, and hangs pipeline preferably by wire rope.
See Fig. 2 and Fig. 3, upper pillar stand 3 is provided with regulating handle 5, and regulating handle 5 is inserted in the suspender mounting hole 14 of upper pillar stand 3, makes upper pillar stand 3 and lower pillar stand 7 relative torsion, what regulate the part that is threaded of upper pillar stand 3 and lower pillar stand 7 screws length, and then the total length of adjusting post.Also regulating handle 5 can be inserted in the suspender mounting hole 14 on lower pillar stand 7, rotate upper pillar stand 3 and lower pillar stand 7 simultaneously.
Pipeline 12 is suspended from suspender 4 by flexible connecting member, is convenient to the adjustment of pipeline 12 injection direction.
See Fig. 1 and Fig. 2, flexible connecting member comprises chain 10 and suspender belt 11, pipeline 12 is suspended from wire rope 43 by chain 10 and suspender belt 11, one end of chain 10 is by the snap ring (hook namely closed, the breach that can be closed by snap ring side or open makes snap ring deviate from or is inserted in wire rope 43) be socketed on wire rope 43, described snap ring can slide along wire rope 43, and the other end of chain is connected with suspender belt 11 by snap ring, and suspender belt 11 is for pipeline 12 of slinging.
It is to be noted, the structure of flexible connecting member is not limited to mode of execution shown in figure, can also be other structural type, the top of such as flexible connecting member is a hook or ring, middle part is rope or chain, bottom is a ring or hook, and mortar pump pipeline 12 passes through through ring or hangs on hook, thus by the hanging of mortar pump pipeline on suspender 4.Also such as mortar pump pipeline 12 also for being set directly at the hook on mortar pump pipeline 12, directly can be suspended on suspender 4 by linking up with by flexible connecting member.But, be preferably mode of execution shown in figure, sling pipeline 12 by the chain of flexibility and suspender belt, be convenient to the adjustment of pipeline 12 mortar spray angle, suspender belt lighter in weight, avoid increasing wire rope burden.Further, the area of contact of suspender belt and pipeline 12 is comparatively large, avoids causing indivedual point on pipeline stressed excessive by modes such as hooks.
Illustrated embodiment of the present invention is by two columns and construction of wire rope hanging pipeline, and its structure is simple, is convenient to transport and assembling, can replaces manually hanging pipeline, reduces required human resources in mortar pump work progress, effectively reduces construction cost.
Pipeline is hung on a steel cord by chain, chain two ends are Snap ring structure, and can pull down from wire rope and suspender belt easily, chain is socketed on a steel cord by snap ring, snap ring can slide easily along wire rope, regulates according to particular location needed for pipeline in work progress.
Further, the short transverse along column is provided with multiple suspender mounting points and mounting hole, and the thread bush at wire rope two ends can easy removal, when needing the height regulating wire rope, pulling down after thread bush regulates wire rope setting height(from bottom) and again loading onto thread bush.The hinged supporting base that column two ends are arranged can rotate in several angle, still can meet usage requirement at the construction field (site) when the injustice of ground.
Finally it is to be noted: above embodiment only in order to technological scheme of the present invention to be described, is not intended to limit.Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technological scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technological scheme.

Claims (12)

1. a mortar pump pipeline hanging device, is characterized in that, comprising:
Rack body, it is for supporting on the ground; And
Suspender, it is arranged on described rack body, for hanging mortar pump pipeline.
2. mortar pump pipeline hanging device as claimed in claim 1, it is characterized in that, described rack body comprises and is vertically supported on ground first column and the second column, described suspender one end is arranged on described first column place, the described suspender the other end is arranged on described second column place, and the suspender mounting points of described first column and the suspender mounting points of described second column are positioned at sustained height place.
3. mortar pump pipeline hanging device as claimed in claim 2, it is characterized in that, described first column comprises the first upper pillar stand and the first lower pillar stand that the mode of being threaded connection links together, and described second column comprises the second upper pillar stand and the second lower pillar stand that the mode of being threaded connection links together.
4. mortar pump pipeline hanging device as claimed in claim 3, it is characterized in that, described first column comprises further and prevents described first upper pillar stand and the first lower pillar stand locking element in relative rotation, and described second column comprises further and prevents described second upper pillar stand and the second lower pillar stand locking element in relative rotation.
5. mortar pump pipeline hanging device as claimed in claim 3, it is characterized in that, described first column has through hole, the central axis upright of described through hole is in the central axis of described first column, described suspender one end is installed to the through hole of the first column, described second column has through hole, and the central axis upright of described through hole is in the central axis of described second column, and the described suspender the other end is installed to the through hole of the second column.
6. mortar pump pipeline hanging device as claimed in claim 5, it is characterized in that, described first column has multiple through hole along short transverse, and described second column has multiple through hole along short transverse.
7. mortar pump pipeline hanging device as claimed in claim 6, it is characterized in that, described suspender comprises suspension rope and suspension rope link, described suspension rope, through the through hole on the first column and the second column, is fixed between described first column and the second column by described suspension rope link.
8. mortar pump pipeline hanging device as claimed in claim 7, it is characterized in that, described suspension rope is wire rope, described suspension rope link is threaded connector, through hole on described steel wire penetrating first column and the second column, described first column and the second column are deviate to stop described wire rope in the two ends that described threaded connector is screwed in described wire rope.
9. mortar pump pipeline hanging device as claimed in claim 8, it is characterized in that, comprise regulating handle further, described regulating handle is inserted in the through hole of described first column, for screwing described first upper pillar stand and/or the first lower pillar stand, described regulating handle is inserted in the through hole of described second column, for screwing described second upper pillar stand and/or the second lower pillar stand.
10. mortar pump pipeline hanging device as claimed in any one of claims 1-9 wherein, it is characterized in that, described mortar pump pipeline is suspended from described suspender by flexible connecting member.
11. mortar pump pipeline hanging devices as claimed in claim 10, it is characterized in that, described flexible connecting member comprises chain and suspender belt, one end of described chain by snap ring can the mode of relative sliding be connected with described suspender, the other end of described chain is connected with described suspender belt by snap ring, and described suspender belt is used for described mortar pump pipeline of slinging.
12. mortar pump pipeline hanging devices as claimed in claim 10, it is characterized in that, the upper end of described first column has the first hinged upper support seat, the lower end of described first column has the first hinged lower support seat, described first upper support seat top on the ceiling, the upper end of described second column has the second hinged upper support seat, and the lower end of described second column has the second hinged lower support seat, and described second upper support seat top on the ceiling.
CN201310701232.5A 2013-12-18 2013-12-18 Mortar pump pipeline hanging device Active CN104728524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310701232.5A CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310701232.5A CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Publications (2)

Publication Number Publication Date
CN104728524A true CN104728524A (en) 2015-06-24
CN104728524B CN104728524B (en) 2017-01-18

Family

ID=53452709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310701232.5A Active CN104728524B (en) 2013-12-18 2013-12-18 Mortar pump pipeline hanging device

Country Status (1)

Country Link
CN (1) CN104728524B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111150562A (en) * 2019-11-15 2020-05-15 陕西飞机工业(集团)有限公司 Stretcher rescue equipment used on airplane
CN111874014A (en) * 2020-07-21 2020-11-03 徐州徐工矿业机械有限公司 Flexible sling with anti-falling mechanism and hinged dumper

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU885563A1 (en) * 1979-10-24 1981-11-30 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Device for erecting shotcrete roof support
CN201301716Y (en) * 2008-11-21 2009-09-02 平煤建工集团有限公司 Device for filling and injecting mud to process inverse well construction collapse area
CN103422659B (en) * 2013-08-13 2015-07-15 王永喜 Mobile spraying device for wall body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111150562A (en) * 2019-11-15 2020-05-15 陕西飞机工业(集团)有限公司 Stretcher rescue equipment used on airplane
CN111874014A (en) * 2020-07-21 2020-11-03 徐州徐工矿业机械有限公司 Flexible sling with anti-falling mechanism and hinged dumper
CN111874014B (en) * 2020-07-21 2021-09-14 徐州徐工矿业机械有限公司 Flexible sling with anti-falling mechanism and hinged dumper

Also Published As

Publication number Publication date
CN104728524B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN103523650B (en) A kind of automobile accessory frame suspender
CN204024004U (en) A kind of scaffold take dismantling device fast
CN205785181U (en) Adjustable Sopwith staff fixed mount
CN104234395A (en) Auxiliary spraying device special for mortar coating machine
CN104728524A (en) Mortar pump pipeline hanging device
CN206930407U (en) A kind of external wall and exterior window liquid distribution
CN103579961A (en) Adjustable lifting type fixing device applied to cable connector manufacturing and achieving method thereof
CN204781895U (en) Adjustable hanging flower basket leans on guide bracket and hanging flower basket of wall distance
CN207365244U (en) A kind of supporting structure for building
CN204370786U (en) A kind of anti-collision body model sheetinstallat hanging basket
CN203239394U (en) Adjustable coal mine underground pipeline hoisting device
CN108590151A (en) A kind of scalable elevator hanging basket in four sides
CN205733328U (en) A kind of wire or cable are from being dynamically connected equipment
CN209016567U (en) A kind of assembly type cable bearer
CN207581233U (en) A kind of easy pipe fitting lifting device
CN207108092U (en) One kind can self-discharging heavy in section steel strand wires vertical type winding equipment
CN101285542B (en) Screw type regulating supporter and completed product pipelining method using the supporter
KR100917395B1 (en) Shelf apparatus in power hole enabling both sides folding and height adjusting for installing power distributing cable
CN205035001U (en) Generator handling device
CN204899183U (en) Hanging cradle
CN204126224U (en) The special auxiliary spray equipment of Mortar spraying machine
CN206632937U (en) A kind of top plate nut locking apparatus
CN213402276U (en) Combined hanger rod
CN104594617A (en) Suspension cable scaffold for construction of high-rise roof structure
CN206156635U (en) Pre -buried stirrup of tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201009

Address after: No.202 Xuanfu street, Xuanhua District, Zhangjiakou, Hebei Province

Patentee after: Hebei Leisa Heavy Construction Machinery Co., Ltd

Address before: 102206 Changping District City, Shahe, Sha Yang Road, Beijing

Patentee before: BEIQI FOTON MOTOR Co.,Ltd.

TR01 Transfer of patent right