CN206233542U - It is a kind of to hang die device for jacking construction platform - Google Patents

It is a kind of to hang die device for jacking construction platform Download PDF

Info

Publication number
CN206233542U
CN206233542U CN201621108790.6U CN201621108790U CN206233542U CN 206233542 U CN206233542 U CN 206233542U CN 201621108790 U CN201621108790 U CN 201621108790U CN 206233542 U CN206233542 U CN 206233542U
Authority
CN
China
Prior art keywords
template
construction platform
jacking construction
hang
die device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621108790.6U
Other languages
Chinese (zh)
Inventor
唐际宇
林忠和
唐阁威
梁月利
武锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan No.6 Construction Co., Ltd.
China Construction Eighth Engineering Division Co Ltd
China Huashi Enterprises Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621108790.6U priority Critical patent/CN206233542U/en
Application granted granted Critical
Publication of CN206233542U publication Critical patent/CN206233542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of die device that hangs for jacking construction platform, including:Template hangs beam, located at the bottom of jacking construction platform;Roll wheel assembly, including the rolling wheel support on template suspension beam and the roller on rolling wheel support are hung on, roller is rolled on template suspension beam;Hang membrane module, including suspension rod, the first connects bearing being connected between the first end of suspension rod and rolling wheel support and the second connects bearing being connected between the second end of suspension rod and template.The utility model set rotatable roll wheel assembly on beam by being hung in the template of jacking construction platform bottom, set in the lower section of roll wheel assembly and hang membrane module, template is set to hang, template can be hung the bottom for being located at jacking construction platform, and template by roll wheel assembly and hang membrane module can along template hang beam move, can thus overcome hang mould can only be arranged in hanger nearby and cause to hang the inadequate problem of modulus amount.

Description

It is a kind of to hang die device for jacking construction platform
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of hangs die device for jacking construction platform.
Background technology
With scientific and technological progress and the raising of construction technology, Super High heavy construction is more and more, Super High Core Walls Structure knot Structure horizontal structure is often separately constructed with vertical structure, and Core Walls Structure vertical structure is using the formwork system-jacking that can be climbed certainly Platform, lifting platform is obtained for application in many Super Highs.
Hanger is the crosshead of construction under lifting platform, for construction provides operating platform, by hanger during normal construction Construction area is moved close to, operating surface is moved away from by hanger during jacking, it is to avoid be affected in jacking stroke.
The volume of lower hanger typically will not be very big, and load is also relatively small, therefore, it is not enough to carry more template, and Implement template construction on lower hanger for the ease of workman, it is necessary to template is hung and is located at lifting platform bottom, in order to lower extension Workman on frame obtains template to carry out model sheetinstallat.The template for using at present hangs the mode of setting, simply using steel wire rope by template Fixation hang be located at lifting platform bottom, near lower hanger position, so result in template hang set quantity nevertheless suffer from it is larger Limitation.
Utility model content
Technical problem to be solved in the utility model be to provide it is a kind of hang die device for jacking construction platform, can Extension template number is limited under solving jacking construction platform, obtains inconvenient problem.
To realize above-mentioned technique effect, the utility model discloses a kind of die device that hangs for jacking construction platform, bag Include:
Template hangs beam, located at the bottom of jacking construction platform;
Roll wheel assembly, including it hang on the rolling wheel support on the template suspension beam and the rolling on the rolling wheel support Wheel, the roller is rolled on template suspension beam;
Hang membrane module, including suspension rod, the first connection for being connected between the first end of the suspension rod and the rolling wheel support Bearing and the second connects bearing being connected between the second end of the suspension rod and template.
Further improvement is the die device that hangs for jacking construction platform, and the template suspension beam includes two grooves Steel, the web of two channel-section steel is relative and close to each other, and the upper flange of two channel-section steel is fixed on the bottom of jacking construction platform, Roller described in two is rolled on the lower wing plate of two channel-section steel.
Further improvement is the die device that hangs for jacking construction platform, and the rolling wheel support includes being located at institute The peg stated two hanging plates of template suspension beam both sides and be connected between two hanging plate, the peg hang on the template and hangs The lower section of drop in beam, roller described in two is installed on the inner side that beam is hung towards the template of two hanging plate by roller shaft.
Further improvement is the die device that hangs for jacking construction platform, and the peg is screw rod, described two The pole perforating hole worn for the peg is offered on hanging plate, the two ends of the peg are screwed with the first clamp nut.
Further improvement is the die device that hangs for jacking construction platform, and first connects bearing includes set The first connecting plate on the peg, the second connecting plate for being articulated in first connecting plate and it is fixed on described second and connects The first inner thread sleeve on fishplate bar, the first end of the suspension rod wears and is threadedly connected in first inner thread sleeve.
Further improvement is that buffering is arranged with the peg to the die device that hangs for jacking construction platform Set, first connecting plate is sheathed on the cushion collar.
Further improvement is the die device that hangs for jacking construction platform, and second connecting plate is U-shaped plate, The open side of the U-shaped plate is articulated in first connecting plate by bolt, and first inner thread sleeve is plugged and is fixed on The closed side of the U-shaped plate.
Further improvement is the die device that hangs for jacking construction platform, and the suspension rod is screw rod, described to hang The first end of bar is screwed with antiskid nut, and the antiskid nut is resisted against the top of the inner thread sleeve.
It is described for jacking construction platform to hang that die device further improves be that the suspension rod is screw rod, described the Two connects bearings include the boom hole for being fixed on the second inner thread sleeve of die head and being opened in template, the boom hole Concentric with second inner thread sleeve, the second end of the suspension rod wears and is threadedly connected to second inner thread sleeve It is interior.
Further improvement is the die device that hangs for jacking construction platform, and the end of the template suspension beam sets There is closed guard.
The utility model makes it have following beneficial effect as a result of above technical scheme:By in jack-up construction Rotatable roll wheel assembly is set on the template suspension beam of mesa base, is set in the lower section of roll wheel assembly and is hung membrane module to hang If template, template can hang the bottom for being located at jacking construction platform, and template by roll wheel assembly and hang membrane module can be along mould Plate suspension beam movement, can thus overcome hang mould can only be arranged in hanger nearby and cause to hang the inadequate problem of modulus amount, make The template lower section for being located at whole jacking construction platform capable of hoisting is obtained, by sliding near hanger, so that the workman on hanger carries out mould Plate is installed.
Brief description of the drawings
Fig. 1 is a kind of front schematic view for hanging die device for jacking construction platform of the utility model.
Fig. 2 is a kind of side schematic view for hanging die device for jacking construction platform of the utility model.
Fig. 3 is a kind of use state schematic diagram for hanging die device for jacking construction platform of the utility model.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
Refering to shown in Fig. 1~3, a kind of die device that hangs for jacking construction platform of the utility model is mainly hanged by template Drop in beam 11, roll wheel assembly and hang membrane module composition.
Template suspension beam 11 is located at the bottom of jacking construction platform 20.In the present embodiment, template suspension beam 11 includes Two channel-section steels 111, the web of two channel-section steel 111 is relative and close to each other, and the upper flange of two channel-section steels 111 is fixed on jacking construction platform 20 bottom.Template suspension beam can also use I-beam, and the upper flange of the I-beam is fixed on the bottom of jacking construction platform Portion.
Roll wheel assembly is made up of rolling wheel support 121 and the roller 122 on the rolling wheel support 121.Roller 122 roll in On the lower wing plate of template suspension beam 11, rolling wheel support 121 is then hung on the lower section that template hangs beam 11 by roller 122.Wherein, Rolling wheel support 121 includes further hanging two hanging plates 1211 of the both sides of beam 11 located at template and is connected between two hanging plate 1211 Peg 1212, the peg 1212 hang on the lower section that template hangs beam 11, and two rollers 122 are installed on two by roller shaft 1213 The relative inner that beam 11 is hung towards template of hanging plate 1211, and two rollers 122 roll in the lower wing plate of two channel-section steels 111 respectively On, so as to realize roll wheel assembly in rolling, sliding on template suspension beam 11.Further, the end of beam 11 is hung in template Closed guard 112 is provided with, can be used to limit the rolling scope of roller 122, it is to avoid roll wheel assembly drops from template suspension beam 11, And cause the engineering accident that can not be saved.Peg 1212 uses the screw rod of surface tapping, on two hanging plates 1211 of rolling wheel support 121 The pole perforating hole worn for peg 1212 is offered respectively, and the two ends of peg 1212 are arranged in perforation hole and are screwed with the first fastening , be fixed on peg 1212 between the hanging plate 1211 of both sides by tightening the first clamp nut by nut 1214.
Membrane module is hung to be made up of suspension rod 130, the first connects bearing and the second connects bearing.In the present embodiment, suspension rod 130 Using the screw rod of surface tapping, the first connects bearing is connected between the first end of suspension rod 130 and rolling wheel support 121, and second connects Connect bearing to be connected between the second end of suspension rod 130 and template 10, template 10 is is hung the template that sets, that is, be mounted and use Template.
Wherein, the first connects bearing further includes the first connecting plate being sheathed on the peg 1212 of rolling wheel support 121 131st, the second connecting plate 132 being articulated on first connecting plate 131 and the first internal thread being fixed on the second connecting plate 132 Sleeve 133, the first end of suspension rod 130 wears and is threadedly connected in first inner thread sleeve 133, by first internal thread The first end of the fixed derrick 130 of sleeve 133.The first end of suspension rod 130 is screwed with antiskid nut 134, and the antiskid nut is resisted against The top of inner thread sleeve 133, the fixing intensity of the first end of suspension rod 130 can be further strengthened using the antiskid nut, prevent from hanging Under the Action of Gravity Field of template 10, slip away bar 130 first inner thread sleeve 133.
Further, cushion collar 1215 is arranged with the peg 1212 of rolling wheel support 121, hangs the first connection of membrane module Pole perforating hole is offered on plate 131, the first connecting plate 131 is sheathed on cushion collar 1215 by the pole perforating hole.
Second connecting plate 132 is U-shaped plate, and with an open side and a closed side, the open side of the U-shaped plate passes through bolt pivot The first connecting plate 131 is connected to, is connected using pivot joint between the first connecting plate 131 and the second connecting plate 132, rather than directly use Be fixedly linked, certain rotation license amount can be provided, it is to avoid when template is rocked because of self gravitation, cause the first connecting plate with Easily twisted off because coupling stiffness is excessive between second connecting plate.First inner thread sleeve 133 is plugged and is fixed on the U-shaped plate Closed side.By the threaded connection between the first inner thread sleeve 133 and the first end of suspension rod 130, the tune of length of boom can be easy to Section, and regulation in place after, antiskid nut 134 is threaded to the top of the first inner thread sleeve 132, make antiskid nut 134 with The top of the first inner thread sleeve 132 pushes against, and fixes the first end of suspension rod 130.
Second connects bearing includes being fixed on second inner thread sleeve 141 at the top of template 10 and is opened in template 10 Boom hole (does not show boom hole) in figure, and makes the boom hole and the concentric setting of the second inner thread sleeve 141, the boom hole Be opened in the side of template it is stupefied on, the second end of suspension rod 130 wears and is threadedly connected in second inner thread sleeve 141, equally Ground, screw togather length between the inner thread sleeve 141 of suspension rod 130 and second by being adjusted, and the length of suspension rod 130 can be adjusted It is whole.Second inner thread sleeve 141 can also use plain nut, can equally reach the effect at the end of fixed derrick 130 second.
Further, a bearing plate 142 is additionally provided with die head, the bearing plate 142 is arranged on what is opened up in template The via corresponding to boom hole is arranged between boom hole and the second inner thread sleeve 141, and on bearing plate 142, so as to suspension rod 130 the second end sequentially pass through boom hole, the inner thread sleeve 141 of bearing plate 142 and second and with second inner thread sleeve 141 Screw togather fixation.Bearing plate 142 can play a part of to strengthen the intensity that suspension rod 130 lifts node with template 10.
The utility model is a kind of to hang die device by the template in jacking construction platform bottom for jacking construction platform Rotatable roll wheel assembly is set on suspension beam, is set in the lower section of roll wheel assembly and is hung membrane module and set template hanging, can be by template The bottom for being located at jacking construction platform is hung, and template can hang beam movement with membrane module is hung by roll wheel assembly along template, this Sample can just overcome to hang mould and can only be arranged in hanger nearby to be caused to hang the inadequate problem of modulus amount so that template is capable of hoisting be located at it is whole The lower section of individual jacking construction platform, by sliding near hanger, so that the workman on hanger carries out model sheetinstallat.
The utility model is described in detail above in association with drawings and Examples, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, some of embodiment details should not be constituted to this reality With new restriction, the scope that the utility model will be defined using appended claims is used as protection domain of the present utility model.

Claims (10)

1. it is a kind of to hang die device for jacking construction platform, it is characterised in that including:
Template hangs beam, located at the bottom of jacking construction platform;
Roll wheel assembly, including the rolling wheel support on the template suspension beam and the roller on the rolling wheel support are hung on, The roller is rolled on template suspension beam;
Hang membrane module, including suspension rod, the first connects bearing for being connected between the first end of the suspension rod and the rolling wheel support And it is connected to the second connects bearing between the second end of the suspension rod and template.
It is 2. as claimed in claim 1 to hang die device for jacking construction platform, it is characterised in that:The template hangs Liang Bao Two channel-section steels are included, the web of two channel-section steel is relative and close to each other, and the upper flange of two channel-section steel is fixed on jacking construction platform Bottom, roller described in two rolled on the lower wing plate of two channel-section steel.
It is 3. as claimed in claim 2 to hang die device for jacking construction platform, it is characterised in that:The rolling wheel support includes Located at the peg that the template hangs two hanging plates of beam both sides and is connected between two hanging plate, the peg hang on described Template hangs the lower section of beam, and roller described in two is installed on being hung in beam towards the template for two hanging plate by roller shaft Side.
It is 4. as claimed in claim 3 to hang die device for jacking construction platform, it is characterised in that:The peg is screw rod, The pole perforating hole worn for the peg is offered on two hanging plate, the two ends of the peg are screwed with the first clamp nut.
It is 5. as claimed in claim 3 to hang die device for jacking construction platform, it is characterised in that:First connects bearing Including the first connecting plate being sheathed on the peg, the second connecting plate for being articulated in first connecting plate and it is fixed on described The first inner thread sleeve on second connecting plate, the first end of the suspension rod wears and is threadedly connected to first inner screw sheath In cylinder.
It is 6. as claimed in claim 5 to hang die device for jacking construction platform, it is characterised in that:It is arranged with the peg Cushion collar, first connecting plate is sheathed on the cushion collar.
It is 7. as claimed in claim 5 to hang die device for jacking construction platform, it is characterised in that:Second connecting plate is U-shaped plate, the open side of the U-shaped plate is articulated in first connecting plate by bolt, and first inner thread sleeve is plugged simultaneously It is fixed on the closed side of the U-shaped plate.
It is 8. as claimed in claim 5 to hang die device for jacking construction platform, it is characterised in that:The suspension rod is screw rod, The first end of the suspension rod is screwed with antiskid nut, and the antiskid nut is resisted against the top of the inner thread sleeve.
It is 9. as claimed in claim 2 to hang die device for jacking construction platform, it is characterised in that:The suspension rod is screw rod, Second connects bearing includes the boom hole for being fixed on the second inner thread sleeve of die head and being opened in template, described Boom hole is concentric with second inner thread sleeve, and the second end of the suspension rod wears and is threadedly connected to spiral shell in described second In line sleeve.
It is 10. as claimed in claim 1 to hang die device for jacking construction platform, it is characterised in that:The template hangs beam End be provided with closed guard.
CN201621108790.6U 2016-10-10 2016-10-10 It is a kind of to hang die device for jacking construction platform Active CN206233542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621108790.6U CN206233542U (en) 2016-10-10 2016-10-10 It is a kind of to hang die device for jacking construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621108790.6U CN206233542U (en) 2016-10-10 2016-10-10 It is a kind of to hang die device for jacking construction platform

Publications (1)

Publication Number Publication Date
CN206233542U true CN206233542U (en) 2017-06-09

Family

ID=58982193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621108790.6U Active CN206233542U (en) 2016-10-10 2016-10-10 It is a kind of to hang die device for jacking construction platform

Country Status (1)

Country Link
CN (1) CN206233542U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130793A (en) * 2017-07-14 2017-09-05 四川华西集团有限公司 Form frame system with exactly vertical elevation and horizontal location function
CN109505244A (en) * 2018-11-27 2019-03-22 黄连芝 A kind of adjustable metal hanging brace
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
WO2022237482A1 (en) * 2021-05-13 2022-11-17 中建三局第三建设工程有限责任公司 Construction apparatus and method for hanging, integrally assembling, and integrally lifting building vertical formwork

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130793A (en) * 2017-07-14 2017-09-05 四川华西集团有限公司 Form frame system with exactly vertical elevation and horizontal location function
CN107130793B (en) * 2017-07-14 2023-08-25 华西工程科技(深圳)股份有限公司 Die carrier system with accurate vertical elevation and horizontal positioning functions
CN109505244A (en) * 2018-11-27 2019-03-22 黄连芝 A kind of adjustable metal hanging brace
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN110792038B (en) * 2019-11-11 2021-06-25 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
WO2022237482A1 (en) * 2021-05-13 2022-11-17 中建三局第三建设工程有限责任公司 Construction apparatus and method for hanging, integrally assembling, and integrally lifting building vertical formwork

Similar Documents

Publication Publication Date Title
CN206233542U (en) It is a kind of to hang die device for jacking construction platform
CN207986489U (en) Hang regulating device in large diameter pile foundation steel reinforcement cage aperture
CN206174504U (en) Steel structure support
CN103206074B (en) Elevator shaft template construction method, platform and support
CN101210418A (en) Non-floor-bracket construction method for suspension bridge tower frame cross beam
CN107879269A (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN201793330U (en) Gantry hanger frame device
CN103953187B (en) A kind of sliding-mode platform system of band center vertical tube structure
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN204627435U (en) Without anchor rope workover rig Anti-side-turning device
CN207863871U (en) A kind of derrick for repairing equipment for petroleum drilling
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN206599363U (en) Vertical transferring apparatus
CN205822812U (en) A kind of floor bar mesh sheet is anti-tramples device
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN209957286U (en) Liftable simple and easy installation device of jib
CN213326443U (en) Quick unloading platform
CN205973671U (en) Hanging flower basket linkage
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN203653000U (en) Novel adjustable inclined ladder
CN205575417U (en) Building side hoist device
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN207619864U (en) Frame lookum
CN205976424U (en) Add elongated hanging flower basket support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190121

Address after: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27

Co-patentee after: China Huashi Enterprises Co., Ltd.

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Co-patentee after: Sichuan No.6 Construction Co., Ltd.

Address before: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27

Patentee before: China Construction Eighth Engineering Division Co., Ltd.

TR01 Transfer of patent right