CN104712060A - Integrated house - Google Patents
Integrated house Download PDFInfo
- Publication number
- CN104712060A CN104712060A CN201510119868.8A CN201510119868A CN104712060A CN 104712060 A CN104712060 A CN 104712060A CN 201510119868 A CN201510119868 A CN 201510119868A CN 104712060 A CN104712060 A CN 104712060A
- Authority
- CN
- China
- Prior art keywords
- integrated house
- hollow column
- mounting rail
- roof
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Building Environments (AREA)
Abstract
Description
技术领域technical field
本发明属于固定建筑物领域,涉及一种集成房屋。The invention belongs to the field of fixed buildings and relates to an integrated house.
背景技术Background technique
一般集成房屋由结构系统、地面系统、楼面系统、墙面系统、屋面系统组成,每个系统由数个单元模块组成,单元模块在工厂制造完成,房屋现场由单元模块装配完成。集成房屋具有可拆装、可移动,不破坏土地的特性,广泛应用于建设工地的临时办公室、宿舍;交通、水利、石油、天然气等大型野外勘探、野外作业施工用房;城市办公、民用安置、展览等临时用房;旅游区休闲别墅、度假屋;抗震救灾以及军事领域等用房。Generally, an integrated house is composed of a structural system, a ground system, a floor system, a wall system, and a roof system. Each system is composed of several unit modules. The unit modules are manufactured in the factory, and the housing site is assembled by the unit modules. The integrated house has the characteristics of detachable, movable, and does not damage the land. It is widely used in temporary offices and dormitories on construction sites; large-scale field exploration and field construction houses for transportation, water conservancy, oil, and natural gas; urban office and civil resettlement Temporary housing for exhibitions and exhibitions; leisure villas and holiday houses in tourist areas; housing for earthquake relief and military fields.
因此,模块化集成房屋在实际使用过程中,在同一场合同一地点的使用周期有限,而当需要将在同一场合的另一地点使用时,所需的模块化集成房屋与上次使用的模块化集成房屋结构相同,故需要保证模块化集成房屋的搭建构件具有可拆卸重复组装的特点。同时,虽然集成房屋作为临时住人或着存放东西的建筑物,但是集成房屋还是要求具备牢固安全的特性。Therefore, in the actual use of the modular integrated house, the use period of the same place in the same place is limited, and when it is required to be used in another place on the same place, the required modularized integrated house is different from the last used modular house. The structure of the integrated house is the same, so it is necessary to ensure that the building components of the modular integrated house are detachable and reassembled. At the same time, although the prefabricated house is used as a temporary residence or a building for storing things, the prefabricated house still requires firm and safe features.
发明内容Contents of the invention
本发明的目的是针对现有的技术存在上述问题,提出了一种集成房屋,本发明解决的技术问题是如何使集成房屋既牢固安全,又能够快速拆装。The object of the present invention is to solve the above-mentioned problems in the existing technology, and propose an integrated house. The technical problem solved by the invention is how to make the integrated house firm and safe, and can be disassembled quickly.
本发明的目的可通过下列技术方案来实现:一种集成房屋,包括地板、设置在地板上的支撑架,设置在支撑架内的墙板以及设置在支撑架上方的屋顶,其特征在于,所述支撑架包括若干根上安装梁、下安装梁、安装纵梁和垂直地板设置的空心立柱;所述安装纵梁沿空心立柱的轴向延伸固连在空心立柱上,所述空心立柱侧向具有安装平面,所述安装纵梁具有与安装平面贴合并向空心立柱两端延伸的安装面;所述上安装梁的两端设置在两根空心立柱的上方,且所述上安装梁与空心立柱之间设有使上安装梁定位在空心立柱上的固定结构;所述下安装梁设置在两根空心立柱之间且固连在地板上;所述两根空心立柱之间的上安装梁、下安装梁以及安装纵梁上都具有向两根中心立柱之间的中心位置方向翻起的定位翻沿,所述的定位翻沿形成用于安装墙板用的安装框。The purpose of the present invention can be achieved through the following technical solutions: an integrated house, including a floor, a support frame arranged on the floor, a wall panel arranged in the support frame and a roof arranged above the support frame, characterized in that the The support frame includes several upper installation beams, lower installation beams, installation longitudinal beams and hollow columns arranged vertically to the floor; the installation longitudinal beams are fixedly connected to the hollow columns along the axial extension of the hollow columns, and the hollow columns have The installation plane, the installation longitudinal beam has a installation surface that fits with the installation plane and extends to both ends of the hollow column; the two ends of the upper installation beam are arranged above the two hollow columns, and the upper installation beam and the hollow column There is a fixed structure for positioning the upper installation beam on the hollow column; the lower installation beam is arranged between the two hollow columns and fixedly connected to the floor; the upper installation beam between the two hollow columns, Both the lower installation beam and the installation longitudinal beam have a positioning turning edge turned up towards the center position between the two center columns, and the positioning turning edge forms an installation frame for installing wall panels.
本集成房屋的工作原理是通过地板、墙板、屋顶、上安装梁、下安装梁、安装纵梁以及空心立柱之间的可拆连接,组装形成了整个集成房屋。区别于点面配合或者线面配合,本集成房屋中空心立柱与安装纵梁之间长度相仿,且通过面面配合,使得两者之间有足够大的接触面积,从而不易产生相对转动或移动,结构更加牢固稳定;同时,上安装梁与空心立柱之间通过固定结构定位,拆装方便,并通过在上安装梁、下安装梁以及安装纵梁上设计定位翻边,墙板安装在定位翻边形成的安装框内,实现墙板的快速拆装。由此,通过上安装梁、下安装梁、安装纵梁以及空心立柱组装形成的支撑架,使集成房屋不仅满足牢固安全的要求,又能够满足快速拆装的要求。The working principle of this integrated house is to assemble and form the whole integrated house through the detachable connection between the floor, wall panels, roof, upper installation beam, lower installation beam, installation longitudinal beam and hollow column. Different from point-surface fit or line-surface fit, the length between the hollow column and the installation longitudinal beam in the integrated house is similar, and through the face-to-face fit, there is a large enough contact area between the two, so that it is not easy to produce relative rotation or movement , the structure is more firm and stable; at the same time, the upper installation beam and the hollow column are positioned through a fixed structure, which is convenient for disassembly and assembly. In the installation frame formed by the flanging, the quick disassembly and assembly of the wall panel is realized. Therefore, through the support frame formed by assembling the upper installation beam, the lower installation beam, the installation longitudinal beam and the hollow column, the integrated house not only meets the requirements of firmness and safety, but also meets the requirements of quick disassembly and assembly.
在上述的集成房屋中,所述固定结构包括上安装梁上向空心立柱方向的凸起,所述的凸起伸入到空心立柱内侧与空心立柱形成定位。利用空心立柱的中空结构,在上安装梁上设计匹配的凸起,使得上安装梁与空心立柱之间的安装更加方便可靠,有利于集成房屋实现快速拆装。同时固定结构还可以采用其他方式,如上安装梁两端与空心立柱之间采用螺栓固定等。In the above-mentioned integrated house, the fixing structure includes a protrusion on the upper installation beam facing the direction of the hollow column, and the protrusion extends into the inner side of the hollow column to form a positioning with the hollow column. Utilizing the hollow structure of the hollow column, a matching protrusion is designed on the upper installation beam, which makes the installation between the upper installation beam and the hollow column more convenient and reliable, and is conducive to the rapid disassembly and assembly of the integrated house. At the same time, other ways can also be used for fixing the structure, such as fixing with bolts between the two ends of the upper mounting beam and the hollow column.
在上述的集成房屋中,所述空心立柱内侧连接有固定板,所述凸起与固定板贴合并通过紧固件固连。上安装梁安装时,先通过凸起与空心立柱定位,然后通过紧固件实现上安装梁与空心立柱之间的固连,并且紧固件拆装方便,有利于集成房屋实现快速拆装;同时通过凸起和紧固件两者定位结合,使上安装梁与空心立柱之间的连接更加牢固可靠。In the aforementioned integrated house, a fixing plate is connected to the inner side of the hollow column, and the protrusion fits on the fixing plate and is fixedly connected by a fastener. When the upper installation beam is installed, the protrusion and the hollow column are first positioned, and then the fastening between the upper installation beam and the hollow column is realized through the fastener, and the fastener is easy to disassemble and assemble, which is conducive to the rapid disassembly and assembly of the integrated house; At the same time, the combination of the protrusion and the fastener makes the connection between the upper installation beam and the hollow column more firm and reliable.
在上述的集成房屋中,所述上安装梁、下安装梁、安装纵梁上都具有两平行的定位翻沿,所述的墙板设置在两定位翻沿之间。墙板安装时,只要将墙板卡在定位翻边形成的凹槽内,就能实现安装,快速方便;并且,由于墙板四周均与定位翻边配合固定,使得集成房屋结构更加牢固稳定。In the above-mentioned integrated house, the upper installation beam, the lower installation beam, and the installation longitudinal beam all have two parallel positioning turning edges, and the wall panels are arranged between the two positioning turning edges. When installing the wall panels, as long as the wall panels are clamped in the groove formed by the positioning flange, the installation can be realized quickly and conveniently; moreover, since the wall panels are all fixed with the positioning flanges on all sides, the structure of the integrated house is more firm and stable.
在上述的集成房屋中,所述屋顶伸出支撑架,且所述屋顶由下向上依次包括屋顶板、防水层和沥青瓦层,所述防水层至少在相对设置的两边沿上具有向下的弯起部一,所述沥青瓦层至少在相对设置的两边沿上具有向下的弯起部二;所述屋顶板边沿顶靠在弯起部一上,所述弯起部二扣合在弯起部一上。通过至少在两边边沿上设计弯起部一和弯起部二,使得屋顶板与防水层和沥青瓦层之间能够快速扣合安装,从而有利于集成房屋的快速拆装。In the above-mentioned integrated house, the roof protrudes from the support frame, and the roof sequentially includes a roof board, a waterproof layer and an asphalt tile layer from bottom to top, and the waterproof layer has at least downward edges on two opposite edges. The first bent part, the asphalt tile layer has at least the second bent part on the two opposite edges; Bend the part up. By designing the first bent portion and the second bent portion on at least the two edges, the fast buckling and installation between the roof slab, the waterproof layer and the asphalt tile layer can be achieved, thereby facilitating the quick disassembly and assembly of the integrated house.
在上述的集成房屋中,所述屋顶沿侧向伸出支撑架,且所述屋顶由下向上依次设有屋顶板、防水层和沥青瓦层,所述防水层至少在相对设置的两边沿上具有向下的弯起部一或者沥青瓦层至少在相对设置的两边沿上具有弯起部二;所述屋顶板边沿顶靠在弯起部一或者弯起部二上。防水层或沥青瓦层的其中一个上设有弯起部与屋顶面配合,使屋顶面能够快速拆装。In the above-mentioned integrated house, the roof protrudes from the support frame laterally, and the roof is provided with a roof board, a waterproof layer and an asphalt tile layer in sequence from bottom to top, and the waterproof layer is at least on two opposite edges. There is a downward bent portion 1 or the asphalt tile layer has bent portion 2 at least on two opposite edges; One of the waterproof layer or the asphalt shingle layer is provided with a bent portion to cooperate with the roof surface, so that the roof surface can be quickly disassembled.
在上述的集成房屋中,所述弯起部一或者弯起部二的下端低于所述屋顶板。In the above-mentioned integrated house, the lower end of the first bent portion or the second bent portion is lower than the roof slab.
在上述的集成房屋中,所述屋顶板设置在上安装梁上,所述屋顶板包括若干块顶面板和工字形连接板,所述顶面板与顶面板通过连接板扣接。连接板与顶面板之间能够快速组装形成屋顶板。In the above-mentioned integrated house, the roof panel is arranged on the upper installation beam, and the roof panel includes several top panels and an I-shaped connecting plate, and the top panel and the top panel are fastened through the connecting plate. The connection plate and the top panel can be quickly assembled to form a roof panel.
在上述的集成房屋中,所述墙板包括呈蜂窝状的芯材,所述芯材的两侧固定有板状的面材。芯材采用纸蜂窝板,面材采用水泥板或硅酸钙板,采用这种墙板有利于房子隔音保温,并且墙板芯材主要材料为植物纤维,绿色无污染,不会对人体造成伤害,材料透气性好,且防火、防水、吸潮,易于保持室内空气清新及湿度均衡,同时作为绝缘材料不会对人体磁场造成干扰;另外,通过将芯材卡设在上安装梁、下安装梁以及安装纵梁形成的回形的定位翻边内,并通过紧固件将面材固定在定位翻边的两侧,从而实现墙板与支撑架之间的快速拆装,且墙板四边定位,使得整个集成房的结构更加稳定牢固。In the above-mentioned integrated house, the wall panel includes a honeycomb-shaped core material, and plate-shaped surface materials are fixed on both sides of the core material. The core material is paper honeycomb board, and the surface material is cement board or calcium silicate board. The use of this kind of wall board is conducive to sound insulation and heat preservation of the house, and the main material of the wall board core material is plant fiber, which is green and pollution-free, and will not cause harm to the human body. , the material has good air permeability, and is fireproof, waterproof, and moisture-absorbing. It is easy to keep the indoor air fresh and the humidity balanced. Beams and installation longitudinal beams form the back-shaped positioning flange, and the surface material is fixed on both sides of the positioning flange by fasteners, so as to realize the quick disassembly and assembly between the wall panel and the support frame, and the four sides of the wall panel The positioning makes the structure of the whole integrated house more stable and firm.
与现有技术相比,本集成房屋具有以下优点:本集成房屋中长度相仿的空心立柱与安装纵梁之间采用面面配合,空心立柱与上安装梁之间通过固定结构安装定位,并在上安装梁、下安装梁以及安装纵梁上设计定位翻边,墙板安装在定位翻边形成的安装框内,且屋顶板与防水层和沥青瓦层上通过弯起部一和弯起部二实现定位配合,结合以上结构组装形成的集成房屋,不仅满足牢固安全的要求,又能够满足快速拆装的要求。同时,墙板采用空心结构,重量较轻,有利于集成房屋的快速拆装。Compared with the existing technology, the integrated house has the following advantages: the hollow column and the installation longitudinal beam of the same length in the integrated house adopt surface-to-surface cooperation, and the hollow column and the upper installation beam are installed and positioned by a fixed structure, and The upper installation beam, the lower installation beam and the installation longitudinal beam are designed with positioning flanging, the wall panel is installed in the installation frame formed by the positioning flanging, and the roof panel, the waterproof layer and the asphalt tile layer pass through the bent part one and the bent part 2. To achieve positioning and coordination, the integrated house formed by combining the above structures can not only meet the requirements of firmness and safety, but also meet the requirements of quick disassembly and assembly. At the same time, the wall panel adopts a hollow structure and is light in weight, which is conducive to the quick disassembly and assembly of the integrated house.
附图说明Description of drawings
图1是本集成房屋的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the integrated house.
图2是图1中A处的局部放大图。Fig. 2 is a partial enlarged view of A in Fig. 1 .
图3是本集成房屋的屋顶拆开结构示意图。Fig. 3 is a schematic diagram of the dismantled structure of the roof of the integrated house.
图4是图3中B处的局部放大图。Fig. 4 is a partial enlarged view of B in Fig. 3 .
图5是图3中C处的局部放大图。Fig. 5 is a partial enlarged view of position C in Fig. 3 .
图6是本集成房屋的整体骨架结构示意图。Fig. 6 is a schematic diagram of the overall skeleton structure of the integrated house.
图7是图6中D处的局部放大图。FIG. 7 is a partially enlarged view at D in FIG. 6 .
图8是本集成房屋中上安装梁的端部平面示意图。Fig. 8 is a schematic plan view of the end of the upper installation beam in the integrated house.
图9是本集成房屋中空心立柱的结构示意图。Fig. 9 is a structural schematic diagram of a hollow column in the integrated house.
图10是本集成房屋中墙板的结构示意图。Fig. 10 is a structural schematic diagram of the wall panel in the integrated house.
图11是本集成房屋中墙板的安装结构示意图。Fig. 11 is a schematic diagram of the installation structure of the wall panel in the integrated house.
图中,1、地板;2、支撑架;3、墙板;31、芯材;32、面材;4、屋顶;41、屋顶板;411、顶面板;412、连接板;42、防水层;43、沥青瓦层;44、弯起部一;45、弯起部二;5、上安装梁;51、凸起;6、下安装梁;7、安装纵梁;8、空心立柱;81、固定板;9、定位翻沿。In the figure, 1. floor; 2. support frame; 3. wallboard; 31. core material; 32. surface material; 4. roof; 41. roof board; 411. top panel; 412. connecting plate; 42. waterproof layer ;43, asphalt shingle layer; 44, bent part one; 45, bent part two; 5, upper installation beam; 51, protrusion; 6, lower installation beam; 7, installation longitudinal beam; , Fixed plate; 9, Positioning edge.
具体实施方式Detailed ways
以下是本发明的具体实施例并结合附图,对本发明的技术方案作进一步的描述,但本发明并不限于这些实施例。The following are specific embodiments of the present invention and in conjunction with the accompanying drawings, the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.
实施例一:Embodiment one:
本集成房屋包括地板1、支撑架2、墙板3、芯材31、面材32、屋顶4、屋顶板41、顶面板411、连接板412、防水层42、沥青瓦层43、弯起部一44、弯起部二45、上安装梁5、凸起51、下安装梁6、安装纵梁7、空心立柱8、固定板81、定位翻沿9。The integrated house includes a floor 1, a support frame 2, a wall panel 3, a core material 31, a surface material 32, a roof 4, a roof panel 41, a top panel 411, a connecting panel 412, a waterproof layer 42, an asphalt tile layer 43, and a bent portion One 44, bent portion two 45, upper mounting beam 5, protrusion 51, lower mounting beam 6, mounting longitudinal beam 7, hollow column 8, fixed plate 81, positioning turning edge 9.
具体来说,如图1和图6所示,本集成房屋包括地板1、设置在地板1上的支撑架2,设置在支撑架2内的墙板3以及设置在支撑架2上方的屋顶4,支撑架2包括若干根上安装梁5、下安装梁6、安装纵梁7和垂直地板1设置的空心立柱8,空心立柱8的下端通过胀紧螺钉固定在地板1上;安装纵梁7沿空心立柱8的轴向延伸固连在空心立柱8上,空心立柱8侧向具有安装平面,安装纵梁7具有与安装平面贴合并向空心立柱8两端延伸的安装面。Specifically, as shown in Fig. 1 and Fig. 6, the integrated house includes a floor 1, a support frame 2 arranged on the floor 1, a wall panel 3 arranged in the support frame 2 and a roof 4 arranged above the support frame 2 , the support frame 2 includes several upper mounting beams 5, lower mounting beams 6, mounting longitudinal beams 7 and hollow columns 8 arranged vertically to the floor 1, and the lower ends of the hollow columns 8 are fixed on the floor 1 by expansion screws; The axial extension of the hollow column 8 is fixedly connected to the hollow column 8 , the hollow column 8 has a mounting plane laterally, and the mounting longitudinal beam 7 has a mounting surface that fits with the mounting plane and extends toward both ends of the hollow column 8 .
如图3、图4和图8所示,上安装梁5的两端设置在两根空心立柱8的上方,上安装梁5上具有向空心立柱8方向的凸起51,凸起51伸入到空心立柱8内侧与空心立柱8形成定位。如图9所示,空心立柱8内侧连接有固定板81,凸起51与固定板81贴合并通过紧固件固连,紧固件可以采用螺钉、定位销等。如图6和图7所示,下安装梁6设置在两根空心立柱8之间且固连在地板1上;两根空心立柱8之间的上安装梁5、下安装梁6以及安装纵梁7上都具有向两根中心立柱之间的中心位置方向翻起的两平行的定位翻沿9,定位翻沿9形成用于安装墙板3用的安装框,墙板3设置在安装框内。As shown in Figure 3, Figure 4 and Figure 8, the two ends of the upper mounting beam 5 are arranged above the two hollow columns 8, and the upper mounting beam 5 has a protrusion 51 towards the direction of the hollow column 8, and the protrusion 51 stretches into To the inner side of the hollow column 8 and the hollow column 8 to form a positioning. As shown in FIG. 9 , a fixing plate 81 is connected to the inner side of the hollow column 8 , and the protrusion 51 fits on the fixing plate 81 and is fixedly connected by fasteners. The fasteners can be screws, positioning pins and the like. As shown in Fig. 6 and Fig. 7, the lower installation beam 6 is arranged between two hollow columns 8 and is fixedly connected on the floor 1; the upper installation beam 5, the lower installation beam 6 and the installation longitudinal Beams 7 are provided with two parallel positioning edges 9 that are raised towards the center position between the two central columns. The positioning edges 9 form an installation frame for installing wall panels 3 , and wall panels 3 are arranged on the installation frames. Inside.
如图2所示,屋顶4伸出支撑架2,且屋顶4由下向上依次包括屋顶板41、防水层42和沥青瓦层43,防水层42至少在相对设置的两边沿上具有向下的弯起部一44,沥青瓦层43至少在相对设置的两边沿上具有向下的弯起部二45;屋顶板41边沿顶靠在弯起部一44上,弯起部二45扣合在弯起部一44上。弯起部一44或者弯起部二45的下端低于屋顶板41。如图3和图5所示,屋顶板41设置在上安装梁5上,屋顶板41包括若干块顶面板411和工字形连接板412,顶面板411与顶面板411通过连接板412扣接。As shown in Figure 2, the roof 4 stretches out from the support frame 2, and the roof 4 includes a roof board 41, a waterproof layer 42 and an asphalt tile layer 43 from bottom to top, and the waterproof layer 42 has a downward direction on at least two opposite edges. Bending portion 1 44, the asphalt tile layer 43 has downward bending portion 2 45 on at least two opposite edges; the edge of the roof plate 41 leans against the bending portion 1 44, and the bending portion 2 45 is buckled on Bending part one 44 on. The lower end of the first bent portion 44 or the second bent portion 45 is lower than the roof slab 41 . As shown in FIGS. 3 and 5 , the roof panel 41 is arranged on the upper mounting beam 5 , and the roof panel 41 includes several top panels 411 and I-shaped connecting plates 412 .
如图10和图11所示,墙板包括呈蜂窝状的芯材,芯材的两侧固定有板状的面材,芯材采用纸蜂窝板,面材采用水泥板或者硅酸钙板。As shown in Figures 10 and 11, the wallboard includes a honeycomb-shaped core material, plate-shaped surface materials are fixed on both sides of the core material, the core material is a paper honeycomb board, and the surface material is a cement board or a calcium silicate board.
实施例二:Embodiment two:
本实施例中的技术方案与实施例一中的技术方案基本相同,不同之处,本实施例中,屋顶4沿侧向伸出支撑架2,且屋顶4由下向上依次设有屋顶板41、防水层42和沥青瓦层43,防水层42至少在相对设置的两边沿上具有向下的弯起部一44或者沥青瓦层43至少在相对设置的两边沿上具有弯起部二45;屋顶板41边沿顶靠在弯起部一44或者弯起部二45上。The technical solution in this embodiment is basically the same as the technical solution in Embodiment 1. The difference is that in this embodiment, the roof 4 protrudes from the support frame 2 in the lateral direction, and the roof 4 is provided with roof panels 41 from bottom to top. 1. The waterproof layer 42 and the asphalt tile layer 43, the waterproof layer 42 has a downward bent portion 1 44 at least on two opposite edges, or the asphalt tile layer 43 has a bent portion 2 45 on at least two opposite edges; The edge of the roof panel 41 leans against the first bent portion 44 or the second bent portion 45 .
本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are merely illustrative of the spirit of the invention. Those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, but they will not deviate from the spirit of the present invention or go beyond the definition of the appended claims range.
尽管本文较多地使用了地板1、支撑架2、墙板3、芯材31、面材32、屋顶4、屋顶板41、顶面板411、连接板412、防水层42、沥青瓦层43、弯起部一44、弯起部二45、上安装梁5、凸起51、下安装梁6、安装纵梁7、空心立柱8、固定板81、定位翻沿9等术语,但并不排除使用其它术语的可能性。使用这些术语仅仅是为了更方便地描述和解释本发明的本质;把它们解释成任何一种附加的限制都是与本发明精神相违背的。Although this article uses more floor 1, support frame 2, wallboard 3, core material 31, surface material 32, roof 4, roof board 41, top panel 411, connecting plate 412, waterproof layer 42, asphalt tile layer 43, Bending part 1 44, bending part 2 45, upper mounting beam 5, protrusion 51, lower mounting beam 6, mounting longitudinal beam 7, hollow column 8, fixing plate 81, positioning edge 9 and other terms, but do not exclude Possibility of using other terms. These terms are used only for the purpose of describing and explaining the essence of the present invention more conveniently; interpreting them as any kind of additional limitation is against the spirit of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510119868.8A CN104712060B (en) | 2015-03-18 | 2015-03-18 | A kind of integrated house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510119868.8A CN104712060B (en) | 2015-03-18 | 2015-03-18 | A kind of integrated house |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104712060A true CN104712060A (en) | 2015-06-17 |
| CN104712060B CN104712060B (en) | 2017-07-07 |
Family
ID=53411748
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510119868.8A Expired - Fee Related CN104712060B (en) | 2015-03-18 | 2015-03-18 | A kind of integrated house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104712060B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106869307A (en) * | 2017-03-10 | 2017-06-20 | 浙江远成精工科技有限公司 | A kind of integrated house |
| CN107090913A (en) * | 2017-06-03 | 2017-08-25 | 万华集成房屋(烟台)有限公司 | A kind of collapsible house and its assembly and disassembly methods |
| JP2019116803A (en) * | 2017-12-27 | 2019-07-18 | 積水ハウス株式会社 | Structure for installing stud material |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009138494A (en) * | 2007-12-10 | 2009-06-25 | Toyota Motor Corp | Independent pillar for steel house, steel house using the same, and panel method |
| CN201428180Y (en) * | 2009-07-27 | 2010-03-24 | 卢锦敏 | Movable wooden house |
| CN202248964U (en) * | 2011-09-14 | 2012-05-30 | 李学毅 | Novel integrated house |
| CN104032874A (en) * | 2014-05-21 | 2014-09-10 | 成都振中电气有限公司 | Novel ecological house structure |
| CN104358309A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Quickly installed high-strength house structure |
| CN204608984U (en) * | 2015-03-18 | 2015-09-02 | 伯恩太阳能科技有限公司 | A kind of integrated house |
-
2015
- 2015-03-18 CN CN201510119868.8A patent/CN104712060B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009138494A (en) * | 2007-12-10 | 2009-06-25 | Toyota Motor Corp | Independent pillar for steel house, steel house using the same, and panel method |
| CN201428180Y (en) * | 2009-07-27 | 2010-03-24 | 卢锦敏 | Movable wooden house |
| CN202248964U (en) * | 2011-09-14 | 2012-05-30 | 李学毅 | Novel integrated house |
| CN104032874A (en) * | 2014-05-21 | 2014-09-10 | 成都振中电气有限公司 | Novel ecological house structure |
| CN104358309A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Quickly installed high-strength house structure |
| CN204608984U (en) * | 2015-03-18 | 2015-09-02 | 伯恩太阳能科技有限公司 | A kind of integrated house |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106869307A (en) * | 2017-03-10 | 2017-06-20 | 浙江远成精工科技有限公司 | A kind of integrated house |
| CN107090913A (en) * | 2017-06-03 | 2017-08-25 | 万华集成房屋(烟台)有限公司 | A kind of collapsible house and its assembly and disassembly methods |
| CN107090913B (en) * | 2017-06-03 | 2024-03-08 | 万华建筑科技有限公司 | Folding house and disassembly and assembly method thereof |
| JP2019116803A (en) * | 2017-12-27 | 2019-07-18 | 積水ハウス株式会社 | Structure for installing stud material |
| JP6997947B2 (en) | 2017-12-27 | 2022-01-18 | 積水ハウス株式会社 | Installation structure of stud material |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104712060B (en) | 2017-07-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9797137B2 (en) | Fully assembled, fully cast-in-place, composite-type house and construction method thereof | |
| US20150252558A1 (en) | Waffle box building technology | |
| CN205444458U (en) | Integrated assembled steel construction building | |
| CN104963408B (en) | A kind of building structure and its construction method | |
| US12392134B2 (en) | Pre-manufactured floor-ceiling panel for a multi-story building having load bearing walls | |
| CN104712060B (en) | A kind of integrated house | |
| CN206128302U (en) | Be applied to modular unit of modularization residential housing | |
| CN203213348U (en) | Large space NALC (Autoclaved Lightweight Concrete) wall board structure | |
| CN204608984U (en) | A kind of integrated house | |
| CN205875540U (en) | Large -span roofing system | |
| US11053681B2 (en) | Ground beam and t-shaped or x-shaped member for a modular constructed building and a building incorporating same | |
| JP7432273B1 (en) | Housing structure and construction method of housing structure | |
| US20150000223A1 (en) | Modular construction system | |
| JP2013019208A (en) | Simple building construction | |
| CN204475514U (en) | A kind of building structure | |
| RU140436U1 (en) | Dismountable seismic-resistant building on the basis of 20 and 40 foot containers | |
| RU127774U1 (en) | Dismountable Module | |
| RU2818384C1 (en) | Collapsible closed-type building using ready-made modules and panels | |
| CN219638123U (en) | Detachable building | |
| CN209195073U (en) | A kind of novel integrated house | |
| RU109166U1 (en) | MULTI-LAYER WALL OF THE BUILDING WITH FACADE PANELS OF VERTICAL CUTTING | |
| Nozza | The USM HALLER stahlbausystem MINI-MIDI-MAXI, designed by Fritz Haller, 1959–1987 | |
| CN116733113A (en) | Reconfigurable assembled building system | |
| CN206034627U (en) | Integrated integrated configuration of modular | |
| RS59823B1 (en) | Energy-efficient, earthquake and wind resistant ecological and prefabricated building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |