CN104698335B - The method that high voltage substation systematization debugging is realized using low tension - Google Patents

The method that high voltage substation systematization debugging is realized using low tension Download PDF

Info

Publication number
CN104698335B
CN104698335B CN201310662550.5A CN201310662550A CN104698335B CN 104698335 B CN104698335 B CN 104698335B CN 201310662550 A CN201310662550 A CN 201310662550A CN 104698335 B CN104698335 B CN 104698335B
Authority
CN
China
Prior art keywords
phase
voltage
winding
transformer
star
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310662550.5A
Other languages
Chinese (zh)
Other versions
CN104698335A (en
Inventor
樊剑飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310662550.5A priority Critical patent/CN104698335B/en
Publication of CN104698335A publication Critical patent/CN104698335A/en
Application granted granted Critical
Publication of CN104698335B publication Critical patent/CN104698335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of method that high voltage substation systematization debugging is realized using low tension; in transformer station, monomer experiment terminates; bus, cable connection finish; all relay protection devices and measuring equipment go up working power; transformer station is not before by high-tension electricity; by adding single-phase 220V, three-phase 380V low tensions in a different manner to transforming plant primary bus; then the corresponding voltage of secondary circuit is measured to judge whether whole group voltage transformer connected mode is correct; simultaneously by Circuit Fault on Secondary Transformer short circuit, apply 380V low tensions in primary side and check that there is indifference stream in differential current protection loop.This method is the completion using the common advance system of 220V, 380V low tension:The connected mode of whole group voltage transformer first and second is checked, checks differential protection loop.Danger and the hidden danger of Normal practice are prevented, while avoids human error, it is simple to operate, save the human cost of a large amount of school ray examination secondary circuits.

Description

The method that high voltage substation systematization debugging is realized using low tension
Technical field
The invention belongs to the method for high voltage substation systematization debugging, more particularly to one kind realizes high voltage variable using low tension The method of electric power station systemization debugging.
Background technology
General newly-built factories and miness 10/0.4kV, the debugging of 35/10kV transformer stations, all it is that each power equipment carries out monomer assays After end, check that the primary and secondary connection of voltage transformer group is correct by work such as wiring checks, power source bus by Judge the correctness of voltage transformer group by measuring voltage transformer secondary line voltage after electricity, current transformer group is similar Method be to be judged by the secondary current of measurement current transform er, system after by electricity not big load current send out When, the electric current for flowing through transformer is seldom, it is not easy to judge whether its function is normal, thus differential current protection loop is only becoming It can just be overhauled after the big load of power station band or throwing reactive power compensator, it is thorough that converting station debugging work is just calculated after the completion of all these Complete at bottom.But it can be seen that this method is not in advance due to not having systematic inspection current differential protection loop in advance System checks the connected mode of whole group voltage transformer.In transformer station after by electricity, then checked, in addition to stopping power transmission repeatedly, Very big danger also be present, easily cause damage and the casualties of power equipment, and can cause to protect in substation operation Protect malfunction, metering inaccuracy.
The content of the invention
The technical problems to be solved by the invention are:One kind is provided and realizes that high voltage substation systematization is debugged using low tension Method.This method is the completion using the common advance system of 220V, 380V low tension:Inspection whole group voltage transformer one, Secondary connected mode, check differential protection loop.Danger and the hidden danger of Normal practice are prevented, while avoids human error, It is simple to operate, save the human cost of a large amount of school ray examination secondary circuits.
The technical scheme is that:
A kind of method that high voltage substation systematization debugging is realized using low tension, it is characterised in that:In transformer station's monomer Experiment terminates, and bus, cable connection finish, all relay protection devices and measuring equipment upper working power, transformer station not by Before high-tension electricity, by adding single-phase 220V, three-phase 380V low tensions in a different manner to transforming plant primary bus, then measure Whether the corresponding voltage of secondary circuit is correct while Circuit Fault on Secondary Transformer is short to judge whole group voltage transformer connected mode Connect, applying 380V low tensions in primary side checks that there is indifference stream in differential current protection loop;
Specific method is as follows:
1st, the system debug of first and second connected mode of whole group voltage transformer is checked, checks the two of voltage transformer pt The connection of star winding and open-triangular winding in secondary winding;Voltage signal twice need to be added during experiment:Three-phase is separately added into pair The three phase sine 380V low tensions of title, high pressure three-phase bus short circuit is added into single-phase sinusoidal 220V low tensions, checks general factories and miness Star winding and open-triangular winding correctness in 10/0.4kV, 35/10kV transformer substation voltage transformer secondary winding are sentenced Disconnected foundation such as table 1,
2nd, then connection is correct for the tabular relationship for meeting in table 1;Table 1
Wherein:
Ua1b1, Ub1c1, Uc1a1 are the line voltages of bis- star windings of PT,
Ua1n, Ub1n, Uc1n are the phase voltages of bis- star windings of PT,
Ua2b2c2 is the voltage of bis- open-triangular windings of PT,
Ua2n is to form a phase transformer secondary winding voltages in bis- open-triangular windings of PT, for 10/0.4kV systems PT no-load voltage ratios are in systemOnce plus 380V PT, secondary star windingIt is for PT no-load voltage ratios in 35/10kV systemsOnce plus 380V PT, secondary star winding
Effect of the present invention is:
This method is the completion using the common advance system of 220V, 380V low tension:Inspection whole group voltage transformer one, Secondary connected mode, check differential protection loop.Danger and the hidden danger of Normal practice are prevented, while avoids human error, It is simple to operate, save the human cost of a large amount of school ray examination secondary circuits.
Brief description of the drawings
Fig. 1 is the figure of method wiring one that high voltage substation systematization debugging is realized using low tension;
Fig. 2 is the figure of method wiring two that high voltage substation systematization debugging is realized using low tension;
Fig. 3 is the method instance graph that high voltage substation systematization debugging is realized using low tension;
In figure:
1 it is one section of bus-bar potential transformer, 2 be two sections of bus-bar potential transformers, 3 be bus connection switch, 4 is voltage transformer First winding wye connection, 5 be secondary windings of PT wye connection, 6 be secondary windings of PT open delta Connection, 7 be one section of bus of transforming plant primary, 8 be two sections of buses of transforming plant primary, 9.1 be three phase sine 380V low tensions, 9.2 Be interim bus short join line for single-phase sinusoidal 220V low tensions, 10,11 be mono- section of bus of 35kV, 12 35kV bis- sections of buses, 13 be Bus connection switch, 14 be 1#35/10kV main transformers, 15 be 2#35/10kV main transformers, 16 be 1# main transformer protection electric currents Transformer, 17 be 2# TA of Main Transformer Protection, 18 be bus differential protection Current Transformer, 19 be transformer secondary Side short circuit copper bar, 20 be three-phase symmetrical 380V sine ac power supplies, 21 be 1# differential protective device of transformer, 22 be bus differential protection Device, 23 are 2# differential protective device of transformer.
Embodiment
A kind of method that high voltage substation systematization debugging is realized using low tension:
Operation principle is:Terminate in the experiment of transformer station monomer, bus, cable connection finish, all relay protection devices and Measuring equipment goes up working power, and transformer station is not before by high-tension electricity.By adding in a different manner to transforming plant primary bus Single-phase 220V, three-phase 380V low tensions, the corresponding voltage of secondary circuit is then measured to judge whole group voltage transformer connection side Whether formula is correct.Simultaneously by Circuit Fault on Secondary Transformer short circuit, apply 380V low tensions in primary side and check differential current protection loop There is indifference stream.Specific method is as follows:
The system debug of first and second connected mode of whole group voltage transformer is checked, groundwork is to check mutual induction of voltage The connection of star winding and open-triangular winding in the secondary winding of device (english abbreviation PT).Voltage twice need to be added during experiment Signal:Three-phase is separately added into symmetrical three phase sine 380V low tensions, as shown in Figure 1.High pressure three-phase bus short circuit is added single Mutually sinusoidal 220V low tensions, check star-like in general factories and miness 10/0.4kV, 35/10kV transformer substation voltage transformer secondary winding The basis for estimation of winding and open-triangular winding correctness such as table 1, then connection is correct for the tabular relationship for meeting in table 1.
Fig. 2 is the wiring diagram of the system debug of differential protection loop, and this figure is with the mono- mother partition operations of 35kV, there is two Exemplified by the 35/10kV transformer stations of 35/10kV main transformers.4 band electrical shorts are transported in debugging to 1 logical 380V low tensions by 10 OK, then check 4 supporting 6 electric currents measured, in 11 indifference stream then 4 transformer differential loop first and second connect correctly. 4 inspections terminate, and remove 4 supporting 9.2, and closing 3 makes 2 by electricity, 5 powered short circuit operations.Check 3 supporting 8 electric currents measured 12 The loop first and second of middle indifference stream then bus differential protection connects correctly.5 supporting 7 electric current measured nothings in 13 are checked simultaneously The transformer differential loop first and second that difference flows then 5 connects correctly.
During a short circuit main transformer secondary side current bus of transformer, it is necessary to assure electric current can flow through main transformer secondary side after short circuit Current transformer primary winding.Main transformer electrification time can not be oversize in experiment.

Claims (1)

  1. A kind of 1. method that high voltage substation systematization debugging is realized using low tension, it is characterised in that:It is real in transformer station's monomer End is tested, bus, cable connection finish, and all relay protection devices and measuring equipment go up working power, and transformer station is not by height Before piezoelectricity, by adding single-phase 220V, three-phase 380V low tensions in a different manner to transforming plant primary bus, two are then measured Whether the corresponding voltage of minor loop is correct to judge whole group voltage transformer connected mode, while by Circuit Fault on Secondary Transformer short circuit, Apply 380V low tensions in primary side and check that there is indifference stream in differential current protection loop;
    Specific method is as follows:
    The system debug of first and second connected mode of whole group voltage transformer is checked, checks the secondary winding of voltage transformer pt In star winding and open-triangular winding connection;Voltage signal twice need to be added during experiment:Three-phase is separately added into symmetrical three Phase 380V low tensions, high pressure three-phase bus short circuit is added into single-phase 220V low tensions, checks general factories and miness 10/0.4kV, 35/ The judgement of star winding and open-triangular winding correctness in 10kV transformer substation voltage transformer secondary windings, specific connection It is:
    A, first winding adds the alternating current 220V voltage of three-phase symmetrical, and line voltage is exchange 380V between three-phase, measurement it is secondary around Group voltage:(1) wherein secondary star winding, three-phase line voltage ua1b1=ub1c1=uc1a1It is equal toThree-phase phase voltage again, with a It is exactly exemplified by phase phase voltage:Ua1n, three-phase phase voltage ua1n=ub1n=uc1n;(2) wherein secondary open-triangular winding, opening Angle voltage Ua2b2c2=0V;
    B, by three-phase first winding short circuit, single phase ac 220V voltages are added, line voltage is exchange 0V between three-phase, and measurement is secondary Winding voltage:(1) wherein secondary star winding, three-phase line voltage ua1b1=ub1c1=uc1a1Equal to 0V, three-phase phase voltage ua1n= ub1n=uc1n;2) wherein secondary open-triangular winding, opening angle voltage Ua2b2c2Equal to secondary star winding phase voltageTimes, It is exactly by taking secondary star winding a phase phase voltages as an example:Ua1n, secondary open-triangular winding is also equal to per phase winding phase voltage 3 times, it is exactly by taking secondary open-triangular winding a phase phase voltages as an example:3Ua2n,
    Wherein:
    Ua1b1、Ub1c1、Uc1a1It is the line voltage of bis- star windings of PT,
    Ua1n、Ub1n、Uc1nIt is the phase voltage of bis- star windings of PT,
    Ua2b2c2It is the voltage of bis- open-triangular windings of PT,
    Ua2nIt is to form a phase transformer secondary winding voltages in bis- open-triangular windings of PT, for PT in 10/0.4kV systems No-load voltage ratio isOnce plus 380VPT, it is secondary star-like around ua1b1=ub1c1=uc1a1= Ua1n=3.8V, it is for PT no-load voltage ratios in 35/10kV systemsOnce plus 380VPT, two Secondary star winding ua1b1=ub1c1=uc1a1= Ua1n=1.089V
CN201310662550.5A 2013-12-06 2013-12-06 The method that high voltage substation systematization debugging is realized using low tension Active CN104698335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310662550.5A CN104698335B (en) 2013-12-06 2013-12-06 The method that high voltage substation systematization debugging is realized using low tension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310662550.5A CN104698335B (en) 2013-12-06 2013-12-06 The method that high voltage substation systematization debugging is realized using low tension

Publications (2)

Publication Number Publication Date
CN104698335A CN104698335A (en) 2015-06-10
CN104698335B true CN104698335B (en) 2018-03-16

Family

ID=53345663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310662550.5A Active CN104698335B (en) 2013-12-06 2013-12-06 The method that high voltage substation systematization debugging is realized using low tension

Country Status (1)

Country Link
CN (1) CN104698335B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108226845A (en) * 2017-12-21 2018-06-29 中冶天工集团有限公司 A kind of test method of voltage transformer angular aperture
CN109633352A (en) * 2018-12-14 2019-04-16 中冶天工集团有限公司 The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current
CN113156276B (en) * 2021-02-22 2024-03-29 云南建投第二安装工程公司 Method for checking and debugging secondary voltage loop of bus alternating-current withstand voltage test of switching equipment
CN113848526B (en) * 2021-09-18 2024-03-12 深圳供电局有限公司 Voltage transformer loop detection method, system, equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101958530A (en) * 2010-10-26 2011-01-26 湖北白莲河抽水蓄能有限公司 Main transformer differential protection CT polarity check method of pumped storage power station
CN102096006A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Multi-switch differential protection CT (Current Transformer) wiring correctness analysis method of three-winding conventional transformer
CN102095950A (en) * 2010-11-10 2011-06-15 中冶建工有限公司 Overall test and construction method of differential protection system of large-scale transformer
CN102096013A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Single-switch differential protection CT (Current Transformer) wiring correctness analysis method of four-winding conventional transformer
CN102095974A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for judging correct wiring of differential protection of conventional three-winding transformer
CN102095971A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for analyzing wiring of differential protection CT return circuit of exciting transformer
CN202002990U (en) * 2011-04-02 2011-10-05 中冶华天工程技术有限公司 Comprehensive experiment system of power quality control device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102096006A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Multi-switch differential protection CT (Current Transformer) wiring correctness analysis method of three-winding conventional transformer
CN102096013A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Single-switch differential protection CT (Current Transformer) wiring correctness analysis method of four-winding conventional transformer
CN102095974A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for judging correct wiring of differential protection of conventional three-winding transformer
CN102095971A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for analyzing wiring of differential protection CT return circuit of exciting transformer
CN101958530A (en) * 2010-10-26 2011-01-26 湖北白莲河抽水蓄能有限公司 Main transformer differential protection CT polarity check method of pumped storage power station
CN102095950A (en) * 2010-11-10 2011-06-15 中冶建工有限公司 Overall test and construction method of differential protection system of large-scale transformer
CN202002990U (en) * 2011-04-02 2011-10-05 中冶华天工程技术有限公司 Comprehensive experiment system of power quality control device

Also Published As

Publication number Publication date
CN104698335A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN102540001B (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
CN104698335B (en) The method that high voltage substation systematization debugging is realized using low tension
CN102608485B (en) Detection method for zero-sequence current loops of transformer substations
CN102593737B (en) Relay protection vector checkout facility method before putting into operation with the transformer station of capacitance compensation
CN107121614B (en) A kind of duplex configuration of bus protection transformation current loop polarity measurement method
CN101867225A (en) Debugging method for integrated automation of transformer substation and integration of relaying protection system
CN102510010A (en) Method for checking and testing relay protection vector before operation of newly-built transformer station
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN203204109U (en) Differential protection field calibration device of transformer
CN211453813U (en) Novel transformer differential protection calibration device
CN109283421A (en) A kind of rail traction substation low-voltage is powered detection test method and device
CN104505863A (en) A method for determining and adjusting wireless phase detection
CN109375047B (en) System and method for testing double-end asynchronous polarity of high-voltage transmission line
CN104898006B (en) A kind of anticipation device of Current Transformer Secondary side open circuit
CN103809146A (en) Test method of main transformer CT (Current Transformer)
CN107978205A (en) A kind of measuring equipment load simulator
CN203432994U (en) Phase sequence conversion device of three-phase alternating current tester
CN203191498U (en) Undercurrent grounding line selecting device
CN206541018U (en) A kind of multipoint grounding seeking instrument of voltage transformer
CN103245842B (en) 10 ~ 35kV new clothes electric device total system dry run detection method
CN105319478A (en) Un-disassembly polarity and transformation ratio testing method for transformer bushing
CN103454553A (en) Secondary side phase checking device of voltage transformer
CN103176048A (en) Method for fast measuring transformer triangular wiring winding direct-current resistance
CN207882364U (en) High voltage direct current converter system simulates live detection complexes
Liu et al. An on-line monitoring method for winding deformation of power transformers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant